MEMORANDUM
TO: Aspen Planning Commission
FROM: Planning Staff (HC)
RE: Park Central Office Building - Conceptual Subdivision
DATE: October 2, 1975
This is a request for conceptual subdivision approval for the Park
Central Office Building located on Lots K, L, M, N, and 0 in Block
75 immediately west of their proposed Aspen Savings and Loan Building
and the existing Crystal Palace building. The property is zoned
0, Office. The land area for the project is 14,949 square feet with
a total building area of 14,980 square feet. The floor area ratio
is approximately 1 to 1.
The Planning Office has not has sufficient time as of this writing
to meet with the applicant to discuss this project. We request
tabling of this conceptual subdivision consideration.
'i""t..~/J ,,. ~
ocr 7. /",f
/
\\)lgjf3 - qz.
~ ~ Peoo./J-
(}]A ~ Po.. \<,S
P evL ~t.dJ Cu .~;;:t" ,"'-.0
Ovv L..;t k - 0
~
/*"
,-.
PEN
box v
MEMORANDUM
DATE:
TO:
FROM:
RE:
September 30, 1975
Hal Clark (;),-
Dave Ellis ~
Conceptual Subdivision Reviews for Oct, 7
Iljllln ~cR.
, 6r-rffl: 1 s:
I J
(J/ ~"C/~
/(' v; pGJ<:s
L.-o-C;s
I. Park Central Office Buildin~ The Engineering Dept.
has no objections with this project. The tabulated
data indicates 34 parking spaces required while the
sketch plan indicates 44 spaces; the latter is correct,
II. Columbine Condominiums The only comment on this
sketch plan is that they have shown the zoning west of
S.,',Spz.:ing St, as being NC instead of C-l,
III. Scott Buildin! This is an existing building which
originally was bui t as a medical office and four apart~
ments. The building permit plans include a sheet show-
ing a future conversion from medical office to apartments
on the first floor. However; since the apartments were not
built, I'm not sure whether the alternate scheme was checked
for density, Under the alternate scheme there would have
been 5 units with 15 bedrooms 1 the current proposal is for
8 units with 16 bedrooms. I feel the density matter should
be considered as a planning review. Should the 16 bedroom
proposal be acceptable, then the project would need an add-
itional 8 spaces assuming the garage remains.
/
.1"",\ '
,
,
,......;
ASPEN/PITKIN PLANNING DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
SUBDIVISION PLAN CHECK FORM
Mailing Date:
Subdivision:
September 17, 1975
.
Park Central Office Building
Conceptua 1 Pl an Pub 1 i c Hearing Oct. 7, 1975
Agency:
The enclosed plat is provided so that each utility company and public
agency may inspect the plat and the site, making comments, concerning
the placement of easements, etc., and where necessary sketching recommended
. '.' , "'.
alterations on a copy of the plat.
Your comments and any corrections'made on the plat must be returned to
the City/County Planning Office no later than October 2, 1975
No response will be interpreted as approval, without comments.
AGENGIES REFERRED:
Mountain Bell
Rocky Mountain Gas
Aspen Fire District
Aspen School District
Metro Sanitation
Electric Dept.
Water Dept.
City Engineer - 2 copies
File - 1 copy
......
r"
,.-,
"'~,
, ASPEN/PITKIN PLANNING DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
SUBDIVISION PLAN CHECK FORM
Mailing Date:
Subdivision:
September 17, 1975
Park Central Office Building
Conceptual Plan Public Hearing Oct. 7, 1975
Water Department
,',
Agency:
The enclosed plat is provided so that each utility company and public
agency may inspect the plat and the site, making comments, concerning
the p:l acement of easements, etc., and where necessary Sketching recommended,
alterations on a copy of the plat.
Your comments and any corrections'made On the plat must be returned to
the City/County Planning Office no later than Octobe~ 2, 1975
No response will be interpreted as approval without comments.
;Up~
-IA~
~.I(rd ~ ~4
__l~.Mb. fir
, '
.
.,-~ L" ";f
I..
".....,
, ,......"
ASPEN/PITKIN PLANNING DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
SUBDIVISION PLAN CHECK FORM
Agency:
September 17, 1975
Park Central Office Building
Conceptual ,Plan Public Hearing Oct. 7, 1975
Metro Sanitation
Mailing Date:
Subdivision:
The enclosed plat is provided so that each utility company and public
agency may inspect the plat and the site, making comments, concerning
,the pI acement of easements, etc., and where necessary ,sketching recommended
alterations on a copy of the plat.
Your comments and any corrections'made on the plat must be returned to
the City/County Planning Office no later than October, 2, 1975
No response wi 11 be interpreted as approval without comments.
.'....
.
I"'"
!",,-,
ASPEN/PITKIN PLANNING DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
SUBDIVISION PLAN CHECK FORM
Mailing Date:
Subdivision:
-.-
September 17. 1975
Park Central 'Office Building
Conceptual Plan Public Hearing ,Oct. 7, 1975,
Rock Hountai n Natura 1 Ga~
~1S:
L-.,:{) p - S
Agency:
The enclosed plat is provided so that each utility company and public
agency may inspect the plat and the site, making comments, concerning
the p:lacement of easements.; etc. ,and where necessary sketching recommended
alterations on a copy of the plat.
Your comments and any corrections'made on the plat must be returned to
the City/County Planning Office no later than October' 2. 1975
No response will be interpreted as approval Without cOmments.
,~~ ~ ~/PlaA..~
~-!2CL<J~.: aF-~ ~~-C
~ ~~ ~~. eJd'> 1l7~
tp~ c;JdVl~
J)~ JJJdM~
.--,..,
^
,-"
, ASPEN/PITKIN PLANNING DEPARTMENT
130 South Galena Street
Aspen, Co 1 orad081611
SUBDIVISION PLAN CHECK FORM
Mailing Date:
Subdivision:
September 17, 1975
Park Central Office Building
Conceptual Plan Public Hearing Oct. 7, 1975
Aspen Fire District
". .r-
~cL '7~
k+.s- . f'- s
Agency:
,The enclosed plat is provided so that each utility company and public
agency may inspect the plat and the site, making comments, concerning
the p:l acement of easements, etc., and where necessary sketching recommended,
alterations on a copy of the plat.
Your comments and any corrections'made on the plat must be returned to
the City/County Planning Office no later' than Octobe 2, 1975
No response will be interpreted as approval without corrrnents.
.~~f1~
r.eq.
r"\
,-'
ASPEN/PITKIN PLANNING DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
SUBDIVISION PLAN CHECK FORM
Mailing Date:
Subdivision:
September 17, 1975
Park CentralOffite Building
Conceptual Plan Public Hearing ,Oct. 7, 1975
Aspen School ,Di s tri ct
1
~L.k .1.i
L.-a ts 1(' - s
Agency:
The enclosed plat is provided so that each utility company and public
agency may inspect the plat and the site, making cOJlll1ents, concerning
the pl acement of easements., etc., and where nece$sary sketching recommended,
alterations on a copy of the plat.
Your comments and any correCtions' made on the plat must be returned to
the City/County Planning Office no later than October 2, 1975
No response will be interpreted as approval ' without comments.
~~</7"(~~~~
~ - --cd....; ~_.
. ", ,.:. ',~ . .' '~"'.' '--
.. . - ~ ....... '".
~
Ir!fuL4~.~
,...,... -
. '~"""""",'
~
,1""1
DAVID R. SLEMON
ANTHONY J. MAZZA
Joml" D. LASALLE
SLEMON & MAZZA. P. C.
ATTORN:EYS AT LA.W
434 EAST COOPER AVENUE
POST OFFICE Box 3219
ASPEN, COLORADO 81611
AREA CODE 303
TELEPHONE 925~2043
June 13, 1975
TO WHOM IT MAY CONCERN;
This is to certify that Richard J. Meeker and Alfred C.
Nicholson, d/b/a Riverview Associates are the owners of
the following described real property:
Block 75, Lots K, L, M, N, 0, P, Q,
R, and S, City and Townsite of Aspen,
and that Andrew Burden as executor of the estate of Gero
Von Schultz Gaevernitz is the beneficiary of a deed of trust
on the, aforesaid property and thattheie are no Qther persons
or entities claiming any interest whatsoever in the aforesaid
property.
Very truly yours,
SLEMON, MAZZA & LaSALLE, P.C.
By: QL9J.r/JJL
(,JOhn D. . LaSalle
\
\