Loading...
HomeMy WebLinkAboutagenda.apz.20090120AGENDA ASPEN PLANNING AND ZONING COMMISSION REGULAR MEETING TUESDAY, January 20, 2009 4:30 p.m. -Public Hearing SISTER CITIES, CITY HALL I. ROLL CALL II. COMMENTS A. Commissioners B. Planning Staff C. Public III. MINUTES IV. DECLARATION OF CONFLICT OF INTEREST V. PUBLIC HEARINGS: A, 401 Castle Creek Road, Aspen Ambulance District, Growth Management Review B. 1490 Ute Avenue, Jewish Community Center, SPA Amendment VI. OTHER BUSINESS VIL BOARD REPORTS VIII. ADJOURN NEXT RESOLUTION NUMBER: #4 ~a. MEMORANDUM TO: Planning and Zoning Commission FROM: Errin Evans, Current Planner THRU: Jennifer Phelan, Deputy Community Development Director DATE OF MEMO: January 12`n, 2009 MEETING DATE: January 20th, 2009 RE: 401 Castle Greek Roar# -Growth Management Quota System Review APPLICANT (OWNER: Aspen Ambulance District REPRESENTATIVE: Leslie Lamont, Lamont Planning Services LOCATION: Civic Address - 401 Castle Creek Road; Legal Description -Pazcel C, Aspen Valley Hospital District Subdivision; Pazcel Identification Number-2735- 123-07-801 CURRENT ZONING & USE Located in the Public (PUB) zone district containing the Aspen Valley Hospital and associated buildings. PROPOSED LAND USE: The Applicant is requesting to continue the use of a temporary vehiculaz tent shelter yeaz round until the ambulances can be relocated to the new fire station downtown and the Aspen Valley Hospital carport which is proposed for Phase III of the Master Facilities Plan. STAFF RECOMMENDATION: Staff recommends that the Planning and Zoning Commission recommend to Council to approve the request fora Growth Management review for an essential public facility at this time to allow the continued use of the temporary vehiculaz shelter until a permanent building is constructed. SUMMARY: The Applicant requests of the Planning and Zoning Commission to recommend approval to Counci] for the request for growth management review of an essential public facility. the Revised 1/15/2009 Page 1 of 6 P1 a~' BACKGROUND: On Mazch 10"', 2008, the Aspen City Council approved a Temporary Use Permit to allow the Aspen Ambulance District to erect a vehicular tent shelter on an existing concrete pad on the Aspen Valley Hospital Campus. The shelter was requested after the Ambulance District acquired the assets, including two additional vehicles, from Mountain Ambulance services. The approved temporary use permit allows the tent to remain in place from October 15`h, 2008 until April 16`h, 2009. To remove the tent annually to accommodate restrictions for temporary use permits, it would cost the ambulance district approximately $12,000 each yeaz. The tent shelter protects ambulances that do not fit into the existing barn until the new fire station downtown and Phase III of the Master Facilities Plan that includes a permanent shelter for the ambulances aze completed. Currently the Aspen Valley Hospital is undergoing a master facilities planning process. If approved, Phase III of the Master Facilities Plan includes a permanent shelter for the ambulances that do not fit into the existing barn, though it will not be constructed unti12013. The fire station that is currently under construction downtown will also be able to assist in accommodating the Ambulance District vehicles. A Temporary Use Permit is only valid for a perioddf six months within any one calendar yeaz. To continue past the six month period, the Ambulance District is required to undergo Growth Management Review as it would no longer be considered a temporary use. The Planning and Zoning Commission is now requested to make a recommendation to Council to approve, approve with conditions or deny the review for growth management. LAND USE REQUEST AND REVIEW PROCEDURES: The applicant is requesting the following land use approvals from the Planning and Zoning Commission: Growth Management Quota System -Essential Public Facilities pursuant to Land Use Code Section 26.470.090 4. Any development to an essential public facility requires the Planning and Zoning Commission, at a public heazing, to make a recommendation to the City Council for approval, approval with conditions or disapproval of the Growth Management Review. The City Council is the final authority. GROWTH MANAGEMENT REVIEW: This application is required to undergo review under Growth Management because it is an addition to an essential public facility. Using the temporary vehicular tent shelter does not create any new employees or new net leasable. space. ,:The tent is not intended to be used for commercial or office purposes. The t8ntwill-be coii`Einued to be used for protecting ambulances from the elements. When Council reviewed `the'itpplication for a Temporary Use Permit, the applicant made it known that they would be expecting to apply to use the shelter yeaz-round and to maintain use until 2013 when the Master Facility Plan anticipates the completion of the permanent shelter for the ambulances. The applicant intends to relocate two of the ambulances to Aspen Fire Protection locations when construction is completed near the end of 2010. Essential Public Facilities are required to mitigate for growth management on a case by case basis. Revised 1/15/2009 Page 2 of 6 P2 Staff Comments The Ambulance District is a function of Pitkin County. They have a management contract with the Aspen Valley Hospital District. The Ambulance District has historically been established as a sepazate district. In the past, SkiCo contracted a private ambulance service from vazious entities over time. Approximately five years ~go,;~ Ambulance District absorbed the private venture, Mountain Ambulance. The number ;of.:~inbulances and drivers remains the same. Overall ambulance services in the community were not expanded and the amount of services provided did not change as a result of the amalgamation. RECOMMENDATION: Community Development Department staff recommends that the Planning and Zoning Commission recommend that the Council approve the request for Growth Management Review at this time with the following conditions: 1. The applicant will not be permitted to use the vehiculaz tent shelter after December 15`, 2013. A permanent shelter must be constructed and growth management mitigation will apply prior to or at that time. 2. As requested in the temporary use permit, the applicant is required to plant two spruce trees that aze four feet high and to work with Ron Moorhead, the adjacent property owner regarding their placement. These trees aze required to be planted by June ls`, 2009. RECOMMENDED MOTION: If the Planning and Zoning Commission chooses to recommend approval for the request, they may use this motion "I move to make a recommendation to City Council to approve the request for the growth management review with the conditions noted." ATTACHMENTS: ~': -~; ~' Exhibit A -Staff findings Exhibit B -Temporary Use Permit Resolution No. 20 of Series 2008 Exhibit C -Application ,,, f., e Revised 1(15(2009 Page 3 of 6 P3 RESOLUTION NO. _ (SERIES 2009) A RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF THE CITY OF ASPEN, MAKING A RECOMMENDATION FOR APPROVAL TO COUNCIL FOR GROWTH MANAGEMENT REVIEW FOR THE PURPOSE OF ALLOWING A VEHICULAR TENT SHELTER UNTIL 2013 TO PARK AMBULANCES AT THE ASPEN VALLEY HOSPTTAL COMMONLY DESCRIBED AS 401 CASTLE CREEK ROAD, LEGALLY DESCIBED AS PARCEL C, ASPEN VALLEY HOSPITAL DISTRICT SUBDIVSION Parcel Identification Number 2735-123-07-801 WHEREAS, Leslie Lamont, located at 725 Melissa Lane, Cazbondale, Colorado on behalf of the Aspen Ambulance District, 401 Castle Creek Road, Aspen, Colorado, submitted a request for Growth Management Review dated December 24°i, 2008 to the Planning and Zoning Commission; and WHEREAS, the subject property is located at 401 Castle Creek Road, Aspen, the pazcel is identified as pazcel number 2735-123-07-801, and the legal description of the property is: Parcel C, Aspen Valley Hospital District Subdivision, City of Aspen, CounTy of Pitkin, State of Colorado; and WHEREAS, upon review of the application, aiid the applicable code standards, the Community Development Department determined mitigation for growth management is not ,;:.:r} necessary at this time. No new net leasable commercial or office space has been created nor have any new employees been generated; and WHEREAS, during a duly noticed public hearing on January 20a', 2009, the Planning and Zoning Commission made a recommettdation to Council to approve the request for Growth Management Review; and, :f. .. ;?. P4 WHEREAS, the Aspen Planning and Zoning Commission has reviewed and considered the development proposal under the applicable provisions of the Municipal Code as identified herein; and, WHEREAS, the Planning and Zoning Commission finds that this resolution furthers and is necessary for the promotion of public health, safety, and welfaze. NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF ASPEN PLANNING AND ZONING COMMISSION AS FOLLOWS: Section 1• Pursuant to the procedures and standazds set forth in' Section 26 of the City of Aspen Municipal Code, the Planning and Zoning Commission hereby approves the request for exemptions for growth management mitigation. The growth management mitigation will be assessed during the Master Facilities Plan process. The applicant intends to use this vehicular tent shelter unti12013. The following conditions apply: 1. The applicant will not be permitted to use the vehicular tent shelter after December 151, 2013. A permanent shelter must be constructed and growth management review will occur again at that time. 2. As requested in the temporary use permit, the applicant is required to plant two spruce trees that are four feet high and to work with Ron Moorhead, the adjacent property owner regazding their placement. These trees aze required to be planted by June 151, 2009. 3. All material representations made in the application and in the hearing by the Applicant and the Applicant's representative shall be considered conditions of approval, unless amended by other conditions. Section 2• All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awazded, whether in public hearing or documentation presented before the Planning and Zoning Commission, aze hereby incorporated in such plan development approvals and the same shall be complied with as if fully;set~forth herein, unless amended by an authorized entity. Section 3: This resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 4• If any section, subsection, sentence, clause, phrase, or portion of this resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a P5 ,_ sepazate, distinct and independent provision and sli~lf not affect the validity of the remaining portions thereof. , ,,,:,; ';: APPROVED BY the Planning and Zoning Commission of the City of Aspen on this 20w day of January, 2009 with a _ - _ vote. Attest: Jackie Lothian, Deputy City Clerk LJ Erspamer, Chairperson APPROVED AS TO FORM James R. True, Special Counsel lJ ~ L 1' ~>,_ P6 EXHIBIT A 26.470.090 Review Standards for Develoument of Essential Public Facilities The development of an essential public facility, upon a recommendation from the Planning and Zoning Commission, shall be approved, approved with conditions, or denied by the City Council based on the following criteria: a.. The CommuniTy Development Director has determined the primary use and/or structure to be an essential public facility (see definitiorh). Accessory uses may also be part of an essential public facility project. The Aspen Palley Hospital Campus including_.the ambulance operation is considered to be an essential public facility. The proposed`vehicular tent shelter is an accessory use to the existing ambulance barn and ambulance operations. It will be used to protect ambulances from foul weather and to keep onboard medicines from freezing in the winter and overheating in the summer seasons. The ambulances should have permanent housing whether on this site or combined with the Fire Protection sites by 2013. New employee generation mitigation will be reviewed for the permanent shelter during the Master Facilities Plan process. Stafffnds this criterion to be met. b. Upon a recommendation from the Community Development Director, the City Council may assess, waive or partially waive affordable housing mitigation requirements as is deemed appropriate or warranted for the purpose of promoting civic uses and in consideration of broader community goals. The employee generation rates may be used as a guideline, but each operation shall be analyzed for its unique employee needs, pursuant to Section 26.470.100, Calculations. The vehicular tent shelter will be used to park ambulances. There will not be any new net leasable commercial or office space created. There will not be any new staff generated as a result. No growth management mitigation is necessary to be assessed at this time for this proposed addition. Staff finds this criterion to be met. ~: ~,g. ,~~~ . ~ Essential Public Facility - A facility which serves an essential public purpose is available for use or by benefit of, the general public and serves the needs of the community. As defined by the Ciry of Aspen Land Use Code. Revised 1/15/2009 ''' Page 4 of 6 ~z~, :~'r EXHIBIT A (Continued) 2_6.470.100 Calculations. Employee veneration and mitigation. Applicants may request an employee generation review with the Planning and Zoning Commission, pursuant to Section 26.470.110, Growth management review procedure. In establishing employee generation the Planning and Zoning Commission shall consider the following: a. The expected employee generation of the use considering the employee generation pattern of the use or of a similar use within the City or a similaz resort economy. The Ambulance District is a function of Pitkin County, Until recently, SkiCo contracted private companies to provide ambulance services at the base of the mountain. Approximately frve years ago, the Ambulance District acquired the assets of the private venture, Mountain Ambulance. Since then the number of ambulances and drivers remains the same. Overall ambulance services in the community were not expanded and the total amount of services provided did not change as a result of the amalgamation. Staff finds this criterion to be met, b. Any unique employment characteristics of the operation. No employees will be occupying the tent shelter. Amore permanent shelter will be constructed during Phase III the Master Facilities Plan in 2013. At that time, the permanent shelter will undergo another review for growth management particular to that building. Staff finds this criterion to be met. c. The extent to which employees of various uses within a mixed use building or of a related off-site operation will overlap or serve multiple functions. This is not a mixed use building. There are no longer any off-site operations now that the Ambulance District has acquired the assets of Mountain Ambulance. All Ambulance junctions in Aspen operate from this site. Staff finds this criterion to be met. d. A proposed restriction requiring full employee generation mitigation upon vacation of the type business acceptable to the Planning and Zoning Commission. It is not anticipated Chat the use will change prior to 2013. If the use of the tent changes, the applicant will be required to remove the vehicular tent shelter. YYhen Phase III of the Master Facilities Plan is reviewed, the .permanent shelter will undergo growth management mitigation at that time. Staff finds this criterion to be met. e. Any proposed follow-up analysis of the project (e.g. an audit) to confirm actual employee generation. When Phase III of the Master Facilities Plan is reviewed, the permanent shelter will undergo growth management review at that time. Staff finds this criterion to be met. £ For lodge projects only: An efficiency or reduction in the number of employees required for the lodging component of the project may, at the discretion of the Commission as a means of incentivizing a project, be applied as a credit towazds the mitigation requirement of the free-mazket residential component of the project. Any approved Revised 1/15/2009 Page 5 of 6 P7 P8 reduction shall require an audit to determine actual employee generation after two complete yeazs of operation of the lodge. This is not a lodge project, so this item is not`ppplicable. Staff finds this criterion to be met. -*x: ~;-. ;~ Revised 1/15/2009 Page 6 of 6 ~XNttS1T RESOLUTION N0.20 (Series of 2008) A RESOLUTION OF THE CITY COUNCIL OF.THE CITY OF ASPEN, COLORADO, GRANTING A TEMPORARY USE PERMIT TO'ALLO W FOR THE PLACEMENT OF A TENT AT THE ASPEN VALLEY HOSPITAti'-CAMPUS,301 CASTLE CREEK ROAD, CITY OF ASPEN, COLORADO Parcel ID 2735-121-29-809 WHEREAS, pursuant to Section 26.450 of the Aspen Municipal Code, the Applicant, The Aspen Ambulance District, has submitted an application for a Temporary Use Permit to place a tent on the Aspen Valley Hospital campus adjacent to the existing ambulance "bam" neaz the southwest comer of the property; and, WHEREAS, the Applicant requests approval for a Temporary Use Permit to place a tent on the campus to shelter three ambulances for six months with a start date of no later than October 15, 2008; and, WHEREAS, Community Development Department reviewed the temporary use application and provided a referral review opportunity to standazd referral agencies resulting in the building department requiring a building permit,an~ appropriate sub-permits to be applied for to install the tent; and, i" - ~~ '~' ,: WHEREAS, City Council finds that,the proposed temporary use is consistent with the character and existing land uses of the surrounding parcels and neighborhood and that granting the temporary use will not adversely impact the neighborhood; and WHEREAS, City Council conducted a duly noticed public hearing on March 10, 2008; and, WHEREAS, City Council has reviewed and considered the temporary use request under the applicable provisions in the Municipal Code, has reviewed and considered the recommendation of the Community Development Director, the applicable referral agencies, and has taken and considered public comment; and, WHEREAS, City Council finds that the temporary use permit meets or exceed all applicable development standazds; and, WHEREAS, the City Council finds that this~~esolution furthers and is necessary for the promotion of public health, safety, and welfaze. ~ ~ , ,t P9 P10 Resolution No. 20, Series of 2008 Page 2 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ASPEN, COLORADO,THAT: Section 1• In accordance with Section 26.450 of the Aspen Municipal Code, the City Council of the City of Aspen, Colorado, does hereby grant the Aspen Ambulance District a Temporary Use Permit to place a tent at the Aspen V alley Hospital campus witlt the following conditions: 1. The temporary use is valid for six (6) months:- 2. The Applicant shall erect the tent no'later than October 15, 2008 to start the six (6) month period. 3. The Applicant shall obtain a building permit and any required sub-permits before erecting the tent. 4. The temporary use shall allow for a tent of thirty-four (34) feet by twenty-six (26) feet with a ridge height oftwenty-two (22) feet and two (2) inches. 5. All material representations made in the application and in the hearing by the Applicant and the Applicant's representative shall be considered conditions of approval, unless amended by other conditions. Section 2' This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be construed and concluded under such prior ordinances. Li: I. J) 1'. Section 3• ' [ `Sr If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a sepazate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED, Mazch 10, 2008, at a public hearing before the City Council of the City of Aspen, Colorado. Mic ael C. Ir land, May r A S. I{,ybh, City Clerk John Worcester, City ttorney _:1+ rl. ~, Dec IB 2008 18:25 RSPEM RMHULRMCE 970 5441978 p.l ~~.,XN, i ~ 1 i ~ December 19, Ms. 7erulfer Phe Aspen Commun 130 South Gales Aspen, CO 8161 Re: Growth Ambulance Deaz Ms. Phelaq S Deputy Director Development Deparhnent Shelter for an Essential Public Facility-Aspen The Aspen Amb ce District (District) is asub-district of Pitkin County. The Boatel of Comlty Conuniss oners is the Board of Director: but the County contracts with Aspen Valley Hospital manage the service. The District's facilities are Located on the Hospital Campus d improvements are coordinated with the Hospital. Several years agd the District acquired the assets of Mountain Ambulance service which increased the n ber of ambulances in ow flcet from fow to siz. The acquisition also requires us to rt injuries from the ski slopes increasing ow service calls. These changes necessi a the need for better protection for ow vehicles from the weather in order to maintain them in a ready response mode. Ow barn is only large enough for three ambulan and last year we gained the City's approval to install a temporary shelter over an e>?taring pazking pad Today, we seek bnger term of approval to keep the shelter in place until the hospital constructs Phase of their Master Facilities Plan which will include a permanent ambulance steel to house ow vehicles. However, in the event Phase III is not constructed by ril of 2013 the District will look for funds to build a permanent garage in the same loea oa as the temporary shelter, obviously pending any City of Aspen approvals. Please find eel to this cover letter ow response to the standards of Section 26.470.090 (4) GrowUl M garlent for an Essential Public Facility. On behalf of the Ambulance District, Leslie Lamont of Lamont Planning Services, ti LLC is our au ~ representative in this matter. Please do not hesitate to contact me or Leslie if you ha any questions or need further information. Sincerely, I ... ~~ RtCherd We1ker,Daector Aspen Ambul District Section 26.470.090 GMQS City Council Application for an Essential Public Facility I. General Overview The Aspen Ambulance District seeks GMQS approval, as an essential public facility, for the long term use of an existing shelter for ambulances located on the Aspen Valley Hospital campus. The District received a temporary use permit and an 8040 Grcenline approval to install a temporary shelter adjacent to the current ambulance barn to protect three ambulances from the weather. The temporary use permit was effective March 23, 2008. . The shelter has been installed and has proved critical in protecting vehicles from the weather. The temporary use is set to expire in April 16, 2009 at which time the shelter must be removed. The District would like to avoid setting up and taking down the shelter every winter until a permanent shelter can be constructed. It is estimated that this procedure-would cost the District $12,000 per season (it cost $6,000 to set up the first time). Additionally, setting up and taking down the structure may damage the fabric and the current ambulance barn has very little storage space. Therefore the District seeks a GMQS approval to set up the shelter and keep the shelter up until April of 2013. Aspen Valley Hospital proposes a pem~anent carport shelter for ambulances in Phase III of the Master Facilities Plan which is anticipated to be constructed in 2013. In the evem Phase ID construction will not be completed by 2013 the District will look for funding to construct a permanent garage at the location of the shelter. The installation of the shelter did. not require site work, excavation, or the removal of any vegetation. The shelter is located in a paved parking area that served as parking for the District's vehicles that are now sheltered. As a condition of the temporary use permit the District committed to installing two 4-6 foot evergreen trees on the hillside behind the shelter to help block the view of the shelter from the adjacent neighbor. The trees were not installed before the winter season this year but will be installed at the first opportunity in the spring of 2009. The adjacent property owner has agreed to this timeframe for installation of the trees. The shelter is necessary to provide protection from snow storms. When a large storm settles over Aspen, over a foot of snow, it typically takes at least a half day to remove snow from vehicles that are parked outside. The winter season is a very busy time for the District ~g mj~ people from the ski slopes, roughly 300 trips Per Year. Advanced life support calls are also handled by the District and total approximately 950 calls per year. Ideally, the ambulances also need protection from the harsh sun at this altitude. The District bases their operation out of a two story .3,830 square foot "barn." The second floor of the building consists of two bedrooms for employees (which serve as shift quarters), two offices, a training mom a~ combination kitchen/living room space. The first floor is comprised of three bays for three ambulances, lockers and storage. Aspen Ambulance District GMQS Application for Shelter Page 1 December 2008 Until recently, the District's fleet consisted of four ambulances and one squad truck. The truck is primarily used for backcountry assistance. The garage provided adequate shelter for the fleet until the District acquired the assets of Mountain Ambulance increasing the fleet from four to six ambulances. One ambulance has been relocated to the North 40 fire Station and two ambulances and the squad truck are parked in the temporary shelter. The shelter is proposed as a temporary solution because one ambulance will be relocated to the new Fire District Headquarters in downtown Aspen. However, that will not occur until the end of 2010 when the station is finished. In addition, a pemrane~ garage for ambulances is proposed as part of the Hospital's MFP. 'This garage is proposed in Phase III of the Hospital's plan and is anticipated to be built in 2013. Completion of Phase III will provide enough sheltered space for the District's fleet. The location of this shelter is on an existing paved parking pad next to tbe ambulance barn. The pad is tucked into the hillside and supported by a railroad tie wall. The pad is correctly sized to accommodate the shelter and required very little work for installation. The footprint of the shelter is 34' x 26' and two ambulances and the square truck are parked inside. The shelter did not require a foundation. The opportunity to-heat the shelter is still being explored. In the meantime the vehicles will be plugged into the bam for heating purposes to keep drugs from freezing and to activate an engine block heater. Please refer to tbe shelter specifics found in the Appendix. . The shelter is located on the Aspen Valley Hospital's parcei C. Parcel C is currently in the land use review process as a Planned Unit Development. proposal for a Master Facilities Plan. A GMQS review for the ambulance shelter to enable the shelter to remain in place until Phase III could not ocxur until the MFP conceptual PUD review was complete. Unfortunately, completion of that phase.of review may not occur until the temporary use permit of the current shelter has expired. Although Phase III of the MFP includes a peananent carport shelter for ambulances that will support the current ambulance bam, Final PUD review of Phase III is not intended to occur until Phase II has been constructed II. Revrew.SYandwds A. Sea 26.470,090. City Council Applications. The following types of development shall be approved, approved with conditions or denied by the City Council, pursuant to Section 26.470.110, Procedures for review, and the criteria for each type of development described below. Except as noted, all growth management applications shall comply with the general requireme~s of Section 26.470.050. Except as noted, all City Council growth management approvals shall be deducted from the respective annual development allotments aad development ceiling levels. Aspen Ambulance District GMQS Application for Shelter ~ Page 2 December 2008 Essential public facilities. The development of an essential public facility, upon a recommendation from the Planning and Zoning Commission, shall be approved, approved with conditions or denied by the City Council based on the following criteria: a The Community Development Director has determined the primary use and/or structure to be an essential public facility (see definition). Accessory uses may also be part of an essential public facility project. b. Upon a recommendation from the Community Development Director, the City Council may assess, waive or partially waive affordable housing mitigation requirements as is deemed appropriate and warranted for the purpose of promoting civic uses and in consideration of broader community goals. The employee generation rates may be used as a guideline, but each operation shall be analyzed for its unique employee needs, pursuant to Section 26.470.100, Calculations. Response: Per Section 26.104.1Q0. Definitions: an Essential public facility is a facility which serves an essential public purpose ~is available for use by or benefit of, the general public and serves the needs of dre community. The Aspen Ambulance District is asub-district of Firkin County and is supported by the tax payers of the Aspen Ambulance District. The District exists solely to service the general public and support the health and welfare of the general public. Currently the shelter is located on an existing parking pad. The shelter is not habitable space and no new employees will be generated by the shelter because the shelter is necessary to protect existing vehicles in the ambulance fleet. B. Section 26.710.250 Public The entire Aspen Valley Hospital Campus was annexed into the City of Aspen in 2003. The property was zoned Public. The Aspen Ambulance District is a land use that is consistent with the uses permitted in the public zone district such as "Public and Private non--profit uses providing a community service" or "Hospital." . Response: The square footage of the shelter is 884 square feet. The Ambulance District is located on Aspen Valley Hospital's Parcel C which includes the Hospital's CEO house, Whitcomb Terrace senior housing and community center, the Hospital facility and the ambulance bam. The total floor area of all structures on the site is 93,369 square feet. The proposed shelter adds 0.9'/o floor area to Parcel C. However, the shelter does add 22% more floor area to the ambulance operations. Aspen Ambulance District GMQS Application for Shelter 'Page 3 December 2008 ATTACIiN1ENTS: 1. Signed Fee Agreement 2. Land Use Application Form 3. Dimensional Requirements Form 4. Authorization Letters S. Dimensions of Shelter 6. Photos of Existing Shelter 7. List of Neighbors for Public Notice 8. Site Plan of Shelter Location Aspen Ambulance District GMQS Application for Shelter Page 4 December 2005 ATTACHMENT 1 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT Atireemeat for Payment of City of Ascen Development Amuliation Fees CITY OF ASPEN (hereinafterCITY)and Aspen Ambulance District (hereinafter APPLICANT') AGREE AS FOLLOWS: 1. APPLICANT has submitted to CITY an appliation forGMQS Approval for an Essential Public Facility THE PROTECT). 2. APPLICANT understands and agees that the City of Aspen has an adopted fee structure for Land Use appliations and the payment of all processing fees is a condition precedent to a determination of application completeness. 3. APPLICANT and CITY agree that because of the size, nature or s~pe of the proposed project, it is not possible at this time to ascertain the fWl extent of the costs involved in processing the application. APPLICANT and CITY feather agree that it is in the interest of the parties that APPLICANT make payment of an initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis. APPLICANT agrees additional costs may accrue following their hearings and/or approvals. APPLICANT agrees he will be benefited by retaining greater cash liquidity and will make additional paymerts upon notifiation by the CITY when they are necessary as costs are incurred. CITY agrees it will be benefited through the greater certainty of recovering its full costs to process APPLICANT'S application. 4. CITY and APPLICANT fiertha agree that it is imptadiable for CITY staff to complete processing or present sufficient information to the Historic Preservation Commission, Planning and Zoning Commission and/or City Council to enable the Historic Preservation Commission, Planning and Zoning Commission amd/or City Council to make legally required fmdings for project consideration, unless current billings are paid in full prior to decision. 5. Therefore, APPLICANT agrees that in consideration of the CTf Y's waiver of its right to called full fees prior toad 'nation of application completecess, APPLICANT shall pay an initial deposit in the amount of S~rwhich is for ~ hours of Community Development staff time, and if actual recorded casts exceed the initial depose; APPLICANT shall pay additiomal monthly billings to CITY to reimburse the CITY for the processing of the appliation mentioned above, including post approval review at a rate of 5235.00 per planner hour ova the initial deposit. Such periodic payments shall be made within 30 days of the billing date. APPLICAAT further agrees that failure to pay such accrued costs shall be groemds for suspension of processing, and in no case will building pemeits be issued urrtil all costs associated with case processing have been paid. CITY OF ASPEN Chris Bendon Community Development Director APPLICANT Dah: I~l.rO r~2 ,r~(~~ ao~~ Billing Address erect Tekp one Namber ~-~r~ 0 Note: The fees for this application have been waived, per the pre-app. JMG PRO,/ECP: ATTACHMENT 2 -LAND USE APPLICATION Name: Aspen Ambulance District - GMQS Approval for Shelter Location: Aspen Valley Hospital Campus 0401 Castle Creek Road (Indicate street address, lot & block number, legal description where appropriate) Parcel ID#(REQUIRED) PID #3039 APPLICANT' Name: Aspen Ambulance District -Rich Walker, Director Address: 0401 Castle Creek Road, Aspen CO 81623 Phone#: 544-1580 REPRESENTATIVE: Name: Leslie Lamont Address: 725 Melissa Lane, Carbondale, CO 81623 Phone#: 963-8434 TYPE of APPLICATION: (please check all that apply): [~ GMQS Exemption ^ GMQS Allotment ^ Special Review ^ ESA -8040 Greenline, Stream Margin, Hallam Lake Blu$ Mountain View Plane ^ Commercial Design Review ^ Residential Design Variance ^ Conditional Use ^ Conceptual PUD ^ Final PUD (& PUD Amendment) ^ Subdivision ^ Subdivision Exemption (includes condominiumization) ^ Lot Split ^ Lot Line Adjustment ^ TexUMap Amendment ^ Conceptual SPA ^ Final SPA (& SPA Amendment) ^ Small Lodge Conversion/ Expansion ^ Other. EXLSTING CONDT110NS: descri 'on of existin buildin uses, revious vats, etc. The District utilizes a two story "barn" for operations and shelter for 3 ambulances. A temporary shelter protects a squad truck and 2 more ambulance next to t e ern. PROPOSAL: descai lion of ro buildin uses, modiScatio etc. The District would like to extend the period of time for the use of the temp. shelter over the parking pad until April of 2013 to provide protectio lave you attached the following? FEES DUE: 50.00, per pre-app U Pre-Application Conference Summary Q Attachment #1, Signed Fee Agreement ® Response to Attachment #3, Dimensional Requirements Form ® Response to Attachment #4, Submittal Requirements-Including V/ritten Responses to Review Standards ^ 3-D Model for Iarge project AIl pleas that are larger than 8.5" X 11" mast be fohled. A disk with au electric copy of all written teat (Microsoft Word Format) must be snbmiHed as part of the application. Large seek projects should include an electronic 3-D model. Your pre-application conference summary will indicate if yon most submit a 3-D model ATTACHMENT3 DIMENSIONAL REQUIREMENTS FORM Project:~ulance Shelter Applicant: spen u ante is nc Location: 0401 Castle Creek Road, Aspen Valley Hospital Campus Zone District: Public Lot Size: 19.1 Acres LOtArea:655 396 c~ ft_ (for the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: Np' Proposed: NA Number of residential units: Existing: NA Proposed: NA Number of bedrooms: Existing: NA Proposed.• NA Proposed % of demolition (Historic properties only): NA DIMENSION8: The campus is zoned Public and dimensions are set via PUD F1oorArea: Existing: 93, 369 Allowable: PUD Proposed.• 884 sq. ft. Principal bldg. height: Ex'isting:25 ft . Allowable: pUpProposed: Access. bldg. height: Existing: Allowable: Proposed.• 2 2 ' 3 " On-Site pazking: Existing: Required.• Proposed: Site coverage: Existing: Required.' Proposed: Open Space: Existing: Required.' Proposed: Front Setback: Existing: Required.' Proposed.' Rear Setback: Existing: Required: Proposed.' Combined F/R: Existing: Required.' Proposed.' Side Setback: Existing: Required.' Proposed: Side Setback: Existing: Required.' Proposed: Combined Sides: Existing: Required: Proposed: Distance Between Existing Required.' Proposed.~- Buildings Existing non-conformities or encroachments:. Variations requested: Yilkin Ceont- • ~ - ~ - ~ ~ 530 E iMain Sveec ~ Aspai. Colorado"81611.1948 " ATTACHMENT 4 December 17, 2008 . • ~ .. . Ms. Jennifer Phelan, Deputy Director Aspen Community Development Department . 130'South (#alena . '" _ Aspen;.CO 81611 ~ ~• ~ _ lte: Aspen Ambulance District Growth Management for an Essential Public Facility =:0401 Castle Cree1E Road • Dear Jennifer, :. . Pitldn County is_ in support of a Growth Management Application which the Aspen Ambulance District is applying'for with the City of Aspen.. ' . We believe that this is an appropriate use of this propetty until ambulances can be relocated to the new firs: station He~uatt'eis downtown and Uie Aspect Valley Hospital carportwhich is. ~- . proposed in Phase III of the Masher Facilities Plan. . . 'i ndmmisaadon ~ : ca:nj cannissiw ~a Camq Ama,~r works ~ ttis ra,c ;301 .. ~ sex.3o~ s~.aan Sb]DI s~ysxiszoo (s~ysxasmo (97710.5190 tsmisms~o ~9ms19e .,s~9~asl9e fsc97A51~ (nc9ffi5730 ASPEN V A L L E Y HOSPITAL s~aHm~.>~wt~t Decerobcr i~, 2008 Ms. Jeooifer Phelan, Deputy Director Aspen Catnmrurity Development Dapertmerrt 130 South Galena Stroet Aspen, CO 81611 Re: Application for Growth Management for an ~tial Public Facility -0401 Castle Creels Road Dear Ms. Phelan, Aspen Valley Hospital is in support of the Grrovvth ManaBenunt application for tbelong-term sae. of a tcmporary cover es shelter for Aspa~ Arobulencc District vehicles. We believe that this is an appropriate use of this ptnperty until an aminrlanco can be relocated to.the downtown fire station l~uartcrs amt urMil Phase lII of the hospltat maker plan is meted. At the tiros, permanent sheher will be pmvidcd for the test of the vehicles That do ~t fit ittto the cutreaR ambnlamx barn. Sincercly, C ~ q ~ ~ S ~~ ATTACHMENT S gs y ~~ 4 A Q ~!I{ n ATTACHMENT 6 ANGUS CRAIG M & KAREN S PO BOX 7965 ASPEN, CO 81611 CITY OF ASPEN ATTN FINANCE DEPT 130 S GALENA ST ASPEN, CO 81611 DESGEORGESJOHN 1D2 GROVE CT ASPEN, CO 81611 3ARDER DEBORAH H 109 TWIN RIDGE DR I,SPEN, CO 81611 {ELEHER JOHN G & LINDA B 1202 MEADOWOOD DR -SPEN, CO 816] 1 MCLEAN ARCHIIiALD JR & ANNE 0 TWIN RH)GE DR ASPEN, CO 81611 ZOREHEAD RONALD L & ERLINDA Z 28 TWINRH)GE CT SPEN, CO 81611 NEIL DENNIS & SHARON /l GROVE CT SPEN, CO 81611 3134 ODHURST AARON S & DOROTHY TRUSTEES i W FLAGLER ST QAMI, FL 33130 20CHASKA JUDITH ELLEN i8 TWIN RIDGE LN SPEN, CO 81611 ATTACHMENT 7 ASPEN VALLEY HOSPITAL BLOEMSMA PHILIP DISTRICT 0074 TWIN RIDGE DR 0401 CASTLE CREEK RD ASPEN, CO 81611 ASPEN, CO 81611 CRIMMEL WII,LIAM & PETRA CROSS SUSAN K 323 GROVE CT 242 GROVE CT ASPEN, CO 81611 ASPEN, CO 81611-3139 DH,BECK JASON GIBSONE ALEXANDER SCOTT PO BOX 8321 ASPEN, CO 81612 HEATHER LANE LLC 5379 LYNBROOK DR HOUSTON, TX 77056-2004 FRIAS RAYMOND C & MARILYN F 100 MEADOWOOD DR ASPEN, CO 816]1 HEGER FRANK & CARLA 222 GROVE CT ASPEN, CO 81 61 1-31 3 9 KIERNAN MARC 161 GROVE CT ASPEN, CO 8]611 MEADOWOOD METROPOLITAN DIST PO BOX 8774 ASPEN, CO 81612 MOUNTAIN OAKS EMPLOYEE HOUSING ASPEN VALLEY HOSPITAL 200 CASTLE CREEK RD ASPEN, CO 81611 _ _ PATTERSON PAUL T & PATRICIA O 499 MEADOWOOD DR ASPEN, CO 81611 POLOVIN DAVID L PO BOX 4382 ASPEN, C0.81612 RINTOUL AMY V 161 GROVE CT ASPEN, CO 81611 LEE BRUCE LANDON 141 GROVE CT ASPEN, CO 81612 MEANS GRAEME DONALD & ELIZABETH C 189 MEADOWOOD DR ASPEN, CO 81611-3341 ODONOVAN DENIS 262 GROVE CT ASPEN, CO 81611 PITKIN COUNTY 530 E MAIN ST #302 ASPEN, CO 81611 PRINCE OF PEACE CHAPEL 77 MEADOWOOD DR ASPEN, CO 81611 RYMAN KAREN L 343 GROVE CT ASPEN, CO 81611 SIDLEY MILTON & SARALYN ___ THISSELL MARINA L C 1!2 10550 WIISHIRE BLVD #103 HOOD JEFFREY M l/2 LOS ANGELES, CA 90024 i21 GROVE CT ASPEN, CO 81611 VANDINE FAMILY TRUST WALLA JOHN D & BEAN D 2132 PASEO DEL MAR PO BOX 161 PALOS VERDES, CA 90274 ASPEN, CO 81612 WESTERN LIFE LLC 188 MEADOWOOD DR ASPEN, CO 81611 TWIN RIDGE HOA 363 GROVE CT ASPEN, CO 81611 WEINKLE JULIAN & MARY NORMA 61 PRIMROSE PATH ASPEN, CO 81611 {} /\ e mom.. ,•~ _ . s m ~ i I® ASPEN VALLEY HOSPRAL crtv of nsre+, caoiuoo 6 ~ oasnHC u~eu~nNCe e~uw oamrr owmr aar B ATTACHMENT 8 /, ._ t ~ ,~ ~/ f~ i i i .~~ ~ i ~. // ,~/~ i i~~ ;~i i i /r i i i i i r r i i tN"~ P-~ i;'ro ~~ I I ~uent,wts BUP-q!T _ tocenow) I `t-ae~ m~~ n/ ~ ~. ` ~ \~ ~~`~ `\ ~\~ `~ o ~ i ® ''~ ~ r I ~ # I _ ... 1 i.''. ,,, MEMORANDUM TO: Aspen Planning and Zoning Commission THRU: Jennifer Phelan, Planning Deputy Director ~~ FROM: Jason Lasser, Special Projects Planner J L ~b. RE: Aspen Jewish Community Center at the Silver Lining Ranch -Consolidated SPA Amendment, Growth Management Quota System (GMQS) Review, Special Review for Parking, Stream Margin and 8040 Greenline Reviews -Resolution No._, Series of 2009 MEMO DATE: January 15, 2009 MEETING DATE: January 20, 2009 APPLICANT /OWNER: The Jewish Resource Center Chabad of Aspen i REPRESENTATIVE: Alan Richman, Alan Richman Planning Services LOCATION: Lot 5, Stillwater Ranch, commonly lmown as the Silver Lining Ranch -1490 Ute Avenue -Parcel ID # 2737-184-06-805 CURRENT ZONING: ' Academic (A) zone district with a Specially Planned Area (SPA) overlay, and Conservation (C) with a Specially Planned Area (SPA) overlay SUMMARY: The Applicant requests consolidated SPA approval to allow conversion into a Jewish Community Center with an addition of an affordable housing cabin. The applicants aze requesting a recommendation of approval for a SPA Amendment, Growth Management Quota System (GMQS) Review, and approval of a Special Review for Pazking, 8040 Greenline Review, and Stream Mazein Review at this time. P11 Photo: The Silver Lining Ranch -Academic zone district shown at left /Conservation zone district shown at right - sepazated by the high water line (top of slope not shown) STAFF RECOMMENDATION: Staff recommends that the Planning and Zoning Commission approve the application converting the Silver Lining Ranch into a Jewish Community Center (primarily internal changes) and for the addition of a small cabin to be used for affordable housing, with conditions. 1 P12 REQUEST OF THE PLANNING AND ZONING COMMISSION: The Planning and Zoning Commission will be making a recommendation to the City Council for the following land use approvals: Specially Planned Area Amendment and Growth Management Review for an Essential Public Facility. The Planning and Zoning Commission has final authority for the. following land use approvals: Off-Street Pazking, 8040 Greenline and Stream Margin reviews. A Specially Planned Area (SPA) is a process in which a site specific development plan is created which encourages flexibility and innovation in the development of land and promotes objectives outlined in the Aspen Area Community Plan by allowing the variation of the underlying zone district's land uses and dimensional requirements for the benefit of the public. The pazcel currently exists with an SPA overlay. Based upon the new proposal the site specific development must be amended to allow the additional development. The review of a Specially Planned Area is (in most cases) a four step review process. Step one is conceptual review before the Planning and Zoning Commission, step two is conceptual review before City Council, step three is final review before P&Z, and step four is final review before Council. The applicant has requested a consolidated review for the SPA (allowing atwo-step review before the Planning and Zoning Commission and then review by City Council). The Community Development Director has granted the consolidated application due to the minor interior and site changes, and to allow for the one step development review for a small affordable housing cabin. The land use reviews required as part of this application are: • Specially Planned Area (SPAT -Consolidated Review (Section 26.440.040 B) to allow for the conversion to a Jewish Community Center. Upon recommendation from the Planning and Zoning Commission, the application shall be approved, approved with conditions or denied by the City Council. • A Growth Management Review for an Essential Public Facility (Section 26.470.090.4(a), The Community Development Director has determined the Jewish Community Center to be an Essential Public Facility, according to the defmition. The Planning and Zoning Commission's authority is to determine employee generation, pursuant to 26.470.100 A(1). Upon a recommendation by the Community Development Director, City Council shall detemune the rate of affordable housing mitigation. • Off-Street Pazkine -Special Review (Section 26.515.040 A) The Planning and Zoning Commission may approve, approve with conditions, or disapprove a Special Review application for establishing, varying, or waiving off-street parking requirements. • 8040 Greenline Review (Section 26.435.030 C) The Planning and Zoning Commission shall by resolution approve, approve with conditions, or disapprove a development application for development in an environmentally sensitive azea (ESA). • Stream Mazgin Review (Section 26.435.040 C) A Stream Mazgin Review by the Planning and Zoning Commission is required if "the expansion, remodeling, or reconstruction will be any closer to the high water line than is the existing development." The Planning and Zoning Commission shall by resolution approve, approve with conditions, or disapprove a development application for development in an environmentally sensitive azea (ESA). 2 P13 BACKGROUND: The Jewish Resource Center Chabad of Aspen recently entered into a contract to purchase Lot 5, Stillwater Ranch, commonly known as the Silver Lining Ranch, located at 1490 Ute Avenue. The Stillwater Ranch Subdivision/PUD (Planned Unit Development) was approved by the Boazd of County Commissioners pursuant to Resolution 94-233. In 1996, the owner of Lot 5, the Litkle Staz Foundation, submitted a petition to annex the property to the City of Aspen which was determined to be compliant through Resolution 68, Series of 1996, and Resolution 3, Series of 1997. The Aspen Planning and Zoning Commission granted conditional use approval, special review to establish parking requirements, 8040 greenline review, and stream mazgin review. Resolution 97-04 also recommended that the City Council zone the property Academic/Conservation/SPA and approve the SPA and GMQS exemption. The Aspen City Council adopted Ordinance 10, Series of 1997 annexing the property to the City of Aspen, and Ordinance 11, Series of 1997, zoning Lot 5 Academic/Conservation/SPA, approving the Conceptual/Final SPA plan and granting a GMQS exemption for an essential public facility. The approvals allowed for the operation of anon-profit kids camp for children with cancer, directed by Andrea Jaeger, commonly known as the Silver Lining Ranch. The Little Staz Foundation operated programs at the Silver Lining Ranch from 1999, when the building was completed, unti12006. The property has had limited occupancy since that time, and the Foundation has been trying to sell for the last two yeazs so that the proceeds can be used to fund its charitable mission. In 2007, the Foundation applied to the City of Aspen to either de-annex (disconnect) or rezone to its former single-family residential use. The City Council denied both requests, viewing the non-profit/institutional use of the property as an important community value, and was not willing to sacrifice the use to convert to a single family residence and miss an opportunity of providing a place for a community facility. PREVIOUSLY-APPROVF,D DTMF,NSTONAT. RF.OUTRF.MRNTC / PRnrncFn ruetvr_Fc Dimensional Standard Approved SPA Plan Proposed Dimension Dimensions Minimum Lot Size 6 acres no change Minimum Lot Area Per Dwelling Unit 2 acres per unit no change Minimum Lot Width 200 feet no change Minimum Front Yazd Setback 30 feet no change Minimum Side Yard Setback 20 feet Amend building envelope to accommodate revised arlcin Minimum Reaz Yard Setback 20 feet no change Maximum Height 28 feet (Measured to the mid- no change point of the roof on all sides o the building, except for the east-facing elevation, which was limited to 32.5 to the mid oint of the roof Minimum Distance Between Principal and No Requirement no change 3 P14 Accessory Buildings Percent of Open Space Required for Building Site As shown on site plan (30%) Add small cabin Floor Area Ratio Allowable floor azea shall not Add 700 sq. ft. for exceed 14,000 squaze feet the affordable housin cabin Off-Street Parking 3 gazage spaces, 10 outdoor 3 garage spaces, 21 s aces outdoors aces PROJECT SUMMARY: The applicant is proposing to amend the SPA (in a consolidated review) in order to convert the existing Silver Lining Ranch into a Jewish Community Center. The applicant proposes few changes to the property. The existing building will be remodeled, but only on the interior - no exterior changes aze proposed. Minor changes to the site plan aze proposed including; the addition of a small affordable housing cabin located northwest of the existing building, adding pazking to the west edge (the Aspen Club common lot line), modifying the vehicular entry/exit loop with associated landscape improvements, and adding a ten (10) foot wide sidewalk connecting the property to Ute Avenue. The applicant is requesting minor changes to the dimensional requirements in the SPA for the property. The building envelope would need to be amended to allow for the new pazking along the west edge of the property (as shown on the site plan), and the maximum allowable floor azea is proposed to be amended to allow for the addition of a small affordable housing cabin -approximately 700 squaze feet (please see the chart above). The applicant is proposing to amend the SPA in order to add to the permitted uses for the property in the Academic (A) zone district. The requested uses are: Arts, Cultural, and Civic Uses; and Affordable housing for employees of the Arts, Cultural and Civic Uses. The proposed activities in the Jewish Community Center include; apre-school, Hebrew school, adult education, religious services, and special events (please see the summary of activities in the chart below). SUMMARY OF ACTIVITIES AT THE JEWISH COMMUNITY CENTER Activity Time Period Frequency Attendance Proposed TDM* measures Pre-School Sam to Spm 5 days per week 35-40 children Pick-up and drop off at Koch Lumber Yazd Pazk Hebrew 3:30pm to Spm 2 days per week 8-10 children Aspen Club & Cross School Town Shuttle Teen Program 6pm to Spm 1 night per 20-25 persons Aspen Club & Cross month Town Shuttle Adult 10:30am to 11:30 am 1 day per week 5-10 persons Aspen Club & Cross Education 7:30pm to Spm 1 night per 15-20 persons Town Shuttle week Religious Friday around sundown every week 10-20 persons No special services Saturday gam to Noon 10-40 ersons measures** Special events Evenings and weekends 5-10 events per more than 50, less Pick-up and drop off yeaz than 200 per at Rio Grande event Pazking Gazage and P15 Little Nell Hotel Affordable Yeaz round 3 units on-site 6.25 employees Bicycles will be Housing provided. Caz sharing with Aspen Club em to ees? '~~lransportat~on llemand Management (1llM) **A significant percentage of the persons who attend religious services in the congregation are observant Jews and will not drive a car or take a shuttle to services. These persons can be expected to walk to and from the facility. STAFF COMMENTS: SPECIALLY PLANNED AREA- CONCEPTUAL DEVELOPMENT PLAN: A Specially Planned Area (SPA) is a process in which a site specific development plan is created which encourages flexibility and innovation in the development of land and promotes objectives outlined in the Aspen Area Community Plan by allowing the variation of the underlying zone district's land uses and dimensional requirements for the benefit of the public. The pacel currently exists with an SPA overlay. Based upon the new proposal the site specific development must be amended to allow the additional development. In the Arts, Culture, and Education section in the AACP, the first and last goals are to "encourage collaboration in Arts, Culture, and Education" and to "ensure the provision of public facilities and services to sustain art, culture, and education in the community. "The creation of affordable housing meets a Housing section goal to "reinforce and enhance a healthy social balance for our community and enhance the character and charm of Aspen. " Staff recommends the Planning and Zoning Commission amend the SPA to allow for the addition of a small cabin -approximately 700 square feet -for the creation of an affordable housing unit. Staff recommends amending the SPA in order to add to the permitted uses for the property in the Academic (A) zone district to allow Arts, Cultural, and Civic Uses and Affordable housing for employees of the Arts, Cultural and Civic Uses to promote and encourage diversity and education in the community. Staff, based on the previous determination for the Specially Planned Area for the Stillwater Ranch in Ordinance 11, Series of 1997, and recommends that the proposed conversion to the Jewish Community Center be recommended for approval. The Land Use Code states; "the dimensional requirements which shall apply to all permitted and conditional uses in the Academic (A) zone district shall be set by the adoption of a conceptual development plan and final development plan, pursuant to Chapter 26.440, specially planned area. " Staff finds that the proposal meets the requirements of the underlying.4cademic (A) zone district, is compatible, and enhances the mix of development in the immediate vicinity of the parcel in terms of land use, height, bul)t architecture, landscaping and open space. See ExhibitA for SPA review criteria and Stafffindings GROWTH MANAGEMENT QUOTA SYSTEM: P16 With Ordinance 11, Series of 1997 (Exhibit #7 of the application -Exhibit G), the City Council granted final approval of the Stillwater Ranch Specially Planned Area (SPA), which also granted a Growth Management exemption for an Essential Public Facility. The Jewish Community Center was reviewed and approved as an essential public facility in Ordinance No. 36, Series of 2006 (Exhibit #8 in the application -Exhibit G). As the Jewish Community Center and the Stillwater Ranch have been determined to be essential public facilities in the past, it is logical to continue to consider the relocated center an essential public facility. When determined to be "an essential public facility, upon recommendation from the Planning and Zoning Commission" "the City Council may assess, waive or partially waive affordable housing mitigation requirements as is deemed appropriate and warranted for the purposes of promoting civic uses and in consideration of broader community goals". Pursuant to Section 26.470.100, Calculations, "each Essential Public Facility proposal shall be evaluated for actual employee generation". The applicant proposes providing housing for 5.75, a mitigation of approximately 60% for the 9-10 employees that will be generated. In the employee analysis provided with the application (see page 20 of the application -Exhibit G) a calculation from the Land Use Code using 1.75 employees for each one-bedroom unit and 2.25 employees for each two-bedroom unit would equa15.75 for the proposed on-site affordable housing. APCHA Staff recommends that the applicant submit an employee audit prior to building permit issuance and two years after issuance of C.O. the form and methodology of the- audit shall be reviewed by APCHA and be consistent for both audits. The applicant shall provide mitigation for any increase in employees unless otherwise waived by City Council. Staff finds that the proposal meets the requirements of "a facility which serves an essential public purpose is available for use by, or beneft of, the general public and serves the need of the community". The Planning and Zoning Commission shall review the essential public facility to determine employee generation. The applicant is not seeking a "waiver" of the affordable housing requirement, but is proposing to house 5.75 employees on-site (1.75 employees for (2) one-bedroom units and 2.25 employees for the two-bedroom unit). Approximately 9 to 10 full time employees (FTE's) will be generated, therefore, approximately 60% (5.75/9.5=0.6) of the affordable housing demand will be mitigated by the applicant. Ordinance No. I1, Series of 1997 granted a GMQS exemption for a non profit entity for the Kids Stuff Foundation, which qualified as an essential public facility. In 2006, Ordinance 36 was approved, determining that "9.63 FTE's shall be generated by the Jewish Community Center (at the 435 W. Main street location), and established mitigation for 4.25 employees (three category 2 rental affordable housing units). It is important to note that the new request to convert the existing facility (which was allowed to waive the mitigation) is proposing to provide mitigation for affordable housing rather than request a waiver. APCHA Staff is requiring that an employee audit be submitted prior to building permit issuance and two years after C.O. Staff, based on the previous determination in Ordinance 11, Series of 1997, recommends that the proposed affordable housing mitigation of ti0% (5.75 employees) be recommended for approval. 6 P17 See Exhibit B for GMQS review criteria and Stafffindings SPECIAL REVIEW FOR PARHING: In the application for Special Review to establish pazking requirements, a proposal of twenty-one (21) surface spaces and three (3) gazage spaces is requested to be approved by the Planning and Zoning Commission. According to the American Planning Association (APA) publication "Off Street Pazking Requirements," an average amount of spaces provided per seat in the sanctuary ranges from 1 space per 2.5 sanctuary seats to 1 space per 8 sanctuary seats. The proposal for the Jewish Community Center at the Silver lining Ranch is approximately 1 space per 4 sanctuary seats. The proposed facility will have a sanctuary capacity (posted occupancy) of 88 seats, which at a 1:4 ratio would have a requirement of 22 spaces, which is exceeded in the proposals total of twenty-four (24) off-street pazking spaces. The proposed Jewish Community Center will increase traffic (see Exhibit #9 of the application). Additional traffic loads associated with the Jewish Community Center have been mitigated through several transportation demand management (TDM) measures by the applicant (see Table 3, page 13 of the application -Exhibit G). The proposed traffic mitigation plan includes: A new free shuttle service for pre-school and special events, coordination with the Aspen.Club existing and proposed shuttle, the City of Aspen Cross Town shuttle, a new den (10) foot wide bike/pedestrian path to the facility, and disincentives to personal auto use (see page 13 -table 3 of the application -Exhibit G). Through coordination with City departments, the applicant has widened the pedestrian/bikeway path to ten (10) feet to comply with Parks department standards, providing an incentive and a safe access route to the facility. Staff recommends that the applicant continue to work with the Engineering and Transportation Departments to establish a `Traffic Mitigation Plan' (with a transportation plan independent of the Aspen Club) to be presented and reviewed prior to City Council Review. See Exhibit C for Special Review criteria and Staff findings 8040 GREENLINE REVIEW: Any development located 150' (measured horizontally) of the 8040 elevation is subject to heightened review as an environmentally sensitive area. A mound on the southern triangle of the property has been surveyed to be an elevation of 8048, therefore the application is subject to 8040 greenline review. In 1997, the suitability of the site for development was determined, allowing for the creation of the Silver Lining Ranch building. The new 10' wide pedestrian/bike path is within both red and blue avalanche hazard zones and the reconfiguration of the driveway is within the blue avalanche hazard zone. The application to add an affordable housing cabin will avoid the steeply sloping portions of the site. No buildings or new uses aze proposed within the mapped red or blue avalanche hazard zones. The avalanche danger from the "Ute Chutes " (drawing A.01 in the application) does not reach the buildings, but does reach the property. The applicant has worked with both Engineering and the Parks Departments to establish proper pedestrian and vehicular access to the proposed community center. Although the new 10' wide pedestrian bikeway crosses through avalanche zones, the Parks and Engineering Departments have determined the location to be acceptable. Although there is new development (and the parcel is potentially exposed to the edge of an avalanche) the cabin will be located adjacent (20) to the top of slope of the Roaring Fork River on the northern most location 7 P18 allowed within the approved building envelope, and is not in immediate danger of mudflow, rock falls, avalanche, or~lood hazards. Staff recommends approval of the 8040 Greenline review for the proposal to allow a reconfiguration of vehicular access and for the construction of a new pedestrian and bike path. See Ezhibit D for 8040 Greenline review criteria and Staff findings STREAM MARGIN REVIEW: Development within the stream mazgin of the Roaring Fork River shall be subject to heightened review as an environmentally sensitive area. Although there is no proposed development on the lower bench of the property and the triangulaz portion that crosses the Roaring Fork River, the application for the construction of the affordable housing small cabin is subject to stream mazgin review. According to the materials submitted by the applicant, the cabin will be located twenty (20) feet from the top of slope. Steam mazgin standads state that "there is no development other than approved vegetation planting taking place below the top of slope or within 15 feet of top of slope or the high waterline, whichever is most restrictive." The exiting facility has several previously approved elements on the lower bench, in the 100 yeaz flood plain; a split rail fence, "tiny town," which is a small movie set fapade backstop on the southeast corner of the corral, and a shed. The applicant requests to keep the elements to be used in association with the proposed (day care) center. An existing fisherman's easement on the west bank of the river has been previously approved. Staff finds that the applicant has worked to meet the goals of the Engineering and Parks Departments for compliance with the standards of the stream margin review. For the proposed changes to the driveway, the Engineering Department is requiring a drainage and stormwater study for all impervious area on the site. The Code reguires dedication of a fisherman's easement, and one has been previously provided along the western bank of the Roaring Fork River. Staff recommends approval of the stream margin review, as the small cabin, minor reconfiguration of the driveway and proposed landscaping are minor in nature compared to the size and scale of the existing, previously approved development, and do not negatively affect the river or riparian zone. See Exhibit E for Stream Margin review criteria and Staff findings REFERRAL AGENCY COMMENTS: The City Engineer, Zoning Officer, Parks Department, Fire Mazshal, Aspen Consolidated Sanitation District, Building Department, Housing Department, Utilities, Transportation, and Parking Departments have all reviewed the proposed application and their requirements have been included as conditions of approval when appropriate. STAFF RECOD'Il1~NDATION: Staff recommends that the Planning and Zoning Commission approve the application for Special Review for Pazking, 8040 Greenline Review, Stream Mazgin Review. Staff recommends that the Planning and Zoning Commission approve the application to recommend approval of the consolidated Specially Planned Area (SPA) Amendment and GMQS review for an essential public P19 facility to convert the Silver Lining Ranch into a Jewish Community Center, for the addition of a small cabin to be used for affordable housing, driveway reconfiguration and associated landscaping. RECOMMENDED MOTION (ALL MOTIONS ARE WORDED IN THE AFFHtMITIVE~: "I move to approve Resolution #35, Series 2008, approving Special Review for Pazking, 8040 Greenline Review, and Stream Margin Review, and recommending approval of the consolidated Specially Planned Area (SPA) Amendment and GMQS review for an essential public facility." ATTACHMENTS: EXHIBIT A -Specially Planned Area (SPA) -review standazds and Staff findings EXHIBIT B-GMQS -review criteria and Staff fmdings EXHIBIT C -Special Review - standazds and Staff fmdings EXHIBIT D - 8040 Greenline Review - standazds and Staff fmdings EXHIBIT E -Stream Mazgin Review - standazds and Staff findings EXHIBIT F - DRC Comments EXHIBIT G -Application EXI-IIBIT H -Supplemental Drawing -Site Plan 9 P20 10 RESOLUTION N0. _, (SERIES OF 2009) A RESOLUTION OF THE CITY OF ASPEN PLANNING AND ZONING COMMISSION GRANTING APPROVAL FOR SPECIAL REVIEW OF PARKING REQUIREMENTS, 8040 GREENLINE REVIEW, AND STREAM MARGIN REVIEW FOR THE ASPEN JEWISH COMMUNITY CENTER, LOCATED ON LOT 5 OF THE STILLWATER RANCH SUBDIVISION, AND RECOMMENDING THE CITY COUNCIL APPROVE A CONSOLIDATED SPECIALLY PLANNED AREA (SPA) AMENDMENT AND GROWTH MANAGEMENT REVIEW AS AN ESSENTIAL PUBLIC FACILITY FOR THE CONVERSION OF THE SILVER LINING RANCH INTO A JEWISH COMMUNITY CENTER, LOCATED UPON LOT 5 OF THE STILLWATER RANCH SUBDIVISION, COMMONLY KNOWN AS THE SILVER LINING RANCH, 1490 UTE AVENUE, CITY OF ASPEN, COLORADO. PARCEL ID: 2735-184-06-805 WHEREAS, The Community DevelopmenYTSepartment received an application from the Aspen Jewish Resource Center Chabad of Aspen, represented by Alan Richman of Alan Richman Planning Services, for review for Art, Cultural, and Civic Use in the Academic zone district; Special Review for pazking requirements in the Academic zone district; 8040 Greenline Review; Stream Mazgin Review; and Conceptual/Final Specially Planned Area (SPA) Review for the property commonly known and referred to as the "Silver Lining Ranch" which has previously been designated a specially planned azea (SPA) on the City of Aspen Official Zone District Map; and WHEREAS, Resolution No. 4, Series of 1997, of the Planning and Zoning Commission of the City of Aspen, granted approval of the Stillwater Ranch Subdivision for Conditional Use Review for Art, Cultural, and Civic Use in the Academic zone district; Special Review for pazking requirements in the Academic zone district; 8040 Greenline Review; Stream Mazgin Review; and WHEREAS, Ordinance No. 11, Series of 1997, of the City Council of the Ciry of Aspen, granted final approval of the Stillwater Ranch Subdivision Specially Planned Area (SPA) final development plan, and to grant a GMQS exemption for anon-profit entity qualifying as an essential public facility; and ~~~1; WHEREAS, Resolution No. 24, Series of`2006, the Planning and Zoning Commission approved with conditions, a Growth Management Review to determine employee generation, and Special Review to establish off-street pazking requirements; and recommending approval to City Council of a Growth Management Review as an Essential Public Facility; and P21 WHEREAS, Ordinance No. 36, Series of 2006, of the City Council of the City of Aspen, granted approving Growth Management review for the Jewish Community Center as an essential public facility; and P22 WHEREAS, upon initial review of the'application and the applicable code standards, the Community Development Department recommended approval with conditions of a Specially Planned Area (SPA); and, WHEREAS, during a duly noticed public hearing on January 20, 2009, upon further public testimony, discussion and consideration, the Planning and Zoning Commission adopted Resolution No. _, Series of 2009 by a to ~-~ vote; and, WHEREAS, the Aspen Planning and Zoning Commission finds that the development proposal meets or exceeds all the applicable development standards and that the approval of the development proposal, with conditions, is consistent with the goals and elements of the Aspen Area Community Plan; and, NOW, THEREFORE BE IT RESOLVED BY THE PLANNING AND ZONING COMMISSION OF THE CITY OF ASPEN, COLORADO THAT: Section 1• Pursuant to the procedures and standazds set forth in Title 26 of the Aspen Municipal Code, the Planning and Zoning Commission hereby recommends City Council approval of a Consolidated Specially Planned Area (SPA) Amendment and Growth Management Quota System Review for an Essential Public Facility. The Planning and'Zoriiiig'Commission approves the application for Special Review for Pazking, 8040 Greenline Review, and Stream Mazgin Review. Section 2: Building The Applicant shall meet adopted building codes and requirements if and when a building permit is submitted. Accessible routes to any public right-of--way and accessible pazking spaces will be required. The proposed project will be subject to the newly adopted Use Tax on building materials. The proposed project may be required to comply with a newly developed Efficient Building Program for Commercial projects. Section 3: Engineerine The building permit application shall include a drainage and stormwater study for all impervious azea on site. The developer will be required to be granted permission from the Aspen Club to construct the retaining wall on the western side of the property. Impacts of construction outside the sites property boundary must be agreed upon with neighboring properties and addressed in the construction management plan. A construction management plan must be submitted in conjunction with the building permit application. The plan must include a planned sequence of construction that minimizes construction impact:''; to the public. The plan shall describe mitigation for: parking, staging/encroachments, .tnigk traffic, noise, dust, and erosion/sediment pollution. The Applicant's design shall be Cump,(ant with all sections of the City of Aspen Municipal Code, Title 21, and all design and construction standazds published by the Engineering Department. Section 4: Affordable Housine Audit The applicant shall submit an employee audit prior to building permit issuance and two yeazs after issuance of C.O. The form and methodology of the audit shall be reviewed by APCHA and P23 be consistent for both audits. The applicant shall provide mitigation for any increase in employees unless otherwise waived by City Council. It is the applicants responsibility to submit the audit. Section 5: Fire Mitieation All codes adopted by the Aspen Fire Protection District shall be met. This includes but is not limited to access (International Fire Code (IFC), 2003 Edition, Section 503), approved fire sprinkler and fire alarm systems (IFC, as amended;, 5`eetion 903 and 907). 3i, Section 6: Public Works ~ ';!i' ' The Applicant shall comply with the City of Aspen Water System Standards, with Title 25, and with the applicable standards of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code, as required by the City of Aspen Water Department. Utility placement and design shall meet adopted City of Aspen standazds. Section 7: Sanitation District Requirements Oil and Grease interceptors are required for all new and remodeled commercial kitchens and food processing establishments. Permanent improvements aze prohibited in sewer easements or right of ways including hazd landscaping which will impact public ROW or easements owned by the district. A revocable license issued by the district to the Institute will be required to construct a terrace on the district's easement. Prior approval of construction material for the terrace will be required. Additional access easements will be required from the applicant to the district to facilitate the district's ability to maintain the main sanitary sewer lines. Service is contingent upon compliance with the District's rules, regulations, and specifications, which are on file at the District office. ACSD will review the approved Drainage plans to assure that cleaz water connections are not connected to the sanitary sewer system. On-site utility plans require approval by ACSD. ACSD will not approve service to food,pfocessing establishments retrofitted for this use at a later date. Driveway entrance drains must-rain to drywells, elevator shafts drains must flow thru o/s interceptor. Permanent improvements~e:prohibited in sewer easements or right of ways. All ACSD fees must be paid prior to fete issuance of an excavation/foundation or access/infrastructure permit. Section 8: Environmental Health The state of Colorado mandates specific mitigation requirements with regard to asbestos. Additionally, code requirements to be aware of when filing a building permit include: a prohibition on engine idling, regulation of fireplaces, fugitive dust requirements, noise abatement and pool designs. Section 9: Exterior LiEhtin¢ All exterior lighting shall meet the requirements of the City's Outdoor Lighting Code pursuant to Land Use Code Section 26.575.150, Outdoor lighting. ;t"''' ::~% i t;~;ir `. P24 Section 10: Dimensional Standards The dimensional requirements which shall apply to this property aze as follows: nnFVinirer v_evrunvFn nTMFNCmNAi, RF.niJiRF,MF.NTS /PROPOSED CHANGES Dimensional Standard V Approved SPA Plan Proposed Dimension Dimensions Minimum Lot Size 6 acres no change Minimum Lot Area Per Dwelling Unit 2 acres per unit no change Minimum Lot Width 200 feet no change Minimum Front Yazd Setback 30 feet no change Minimum Side Yazd Setback 20 feet Amend building `~ envelope to accommodate revised arlcin Minimum Reaz Yazd Setback 20 feet no change Maximum Height 28 feet (Measured to the mid- no change point of the roof on all sides o the building, except for the east-facing elevation, which was limited to 32.5 to the mid oint of the roof Minimum Distance Between Principal and No Requirement no change Accesso Buildin s Percent of Open Space Required for Building Site As shown on site plan (30%) Add small cabin Floor Area Ratio Allowable floor azea shall not Add 700 sq. ft. for exceed 14,000 square feet the affordable housin cabin Off-Street Pazking 3 garage spaces, 10 outdoor 3 garage spaces, 21 s a~ s outdoors aces Section 11: Allowed Uses: In addition to the permitted and conditional uses allowed in the Academic and Conservation zone districts, this property is also allowed to be used for Arts, Cultural, and Civic Uses, and Affordable housing for employees of the Arts, Cultural and Civic Uses. The proposed activities in the Jewish Community Center include; apre-school, Hebrew school, adult education, religious services, and special events. The uses which shall apply to this property aze as follows: erm,rr,r~nv n~ er~rrvrTrFC eT THF.iFWiCH f'nMMiJN1TY CENTER U.,......~.... Activity Time Period Frequency Attendance Proposed TDM* measures Pre-School Sam to 3pm 5 days per week 35-40 children Pick-up and drop off at Koch Lumber Yard Pazk Hebrew 3:30pm to Spm 2 days per week 8-10 children Aspen Club & Cross School Town Shuttle P25 Teen Program 6pm to 8pm 1 night per 20-25 persons Aspen Club & Cross month" Town Shuttle Adult 10:30am to 11:30 am 1 day per week 5-10 persons Aspen Club & Cross Education 7:30pm to 9pm 1 night per 15-20 persons Town Shuttle week Religious Friday azound sundown every week 10-20 persons No special services Saturda gam to Noon 10-40 ersons measures** Special events Evenings and weekends 5-10 events per more than 50, less Pick-up and drop off yeaz than 200 per at Rio Grande event Parking Gazage and Little Nell Hotel Affordable Yeaz round 3 units on-site 6.25 employees Bicycles will be Housing provided. Caz shazing with Aspen Club em to ees? *Transportation Demand Management (TDM) **A significant percentage of the persons who attend religious services in the congregation aze observant Jews and will not drive a car or take a shuttleto services. These persons can be expected to walk to and from the facility. Section 12: Parks An approved tree permit is required before submission of the building permit set (decrease the amount of spruce trees, increase in aspen, cottonwood, Douglas fir, and service berry bushes). The new grading and planting will require City seed mixes and approval of the landscaping. All new plantings will need to be imgated and the landscape plan reviewed by Pazks Department. Tree protection fences must be in place and inspected by the city forester or his/her designee before any construction activities aze to commence. No excavation, storage of materials, storage of construction backfill, and storage of equipment, foot or vehicle traffic allowed within the drip line of any tree on site. Hand work only will be approved within the protection zones and for the re-opening of the irrigation ditch. Section 13: Transaortation Transportation requests that the Jewish Community Center meet with Staff prior to each summer season to discuss their schedule of events and associated transportation/pazking impacts as well as mitigation such as increased shuttle service, etc. Transportation requests that the Jewish Community Center communicate with event staff/attendees about alternative transportation options prior to lazge events. ~ ,fc Section 14: All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Planning and Zoning Commission or City Council, aze hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, unless amended by an authorized entity. Section 15• P26 This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. ;; Section 16: If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a sepazate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED BY the Planning and Zoning Commission of the City of Aspen on this 20th day of Januazy, 2009. APPROVED AS TO FORM: Jim True, Special Counsel ATTEST: Jackie Lothian, Deputy City Clerk PLANNING AND ZONING COMMISSION: LJ Erspamer, Chair `- ., ,: P27 EXHIBIT A sPa Sec. 26.440.050. Review standards for development in a Specially Planned Area (SPA), A. Genera]. In the review of a development application for a conceptual development plan and a final development plan, the Planning and Zoning Commission and City Council shall consider the following: I. Whether the proposed development is compatible with or enhances the mix of development in the immediate vicinity of the parcel in terms of land use, density, height, bulk, architecture, landscaping and open space. ,.. Stafff Finding: The applicant does not propose any exterior changes to the existing structure, which was approved in 1997. The existing building was designed to appear to be a single family residence, breaking up the visual height and bulk through a variety of roof forms and pedestrian level porches. The addition of a small affordable housing cabin enhances the mix of development by adding development at a smaller scale, which helps to reduce the perceived mass from the river and associated trails. Staff finds this criterion to be met. 2. Whether sufficient public facilities and roads exist to service the proposed development. St~Findin2: The proposal will remove bathroom fixtures in the conversion to a Jewish Community Center, reducing the water and sewer loads, even with the addition of a small cabin. The proposed traffic mitigation plan includes; anew free shuttle service for pre-school and special events, coordination with the Aspen Club existing and proposed shuttle, the City of Aspen Cross Town shuttle, a new bike/pedestrian path, and disincentives to personal auto use (see page 13 -table 3 of the application). Staff finds this criterion to be met. 3. Whether the parcel proposed for development is generally suitable for development, considering the slope, ground instability and the possibility of mudflow, rock falls, avalanche dangers and flood hazards. Sta Finding: •; ~, The previously approved building envelope allows far development in the upper bench of the property. The lower bench is zoned Conservation (C) and was approved with Stream Margin review in 1997. The avalanche danger from the "Ute Chutes " (drawing A.01 in the application) does not reach the buildings, but does reach the property. While the cabin will be located adjacent to the top of slope of the Roaring Fork River and the parcel is potentially exposed to the edge of an avalanche, it is not in immediate danger of mudflow, rock falls, avalanche, or flood hazards. Stafffinds this criterion to be met. 4. Whether the proposed development creatively employs land planning techniques to preserve significant view planes, avoid adverse environmental impacts and provide open space, trails and similaz amenities for the users of the project and the public at large. Staff Finding: As described above, the existing development avoids the River, riparian area, and is sensitive to the landscape. The proposed parking and revised vehicular circulation route allows for more efficient use of the site without significant construction. The proposed bike path will not only ,, P28 provide an option for users of the Center, but will also be an amenity for the public. Staff finds this criterion to be met. 5. Whether the proposed development is in compliance with the Aspen Area Comprehensive Plan. Staff Finding: In the Arts, Culture, and Education section in the AACP, the first and last goals are to "encourage collaboration in Arts, Culture, and Education" to "ensure the provision of public facilities and services to sustain art, culture, and education in the community. " (The Ciry of Aspen) "will foster artistic creativity and excellence, promote cultural diversity, and provide continuing learning opportunities.... Nurture intellectual and spiritual growth that enriches our lives while challenging our imaginations. " Establishing a Jewish Community Center promotes cultural diversity and nurtures intellectual and spiritual growth. Operating apre-school is a very difficult economic model in the City of Aspen, and seeking to open a new pre-school that will be open to all members of the community reflects a significant learning opportunity. Other educational programs for teens and adults, including both Jewish persons and members of the broader community, represents an additional learning opportunity, promotes cultural diversity and promotes understanding between cultures. The creation of affordable housing meets a Housing section goal to "reinforce and enhance a healthy social balance for our community and enhance the character and charm of Aspen. " Improvements to the pedestrian and bike paths are action plan items that are in compliance with the AACP. Stafffinds this criterion to be met. 6. Whether the proposed development will require the expenditure of excessive public funds to provide public facilities for the parcel or the surrounding neighborhood. Staff Finding: The proposal does not require public funds to provide public facilities for the proposed parcel. The applicant has been working with the Transportation and Engineering Departments to address additional impacts to the existing shuttle and for the proposed services. Staff finds this criterion to be met. 7. Whether proposed development on slopes in excess of twenty percent (20%) meet the slope reduction and density requirements of Subsection 26.445.040.B.2. Staff Finding: Not applicable. 8. Whether there are sufficient GMQS a}~otments for the proposed development. Staff Finding: If continued to be determined an essential public facility, this criterion is not applicable. B. Vaziations permitted. The final development plan shall comply with the requirements of the underlying zone district; provided, however, that vaziations from those requirements may be allowed based on the standards of this Section. Variations may be allowed for the following requirements: open space, minimum distance between buildings, maximum height, minimum front yard, minimum rear yard, minimum side yazd, minimum lot width, minimum lot area, trash access azea, internal floor area ratio, number of off-street parking spaces and uses and design standards of Chapter 26.410 for streets and related improvements. Any vaziations allowed shall be specified in the SPA agreement and shown on the final development plan. P29 Sta Finding: The applicant is proposing to amend the SPA in order to add to the permitted uses for the property in the Academic (A) zone district andfor.charnges to the dimensional requirements in the SPA for the property.. The requested uses are; Arts,- Cultural, and Civic Uses; and Affordable housing for employees of the Arts, Cultural and Civic Uses. The building envelope would need to be amended to allow for the new parking along the west edge of the property. The maximum allowable floor area is proposed ro be amended to allow for the addition of a small affordable housing cabin -approximately 700 square feet. Staff finds this criterion to be met due to the minor changes to the site plan and for the creation of affordable housing. ,,,a~,, rs a ~, P30 EXHIBIT B GMQS Sec. 26.470.050. Geueral requirements. B. General requirements: All development applications for growth management review shall comply with the following standazds. The reviewing body shall approve, approve with conditions or deny an application for growth'miipagement review based on the following generally applicable criteria and the review criteria applicable to the specific type of development: 1_. 1. Sufficient growth management allotments aze available to accommodate the proposed development, pursuant to Subsection 26.470.030.D. Applications for multi-year development allotment, pursuant to Paragraph 26.470.090.1 shall not be required to meet this standard. Staff Finding: If determined to be an essential public facility, the additional cabin square footage will not be applicable. Staff finds this criterion to be met. 2. The proposed development is consistent with the Aspen Area,Community Plan. Staff Finding: From the AACP; "Aspen as a unique community... in which arts, culture and education provide cornerstones of our lifestyle, character, and economy. " The Jewish Community Center will provide a venue to facilitate many of the goals of AACP, specifically Arts, Culture, Education, and Housing. Staff finds this criterion to be met. 3. The development conforms to the. requirements and limitations of the zone district. ,: °! i'.,` i~~' Staff Finding: ;, The Land use Code states, "the dimensional requirements which shall apply to all permitted and conditional uses in the Academic (A) zone district shall be set by the adoption of a conceptual development plan and final development plan, pursuant to Chapter 26.440, specially planned area. The Academic (A) zone district requirements are set by the SPA, no variations from the requirements and limitations are requested or necessary. Staff finds this criterion to be met. 4. The proposed development is consistent with the Conceptual Historic Preservation Commission approval, the Conceptual Commercial Design Review approval and the Conceptual Planned Unit Development approval, as applicable. Staff Finding: Not applicable. 5. Unless otherwise specified in this Chapter, sixty percent (60%) of the employees generated by the additional commercial or lodge development, according to Subsection 26.470.IOO.A, Employee generation rates, are mitigated through the provision of affordable housing. The employee generation mitigation plan shall be approved pursuant to Pazagraph 26.470.070.4, Affordable housing, at a Category 4 rate as defined in the Aspen/Pitkin County Housing Authority Guidelines, as amended. An applicant may choose to provide mitigation units at a lower category designation. ;, ea. 1; ,:-~, P31 Sra Findin The applicant is not seeking a "waiver" of the affordable housing requirement, but is proposeing to house 5.75 employees on-site (1.75 employees for (2) one-bedroom units and 2.25 employees for the two-bedroom unit). Approximately 9 to 10 full time employees (FTE's) will be generated, therefore, approximately 60% (5.75/9.5=0.6) of the a,~ordable housing demand will be mitigated by the applicant. Staff finds this criterion to be met. 6. Affordable housing net livable area, for which the finished floor level is at or above natural or finished grade, whichever is higher, shall be provided in an amount equal to at least thirty percent (30%) of the additional free-market residential net livable area, for which the finished floor level is at or above natural or finished grade, whichever is higher. Affordable housing shall be approved pursuant to Pazagraph 26.470.070.4, Affordable housing, and be restricted to a Category 4 rats as defined in the Aspen/Pitkin County Housing Authority Guidelines, as amended; An applicant may choose to provide mitigation units at a lower category designatign. Affordable housing units that are being provided absent a requirement ("voluntary units") may be deed-restricted at any level of affordability, including residential occupied. Staff Finding: Not Applicable. 7. The project represents minimal additional demand on public infrastructure, or such additional demand is mitigated through improvement proposed as part of the project. Public infrastructure includes, but is not limited to, water supply, sewage treatment, energy and communication utilities, drainage control, fire and police protection, solid waste disposal, parking and road and transit services. (Ord. No. 14, 2007, § I } Staff Finding: Please see 5PA criterion 2. Stafffinds this criterion to be met. Sec. 26.470.090. City Council applications. The following types of development shall be approved, approved with conditions or denied by the City Council, pursuant to Section 25:470.110, Procedures for review, and the criteria for each type of development described below., Except as noted, all growth management applications shall comply with the genera} requiretrfemts of Section 26.470.050. Except as noted, all City Council growth management approvals shalt be deducted from the respective annual development allotments and development ceiling levels. 4. Essential public facilities. The development of an essential public facility, upon a recommendation from the Planning and Zoning Commission, shall be approved, approved with conditions or denied by the City Council based on the following criteria: a. The Community Development Director has determined the primary use and/or structure to be an essential public facility (see definition). Accessory uses may also be part of an essential public facility project. Sta Findin The applicant is requesting that the Jewish Community Center continue to be an Essential Public Facility as determined in Ordinance No. 36, Series of 2006 (see Exhibit 118 in the application). Staff finds this criterion to be met. 2 u` N,;: P32 _ ,- `, . a: ra b. Upon a recommendation from the Community Development Director, the City Council may assess, waive or partially waive affordable housing mitigation requirements as is deemed appropriate and warranted for the purpose of promoting civic uses and in consideration of broader community goals. The employee generation rates may be used as a guideline, but each operation shall be analyzed for its unique employee needs, pursuant to Section 26.470.100, Calculations. Sta Findin The applicant is not requesting a waiver if the affordable housing mitigation. Please see GMQS criterion 5. Staff frnds this criterion to be met. ~.: ,,i,, ',, 3 P33 EXHIBIT C Chapter 26.430 SPECIAL REVIEW Sec. 26.430.040. Review standards for special review. No development subject to special review shall be permitted unless the Planning and Zoning Commission makes a determination that the proposed development complies with all standards and requirements set forth below. A. Dimensional requirements. Whenever the dimensional requirements of a proposed development are subject to special review, the development application shall only be approved if the following conditions aze met. 1. The mass, height, density, configuration, amount of open space, landscaping and setbacks of the proposed development ate designed in a manner which is compatible with or enhances the character of surrounding ]and uses and is consistent with the purposes of the underlying zone district. Sta Findin :Please see SPA criterion (A)I provided in Exhibit A of the packet. Staff finds this criterion to be met. 2. The applicant demonstrates that the proposed development will not have adverse impacts on surrounding uses or will mitigate those impacts, including but not limited to the effects of shading, excess traffic, availability of pazking in the neighborhood or blocking of a designated view plane. `.!' Sta Finding The proposed Jewish Communitq:Center will increase traffic (see Exhibit #9 of the application). Staff recommends that the applicant continue to work with the Engineering and Transportation Departments to establish a 'Traffic Mitigation Plan' - a pedestrian/6ikeway connection and transportation plan that will be presented and reviewed prior to City Council Review. Stafffrnds this criterion to be met. P34 ~i~ Chapter 26.435 EXHIBIT D DEVELOPMENT IN ENVII2ONMENTALLY SENSITIVE AREAS (ESA) Sec. 26.435.030. 8040 Greenline review. 26.435.030 C. 8040 Greenline review standards. No development shall be permitted at, above or one hundred fifty (150) feet below the 8040 Greenline unless the Planning and Zoning Commission makes a determination that the proposed development complies with all requirements set forth below. 1. The parcel on which the proposed development is to be located is suitable for development considering its slope, ground stability characteristics, including mine subsidence and the possibility of mudflow, rock falls and avalanche dangers. If the pazcel is found to contain hazardous or toxic soils, the applicant shall stabilize and revegetate the soils or, where necessary, cause them to be removed from the site to a location acceptable to the City. Staff Finding The applicant has worked with both Engineering and the Parks Departments to restore the area fifteen feet (I S) from top of slope to top of slope with native vegetation, detailed in the landscape and surveys of the drawings submitted by the applicant. Staff finds this criterion to be met. 2. The proposed development does not have a significant adverse affect on the natural watershed, runoff, drainage, soil erosion or have consequent effects of water pollution. Staj1 Finding_ The applicant has been working with the Engineering and Parks Departments to resolve any development or construction erosion, sedimentation, and drainage to mitigate any potential far pollution or interference with the natural changes of the river. Any on-site drainage issues will be addressed per a grading and erosion control plan provided at the time of building permit submittal, all drainage will be accommodated within the parcel, no drainage will be allowed into the river or onto its banks. Stafffinds this criterion to be met. 3. The proposed development does not have a significant adverse affect on the air quality in the City. Sta Finding: The applicant has worked with Environmental Health to determine that the traffic increase will be mitigated to provide environmentally sensitive alternatives in order to comply with the requirements of the review. Staff frnds this criterion to be met. i; 4. The design and location off' any, propped development, road or trail is compatible with the terrain on the parcel on which the prgposed development is to be located. Staff Finding.• The applicant has worked with The Engineering and Parks Departments to determine that the road and [rail improvements are compatible with the terrain in order to comply with the requirements of the review. Stafffinds this criterion to be met. 5. Any grading will minimize, to the extent practicable, disturbance to the terrain, vegetation and natural land features. P35 Sta Finding The applicant has worked with both Engineering and the Parks Departments to minimize the disturbance to the terrain, vegetation, ps detailed in the landscape and surveys of the drawings submitted by the applicant. Staff finds this`criterion to 6e met. ,.. 6. The placement and clustei•ing,of s'~ otures will minimize the need for roads, limit cutting and grading, maintain' open space and preserve the mountain as a scenic resource. Sra Finding The applicant is not proposing any modifications to the existing building. The proposed affordable housing cabin complies with this criterion, as detailed in the site section, landscape, surveys, and architectural drawings submitted by the applicant. Staff finds this criterion to be met. 7. Building height and bulk will be minimized and the structure will be designed to blend into the open chazacter of the mountain. Sta Findittg The applicant is not proposing any modifications to the existing building. The proposed affordable housing cabin complies with this criterion, as detailed in the drawings submitted by the applicant. Stafffinds this criterion to be met. 8. Sufficient water pressure and other utilities are available to service the proposed development. St~Finding The applicant is not proposing any modifications to the existing building. There are already utilities in place to serve the site, and thf~roposed affordable housing cabin will not put excessive demands on the existing systems. Stafff:nds this criterion to be met. ii7 9. Adequate roads are available to serve the proposed development and said roads can be properly maintained. Sta Finding The applicant is not proposing any modifications to the existing building. The proposed affordable housing cabin complies with this criterion, as detailed in the drawings submitted by the applicant. Staff finds this criterion to be met. 10. Adequate ingress and egress is available to the proposed development so as to ensure adequate access for fire protection and snow removal equipment: Sta Finding The existing site plan and approvals accounted for fire protection and snow removal with a loop around the facility, which will not be affected by the minor changes to the site plan, as detailed in the drawings submitted by the applicant. Staff finds this criterion to be met. I1. The recommendations of the Aspen Area Community Plan: Pazks/Recreation/Trails Plan are implemented in the proposed development, to the greatest extent practical. (Ord. No. 55-2000, § 7) Sta Finding Please see criterion 2 of the stream margin review standards (Exhibit E). Staff finds this criterion to be met. 1,`" ~;,, . :F'ap; P36 EXHIBIT E Chapter 26.435 DEVELOPMENT IN ENVIItONMENTALLY SENSITIVE AREAS (ESA) Sec. 26.435.040. Stream margin review. ,; .: 26.435.040 C. Stream mazgin review standazds. No development shall be permitted within the stream mazgin of the Roaring Fork River unless the Community Development Director makes a determination that the proposed development complies with all requirements set forth below: 1. It can be demonstrated that any proposed development which is in the Special Flood Hazard Area will not increase the base flood elevation on the pazcel proposed for development. This shall be demonstrated by an engineering study prepazed by a professional engineer registered to practice in the State which shows that the base flood elevation will not be raised, including, but not limited to, proposing mitigation techniques on or off-site which compensate for any base flood elevation increase caused by the development; Sta Finding.• The proposed development will not increase the base flood elevation. The proposal will not affect the river, all development is required to follow the Engineering Department checklist, site grading plan, drainage and erosion plan, and excavation and stabilization plan which will not allow disturbance to the river. The applicant has requested to maintain several structures which are currently located within the floodplain, which have been allowed in previous approvals. Stafffinds this criterion to be met. 2. The recommendations of the Aspen Are~.Community Plan: Pazks/Recreation/Open Space/Trails Plan and the Roaring Fork River Greenway Plan aze implemented in the proposed plan for development, to, the greate~t,extent practicable. Areas of historic public use or access shall be dedicated via a ~reeozded easement for public use. A fisherman's easement granting public fishing access within the high water boundaries of the river course shall be granted via a recorded "Fisherman's Easement;" and Staff Finding Staff finds that the application has worked to meet the goals of the Engineering and Parks Departments to maintain the high water boundaries of the river course. As noted on the survey, "this property is subject to all easements, rights-of--way and/or requirements as noted or shown in the records of the Pitkin County Clerk & Recorder. The Code requires dedication of a fisherman's easement, which has already been provided. Stafffinds this criterion to be met. 3. There is no vegetation removed or damaged or slope grade changes (cut or fill) made outside of a specifically defined building envelope. A building envelope shall be designated by this review and said envelope shall be designated by this review and said envelope shall be recorded on a plat pursuant to Subsection 26.435.040.F.1; and Staff Finding The applicant has worked with both Engineering and the Parks Departments to restore the area fifteen feet (15) from top of slope to top of slope with native vegetation, detailed in the landscape and surveys of the drawings submitted by the applicant. Staff finds this criterion to be met. t 4. The proposed development does not pollute or interfere with the natural changes of the river, stream or other tributary, iRCl~dipg erosion and/or sedimentation during construction. Increased on-site drainage; sl 11 be accommodated within the pazcel to prevent entry into the river or onto its banks. ~ools or hot tubs cannot be drained outside of the designated building envelope; and P37 Sta Finding The applicant has been working with the Engineering and Parks Departments to resolve any development or construction erosion, sedimentation, and drainage to mitigate any. potential for pollution or interference with the natural changes of the river. Any on-site drainage issues will be addressed per a grading and erosion control plan provided at the time of building permit submittal, all drainage will be accommodated within the parcel, no drainage will be allowed into the river or onto its banks. Staff finds this criterion to be met. 5. Written notice is given to the Colorado Water Conservation Board prior to any alteration or relocation of a water course and!a copy of said notice is submitted to the Federal Emergency Management Agency; and; ii; St~Finding 77te water course will not be altered o~ relocated, Stafffinds this criterion to be not applicable. 6. A guazantee is provided in the event a water course is altered or relocated, that applies to the developer and his heirs, successors and assigns that ensures that the flood carrying capacity on the parcel is not diminished; and Sta Finding The proposed development will nor alter or relocate the water course (see criterion S). Staff finds this criterion to be not applicable. 7. Copies are provided of all necessary federal and state permits relating to work within the 100-yeaz flood plain; and St Finding There is no work proposed within the 100 year flood plain, Staff finds this criterion to be not applicable. 8. There is no development other than approved native vegetation planting taking place below the top of slope or within fifteen (15) feet of the top of slope or the high waterline, whichever is most restrictive. This is an effort to protect the existing riparian vegetation and bank stability. New plantings (including trees, shrubs, flowers and grasses) outside of the designated building envelops~on the river side shall be native riparian vegetation as approved by the City. A:.l~tdscape plan will be submitted with all development applications. The top.. of slope~knd 100-year flood plain elevation of the Roaring Fork River shall be determined by the Stream Margin Map located in the Community Development Deparhnent and filed at the City Engineering Department; and Staff Finding The applicant has worked with both Engineering and the Parks Departments to restore the area fifteen feet (IS) from top of slope to top of slope with native vegetation, detailed in the landscape and surveys of the drawings submitted by the applicant. Staff finds this criterion to be met. 9. All development outside the fifteen (15) foot setback from the top of slope does not exceed a height delineated by a line drawn at a Forty-five (45) degree angle from ground level at the top of slope. Height shall be measured and determined by the Community Development Director using the definition for height set forth at Section 26.04.100 and method of calculating height set forth at Section 26.575.020 as shown in Figure "A"; StaflFinding The applicant is not proposing any exterior modifications to the existing building. The proposed affordable housing cabin complies with this criterion, as detailed in the site section provided, landscape and surveys of the drawings submitted by the applicant (see drawing A.01 in the application). Staff finds this criterion to be met. „t ~ . ~ii~i .. , :':.i ,:,fi ~~~~ P38 10. All exterior lighting is low and downcast with no light(s) directed towazd the river or located down the slope and shall be in compliance with Section 26.575.150. A lighting plan will be submitted with all development applications; and Stajj'Finding_ The applicant has worked with the Zoning Officer to determine that the lighting will comply with the requirements of the review as seen in the architectural drawings submitted by the applicant. Stafff:nds this criterion to be met. 11. There has been accurate identification of wetlands and riparian zones. StatJ Finding The applicant has worked with the Community Development Staff to determine the accuracy of the surveys, engineering, landscape and architectural drawings submitted by the applicant. Staff finds this criterion to be met. ;,:;:. P39 DRC EXHIBIT F November 13, 2008 City Parks Department Requirements Property: Jewish Community Center Conditions of Approval: 1) Tree Protection: A vegetation protection fence shall be erected at the drip line of each individual tree or groupings of trees remaining on site and their represented drip lines. A formal nlan indicatine the location of the tree protection will be required for the bldg Hermit set. No excavation, storage of materials, storage of construction backfill, and storage of equipment, foot or vehicle traffic allowed within the drip line of any tree remaining on site. This fence must be inspected by the city forester or his/her designee (920-5120) before any construction activities aze to commence. Please note the tree protection code includes native species or serviceberry, gamble oak and other shrubs. These have not been reflected in the application. The applicant should be awaze that these species will affect the overall mitigation requirements. 2) Plant Spacing_ Appropriate spacing will be required for all new plantings. Coniferous Trees will require adequate spacing between trees and distance from buildings or structures to allow for mature growth. Deciduous Trees will require adequate spacing from structures to accommodate mature growth in height. 3) Seed Mix and Irrigation: Applicant shall use the City of Aspen approved native seed mix and a temporary or permanent irrigation system will be required for establishment of native area disturbed during construction. 4) Weed Mana ement: Applicant shall detail and define how it will manage noxious weeds during the seed establishment period. 5) Trail Easements: City Pazks Department will require a 15-foot public trail easement around the follows property line from. the corner adjacent to the Fabi Benedict Bridge along the river and back up to the driveway entrance on Ute Ave. In addition the City is requiring a 15-fp`of pu~~lic trail easement, location to be determined, on the triangulaz portion of the property located across the river. The actual location of the public trails will be determined and located in the field prior to any approvals. 6) Stream Maz~in: The applicant has requested to maintain several structures which aze currently located within the floodplain. As required by the Stream Margin Review all non-exempt structures located within the flood plain aze to be removed P40 ;, and the area re-vegetated back to its native state. A detailed plan should be provided showing the removal of these items and the plans for re-vegetating the areas of impact. ,`. aY• c]' Page 1 of 1 P41 Jason Lasser From: Chris Bendon Sent: Tuesday, January 13, 2009 5:29 PM To: Jason Lasser Cc: 'Alan Richman'; Jim True; Brian Flynn Subject: JCC trail request ason: I read the comments from the Parks Department and cannot support a condition requiring a trail dedication on the JCC ase. I think their desire is well placed .but neither the code nor the proposed improvements allow us to require this. Nothing in re development application, the nature of the proposed uses, or the proposed physical changes to the property result in a istifiable exaction of a trail easement from the property owner. The City may ask for a trail easement and the applicant may offer uch an easement, but not as a requirement of approval. Otherwise, it looks like a classic Nolan situation. The City retains two ptions to obtain an easement if it chooses: 1) work in a cooperative manner with the landowner in the acquisition of an asement. This could involve the purchase of the easement. Or, 2) pursue condemnation of an easement. In this case the City could need to show public purpose and may also need to compensate the landowner. sheers, :hris Bendon, AICP :ommunity Development Director :ity of Aspen ~ 970.429.2765 !ww.aspenpitkin.com! . ;:: !~~f~ f;rr ,:, ~. •Ir i. G'ii 111 dl9(1f19 P42 DRC 12-10-08 ACSD Review Comments AJCC-Silver Lining Ranch Service is contingent upon compliance with the District's rules, regulations, and specifications, which are on file at the District office at the time of construction. All cleaz water connections are prohibited (roof, foundation, perimeter, patio drains), including entrances to underground pazking garages. On-site drainage and landscaping plans require approval by the district, must accommodate ACSD service requirements and comply with rules, regulations and specifications. On-site sanitary sewer utility plans require approval by ACSD. Oil and Grease interceptors are required for all new and remodeled commercial kitchens and food processing establishments. Plans for interceptors, separators and containment facilities require submittal by the applicant and approval prior to building permit. Glycol snowmelt and heating systems must have containment provisions and must preclude discharge to the public sanitary sewer system. Below grade development will require installation of a pumping system. > r. One tap is allowed for each building. Shared servicedige agreements may be required where more than one unit is served by a single service line. . ~..~: Permanent improvements are prohibited in areas covered by sewer easements or right of ways to the lot line of each development. All ACSD total connection fees must be paid prior to the issuance of a building permit. Where additional development would produce flows that would exceed the planned reserve capacity of the existing system (collection system and or treatment system) an additional proportionate fee will be assessed to eliminate the downstream collection system or treatment capacity constraint. Additional proportionate fees would be collected over time from all development in the area of concern in order to fund the improvements needed. The district will be able to respond with more specific comments and requirements once detailed building and utility plans are available. lyt~ P43 Date: December 2008 Project: Aspen Jewish Community Center At The Silver Lining Ranch City of Aspen Engineering Department DRC Comments 26.440 I-' _~f1w ~~v~ ~~ 26.440.050 Review Standazds for Development in a SPA 2. Whether sufficient public facilities and roads exist to service the proposed development 0 ~5~ Currently there aze not adequate pedestrian/trail facilities for the proposed facility and the Aspen Club. The community center will need to submit a plan, contribution schedule, and overall cost estimate for the sidewalk and trail connection. The developer will need to show these infrastructure improvements mitigate any quality of service impacts on the neighborhood. 3. Whether the pazcel proposed for development is generally suitable for development, considering the slope, ground instability, and the possibility of mud flows, rock falls, avalanche dangers, and flood hazards. o Shown on site map. 6. Whether the proposed development will require the expenditure of excessive public funds to provide public facilities for the pazcel, or the surrounding neighborhood. o Existing Trail and Sidewalk infrastructure is not adequate for the needs of additional development in the neighborhood. Any additional trail or sidewalk infrastructure will need;to be provided by the developed in conjunction with the Aspen C1ub..~Cost estimates, layout and contribution schedule will need to bey providec~'to the City for review. 26.435 8040 Review 26.435.030 Review Standards 2. The proposed development does not have a significant adverse affect on the natural watershed, runoff, drainage, soil erosion, or have consequent effect on water pollution. o The application states stormwater will be detained on site. The City is unable to determine where and how this will occur. Limited room due to the flood plain and stream mazgin will make stormwater quality infrastructure difficult to install. 4. The design and location of any proposed development, road, or trail is compatible with the terrain on the pazcel on which the proposed development is to be located. o See 26.440 (6) above . ;r ~, !,iu t P44 5. Any grading will minimize, to the extent practicable, disturbance to the terrain, vegetation and natural land features. o Developer will be required to be granted permission from the Aspen Club to construction the retaining wall on the western side of the property. Impacts of construction outside the sites property boundary must be agree upon with neighboring property and addressed in the construction management plan. 9. Adequate roads are available to serve the proposed development; and said roads can be properly maintained o Application complies 11. The recommendations of the Aspen Area Community Plan: Pazks/Recreation/Trails Plan aze implemented in the proposed development, to the greatest extent practical. ` "` o Applicant will need to determine what sidewalk and trail infrastructure will ultimately be installed in conjunction with the Aspen Club project. 26.435 Stream Margin Review 26.435.040 Stream Mazgin Review Standazds 1. It can be demonstrated that any proposed development which is in the Special Flood Hazazd Areas will not increased the base flood elevation on the pazcel proposed for development. This shall be demonstrated by an engineering study prepazed by a professional engineer registered to practice in the State of Colorado which shows that the base flood elevation will not be raised including but not limited to, proposing mitigation techniques on or off-site which compensate for any base flood elevation increased caused by the development. 4. The proposed development does not pollute or interfere with the natural changes of the river, stream or other tributary, including ,erosion and /or sedimentation during construction. Increased on-site drainage shall be accommodated within the pazcel to prevent entry into the river or onto its banks. Pools or hot tubs cannot be drained outside of the designated building envelope. o The City is unable to determine what impacts increased impervious surfaces would have on the site. 'I:he developer will need to provide a drainage and stormwater study fo,~all impervious azea on site. Miscellaneous Construction Management - A construction management plan must be submitted in conjunction with the building permit application. The plan must include a planned sequence of construction that minimizes construction impacts to the public. The plan shall describe mitigation for: pazking, staging/encroachments, truck traffic, noise, dust, and erosion/sediment pollution. Detailed plans are required prior to council -please see engineering department for specific details. Page 1 of 1 Jason Lasser P45 From: Cindy Christensen Sent: Wednesday, December 10, 2008 4:07 PM To: Jason Lasser Subject: Silver Lining Ranch am so sorry I missed this meeting. I had every intention of being there and another meeting came up. Ay concern is with that the deed-restricted units that the Jewish Community Center currently has on Main Street are out of ompliance. Housing has not seen any one come in and get qualified for this units since 2000; so they are currently out of ompliance with their current location. There are three units located at the L'Auberge -Category 2 - 2 studios and 1 one- edroom unit. ,s to the other location, I agree that the three units that they intend to provide would mitigate at 5.75 FTE's. At 9.5 employees, his would mitigate at 60°h. An audit would definitely need to be required after two years of CO. ,ny questions, please let me know. Again, I am sorry I missed this meeting. `indy Christensen [spenjJ°itkin County Rousing Authority aerafions Manager ??Q-920-555/Fca~c 970-920-55&Q 1812009 P46 Jason Lasser From: Brian Flynn '`' Sent: Tuesday, December 09, 2008 2:32 PM To: 'Alan Richman'; Stephen Ellsperman; Jason Lasser Cc: aspenchabad@aol.com; srichman@designworkshop.com Subject: RE: Trails on Silver Lining Ranch Alan, Thanks for your email I hope to address all of your questions so your team can prepare for the DRC meeting. I will address each question individually. 1) Ute Ave Trail Connection: To clarify, I did not propose that the applicant contribute to extending the Ute Trail to the property, I proposed extending through the property to the entry of the building. The City is responding to application comments found on page 6 and page 16, first paragraph. On Page 6, Section III Consolidated Conceptual and Final SPA, third paragraph, #2 the applicant references the construction of "a sidewalk connecting the property to Ule Ave' The City, as does your applicant, feels this is a critical need for the development. The connection should be able to accommodate multiple users and should tie directly into the portion of the Ute Trail being built, by the adjacent property to the applicants property line. The conceptual site plan, A0.1 depicts a sidewalk from the property line to the loop road and entry of the building. The City feels strongly that this should be built to City standards for multi-use. This is also addressing one of the goals of the AACP which states "Develop construction standards for trails, that include seeding of the adjacent ....' The City also fees the extension of the trail from your property line to the building entry will address your applicants needs: to mitigate for traffic impacts, to allow for proper access of the proposed bike fleet, and to accommodate alternate transportation for the proposed activities found on page 8 of the application. 2) Trail Easements: We have based our requests on the following. The Roaring Fork Greenway Plan identifies a Trail System and Criteria plan: "A developed trail system throughout the Greenway is essential if the maximum p~s5ible recreational and educational potentials are to be achieved. Trails of the inner core are strongly connected with those of the outer complez'tha't branches to Hunter Creek, to Difficult, to the Sunnyside Trail, ....." The Ute Trail serves as to connect the inner core to the outer core,'specifically to Difficult. The City currently holds assessments across the river from the Ranch and it is our intent to secure the easements on the Ranch which will make it possible for future connections. The Greenway Plan goes on to say "Provisions of access to the river for fisherman and other interested groups. If trails exist, there will be less wandering of individuals into sensitive areas.' In addition to making connections to existing easements held by the City, the above speaks to why we are asking for the two new easements identified on my map shown in the color violet. The trail located across the river is to accommodate an existing trail used by people accessing the river, which is identified on the site improvement survey in the application. The existing fisherman's easement needs to be better defined and rewritten to accommodate the criteria of the Greenway Plan. The AACP speaks to providing trail alignments along rivers and creeks for use by hikers and fisherman, it goes on to say "whenever possible, develop future trails, trail bridges, signs and trail amenities in conjunction with other trails groups in the Aspen Area. The City feels that what we have proposed and are requesting as trail easements fulfills these AACP goals. These easements will provide future connections for existing easements already held by the City. The SVeam Margin Review requires "The recommendations of the Aspen Area Community Plan: ParkslRecreationlOpen Spaceffrails Plan and the Roaring Fork River Greenway Plan are implemented in the proposed plan for development, to the greatest extent practicable." ----Original Message---- From: Alan Richman [mailto:arichman@sopris.net] Sent: Tuesday, December 09, 2008 7:49 AM To: Brian Flynn Cc: aspenchabad@aol.com; srichman@designworkshop.com ~ ~.:. Subject: Trails on Silver Lining Ranch Brian, Suzanne forwarded to me the map you prepared identifying three trail easements that the City Parks Department wants the Jewish Community Center to dedicate to the City. As you might expect, we view this as an unexpectedly significant demand, particularly since it is in addition to a request that this non-profit applicant pay for a share of the costs of extending the Ute Avenue Trail to this site. I have one simple question for you as I prepare for tomorrow's DRC meeting. Can you tell me if these three trails on our property are depicted on a trails plan that has been adopted by the City of Aspen? If so, please tell me which map in which document shows these trail segments so that I may review it. Thank you! ,~ ,~ ;:- ,'ti ;. `;, ,~is1, 4:..-- A{ , ~~ ~1. .:~.} 4 u,'t '~ f5 , _ .-~,~x -:,~ ( ~ ~ ~~ ! ~ 1j~ ~ "`~ Y _ ~~ ,<'~ f/ i if i I ~' f r ~,.r' ~. X4 ~ _ ~_ '~f, ~ f J x~ 4 ~'~~~ }~ j ='~~ ~.; ' , ~ ~ s'' : ~f it > Y ` r * +~ t ~ ~'= ~ s i [ ~' r~~ ,~ !` ~ -~ ".. f ` __ ,, I , ~ _ ~ ~ ~- _ -- - - p °~;~ ~ ~~ ~F ~''.•?{x'. j~ ~ ~ ~~ '~~ ~s ~.. ~ J ~\~ _ { r ,~~ ,~ ~ ~.. ~ ~ ~ , ~~ a /~ ~ _ ~. ~~~ \ ~ ~---7~ ~~--r--" Dui.' ~_•- X ~ ~ ~ O %~ ~~ F 2 ~ Y O +~ ~F ~1~ ~~~$ 5 t ~ l 1 ~~ ~~.11 l~ ~~ ~i ~ti~~11`1 ~~ ~ ~l ` r~ ""..~ ~~~ i e ~~~~ nt S~L~~'R -~11~INr' 45PEw+CQLORADQ