HomeMy WebLinkAboutLand Use Case.938 S Mill St.A073-03f..,,
... .._..
RETAMi FOR PERMANEIR RECOf1D
,~ ..
~, ,
ATTACHMENT?
AFFIDAVIT OF PUBLIC NOTICE
REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE
ADDRESS OF PROPERTY: ~~ v ='`+_~i'' ~1 f~~ ,Aspen, CyyO
SCHEDULED PUBLIC HEARING DATE: ~~~ ~ ~ , 200 'F-
STATE OF COLORADO )
ss.
County of Pitkin )
I, ~~~ ~1~,\aw. `~/ 5 (name, please print)
being or representing an Applicant to the City of Aspen, Colorado, hereby personally
certify that I have complied with the public notice requirements of Section 26.304.060
(E) of the Aspen Land Use Code in the following manner:
Publication of notice.• By the publication in the legal notice section of an official
paper or a paper of general circulation in the City of Aspen at least fifteen (15)
days prior to the public hearing.. A copy of the publication is attached hereto.
Posting of notice: By posting of notice, which form was obtained from the
Community Development Department, which was made of suitable,
waterproof materials, which was not less than twenty-two (22) inches wide
and twenty-six (26) inches high, and which was composed of letters not
less than one inch in height. Said notice was posted at least fifteen (15) days
prior to th public hearing and was continuously visible from the ~ day of
^~ C2w.b e ~ , 2003 , to and including the date and time of the public
hearing. A photograph of the posted notice (sign) is attached hereto.
~~ Mailing of notice. By the mailing of a notice obtained from the Community
Development Department, which contains the information described in Section
26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior to
the public hearing, notice was hand delivered or mailed by first class postage
prepaid U.S. mail to any federal agency, state, county, municipal government,
school, service district or other governmental or quasi-governmental agency that
owns property within three hundred (300) feet of the property subject to the
development application. The names and addresses of property owners shall be
those on the current tax records of Pitkin County as they appeared no more than
sixty (60) days prior to the date of the public hearing. A copy of the owners and
governmental agencies so noticed is attached hereto.
(continued on next page)
(_`
`..,
Rezoning or text amendment. Whenever the official zoning district map is in
any way to be changed or amended incidental to or as part of a general revision
of this Title, or whenever the text of this Title is to be amended, whether such
revision be made by repeal of this Title and enactment of a new land use
regulation, or otherwise, the regturement of an accurate survey map or other
sufficient legal description of, and the notice to and listing of names and
addresses of owners of real property in the area of the proposed change shall
be waived. However, the proposed zoning map has been available for public
inspection in the planning agency during all business hours for fifteen (15) days
prior to the public heazing on such amendments.
~~
ignatur
The foregoing "Affidavit of Notice" was acknowledged before me this Zz day
of~_~ , 2003 , by Zj fchlur\ '~N,uww~
WITNESS MY HAND AND OFFICIAL SEAL
My commission expires: ~ z a~ Zooms __
Notary Public
ATTACHMENTS:
COPY OF THE PUBLICATION
PHOTOGRAPH OF THE POSTED NOTICE (SIGN)
LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED
BYMAIL
o °
`.. _- 4 ~r
V 4. ',,b
1 t.
~. ',,~~~i i.
- • :: --_ • ~,, ,, DATE--- `- ~ -
- _ r - _ ~ ~ TIME _-
,. c - f
~_ PLACE - ~ ~~
* PURPOSE
-~ri
-- -- ?i
- -- --- _ _. 6'
Smooth Feed SheetsT"^ F `Use template for 5160®
~ r' ,
L_,
ASPEN CENTRAL RESERVATIONS ASPEN SKIING COMPANY ASPEN VALLEY RANCH
TRAVEL INC PO BOX 1248 PO BOX 250
425 RIO GRANDE PL ASPEN, CO 81612 WOODY CREEK, CO 81656
ASPEN, CO 81611
BANNON SUSAN B BENNETT WOOD INTERESTS LTD BILLINGSLEY FAMILY LP
8232 AVALON DR PO DRAWER 1011 1206 N WALTON BLVD
MERCER ISLAND, WA 98040 REFUGIO, TX 78377 BENTONVILLE, AR 72712
BLEILER JUDITH A BRIDGE TIM CERISE CONRAD N & LAVANIA
PO BOX 10220 300 PUPPY SMITH ST STE 203-225 3004 EMMA RD
ASPEN, CO 81612 ASPEN, CO 81611 BASALT, CO 81621
CERISE RENO K CHILDS EVELYN CLAYCOMB J BARRY
PO BOX 885 0284 COUNTY RD 102 3157 D PINEHURST DR
BASALT, CO 81621 CARBONDALE, CO 81623 LAS VEGAS, NV 89109
COLE CONSTANCE P CONSIDINE ELIZABETH CRYSTAL RIVER RANCH COMPANY
1647 E MAPLEWOOD AVE C/O BUZ WORLEY PO BOX 68
LITTLETON, CO 80121 PO BOX 456 CARBONDALE, CO 81623
CARBONDALE, CO 81623
DUBS DAVID CRAIG EAST JAMES COLLIER TRUSTEE EDGAR ROBERT G
2165 E OCEAN BLVD 5800 R ST 167 COUNTRY CLUB DR
NEWPORT BEACH, CA 92661 LITTLE ROCK, AR 72207 GROSSE POINTE, MI 48236-2901
FALES W ILLIAM E L
4239 HWY 133 COLD MTN RANCH
CARBONDALE,CO 81623
FORT BERNARDO & LAURINDA SPEAR
3315 DEVON CT
COCONUT GROVE, FL 33133
GABRIELLE BRIEGITTE M TRUST
PO BOX 12011
ASPEN, CO 81612
GLASSIER FREDA
0543 HOOKS RD
BASALT. CO 81621
FENDER WILLIAM O
FENDER PATRICIA ONEIL
0111 W SOPRIS CREEK RD
BASALT, CO 81621
FREEDMAN MICHAEL & NANCI WOLF
32460 EVERGREEN
BEVERLY HILLS, MI 48025
GARDNER CHARLES L
GARDNER RITA WALSH
840 LOCUST AVE
WINNETKA,IL 60093
GLASSIER HUGH 8 JUDEAN
0794 HOOKS SPUR
BASALT, CO 81621
I FINKLE ARTHUR A & AMELIA
I ' 2655 LE JEUNE RD PENTHOUSE #1
I CORAL GABLES, FL 33134
FRIEDKIN THOMAS H
PO BOX 4718
HOUSTON, TX 77210-4718
GHANEM MICHAEL
C/O FOREIGN CARS CNTL INC
70 SW 10TH ST
DEERFIELD BEACH, FL 33441
GRIGSBY GEORGE T JR
PO BOX 145
HOLLY SPRINGS, NC 27540
ir'
//p AVERY® Address Labels Laser 5160®
Smooth Feed SheetsT"' r ~ ~ Use template for 5160
GUEST KELLEY & CATHERINE HAGER FRANCES ~.. HIBBERD LORNA W FAMILY TRUST
PO BOX 5578 C/O ASPEN LODGING CO MGT PINE ISLAND
CARMEL, CA 93921 747 GALENA ST RYE, NY 10580
ASPEN, CO 81611
LLOYD ASSOCIATES
KERR WAYNE & CATHY LEASURE BRIAN J DAVID LLOYD ASSOC LTD
2374 FOOTHILLS DRS 1211 HERITAGE DR 12 LEYS RD OXSHOTT
GOLDEN, CO 80401 CARBONDALE, CO 81623-3147 SURREY ENGLAND KT2200E,
LOWE JAMES H LPRP MILL LLC 50% LPRP RIVER LLC
8232 AVALON DR - 7714 FISHER ISLAND DR C/0 HERBERT S KLEIN & ASSOC
MERCER ISLAND, WA 98040 FISHER ISLAND, FL 33109 201 N MILL ST STE 203
ASPEN, CO 81611
MACAPA CORP MARMONT LOTS O MCBRIDE JOHN P
9465 WILSHIRE BLVD STE 400 PO BOX 9572 2500 ELK CREEK RD
BEVERLY HILLS, CA 90212 ASPEN, CO 81612 SNOW MASS, CO 81654
MCVICKER JULIET MEHRA RAMESH TRUSTEE MICHAUD HOLLY 1.16% INT
PO BOX 567 3115 WHITE EAGLE DR 314 MARLBOROUGH APT 3
MIDDLEDURY, VT 05753 NAPERVILLE, IL 60564 BOSTON, MA 02116
MOORE ISABEL D TRUSTEE 50%
0426 WHITEBRIDGE LN
ST LOUIS, MO 63141
MOORE JOHN W 50%
10426 WHITEBRIDGE LN
ST LOUIS, MO 63141
i MURCHISON ANNE A
i PO BOX 8968
ASPEN, CO 81612
NIESLANIK JOHN & SONS
0979 CR 101
CARBONDALE, CO 81623
OLSEN MARSHALL G 8 SUSAN A
4404 GREENWOOD DR
BENTON HARBOR, MI 49022
REARDON GENE F & DIANA
PO BOX XX
ASPEN, CO 81612
S C JOHNSON AND SON INC
TAX DEPT 412
1525 HOWE ST
RACINE, WI 53403
NIESLANIK PAUL & CELIA
0481 CR 100
CARBONDALE, CO 81623
PATRICK GARY R & PATRICIA A
537 MARKET ST STE 202
CHATTANOOGA, TN 37402
ROANOKE INVESTORS LP
109 CLUB CREEK CT
PO BOX 17
ST ALBANS, MO 63073
SANCHEZ MARIA J & AR JR
PO BOX 2986
LAREDO. TX 78044
NIESLANIK ROBERT & WANDA
0828 CR 165
CARBONDALE, CO 81623
PERRY ROBERT M & RUTH B
0163 MT SOPRIS RANCH RD
CARBONDALE, CO 81623
ROOKE JOAN ELIZABETH
P O BOX 1035
REFUGIO, TX 78377-1035
SCHAINUCK LEWIS I & MICHELLE T
2900 OCEAN BLVD
CORONA DE MAR, CA 92625
A~ AVERY® Address Labels Laser 5160®
Smooth Feed SheetsT"^ ~ Use template for 5160®
~, .
SCHERER ROBERT P JR SHAW GEORGE G 97.68%INT SHAW GEORGE W 1.16%INT
167 COUNTRY CLUB DR 101 HIGH ST 525E 72ND #22C
GROSSE POINTE, MI 48236-2901 DENVER, CO 80218 NEW YORK, NY 10021
SHINE THOMAS K 78.7016% INT SIMON HERBERT REV TRUST SMITH CARLETON K
8677 LOGO 7 CT 8765 PINE RIDGE DR 1 PARK PL
INDIANAPOLIS, IN 46219-1430 INDIANAPOLIS, IN 46260-1778 BRISTOL, VT 05443
SPEYER LESTER D PR TST STANFORD JOHN STEWART STAN & RITA
C/O TENNSCO CORPORATION C/O LEE MILLER 747 S GALENA ST
PO BOX 1888 747 S GALENA ASPEN, CO 81611-1872
DICKSON, TN 37056-1888 ASPEN, CO 81611
TOP OF MILL INVESTORS LLC TURNBULL THOMAS 8 ROSAMOND TYBAR RANCH COMPANY
1000 S MILL ST PO BOX 686 1644 PRINCE CREEK RD
ASPEN, CO 81611-3800 CARBONDALE, CO 81623 CARBONDALE, CO 81623
VELMAR A COLORADO CORP WALDE WILLIAM L WAPITI RUNNING LLC
C/0 GRUPO DE MAR S A D E C V 6501 GOLDLEAF DR PO BOX 1003
747 S GALENA #F 204 gETHESDA, MD 20817 ASPEN, CO 81612
ASPEN, CO 81611
WEEKS WILLIAM H WELCH PATRICK T & DEBORAH P ZUBROD MATTHEW S TRUST
JOHNSON-WEEKS FAMILY OFFICE ASPEN SNOWMASS LODGING CO C/O V p0 BOX 8881
22 GRIGG ST GARWOOD ASPEN, CO 81612
GREENWICH, CT 06830 747 S GALENA ST
ASPEN. CO 81611
//.~ AVERY® Address Labels Laser 5160®
N
N
C.O
CD
V
~,
~...y
~~
d
s ~
C
y p
O
~
@
X
O
g ~ ~
~
Q
S
Q o
n
~ ~ ~
~
m x
a
m
S
c~
y
V 99
< ~ ~~JJ
Z N
3 c ~
m N ~o
~,
m c~i~~D
arc com(A
Z`^''m
Q #4aZ
m 8~~
~ g+ Z
O y
0
\l~ mD
f ~ W~
m
~ ~ ' y
~.~
DEVELOPMENT ORDER
Of the
City of Aspen
Community Development Department
This Development Order, hereinafter "Order", is hereby issued pursuant to Section 26.304.070,
"Development Orders", and Section 26.308.010, "Vested Property Rights", of the City of Aspen
Municipal Code. This Order allows development of asite-specific development plan pursuant to
the provisions of the land use approvals, described herein. The effective date of this Order shall
also be the initiation date of a three-year vested property right. The vested property right shall
expire on the day after the third anniversary of the effective date of this Order, unless a building
permit is approved pursuant to Section 26.304.075, or unless an exemption, extension,
reinstatement, or a revocation is issued by City Council pursuant to Section 26.308.010. After
Expiration of vested property rights, this Order shall remain in full force and effect, excluding
any growth management allotments granted pursuant to Section 26.470, but shall be subject to
any amendments to the Land Use Cade adopted since the effective date of this Order.
This Development Order is associated with the property noted below for the site-specific
development plan as described below:
Ton of Mill Investors, LLC 1000 S. Mill St Asoen CO 81611
Property Owner's Name, Mailing Address and telephone cumber
Parcel 6, Aspen Mountain Subdivision 938 South Mill Street Aspen Co
Legal Description and Street Address of Subject Property
8040 Greenline Review
Written Description of the Site Specific Plan and/or Attachment Describing Plan
Resolution No. 03-2004, Aonroved on 1/13/04
Land Use Approval(s) Received and Dates (Attach Final Ordinances or Resolutions)
February 10, 2004
Effective Date of Development Order (Same as date of publication of notice of approval.)
February 10, 2007
Expiration Date of Development Order (The extension, reinstatement, exemption from expiration
and revocation may be pursued in accordance with Section 26.308.010 of the City of Aspen
Municipal Code.)
Issued this 9t~' day of February 2004, by the City of Aspen Community
Development Director.
Woods, Community Development Director
,,...
PUBLIC NOTICE
Of
DEVELOPMENT APPROVAL
Notice is hereby given to the general public of the approval of a site specific development
plan and the creation of a vested property right pursuant to the Land Use Code of the City
of Aspen and Title 24, Article 68, Colorado Revised Statutes, pertaining to the following
described property: Parcel 6, Aspen Mountain Subdivision PUD, 938 South Mill Street,
Aspen, Co., by Resolution of the Aspen Planning and Zoning Commission, numbered 3.
For further information contact Scott Woodford at the Aspen/Pitkin Community
Development Dept. located at 130 S. Galena St, Aspen, Colorado (970) 920-5102.
s/City of Aspen Account
Publish in The Aspen Times on February 14, 2004
S c.
MEMORANDUM
TO: The Aspen Planning & Zoning Commission
THRU: Joyce Allgaier, eputy Director of Community Development
FROM: Scott Woodford, City Planne43~
RE: 93S SOUTH MILL STREET PARCEL 6, ASPEN MOUNTAIN SUBDIVISION
PUD; RESOLUTION NO. ~ SERIES 2004
DATE: January 13, 2004
REQUEST SUMMARY:
The applicant, Top of Mill Investors, LLC, represented by John Galombos, proposes to
construct a 5,200 square foot single-family house and accessory dwelling unit on their
10,806 square foot lot (see building plans in the attached Application).
REVIEW PROCESS:
The applicant requests the following land use approvals for the project described above:
1) 8040 GREENLINE REVIEW; According to Section 26.435.030 of the Land Use Code,
no development shall be permitted at, above, or one hundred fifty feet below the 8040
Greenline unless the Planning Commission makes a determination that the proposed
development complies with specific requirements. As Parcel 6 is located within this
range of elevation, this review is required prior to issuance of building permit. Final
Review Authority: Plannine and Zoning Commission.
BACKGROUND/EXISTING CONDITIONS:
The Top of Mill Subdivision was approved by the Aspen City Council on March 11,
2002.
PREVIOUS ACTIONS:
There has been no previous land use activity or approval on this particular parcel.
STAFF COMMENTS:
1. 8040 GREENLINE REVIEW; Staff finds the proposed single-family structure to be in
compliance with the standards for 8040 Greenline Review (See Exhibit A for Staff
Findings). Furthermore, the majority of the review criteria for 8040 Greenline Review
was more pertinent during design and consideration of the original subdivision/PUD, as
most of the environmental impact occurred during the construction of roads, utilities and
building lots and similar criteria were used in the evaluating of the subdivision/PUD
when it was proposed. In this case, Parcel 6 was graded into a relatively level site during
the subdivision construction. The proposed home on Parcel 6 will not create any
938 SOUTH MILL STREET STAPP REPORT PAGE 1
,. _
....., ,
significant additional environmental impacts, such as removal of vegetation or new cut of
the hillside.
STAFF SUMMARY AND RECOMMENDATION
Staff recommends approval of the 8040 Greenline Review for the proposed single-family
residence at 938 South Mill Street, Parcel 6, Aspen Mountain Subdivision PUD.
RECOMMENDED MOTION Agg
"I move to approve Resolution No. oa, Series of 2004, for an 8040 Greenline Review
for the proposed single-family residence at 938 South Mill Street, Parcel 6, Aspen
Mountain Subdivision PUD."
ATTACHMENTS
Exhibit A: 8040 Greenline Review -Staff Findings
Exhibit B: Application
938 SOUTH MILL STREET RESIDENCE /PARCEL 6 ASPEN MOUNTAIN SUBDIVISION $TAFE REPORT PAGE 2
RESOLUTION N0.
(SERIES OF 2004)
A RESOLUTION OF THE CITY OF ASPEN PLANNING AND ZONING
COMMISSION APPROVING AN 8040 GREENLINE REVIEW FOR 938 SOUTH
MILL STREET, PARCEL 6, ASPEN MOUNTAIN SUBDIVISION PUD, CITY OF
ASPEN, PITKIN COUNTY, COLORADO.
Parce! ID: 2737-182-02-206
WHEREAS, the Community Development Department received an application
from Top of Mill Investors LLC, requesting 8040 Greenline Review; and,
WHEREAS, upon review of the application, referral comments, and the
applicable Land Use Code standards, the Community Development Department
recommends approval of the 8040 Greenline Review for 938 South Mill Street/Parcel 6,
Aspen Mountain Subdivision PUD; and
WHEREAS, the City of Aspen Planning and Zoning Commission finds that the
development proposal meets or exceeds all applicable development standards and that the
approvals of the development proposal are consistent with the goals and elements of the
Aspen Area Community Plan; and,
WHEREAS, the City of Aspen Planning and Zoning Commission finds that this
Resolution furthers and is necessary for the promotion of public health, safety, and welfare;
and.
WHEREAS, the City of Aspen Planning and Zoning Commission approved the
request via Resolution No. _, Series of 2004, by a vote of to L - ~, to
approve the 8040 Greenline Review; and
NOW, THEREFORE BE IT RESOLVED that the Planning and Zoning Commission
approves the 8040 Greenline Review for the property at 938 South Mill Street/Parcel 6,
Aspen Mountain Subdivision PUD, subject to the conditions listed in Section 1 below.
Section 1:
The approval is subject to the following conditions:
1. Prior tp issuance of a building permit:
a. The primary contractor shall submit a letter to the Community Development
Director stating that the conditions of approval have been read and understood.
b. All tap fees, impacts fees, and building permit fees shall be paid. If an
alternative agreement to delay payment of the Water Tap and/or Parks Impact
fee is finalized, those fees shall be payable according to the agreement.
938 SOUTH MILL STREET RESIDENCE /PARCEL 6 ASPEN MOUNTAIN SUBDNISION STAPP REPORT PAGE 3
c. The Community Development Engineer shall approve the grading and drainage
plan for the parcel, including the proposed addition, driveway, and garage.
d. The Applicant shall submit for approval to the Environmental Health
Department a fugitive dust control plan to ensure that dust does not blow onto
neighboring properties or get tracked onto adjacent roads.
e. Run-off from the site during construction must be prevented by detention
ponds, hay bales, or similar methods to be approved by the Community
Development Engineer.
f. The Applicant shall submit for approval to the Parks Department and
Community Development Department a detailed landscaping plan. A tree
removal permit may be required by the City Parks Department and approval
from the Parks Department is necessary for any off-site replacement or
mitigation of removed trees.
2. The building permit application shall include the following:
a. A copy of the final recorded P&Z Resolution.
b. The Applicant shall provide the Community Development Engineer with a
soils test performed by a professional licensed geo-technical engineer in the
State of Colorado demonstrating that the parcel is suitable for additional
development considering its slope, ground stability characteristics, including
mine subsidence and the possibility of mud flow, rock falls and avalanche
dangers. If the soils test does not demonstrate that the parcel is suitable for
additional development, then this Resolution shall be rendered null and void.
c. The conditions of approval printed on the cover page of the building permit
set.
d. A completed tap permit for service with the Aspen Consolidated Sanitation
District.
e. The building plans shall demonstrate an adequate fire suppression system for
fire protection approved by the Aspen Fire Marshal. The Aspen Fire Marshal
shall approve ingress and egress to the property.
f A construction fence shall be erected along all portions of the property.
There will be no storage of construction materials, backfill, tools or
construction traffic outside of the protective fence. Erosion control measures
may be necessary depending upon the site. There is no excavation or
disturbance of the native area outside of the protective fence. This fence must
be inspected by the city forester or his/her designee (920-5120) before airy
construction activities are to commence.
g. Per requirements of the PUD Agreement, a detailed erosion control and
irrigation plan will be required for review by the Parks Department,
identifying the irrigation along any Public ROW and native areas.
h. Per requirements of the PUD Agreement, construction of the mud and debris
wall will require over dig, the area of said over dig will be re-vegetated.
Reference # 5.
938 SOUTH MILL S"IREET RESIDENCE /PARCEL 6 ASPEN MOUNTAIN SUBDIVISION STAFF REPORT PAGE 4
i. Per requirements of the PUD Agreement, a detailed landscape plan submitted
and reviewed during the building permit review process. Landscape plan
should reflect the species, numbers and locations of plantings. Additionally,
included on the detailed plan will be any right-of--way plantings or
requirements.
j. Areas outside of the building envelope currently disturbed by the excavation
of the entire Top of Mill site shall be restored with native plants and
materials.
k. Landscape plan shall take into consideration fire mitigation and use only
drought tolerant trees and plants as well as space and group away from the
house to prevent future problems with fuels.
3. All construction vehicles, materials, and debris shall be maintained on-site and
not within public rights-of--way unless specifically approved by the Director of
the Streets Department. All vehicle parking, including contractors' and their
employees', shall abide by the parking limitations of the area. The applicant shall
inform the contractor of this condition.
4. The applicant shall abide by all noise ordinances. Construction activity is limited
to the hours between 7 a.m. and 7 p.m on Monday thru Saturday.
5. The applicant shall not track mud onto City streets during construction. A
washed rock or other style mud rack must be installed during construction.
6. The Applicant or owner shall mitigate any public impacts that this project causes,
including but not limited to utility expenses and sanitary sewer and water lines.
7. Colors shall tend to be earth tones to make the building compatible with the
hillside. No reflective materials shall be used.
8. The Applicant shall submit an outdoor lighting plan and exterior lighting cuts
sheets that demonstrate compliance with the City of Aspen Lighting ordinance at
the time of Building Permit Submittal and/or prior to purchasing the lighting
fixtures.
9. The Applicant shall install a fire sprinkler system throughout the residence if it is
over 5,000 SF.
10. Barrier and Construction fencing shall be placed around the building envelope
during construction and shall not be removed until the applicant obtains a
Certificate of Occupancy.
11. The Applicant shall place a vegetation protection fence around the drip lines of
any trees to be saved and shall have the City Forester or his designee inspect the
fencing prior to commencing construction activities. No excavation, storage of
materials, storage of construction equipment, construction backfill, foot or
vehicular traffic shall be allowed within the drip lines.
938 SOLrrn MILL STRGGr RESIDENCE / PARCGL 6 ASPEN MOUNTAIN SUBDIVISION STME REPORT PAGE 5
,.
section 2•
All material representations and commitments made by the applicant pursuant to this
application, whether in public heazings or documentation presented before the Planning and
Zoning Commission are hereby incorporated in such plan approvals and the same shall be
complied with as if fully set forth herein, unless amended by an authorized entity.
Section 3:
This Resolution shall not effect any existing litigation and shall not operate as an abatement
of any action or proceeding now pending under or by virtue of the ordinances repealed or
amended as herein provided, and the same shall be conducted and concluded under such
prior ordinances.
Section 4:
If any section, subsection, sentence, clause, phrase, or portion of this resolution is for any
reason held invalid or unconstitutional in a court of competent jurisdiction, such portion
shall be deemed a separate, distinct and independent provision and shall not affect the
validity of the remaining portions thereof.
Approved by the Commission at its regular meeting on January 13, 2004.
APPROVED AS TO FORM: PLANNING AND ZONING
COMMISSION:
City Attorney
ATTEST:
Jackie Lothian, Deputy City Clerk
Jasmine Tygre, Chair
938 SOUTH MILL STREET RESIDENCE / PARCEL6 ASPEN MOUN'rA1N SUBDIVISION STAFF REPORT
PncE 6
EXHIBIT A
g~40 tiREENLINE REVIEW
According to Section 26.435.030 of the Land Use Code, no development shall be
permitted at, above, or one hundred fifty feet below the 8040 Greenline unless the
Planning Commission makes a determination that the proposed development complies
with all requirements set below:
1. The parcel on which the proposed development is to be located is suitable for
development considering its slope, ground stability characteristics, including
mine subsidence and the possibility of mud flow, rock falls and avalanche
dangers. If the parcel is found to contain hazardous or toxic soils, the applicant
shall stabilize and re-vegetate the soils, or, where necessary, cause them to be
removed from the site to a location acceptable to the city.
STAFF FINDING: DOES IT COMPLY? YES
The site is suitable for development. It has been graded and a building pad has been
flattened out so there are no concerns about slope stability, rock falls, and avalanche
dangers. During the review process for the subdivision, there was a concern about mud
flow from the slopes above the site, so mud and debris flow walls were required along
portions of the south property line, including along Parcel 6, to help protect the
structures. To staff's knowledge, there have been no hazardous or toxic soils
encountered on the parcel.
2. The proposed development does not have a significant adverse affect on the
natural watershed, runoff, drainage, soil erosion or have consequent effects on
water pollution.
STAFF FINDING: DOES IT COMPLY? YES
Consideration of the subdivisions impacts on drainage and run-off were considered
during the original approval and were either deemed to not be a concern or were
properly mitigated. With proper construction management and prompt re-vegetation this
Spring, there should not be any impacts on any of the watersheds.
3. The proposed development does not have a significant adverse affect on the air
quality in the city.
STAFF FINDING: DOES IT COMPLY? YES
Although all single-family residences in the city, collectively, create an impact on the air
quality of the city from vehicle trips created and remaining wood burning stoves, staff
finds that this single-family residence, by itself, will not have an adverse impact on the
air quality of the city.
938 SOUTH MILI. STREET RESIDENCE /PARCEL 6 ASPEN MOUNTAIN SUBDIVISION STAFF REPORT PAGE. 7
4. The design and location of any proposed development, road, or trail is
compatible with the terrain on the parcel on which the proposed development is
to be located.
STAFF FINDING: DOES IT COMPLY? YES
Staff finds that the proposed home and driveway are compatible with the terrain of the
parcel, which was largely determined at the .time that the original subdivision was
designed and approved. Driveway access to the home appears to be easily accomplished
without need for any further environmental impact.
5. Any grading will minimize, to the extent practicable, disturbance to the terrain,
vegetation and natural land features.
STAFF FINDING: DOES IT COMPLY? YES
The grading and disturbance to the lot was created with the construction of the
subdivision's road and lots and the installation of the utilities. The only additional
disturbance to this parcel will be the excavation of the foundation for the house and the
house itself, which is accepted as a necessary disturbance.
6. The placement and clustering of structures will minimize the need for roads,
limit cutting and grading, maintain open space, and preserve the mountain as a
scenic resource.
STAFF FINDING: DOES IT COMPLY? YES
The placement of the house on this lot was largely determined with the original
subdivision, but the placement of this structure will not require any new roads (but will
require a new driveway), will maintain open space outside of the building envelope, will
limit new cutting and grading and will not degrade the mountain as a scenic resource.
7. Building height and bulk will be minimized and the structure will be designed to
blend into the open character of the mountain.
STAFF FINDING: DOES IT COMPLY? YES
The building height and bulk will be minimized to the extent that it does not exceed
floor area ratio and height limitations established through the PUD process creating the
subdivision. Staff finds that it will blend into the "open character" of the mountain
because of its relatively low profile.
8. Sufficient water pressure and other utilities are available to service the proposed
development.
STAFF FINDING: DOES IT COMPLY? YES
There exists sufficient water pressure and other utilities to service the proposed
structure, as evidenced by the approval of the subdivision.
938 SOUTH MILL STREET RESIDENCE /PARCEL 6 ASPEN MOUNTAM SUBDIVISION STAEP REPOR"r PAGE 8
9. Adequate roads are available to serve the proposed development, and said roads
can be properly maintained.
STAFF FINDING: DOES IT COMPLY? YES
The City approved the roads of the subdivision when it was originally approved. No
new roads are proposed with the development although there will be a new driveway,
which will be required to comply with design criteria for driveways. Adequate ingress
and egress is available to the proposed development which ensures adequate access for
fire protection and snow removal equipment. The recommendations of the Aspen Area
Community Plan: Parks/Recreation/Trails Plan are implemented in the proposed
development, to the greatest extent practical and were considered during the subdivision
process and incorporated into the plan.
938 SOU"rH MILL STREET RESIDENCE /PARCEL 6 ASPEN MOUNTAIN SUQDIVISION STAFF REPORT PAGE 9
ATTACHMENT?
AFFIDAVIT OF PUBLIC NOTICE
REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE
ADDRESS OF PROPERTY: ,Aspen, CO
SCHEDULED PUBLIC HEARING DATE: ~ , 200_
STATE OF COLORADO )
ss.
County of Pitkin )
I, 1 ~ ~,~~4~ ~ ~ ,~,~ `~ (name, please print)
being or representing an Applicant to the City of Aspen, Colorado, hereby personally
certify that I have complied with the public notice requirements of Section 26.304.060
(E) of the Aspen Land Use Code in the following manner:
X Publication of notice: By the publication in the legal notice section of an official
"'"`~~~ paper or a paper of general circulation in the City of Aspen at lust fifteen (15)
days prior to the public hearing. A copy of the publication is attA~hed hereto.
Posting of notice: By posting of notice, which form was obtained from the
Community Development Department, which was made of suitable,
waterproof materials, which was not less than twenty-two (22) inches wide
and twenty-six (26) inches high, and which was composed of letters not
less than one inch in height. Said notice was posted at least fifteen (15) days
prior to the public hearing and was continuously visible from the _ day of
200_, to and including the date and time of the public
hearing. A photograph of the posted notice (sign) is attached hereto
Mailing of notice. By the mailing of a notice obtained from the CoriI nwiity
Development Department, which contains the information described in Section
26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (I S) days prior to
the public hearing, notice was hand delivered or mailed by first class postage
prepaid U.S. mail to any federal agency, state, county, municipal government,
school, service district or other governmental or quasi-governmental agency that
owns property within three hundred (300) feet of the property subject to the
development application. The names and addresses of property owners shall be
those on the current tax records of Pitkin County as they appeared no more than
sixty (60) days prior to the date of the public hearing. A copy of the owners and
governmental agencies so noticed is attached hereto.
(continued on next page)
Rezondng or text amendment. Whenever the official zoning district map is in
any way to be changed or amended incidental to or as part of a general revision
of this Title, or whenever the text of this Title is to be amended, whether such
revision be made by repeal of this Title and enactment of a new land use
regulation, or otherwise, the requirement of an accurate survey map or other
sufficient legal description of, aild the notice to and listing of names and
addresses of owners of real property in the area of the proposed change shall
be waived. However, the proposed zoning map has been available for public
inspection in the pla)ming agency during all business hours for fifteen (15) days
prior to the public hearing on such amendments.
C
S'gnature
The f regoing "Affidavit of Notice" was aclui wledged befgre me tlus~ day
of ~e~ - , 200, by ~o~--~-5 f-•~)
WITNESS MY HAND AND OFFICIAL SEAL
My commission expires:
s ~
m~,..
rlu Im
• Notary Public
u Pm-
~(p`PY- PV
o.,.
SP.RAH
OATES
NJ,`,.
NO'flCE IS NERFJSY
vNi.be he1G m 1Yli
tieeung m hegm ai
Planting and Za11E
Room. Cllr Xsll. 1
Por homer WormaDOn, mp[ect Scott Woud~oN
at the City of AaDm Commotity Development Da.
WrmKnt, I3DS Sl, bPen, CO (97926
5102, (or 6yeRW(itlwOcLnpm.c¢us).
a/Jamnme 7yge,CMir
Aspen wd ZOnlYg ConmOsabn
PubWhpl m 711e~11ona on Deceotber 27.
2802. (1096) •, -
~~*-^^= ATTACHMENTS:
'Y OF THE PUBLICATION
4), ~..•
FOF CO
PHOTOGR,4PH OF THE POSTED NOTICE (SIGN)
LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED
BYMAIL
!7 '"'
~.. .,.
TRANSMITTAL
To: Scott Woodford, Planner, City of Aspen
From: John Galambos
Re: Top of Mill parcel 6 8040 Greenline Review Application
Cc: Frank Goldsmith c A L A M B O S
, R ~ „, r E ~ r s, N
Date: November 25, 2003
Scott,
Attached are ]0 copies of our 8040 Greenline review application. It contains the following: Attachment
2- land use application; Attachment 3-Demensional requirements form; Ageement for payment of City of
Aspen development application fees; Title commitment for proof of ownership; letter from owner
allowing us to act on their behalf; vicinity map, and Response to 8040 geenline review requirements.
Also included are 10 copies of 11x17 drawings including the following: survey of top of mill per pud,
gading and drainage plan of top of mill per pud; Site plan, Floor plans, Elevations, and Sections. And
finally one disk of our response to the 8040 requirements for this site.
Please let me know if you have everything you need to process this application. As we discussed, I would
like to be on the January 6, 2004 agenda with Planning and Zoning.
Thanks,
John
Bldg 300, Unit D AABC • Aspen, Colorado 8161 I
P: 970-029-1286 • F: 970-029-1296
E: gainc@galambosarchitec[s.ne[
112503 8040 transmittal.doc
-,
_.-~,
~,.. .,.,
ATTACHMENT 2 -LAND USE APPLICATION
APPLICANT:
Name: '~ a~ N,~\\ ~.v,u~t5N+7 CL~-, 1nw~cGl
Location: g4,°~ S. *ill 54KSF ~ ~o.col G,lk~v` Ana.•.}..i.ti Sti~aioTS>~,.. 7uD
(Indicate street address, lot & block number, legal description where appropriate)
Pazcel ID # (REQUIItED) 2"13 • l82•oL'Zo(.
1?;EPRESENTATIYE'
Name: ~lnv. h.,~,wbes ~ tta~4~~vs A~c(.:~s ~c,L
Address: 30 o V, k~q G, /~S~eH, 4~ i~ I b i l
Phone #: 9'Lg • !t °0 6
PROJECT:
Name: ~a.ce~ ~~ ~~ a~ Mill - ~si~ewce.
Address: 93~ S• pnill ~•ree>< p~,~s~. Lo Ste"
Phone #: q 25 • ZI 14
TYPE OF APPLICATION: (please check all that apply):
^ Conditional Use
^ Special Review
^ Design Review Appeal
^ GMQS Allotment
^ , GMQS Exemption
[~ ESA - 040 Grcenline tream
Mazgin, Hallam Lake Bluff,
^ Mountain View Plane
Lot Split
^ Conceptual PUD
^ Final PUD (& PUD Amendment)
^ Conceptual SPA
^ Final SPA (& SPA Amendment)
^ Subdivision
^ Subdivision Exemption (includes
condominiumization)
^ Temporary Use
^ Conceptual Historic Devt.
^ Final Historic Development
^ Minor Historic Devt.
^ Historic Demolition
^ Historic Designation
^ Small Lodge Conversion/
Expansion
^ Other:
EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.)
UwLtxi- (e~ ~.s ~eyJCloYc~ L7 'rmYeFwi~l ~,U[Sprs GLC ~,cr 1L,
I°""•N~~ ~~~n$yi a.~ `l J~ f ~K-~o rde~ ~~5'r ~8, ~OZ. ~ ~IF LL, ~eF.-
PROPOSALL: (descript1ion orf proposed buildings, uses, modifications, etc.)
/ \IC+~S Siw~~c. ~w. ~ ~y ~Siaewce o~ ~~~ >~ t]
Have you attached the following? ~,~ FT~ES DUE: $
Q Pte-Application Conference Summary N°~" K~~`"Z ~ej
[/~ Attachment #1, Signed Fee Agreement
esponse to Attachment #3, Dimensional Requirements Form
[3 Response to Attachment #4,-Submittal Requirements-Including Written Responses to Review Standazds
All pleas that are larger than 8.5" x I l" must be folded and a floppy disk with an electronic copy of all written
text (Microsoft Word Format) must be submitted as part of the application.
RET/JN FOR PERMAIEI~T REO~D
y
1y . uyy
ATTACHMENT3
DIMENSIONAL REQUIREMENTS FORM
Project:
Applicant:
Location:
Zone District:
Lot Size:
Lot Area:
~1a~aw.le•s A~ol•.t~~rrcl-~
°l1i°o 5. 01Ai11 .SiKt l~vcc( ti ~P~ u.VV.~+,i~ ~I~iJi51a... '~Uj>
8ofo SF
'bp 6 5F
(for the purposes of calculating Floor Area, Lot Area may be reduced for areas
within the high water mazk, easements, and steep slopes. Please refer to the
defmition of Lot Area in the Municipal Code.)
Commercial net leasable:
Number of residential units:
Number of bedrooms:
Existing: Proposed:
Existing: o Proposed: / his%de~cc / Aau
Existing.• Proposed: G ~~ ~ AnJ
-~~-
Proposed % of demolition (Historic properties only):
DIMENSIONS:
F1oorArea: Existing: v Allowable:5~2~ #itf=Proposed:~~-
Principal bldg. height: Existing: Allowable: Zm Proposed: Zo
Access. bldg. height: Existing: Allowable: Z o Proposed: Z ~
On-Site pazking: Existing: Required:
3 Proposed.• ~
°
/o Site coverage:
Existing: p~
m /e
D Proposed:
Required.• C w
~~ °
Open Space: Existing: _
Required.• '~~ Proposed: T"~ s
Front Setback: Existing: Reguired.• IS Proposed: 15
ReazSetback: Facisting: Required: to Proposed.• lb .P~ ~D
Combined F/R: Existing: Required.• Proposed:
Side Setback: Existing: Required.• tv Proposed: ~D
Side Setback: Existing: Required.• 10 Proposed: to
Combined Sides: Existing: Required: Proposed:
Existing non-conformities or encroachments : N°`"~'
Variations requested:
RETAIN FOR PERMANENT RECORD
r
.~i/
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF ASPEN (hereinafter CITY) and _ ~~D~H C"ta~kwl~oj ~ Z"1~~aNn~aS ~rC~,rc}ec.~ts IAA .
(hereinafter APPLICANT) AGREE AS FOLLOWS:
has submitted to CITY an appplication for ,At ~ 11 II ^,
fl°,U It vJ .~./ I~.eel ~ 1t~.e~°v~ /luo~ntaiti J~~+hoiJ iSia~.
(hereinafter, TIIE PROJECT).
2. APPLICANT understands and agrees that City of Aspen Ordinance No. 57 (Series of 2000)
establishes a fee structure for Land Use applications and the payment of all processing fees is a condition precedent
to a determination of application completeness.
3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed project, it
is not possible at this time to ascertain the full extent of the costs involved in processing the application.
APPLICANT and CITY further agree that it is in the interest of the parties that APPLICANT make payment of an
initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis.
APPLICANT agees additional costs may accrue following their hearings and/or approvals. APPLICANT agrees he
will be benefited by retaining greater cash liquidity and will make additional payments upon notification by the
CITY when they are necessary as costs aze incurred. CITY agrees it will be benefited through the greater certainty
of recovering its full costs to process APPLICANT'S application.
4. CITY and APPLICANT further agree that it is impracticable for CITY staff to complete
processing or present sufficient information to the Planning Commission and/or City Council to enable the Planning
Commission and/or City Council to make legally required findings for project consideration, unless current billings
aze paid in full prior to decision.
5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect
full fees prior to a determination of application completeness, APPLICANT shall pay an initial deposit in the
amount of $ which is for hours of Community Development staff time, and if actual
recorded costs exceed the initial deposit, APPLICANT shall pay additional monthly billings to CITY to reimburse
the CITY for the processing of the application mentioned above, including post approval review at a rate of $205.00
per planner hour over the initial deposit. Such periodic payments shall be made within 30 days of the billing date.
APPLICANT further agees that failure to pay such accrued costs shall be grounds for suspension of processing, and
in no case will building permits be issued until all costs associated with case processing have been paid.
CITY OF ASPEN
sy:
Julie Auu Woods
Community Development Director
g:lsupport~formstagrpayas.doc
vlorol
APPLICANT
~.~.;~.~
sy: ,u~
I I )2s~v~
Mailing Address:
L'(a~aw.~s ftre~n[Cd~ ~.
~h, Co _ °of611
RETAIN FOR P R~
F~~ !^1
~..~/ Va/
November 25, 2003
Mr. Frank Goldsmith, Manage
Top of Mill Pazcel 6, LL,C
1000 S. Mill Street
Aspen, Colorado 81611
To City of Aspen Planning Dtrector,
As the Owner of Pazcel 6, Aspen Mountain PUD, I authorize John Galambos of Galambos Architects Inc.,
located at 300 D AABC, Aspen, Colorado 81611 (970-429-1286), to act on my behalf with regards to City
of Aspen's public heazings for 8040 Greenline Review on this project.
,..
.~. ~~
Commonwealth
a Landamerica Company
ALTA Commitment For Title Insurance
American Land Title Association
(1966)
AUTHORIZED AGENT:
PITKIN COUNTY TITLE, INC.
601 E. HOPKINS AVE. 3RD FLOOR
ASPEN, COLORADO 81611
970-925-1766-PHONE
970-925-6527-FAX
877-217-3158-TOLL FREE
E-MAIL ADDRESS: pitkincountytitle®starband.net
Issued by
Commonweekh Land Tkle Insurance Company
Home Office:
101 Gateway Crntre Parkway, Gateway One
Richmond, Virginia23135-5153
1-800416-7086
B 1004268
,..,
a.s ~ ,
COMMITMENT FOR TITLE INSURANCE
SCHEDULE A
1. Effective Date: July 15, 2003 at 8:00 AM
2. Policy or Policies to be issued:
(a) ALTA Owner's Policy-Form 1992
Proposedlnsured:
FALLRIDGE LTD.
(b) ALTA Loan Policy-Form 1992
Proposedlnsured:
Case No. PCT18274C
Amount$ 7,950,000.00
Premium$ 6,194.00
Rate: Developers
Amount$ 0.00
Premium$ 0.00
Rate:
Tax Certificate: $10.00
3. Title to the FEE SIMPLE estate or interest in the land described or referred to in this Commitment is at the
effective date hereof vested in:
TOP OF MILL INVESTORS, LLC, A DELAWARE LIMITED LIABILITY COMPANY
4. The land referred to in this Commitment is situated in the County of PITKIN State of COLORADO and is
described as follows:
PARCEL 6,
TOP OF MILL SUBDIVISION/PUD, A PLANNED COMMUNITY, according to the Final Plat for Top of Mill
SubdivisionlPUD, a Planned Community recorded August 16, 2002, in Plat Book 62 at Page 4 as Reception
No. 471099.
PITKIN COUNTY TTTI.E, INC.
601 E. HOPKINS
ASPEN, CO. 81611
970-9251766 Phone
9749zs-6sz7 PAx
877-217-3158 Toll Pree
AUTHORIZED AGENT'
Schedule A-PG.1
This Commitment is invalid
unless the Insuring
Provisions and Schedules
A and B are attached.
COUNTERSIGNED:
~o Ems? ~ ~~~~
I ~ f LS~s 3 ~j'/k W G
.. , ,.
November 25, 2003
Response to requirements for 8040 Greenline Review oer section 26.435.0020(C)
Single Family Residence
Pazce16, Aspen Mountain Subdivision PUD
Galambos Architects Inc
300 D AABC
Aspen, Colorado 81611
429-1286
1. The parcel on which the proposed development is to be located is suitable for
development considering its slope, ground stability characteristics, including mine
subsidence and the possibility of mud flow, rock falls and avalanche dangers. If the parcel
is found to contain hazardous or toxic soils, the applicant shall stabilize and re-vegetate
the soils, or, where necessary, cause them to be removed from the site to a location
acceptable to the city.
This pazcel is suitable for the proposed development of a single family home. This was
established by the extensive PUD process the developer went through with the city. The
slope and ground stability was analyzed and tested by the developer and accepted by the
City Engineer. The dangers posed by Mud Flow were mitigated by Debris and Deflection
walls as shown on the original PUD application. Extensive soils testing were completed by
the developer of the pazcel for hazazdous materials. If any hazazdous materials are
encountered during excavation they will be dealt with per the report submitted with the
original PUD.
2. The proposed development does not have a significant adverse affect on the
natural watershed, runoff, drainage, soil erosion or have consequent effects on water
pollution.
This project does not have significant adverse affects on natural watershed. This was again
established during the overall PUD process for this subdivision. Refer to the final plat
submission, Grading and Drainage plan prepazed by Schemuser Gordon Meyer dated
5/31/02.
3. The proposed development does not have a significant adverse affect on the air
quality in the city.
This project is a single family residence and does not have a significant adverse affect on
the air quality in the city. The driveway will be paved and the Top of Mill Street is paved.
4. The design and location of any proposed development, road, or trail is compatible
with the terrain on the parcel on which the proposed development is to be located
The proposed development is compatible with the terrain of the pazcel. This was
established during the original PUD process.
5. Any grading will minimize, to the extent possible, disturbance to the terrain,
vegetation and natural land features.
The grading, disturbance to the terrain, vegetation and land features were all dealt with
during the Original PUD. The grading and drainage plan by Schemuser Gordon Meyer
dated 5/31/02 was accepted with the submission of the fmal plat.
6. The placement and clustering of structures will minimize the need for roads, limit
cutting and grading, maintain open space, and preserve the mountain as a scenic resource.
The placement and clustering of the structures was established during the original PUD
process.
7. Building height and bulk will be minimized and the structure will be designed to
blend into the open character of the mountain.
The building height limit was established during the original PUD process. The home is
allowed to be 28. feet above 1975 topography as submitted by SGM dated 5/31/02.. The
home as drawn is a[ or under the height limit. Please refer to the elevations.
8. Suj~cient water pressure and other utilities are available to service the proposed
development.
The water pressure and other utilities were all established during the extensive PUD
process. These utilities have been installed and accepted by the vazious city departments.
~•~
9. Adequate roads are available to serve the proposed development, and said roads
can be properly maintained. Adequate ingress and egress is available to the proposed
development so as to ensure adequate access for fire protection and snow removal
equipment.
The roads and maintenance of said roads were established during the PUD. They have
been installed by the developer. The Fire department reviewed and approved the design
of the proposed road during the PUD process.
10. The recommendations of the Aspen Area Community Plan: Parks/Recreation)
Trails Plan are implemented in the proposed development, to the greatest extent practical.
These recommendations were all considered during the Original PUD process.
a~~~
g~s2€€
~~z5'
s~
~ 3 B a
¢~~ a ; ~ s
F
A a ~ `F ~~~ H W u o
g8 ~ _ ~ m
¢a@,xgx~~ d€$ iGT g~ $~ ~f##fa ~ i z o ~ a ~ ~
Y~pg~D ~$~ ~' ~ 4 ~3~ ~ Y a o ~ 3 i~ w o g
g { 999¢ ~~ `~ a~ x x Y o> o a o W
~~~gp~ $~~x ~~ ~~;~_~~ ~ m ~ ~ ~ ~ W 3 ~ ~ W
g E1$~RC€3~F~~~~g~ 9b$ ~a8 gt'~a~ W ~ ~ ® OO OO O $ D OO o
~ ~~ ~.d ~^
~ ~ J
Fp
°`ve~
0
3 _ 3 3 3
n °o ~i
o fl N
~ o
K
a z
m
w
`
W
z
~ w
~
~
w
z J
~~
fit,
€e°OpF
E~p`@€.
~k~'E~
~~> ~~"
og `~~s
$~~k, e;,
$. ,r._
~ ~ ~
o
o ~_
0
0
~a
h k
~ 1i1~ J~
~ ~_
v
h g, ~ r
,.m l
~.~- n
~
o
a
y ~ ti~
,.
w
=~ q ~
~
a
C'
1 ~
_ ~
gQ
~ A
~
e - "wv
>,
~
~ ~_
~ ~ o0
~ ~ ~, ~ e
x~ ~
,
~~ ~ w
o ~~
~~
~ ;e
. ~
~ ~
m a
_ , ~ h
_
~o;~
~~~
c a~
~ ~
~
~~ _ ~ g m ~
o
~l'j~ ~~I n r~ ~ 80a0
~ ~
r-^ ~ ~_ ~~~ ~~ly! ~~
'~w ' ~~ ~ .. w ~~
~~
~ _ -_ ~_
~ ^~.~ ~ ~ ~/ ~1
~ _ ~ i ~' z~ ~ ~..~ zWz
~~
~~` ~ W ~ ~ ~_ Q .
K ~ i _-mac ~~~ ~ ~ o ~~~ .~ ~ ~ / ~~,~~
~~ P ~ ~~
e ~ m,~
((( _ ~
~ "' ~ ~~~
!1 ~.
hVy _
( ~~
,.
rv ~ ~LL
~~ ti ~ / < 0
h
O ~fi .. ' i^~ ~ / ..a ~ QA ~ r
W ~e - _ ~ CSQ~ / ~
q o s~ ~ 0 ~/ O ~Y / / lvi
__
a~Y o~ S
aE s ~ Y
.. ~~
_ / g _ /, ~ ~
~ / ~ ~ "!
_ ~ m
`" o ~ ~l 11 I I ~ - /// o
~'
r ~ ~
~ .lam/ ,- ~ ~ /~
ii ~ /
/ ~~
a~
rt _ __-
_ `
g ~~
__ / F
~o=~
~~
. ~"
/ ~ ~ ' i / - 3~°p
' i /(~' i ~ -- oA
/ ~.~, ~-P C as
~ m ~ / i / i
u l ~ / i
e ~~ i ~~/ _i m~.
~ ~ ~ ~ ~~~ / ~~~ ~ ~ ~ ~~iw~
8; '~ t / i ~ ~_3°°~ ~o~
~t ~ ~~~ 'i ~ ~s°'. ~ a
w3 ^I z ~ ~QNC1
V ti
hN
~~ ~ ~ ~ ~ ~~ s 2p~~0~
o ~~a U~~~
e ~ ~.~ c wrCa aril vi ape
!n a_~ E
c;~~o ° `.. w~~mg~~
=®o~UOg
~V l
,'~o _, ~ - I33^ ~~ o
B°.i ~~,_ ~~ Um~~ma~
>~i ~ fA-u_auw
~ 1 ¢
0~~~ !~ a
1 ~ Gi
~ ~ £o
1 1'
^ \ 1 w
~~~ ~ ~ ~a
~ A A
1, \ ~ u
~ .~ 1
V~~ ~a
9^ ~
y~ z
~ ~
~ o
c. ~,pr ~ x
°~bOV ~
B1`
1
*~ W
8,10-_.. ~ 0
N
~~j0
N
Q~Nn
~Z
~O
ZU
o= nm OQb'Z~O-100 'N3dS'd a ~, ~ i i ~,.
m~ amp ~~IW d0 d01 '9 ~302ib'd ~I 5
a~ o=° ~~N3aIS~a .I~IWb'~ ~~JNIS ~ ~,~
<a ~~m ~~~ 9 ~~~?Jb'd ~~IW ~O d01 I '~ ~
~<
2
~~
P
N
F1
3
s
Y
4
s
z
~o
~`
~°
o= mm OQd2lOlOJ 'N3dS`d a '..
m-" ~~IW 30 d01 '9 ~30add ~ ~ I
s~ ~oN i
~_ °sWa 3~N3aIS~b .I~IWb'~ 3~JN!S ~ ~~~ ~'I '~,
~a
~-
Z
Q
W
J
3 4
Q o
J
"° _m Oab4i0~0~ 'N3dSb'
m~ <m" ~~IW d0 d01 '9 ~30ab'd a ~~
;_ °s WO 3~N3aIS3?~ ,I~IW`d~ 3~JNIS ~ I,I
U'6
J ~ ~/'~J~
8 -' ~~
~ ry
~ ~ I
~ ~ 1i ~ ~~
i
_~
- - J~,'
li ~ I ii
W ~oJ~
~. ~~~ o
i
a '
_.L.-. ~I. ~~~
~_ I
~I II
~ I~
T ~~
~ I
~~ ~ ~
~ ~' ~~
~ ~5
8
0
Z
i~ ~ ~~ ______~Tl
F I I
I ~I I I I ~~ it
~,. y x IT
w
r ~. ~ ~
u
~~
1~---~`
z
Q
W
J
Zp
<Q
G
o=
m~ ~mm
<m= OQV2~0100 'N3dSb'
~11W d0 d01 9 1302~t/d a S', s.
~ _
o=° 3~N341S3~i A11Wb'~ ~~JNIS ~ ~'~
`a
t~ a ~~~ ~~~ 9 ~3~?Jt/d ~11W .~O d01 I ~~
" \/
Z
Q
J
J
W
J
W P
~_
~ a
~,,
` _._.
_~.____
it it
i i
i i
i
__CS ._
l
i
0
, , `a
i
_J
m„ _°
<m" OQb'a0~00 ' N3dStl
~11W d0 d01 '9 ~30a`dd ~ ~ ~,
s
E°
<. a°m
°°Q
°
3~N~aIS32~ ,I~IW`d~ 3~JNIS
g ~
`°
~'"°
~~1 9 ~3~~Ib'd X11 W ~O d01 ~~ I
~
U6
.~
~3
W
I~d
:~ I
g
3
i
1
Y .
a `s ~ ~
Y g
.~
s+ ~~
yr ~ r
i
5
€_
a
Y
F
9p
Y
y
9
i
4
2
y
W
I s ~~ ~ ~t
m~ <m" ~~IW d0 d01 '9 ~302ib'd a
a= oWO 3~N341S32~ J~~IW~J~ ~~JNIS ~ j~ i, ~
~< m== ~~1 9 ~3~bb'd ~~IW ~O d01 ~ ~~, g
t
W
3
3
F
~P
V`i
3
Y
Y
•1
1
1
5Q3j~ 1
S~ I
...- .;L
~...
%.._
o=_ „mm OQ`d2i0~00 'N3dSb' a ~~, ~ ', '~
m„ Vim" ~~IW d0 d01 9 ~302i`dd i
a= °swo 3~N3aIS3b J~~IW`d~ 3~JNIS ~ ~ ~~ ~ 'I
as ~<° ~~~ 9 ~3~i~`dd X11 W ~O d01 a ~' ~' i ! ' ' i
~<
~o
~~ ~a
~_~ _~
UU U~
~~ Wz_
~\ J
2 O
UZ N,~
_: ,4
~~ J`
O
2~ ~
~O VO
O~
U!
2Ci llt~
2Q
Y 3+'
L1. 34
• w
~,
-- II -1~'I
`a-
I ~~I
i
_.
~,
~~ ~
_~-- I;
~~^;ii
i
-~=----"
~~
',
• ~ ~ -
I
~~
--- ~~
-~ ~
I
i
~1
-°------
- -
~ j'I
~,~ - _il
~- ~•
Z
r=
V
J
W a
w m
~.~