HomeMy WebLinkAboutresolution.council.056-01 RESOLUTION # ~r~
(SERIES OF 2001)
A RESOLUTION OF THE CITY OF ASPEN, COLORADO AUTHORIZING
SPENDING FUNDS GENERATED THROUGH THE
RENEWABLE ENERGY MITIGATION PROGRAM
WHEREAS, on December 13, 1999, City Council approved Ordinance No.55
adopting the Aspen/Pitldn Energy Conservation Code, and
WHEREAS, the Aspen/Pit!dh Energy Conservation Code allows that the funds be
spent in accordance with a joint resolution by the Aspen City Council and the Pitkin
County Board of County Commissioners, and
WHEREAS, pursuant to the Agreement, the Board of the Community Office of
Resource Efficiency approved a number of spending proposals, and
WHEREAS, the spending proposals meet the screening criteria of affordable housing,
cost-effectiveness, public visibility and education, environmental benefits, energy
efficiency, leverage, unique opportunity, new technologies and green design, and
WHEREAS, the Renewable Energy Mitigation Fund has a balance of approximately
$670,000 and the total of the proposed expenditures equals $335,500.
NOW, WHEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ASPEN, COLORADO:
Section 1:
The Aspen City Council does hereby authorize the Community Office of Resource
Efficiency to negotiate and secure contracts and manage the installation and/or
implementation of the following projects:
1. ISELIN POOL & RINK: To date, the Council and Commissioners have approved
$55,000 for a Capstone turbine and funds for green design for Iselin. CORE Board is
recommending spending an additional $185,000 for efficiency and renewable energy up-
grades. With these additional appropriations, KEMP funds will pay $253,000 for system
up-grades. We propose these additional measures for the building.
a. $70,000 for Two High Efficiency Boilers: This winter, the price of Natural Gas
increased 400% at the well head. This up-grade is a wise investment. Heating hot water
for thc pools and showers with 94 % efficient Veisman boilers instead of the planned
80% efficient system will save 160 tons per year of CO2 and over $16,000 per year in
energy costs.
b. $20,000 for High Efficiency Motors and Variable Speed Drives: All motors and
selected drives were up-graded to provide efficiency gains. By saving electricity in these
systems, 26 tons of CO2 will be saved per year.
c. $25,000 Hot Air Heat Recovery: The air handling system will vent thousands of cubic
feet of heated pool air. A heat recovery system will recover the heat from the air vented to
the outside and preheat incoming air. Natural gas will be saved, off-setting 34 tons per
year of CO2.
d. $5,000 Natural Ventilation Design: The spine section of the Iselin Project will be
naturally ventilated. The engineers are computer modeling this section to reduce
mechmfical air handling. Fresh air will be supplied from operable windows as the weather
allows. The high tower acts as a chimney for air circulation when windows are opened.
e. $20,000 Commissioning: Iselin will be a complicated building to operate. The
engineers have outlined an excellent commissioning plan for the building systems. REMP
funds will be used to provide training support for the system operators and to insure that
the energy efficiency systems are functioning as designed.
f. $30,000 Solar Hot Water Heating System for the Pool. We are budgeting $30,000
for a solar hot water system for the pool. We estimate it will save $4,000 per year,
keeping 34 tons of greenhouse gases out of the air each year.
g. $15,000, Low-E ceiling for the ice rink. Installing a layer oflow-e fabric insulation
on the inside of the ceiling will reduce heat losses from the ice rink. This insulation is
widely used in Canada and is recommended by Keen Engineering, the engineers on the
project. It will save $3,000 per year and keep 25 tons of greenhouse gas out of the air
each year.
2. CITY OF ASPEN CAR SHARING PROGRAM $30,000 Initially, Car Share
program members will share three cars (a Toyota Prius and two Honda Civics). The City
of Aspen has appropriated $30,000 to support the program. We propose a match,
spending $10,000 of REMP funds for each of the next three years. Based on 3 cars, this
expenditure should eliminate 15 tons of greenhouse gases per year. If successful, this
traffic reduction measure will have significant air pollution benefits to the City and
region. Promotional materials will also publicize the energy and climate benefits of
efficient vehicles.
2
3. ASPEN HIGH SCHOOL Construction will start next month on the new Aspen High
School. We propose spending some REMP funds to enhance the building's energy
performance.
a. $20,000, Daylighting Design & Analysis. Daylighting is a good thing in schools; it
improves academic performance and the classroom setting. The new school has tons of
glass, facing southeast, south, wesT, and northwest. We would like to hire Architectural
Energy Concepts to help the architect analyze and refine the daylighting design and the
glazing specification, with a goal of improving energy performance, reducing glare, and
avoiding smnmer[ime overheating. AEC will use a software program called Radiance to
analyze these issues, and quantify the energy savings.
b. $50,000, Mechanical System Improvements. Given the steep run-up in natural gas
prices, it makes sense to upgrade the boilers and add variable speed drives to the
ventilation equipment in the high school. We believe these measures will save $7,000 per
year, and keep 60 tons of greenhouse gases out of the air each year.
4. COMMUNITY CAMPUS RESTORATION PROJECT- Iselin Site $20,000. The
3-acre site of the Iselin Recreation Center, including the adjoining softball and soccer
fields, is the focus on an ambitious landscaping plan. The detailed revegetation plan for
the Iselin site includes areas dedicated to native plants, stormwater runoff and filtration,
wetlands, and trees, which will provide the following benefits: significant carbon
sequestration, air quality improvements, rainfall interception, erosion control, and
stormwater filtering. We expect the green house gas emission mitigation to be in the
range of 25 tons/year.
5. CORE Fees. The REMP legislation authorized CORE to collect up to 10% in fees for
developing and rewewmg REMP projects. The CORE board recommends to the City and
County that CORE get the full 10% fee for the projects described above. Budget:
$30,500.
Section 2:
The Community Office of Resource Efficiency will report quarterly to the Aspen City
Council regarding the progress and completion of the approved projects.
I, Kathryn S. Koch, duly appoimed and acting City Clerk do certify that the foregoing is a
true and accurate copy of that resolution adopted by the City Council of the City of
meeting held May 14, 200 .