Loading...
HomeMy WebLinkAboutagenda.apz.20090929AGENDA ASPEN PLANNING AND ZONING COMMISSION SPECIAL MEETING TUESDAY, September 29, 2009 4:30 p.m. -Sister Cities Room CITY HALL I. ROLL CALL II. COMMENTS A. Commissioners B. Planning Staff C. Public III. MINUTES IV. DECLARATION OF CONFLICT OF INTEREST V. PUBLIC HEARINGS: A. 1450 Crystal Lake Road -Aspen Club Redevelopment, Final Specially Planned Area and associated reviews VI. OTHER BUSINESS VII. BOARD REPORTS VIII. ADJOURN Next Resolution Number: 15 P1 MEMORANDUM TO: Aspen Planning and Zoning Commission THRU: Jennifer Phelan, Community Development Deputy Director FROM: Jessica Garrow, Long Range Flanner~{t~/"~ RE: 1450 Crystal Lake Road -Final SPA, Final PUD, Final Timeshare, Multi-Year Growth Management, Affordable Housing Growth Management, Stream Margin, and Subdivision Reviews Resolution No. ~ ~ Series of 2009 MEETING DATE: September 29, 2009 APPLICANT /OWNER: Aspen Club and Spa, LLC REPRESENTATIVE: Sunny Vann, Vann Associates, LLC LOCATION: ] 450 Crystal Lake Road -Lot 15 of the Callahan Subdivision CURRENT ZONING: RR/PUD (Rural Residential) zone district with a Planned Unit Development (PUD) Overlay SUMMARY: The Applicant requests final PUD, final SPA, final Timeshare, Growth Management Reviews, Stream Margin Review, and Subdivision Review in order to develop 20 timeshaze units, 12 affordable housing units, and 132 pazking spaces on Lots 15 and 14A (the existing 35 spaces on Lot 14A will not change as part of this application) of the Callahan Subdivision. STAFF RECOMMENDATION: Staff recommends that the Planning and Zoning Commission require that the applicant eliminate units 5 & 6 prior to proceeding to City Council. Aspen Club building'and location. STAFF NOTE: The previously provided Contact Jessica if yot Application has been to the Commission. need another copy. REQUEST OF THE PLANNING AND ZONING COMMISSION: The review of an SPA, PUD, and Timeshare is a four step review process. Step one is conceptual review before the 1 Aspen Club P&Z 9.29.09 P2 Planning and Zoning Commission, step two is conceptual review before City Council, step three is final review before P&Z (this public hearing), step four is final review before Council. The Applicant is requesting the following land use approvals from the Planning and Zoning Commission to redevelop the site: Planning and Zoning Commission Approvals: • Stream Margin approval for development within 100 feet of the high water line of the Roaring Fork River, pursuant to Land Use Code Chapter 26.435.040, Stream Margin Review (The Planning and Zoning Commission is the final review authority.) A Growth Management Review (Chapter 26.470.040.0.7, Affordable Housing) for the development of affordable housing. (The Planning and Zoning Commission is the final review authority.) City Council Approvals: • Final PUD approval for the construction of Affordable Housing and Timeshare Lodge pursuant to Land Use Code Chapter 26.445, Planned Unit Development. (City Council is the final review authority after considering a recommendation from the Planning and Zoning Commission). • Final SPA approval for the construction of Affordable Housing and Timeshaze Lodge pursuant to Land Use Code Chapter 26.440, Specially Planned Area. (City Council is the final review authority afrer considering a recommendation from the Planning and Zoning Commission). • Subdivision approval for the creation of multiple affordable housing units and timeshaze units and subdividing the lot into 5 new lots pursuant to Land Use Code Chapter 26.480, Subdivision (Gifu Council is the final review authority after considering a recommendation from the Planning and Zoning Commission); • Rezoning to include an SPA Overlay pursuant to Land Use Code Chapter 26.310, Amendments to the Land Use Code and Offcial Zone District Map (City Council is the final review authority afrer considering a recommendation from the Planning and Zoning Commission); • A Multi-Yeaz Growth Management Review (Chapter 26.470.090.1, Multi-year development allotment) for the development of lodge pillows. (City Council is the final review authority after considering a recommendation from the Planning and Zoning Commission). • A seven (7) yeaz Vested Rights period (Chapter 26.308, Vested Property Rights). (City Council is the final review authority.) Administrative Reviews: Condominiumization (Chapter 26.480.090, Condominiumization) to demarcate ownership of the timeshare units. (This is an Administrative Review that is completed after all other reviews have been granted.) Aspen Club P&Z 9.29.09 P3 BACKGROUND: The Aspen Club is located in the Rural Residential (RR) zone district and currently has a PUD overlay. The Club is pazt of the Callahan Subdivision and PUD, which was initially approved in 1976. The original approval included sixteen (16) lots. Lot 14A was designated as a parking facility for the use and benefit of the clubhouse and recreational facility that was proposed on Lot 15 (the current location of the Aspen Club). The parking area on Lot 14A includes thirty-five (35) spaces, and is accessed from Lot 15 via a bridge over the Roaring Fork River and through Lot 14. A number of PUD Amendments have been made to the Callahan Subdivision since the original approval. These included expanding the Club to 72,409 sq. ft., splitting Lot 14 into Lots 14E and 14W (each has asingle-family home now), and adding fifty-six (56) parking spaces on Lot 15. Lot 15 is zoned Rural Residential (RR); this is the only zone district within the city that permits a recreational facility. The existing Aspen Club lot includes a large grade change between the Club facility and surface parking, and the tennis courts. The tennis courts are located nearly ten (10) feet lower than the surface parking. This memo will refer to "benches", with the "upper bench" indicating the Club building and surface pazking lot, and the "lower bench" representing the tennis courts. A similar application was made in 2004, but was withdrawn at City Council. Since that time the Applicant has refined the proposed health/wellness program, and better articulated the operation of the timeshaze units. The Aspen Club is located on Ute Avenue. The site is located near the urban/rural fringe, and as such has a more rural feel than other areas of town. Ute Ave has a variety of uses, including non-profit (Silverlining Ranch), commercial (Benedict Office Building), affordable housing, free-mazket housing (both single family and multi-family), and short term accommodations (The Gant functions as short term accommodations, though it is technically multi-family residential). Immediately across the river from the Club are two single family homes (Lots 14E & 14W), zoned Moderate-Density Residential (R-15) with a PUD overlay. The Benedict Office Building is located immediately west of the Aspen Club. This parcel is zoned Rural Residential (RR) with a PUD overlay and an SPA overlay. The building contains commercial and residential uses, and the SPA was established to permit commercial uses. Also immediately to the west of the Aspen Club is the 10`h Mountain Division affordable housing, also zoned Rural Residential (RR) with a PUD overlay and an SPA overlay. Immediately to the east of the Club is the Silverlining Ranch, zoned Academic (A) and Conservation (C) with an SPA Overlay. The SPA was established to allow the Silverlining Foundation's activities with sick kids and to establish dimensional requirements. Across Ute Avenue to the North are the Ute Park Townhomes, zoned Affordable Housing (AH) with a PUD overlay. PROJECT SUMMARY: The Applicant is proposing to add twenty (20) new timeshare units to the Aspen Club property. Fourteen (14) of these units aze stand alone "townhouse" units that aze in four groups. Six (6) of the units aze proposed to be added to the existing Club building (the "club" units). This is the same unit number and mix that was approved conceptually. 3 Aspen Club P&Z 9.29.09 P4 The Applicant also proposes twelve (12) affordable housing units. These units aze all proposed to be 2-bedroom, and will be a mix of Category 2, 3, and 4. This is the same unit count and mix as proposed at conceptual review. A total of 132 pazking spaces are proposed for the development. This is one less space than was proposed at Conceptual Review. The decrease is a result of needing additional access stairs from the subgrade gazage. Lottine• The Applicant is proposing to subdivide Lot 15 into 5 new lots, as follows: • Lot 1: Contains the Club, the subgrade and surface pazking, and other open areas • Lot 2: Contains the "club" units • Lot 3: Contains the "townhouse" units that aze on the lower "bench" • Lot 4: Contains the "townhouse" units that are on the upper "bench" • Lot 5: Contains the Affordable Housing units Lot 2 is an "air rights lot." It has no land area associated with it, as it is located between the floor and ceiling of a portion of the club building. The Applicant is proposing this kind of subdivision so the Club can be retained and owned entirely separate from the timeshare owners. The Application Appendix (Exhibit 4 of Appendix D) explains the subdivision proposal. The City Attorney's Office has reviewed the proposal and believes it complies with the Colorado Revised Statutes and City Code. Dimensional Requirements: The applicant's proposal in terms of mass and scale has not changed from the conceptual approval. However, additional dimensional vaziances are needed because of the subdivision request. The dimensional table below outlines the proposed dimensional requirements. When listing the dimensional requirements, all front yazd setbacks aze the south side of the lots, all the rear yard setbacks are on the north side of the lots, and all the side yazd setbacks aze the east and west sides of the lots. Underlying RR Proposed Dimensional Requirements Dimensional Requirements Zone District Dimensional for subdivided Tots based on fathering parcel Dimensional Requirement Re uirements Lot I : 3.702 acres or 161,259 sq. ft. Total Lot Area: 4.941 acres, Minimum Lot Lot 2: N/A or 215,232 sq. ft. Size Lot 3: 0.264 acres or 11 499 sq. ft. Lot Area after Slope 2.0 acres Lot 4: 0.716 acres or 31,188 sq. ft. Reduction: 171,047 sq. ft. Lot 5: 0.260 acres or 11,325 s . ft. Minimum Lot Multi-Family: Area per N/A N/A N/A dwelling unit Lodge: N/A Lot 1: 305 Feet Lot 2: N/A Minimum Lot Lot 3: 135 Feet 370 Feet 200 Feet Width Lot 4: 266 Feet Lot 5: 95 Feet 4 Aspen Club P&Z 9.29.09 P5 Underlying RR Proposed Dimensional Requirements Dimensional Requirements Zone District Bimensional for subdivided lots based on fathering parcel Bimensional Requirement Re uirements Lot 1: 30 feet above grade, 5 feet below grade Minimum Lot 2: N/A 7.5 Feet for Affordable 30 Feet Front Yard Lot 3: 10 feet Housing Units Setback Lot 4: 0 feet Lot 5: 7.5 feet Lot 1: 0 feet above and below grade Minimum Side Lot 2: N/A 5 Feet on east side for Yard Setback Lot 3: 10 feet Affordable Housing Units. 20 Feet (East Side) Lot 4: 20 feet Lot 5: 5 feet Lot 1: 60 feet above grade for building, 20 feet above grade for garage access Minimum Side stair, 5 feet below grade 5 Feet on west side for Yard Setback Lot 2: N/A subgrade garage; 20 feet for 20 Feet (West Side) Lot 3: 20 feet timeshare Unit 1. Lot 4: 5 feet Lot 5: 0 feet Lot 1: 100 feet (15 feet from Top of Slope) Minimum Rear Lot 2: N/A 100 Feet 20 Feet Yard Setback Lot 3: 10 feet Lot 4: 10 feet Lot 5: 10 feet Townhouse Units (Lots 3 & 4) Affordable Housing Unit Pitched Roofs (Units 1, 7, 14): 28 feet 11, Northwest Corner: 32 Flat Roofs (Units 2-5, 8-13): 28 feet feet Club Units (Lot 2): 28 feet Affordable Housing Unit Maximum Affordable Housing Units (Lot 5): 28 12, Northwest Corner: 41 28 Feet Height feet with the following exceptions: feet Unit 11, Northwest Corner: 32 feet Affordable Housing Unit Unit 12, Northwest Corner: 41 feet 12, Southwest Comer: Unit 12, Southwest Corner: 31.25 feet 31.25 feet Aspen Club Building (Lot 1): 28 feet Minimum % N/A N/A N/A Open Space Total FAR:.55:1 Total FAR:.55:1 Single-family: Total: 94,750 sq. fr. Total: 94,750 sq. ft. Same as R-15 Allowable Multi-family (affordable housing units): Multi-family (affordable zone district Floor Area 12,390 sq. fr. housing units): 12,390 sq. ft. Multi-family: Lodge: 50,490 sq. fr. (Townhouse Units: Lodge: 50,490 sq. fr. N/A 34,410 sq. ft.; Club Units: 16,080 s . fr.) (Townhouse Units: 34,410 Lodge: N/A Aspen Club P&Z 9.29.09 P6 RR Dimensional Requirement Proposed Dimensional Requirements for subdivided lots Dimensional Requirements based on fathering parcel Underlying Zone District Dimensional Re uirements Commercial (Club): 31,870 sq. ft. sq. ft.; Club Units: 16,080 sq. Commercial: N/A ft.) Commercial (Club): 31,870 s . ft. Lodge:.5 spaces per key (20 132 spaces total: 132 spaces total: spaces) Lodge: 20 spaces Lodge: 20 spaces Club and Spa: 1 Minimum Off- Aspen Club and Spa: 95 spaces (60 Aspen Club and Spa: 95 space per 1000 Street Parking spaces on Lot 1; 35 spaces on Lots 14A spaces (60 spaces on Lot 1; sq. ft. of net & 14W) 35 spaces on Lots 14A & leasable (43 AH units: 17 spaces 14W) spaces) AH units: 17 spaces AH units: 1 space per unit (12 s aces) Parkine::' Lot 15 currently contains fifty-six (56) pazking spaces and Lot 14A currently contains thirty-five (35) pazking spaces, for a current parking level of ninety-one (91) spaces. The Applicant proposes reducing the number of surface pazking spaces on Lot 15 from fifty-six (56) to thirty-nine (39), adding fifty-three (53) spaces in a sub-grade gazage on Lot I5, and five (5) spaces in front of the affordable housing units that will be signed for short-term pazking. The thirty-five (35) existing space on Lot 14A will remain. This brings the total parking to: Lot 15: 97 spaces Lot 14A: 35 spaces Total: 132 spaces (net increase of 41 spaces) Access to the sub-grade pazking gazage will be provided along Ute Ave, and access to the spaces on Lot 14A will be maintained via the path over the River. Twenty (20) of the spaces aze dedicated to the timeshaze units and will be in the subgrade garage. Seventeen (17) of the spaces aze dedicated for the affordable housing units -twelve (12) of these will be for long term storage of cars and will be provided in the sub-grade gazage; the other five (5) will be for short term parking and will be located above grade in front of the affordable housing units. Ninety-six (96) spaces will be dedicated to the Club use (these consist of 22 sub-grade garage spaces, 39 surface pazking spaces, and 35 spaces on Lot 14A). Timeshare Units: The proposal includes twenty (20) timeshaze units, divided into fourteen (14) "townhome" units and six (6) "club" units. The club units will be added to the existing Club building, while the townhome units will be stand alone units. The townhome units aze divided into four sepazate two-story structures, consisting of ten (10) three-bedroom units and four (4) four-bedroom units. Lock offs are proposed in these units to 6 Aspen Club P&Z 9.29.09 P7 permit flexibility (for instance athree-bedroom unit could be locked off to include aone- bedroom unit with a kitchen and atwo-bedroom unit), which results in a total of twenty-eight (28) separately occupiable divisions or keys (14 units with 141ock-offs). Three of the two-story structures are located on the "lower bench" of the property, where the tennis courts currently exist. The townhouse units will range in size from 2,310 sq. ft. of floor area to 2,740 sq. ft. of floor area. The six (6) club units consist of four (4) three-bedroom units and two (2) two-bedroom units. The lock-offs proposed for these units will enable them to be used as eight (8) one-bedroom hotel-style units (no kitchen) and four (4) two-bedroom suites (with a kitchen). The lock-offs will contain six lock-off bedrooms, for a total of twelve (12) keys. The club units will range in size from 1,670 sq. ft. of floor azea to 2,150 sq fr of floor area. The total number of lodge keys proposed as part of this development is: Townhomes: 28 keys Club Units: 12 keys Total: 40 keys Each fraction interest purchaser will own an undivided 1/8 fee interest in a specific unit along with an undivided interest in the common elements. There are a total of 160 separate timeshare interests (20 units x 8 estates per unit). The conceptual application proposed undivided 1/16 interests, for a total of 320 separate timeshare interests (20 units x 16 estates per unit). The proposed units will be used by owners in two two-week fixed blocks of time for 32 weeks of the year (two fixed weeks from approximately December 15 through April 15 and two fixed weeks from June 1 through September 30). The dates will be fixed, so the same group of people will visit the Club at the same time each year. In addition, each owner will be able to reserve up to two weeks of time during the spring and fall "mid-seasons" on a first come, first served basis. When the units are not used by owners, the units will be available for nightly rental or for use in one-week increments. The Applicant proposes building these units to LEED for homes standards. Affordable Housine: The Application includes twelve (12) affordable housing units in a three-story structure. Nine (9) of the units will contain 955 sq. ft. of net livable azea and three (3) of the units will contain 860 sq. fr. of net livable area. The proposal is for a mix of Category 2, 3 and 4 units, and the units are proposed to be rentals controlled by the Aspen Club and Spa in order to ensure Aspen Club employees have the first opportunity to live in the units. APCHA has recommended, and the applicant has agreed, that the smaller units be Category 2, and that the larger units be designated at Categories 3, and 4. The Applicant proposes building these units to LEED for homes standazds. Vestin The applicant is requesting a seven (7) yeaz vesting period. State Law, as well as the Land Use Code allow for a three (3) year vesting period. The applicant is requesting a longer vesting period because of the uncertainty of the national economy. 7 Aspen Club P&Z 9.29.09 P8 Healthy Livine Proposal: The Applicant's over-arching goal with this proposal is to create an integrated healthy-living community that the fractional owners, Club members, and the general public can participate in. Different health and wellness programs will be offered throughout the yeaz for timeshare owners and community members to take part in (for instance a cancer survivors program, yoga retreat, etc). The application outlines six key concepts that form the basis for the "Aspen Club Living" proposal: 1. Demonstrate leadership in the area of sustainable development. The applicant is striving to have fewer impacts to the community after the project is completed compared to the current impacts. The applicant has committed to no growth in traffic levels on Ute Avenue and to maintain or reduce the carbon footprint of the lot after development. 2. Demonstrate what defines a healthy neighborhood and a healthy lifestyle. The proposal has been accepted into the new LEED for Neighborhood Development (LEED- ND) Pilot Program, and the Applicant intends for the project to "provide a landmark sustainable environment for a healthy lifestyle in healthy buildings." 3. Improve the neighborhood. The applicant is implementing a safety plan for Ute Ave, including the installation of curb and gutter, and speed reducing measures (speed bumps and humps). The applicant is also providing a trail easement along their property to • complete the Ute Ave trail. 4. Be a leader in energy conservation. The Applicant has committed to reducing the Club's cazbon footprint from today's levels by using geothermal ground source heat pumps, using solar photovoltaic panels to generate a significant portion of the Club's electricity, and reducing existing heating/cooling loads by upgrade HVAC systems, insulation, etc. Details on the applicant's energy savings proposals are in the Applicant's Appendix (Exhibit 2 of Appendix D). 5. Benefit the Club's current members, employees, guests and the Aspen community. The applicant anticipates 7 million dollars of investment in the Club as a result of this development proposal. This money will help pay for an upgraded HVAC system, new programs and activities, outdoor fitness azeas, an outdoor pool area, new equipment, and new locker rooms. 6. Directly support and promote its employees. The applicant states that the development proposal will allow for increased employment opportunities for club employees. This would occur because of more consistent business that results from the timeshare units and because of the planned expansion of programming and activities beyond the current offerings. In terms of trarisportation, the applicant has committed to the following steps in an effort to minimize automobile use in the project and to ensure there is no increase in traffic beyond today's levels (see Exhibit L, the Applicant's revised TDM Plan, for more details on this plan): • Implement paid parking as an auto-disincentive; • Increase Shuttle service to the Club and maintain regular pick-ups are locations throughout the City; 8 Aspen Club P&Z 9.29.09 P9 • Purchase alternative fuel cars for use by the Club's timeshare owners, employees, and guests; • Provide pick-up service at the Airport to discourage car rentals by timeshare owners; • Require all Club employees to carpool, take public transportation, or use the Club's Shuttle service; • Participate in the City's Car Sharing Program; and • Create a bicycle sharing program. The Applicant intends to continue the use of the Club as a day-use health and fitness center, while' adding an additional "Aspen Club Living" component that provides more healthy living programming. STAFF COMMENTS: SPECIALLY PLANNED AREA: A Specially Planned Area (SPA) is a process in which a site specific development plan is created which encourages flexibility and innovation in the development of land and promotes objectives outlined in the Aspen Area Community Plan by allowing the variation of the underlying zone district's land uses and dimensional requirements for the benefit of the public. The parcel does not currently have an SPA overlay. An overlay is proposed to allow for the lodge use and ~nulti- family housing use (the proposed affordable housing) on the property. While the site is quite large, there are significant slopes, a required Stream Margin buffer, and a sewer easement that create site constraints. These constraints, however, offer unique development possibilities. For instance, the proximity to the river enables new development to better interact with the riparian area than the existing tennis courts have. Strong attention to the relationship between the new development and the riparian area should be considered. There are no protected view planes in the vicinity, but Staff believes it is important to retain the perception of the riparian corridor from the center of the site. The applicant made a number of changes to the architecture and site plan during the conceptual review process in an to address staffs concerns, however staff does not believe these changes go far enough to ensure the riparian area is made prominent in the design. The site is located near the urban/rural fringe, and as such has a more rural feel than many other parts of town. The location at the end of Ute Avenue also contributes to a more rural feeling. Staff recommends that "townhouse" units S m2d 6 be eliminated or relocated to provide a break in the massing, to better fit in with the context of the area, m7d to create a clearer com2ection to the riparian area. In addition, stafffinds that additional refnement is needed for the landscape plan. The landscape plm2 includes a great deal of paving and feels rather formal for the setting. Additionally, a water feature cuts through the middle of the site and does not create the kind of connection to the riparian area that staff believes is needed. The elimination of units 5 and 6 would better achieve this connection. PLANNED UNIT DEVELOPMENT: The Callahan Subdivision already includes a PUD Overlay, so this application would amend the PUD to establish dimensional requirements for the Aspen Club parcel (Lot 15). Because of the proposed subdivision into 5 new lots, there are a number of dimensional requirements that need 9 Aspen Club P&Z 9.29.09 P10 to be amended as part of the PUD. Staff believes these dimensional variations are appropriate in the setting given the slope changes between this azea and the adjacent parcel and Ute Avenue. Staff is supportive of the programs the Applicant is attempting to bring to the Club and to Aspen. The program will create a unique addition to the Aspen Community. The applicant has stated that programming will provide opportunities for locals to participate, in addition to the timeshare users. Staff would like to see additional information on the programming element to ensure locals are able to attend the new health and wellness programs at the Club. The applicant has come a long way since the initial conceptual application in terms of transportation. The applicant has worked with the city to create a monitored Transportation Demand Management (TDM) plan. These tools include the use of carpooling and incentives for employees to use alternative modes of transportation, participation in the CarShaze program, the availability of bikes for use by affordable housing residents and timeshare users, and coordinated shuttle service for visitors. Additionally, the applicant is installing a sidewalk along Ute Ave to create a more pedestrian friendly environment. The applicant has also committed to zero growth in traffic as a result of this project. Staff does have concerns about certain aspects of this PUD proposal, specifically that there is too much mass on the site. As mentioned above, Staff has some concerns that the site plan does not provide a connection to the riparian area. Staff believes the elimination of units S and 6 would help the project fit in better with the area context. TIMESHARE DEVELOPMENT: The Applicant proposes a timeshare use program for the twenty (20) lodge units. As mentioned above, these units are divided between six (6) "club" units and fourteen (14) "townhouse" units. The Applicant proposes 160 sepazate timeshare interests. There are twenty (20) timeshare units, and the Applicant proposes each owner have a 1/8 deeded interest in a specific unit for two sets of two (2) fixed weeks. The timeshare plan includes nineteen (19) "Mid-season weeks" that will used as the plan's "float time." These weeks, and any unused portion of the fixed weeks, will be made available to the public for nightly rentals. The owners of the unit would be able to reserve no more than two weeks or fourteen (14) days of the "float time" at any one time. Each timeshare owner is prohibited from occupying a unit for more than thirty (30) consecutive calendar days. The Applicant has not determined if the units will be part of an exchange program, but the timeshaze instruments submitted with the final application will permit participation in a timeshaze exchange program should the condominium association approve it. The timeshaze program, called "Aspen Club Living" by the Applicant, will have afully-staffed, on-site front desk located in the existing Club's main entry. The Applicant anticipates current Aspen Club Staff to staff this firnction. The program will follow the mandatory operational practices outlined in Land Use Chapter 26.590.060.B, Mandatory Operational Practices. The Applicant proposes more affordable housing mitigation than is required by the code for the proposed timeshaze units. The lodge development includes 62 bedrooms (ten 3-bedroom units, four 4-bedroom units, four 3-bedroom units, and two 2-bedroom units). Land Use Code section 10 Aspen Club P&Z 9.29.09 P11 26.470.100.A.1 states that there are .5 FTEs per lodging bedroom. Therefore, the employee generation is 31 FTEs (62 lodge bedrooms * .5 FTEs = 31 FTEs). At a mitigation level of 60%, the required mitigation for the project is 18.6 FTEs (31 FTEs * 60% = 18.6 FTEs). The applicant is providing twelve 2-bedroom affordable housing units. Land Use Code section 26.470.100.A.2 states that each 2 bedroom unit houses 2.25 FTEs. Therefore, the proposed 12 affordable housing units will house 27 FTEs (12 two-bedroom units * 2.25FTEs = 27 FTEs). This is approximately 145% of the required affordable housing mitigation. No mitigation is required as part of the Club remodel, as there is no increase in the amount of net leasable area. The Applicant has pledged to meet all of the applicable timeshare requirements. Information on the timeshare development instruments will be submitted as part of the final application. A drafr disclosure statement has been provided as part of the Application Appendix (see Appendix E, Exhibit 4 in the Application). Staff reconunends approval of the proposed timeshare. GROWTH MANAGEMENT REVIEW -AFFORDABLE HOUSING: As mentioned above, the applicant is providing more affordable housing than is required by code. The applicant is providing 12 housing units that will house 27 FTEs, when mitigation for 18.6 FTEs is required. Staff recommends that the 12 affordable housing allotments be granted. Staff further recommends that the affordable housing be a mix of Category 2, 3, and 4 rental units, as outlined by APCHA and the applicant. GROWTH MANAGEMENT REVIEW -MULTI-YEAR REVIEW FOR LODGING: The applicant needs a total of 124 lodge allotments for the proposed development. Only 112 allotments are available in any one growth management year, so the applicant is requesting allotments from multiple years. The review for multi-year allotments requires that the proposal be "exceptional" (section 26.470.090.1 of the Land Use Code). Staff believes many aspects of the proposal are "exceptional," though some changes should be made to the site plan to meet this review. The applicant is providing a mix of 2, 3, and 4 category affordable housing units as part of the proposal when the code requires category 4 units. Staff believes this is a benefit to the community and believes it contributes to the "exceptional" nature of the project. In addition, the applicant is providing 145% of the required affordable housing. The applicant has committed to creating no net new energy usage as a result of the development, which is a significant commitment and contributes to the project being "exceptional." The applicant is investigating the use of modulaz construction methods in an effort to reduce construction impacts on the neighborhood. In terms of transportation, the applicant is committing to having no new traffic created as a result of this project. This commitment to "zero growth" in traffic is significant and also contributes to the project being "exceptional." Staff does not believe the site plan is "exceptional." As mentioned in the SPA and PUD sections above, the elimination of the water feature and units 5 and 6 is appropriate. 11 Aspen Club P&Z 9.29.09 P12 Staff recommends that 112 allotments come from the 2009 Growth Management Year and I2 come from the 2010 Growth Management Year. Staff would like to see more detail regarding construction techniques be provided prior to final approval. Staff also recommends the elimination of units 5 and 6 to create a more "desirable site plan and architectural design solution. "~ Staff does not recommend in favor of the allocation of multi year lodge growth management allotments at this time. REZONING: The applicant is required to rezone the property because of the creation of the SPA overlay. The overlay is needed to allow the multi-family residential and lodging uses on the property. The area contains a mix of uses, including short-term accommodations, affordable housing, commercial, and free-market housing, and staff believes the SPA overlay is appropriate and is consistent with the uses and zoning in the azea. Staff recommends approval of the Rezoning. STREAM MARGIN: The applicant is required to receive a stream mazgin review because of the development proposal's proximity to the Roaring Fork River. No development is taking place in the protected stream mazgin azea. The applicant is dedicating a trail easement that runs through the stream margin area. Al] the work that will be done on this trail will be conducted in conjunction with parks Department review and will be done using hand tools. The stream mazgin area will not be used for any construction activities. Staff recommends approval of the Stream Margin Review. SUBDIVISION: The applicant is requesting a subdivision for the creation of 5 lots. The subdivision is proposed to help facilitate the ownership, control, operation and management of the timeshaze units separately from the Aspen Club and Spa and the affordable housing units. The affordable housing units will be owned by the Aspen Club and rented to qualified employees of the Aspen Club. Each of the fractional interests will own an undivided interest in Lots 3 and 4, which will be designated as common elements in the condo and timeshare documents. The applicant will record an easement agreement between the Aspen Club & Spa and the club units (Lot 2) regazding maintenance, repair, and restoration of common structural features (walls, roof, etc). Subdivision is also requested for the creation of individual ownership interests in the timeshaze units. Staff recommends in favor of the Subdivision Review. VESTED PROPERTY RIGHTS: The Applicant is requesting a vested property right for the proposed development plan for a period of seven (7) years rather than the standazd three (3) yeaz period. The Applicant is requesting the longer vesting period "given the current state of the national and local economy, and the availability of financing for projects such as the proposed development." Vesting provides an Applicant a timeframe in which the Applicant can rely on the approvals granted in a site specific development plan. It allows the Applicant to undertake and complete 12 Aspen Club P&Z 9.29.09 P13 the development and use of said property under the terms and conditions of the site specific development plan. Once vested, a development plan shall not be required to be amended as a result of "any zoning or land use action by the city or by an initiated measure" during the vesting period. If the vested rights expire, the project will be subject to any new regulations that may impact the approval granted. The Land Use Code typically provides for a three year vesting period and a vm•iation front that period is at the sole discretion of the City Council. The City does have a process for extending or reinstating vested rights (Section 26.308.101 C., Extension or Reinstatement of T/es'ted Rights). An extension, if granted would be approved by the Ci[y Council. Staff recommends that the longer vesting period not be granted, as it does not provide a community inside benefit. REFERRAL AGENCY COMMENTS: The City Engineer, Building Department, Aspen Sanitation District, Housing Department, Fire Marshall, Attorney's Office, Environmental Health Department, Transportation Department, Utilities and the Parks Department have all reviewed the proposed application and their requirements have been included as conditions of approval when appropriate. Parks has requested that a trail easement be granted on the property adjacent to Ute Avenue to allow the completion of the Ute Ave trail. This has been included as a condition in the Resolution. In addition, Engineering and Utilities/Public Works have both identified on-site drainage and soil conditions as a potential challenge for the proposed site. The affordable housing proposed meets the required housing mitigation and provides housing categories above what is required by code. APCHA has recommended that the smaller units be designated as Category 2 units, and the large units be designated Categories 3 and 4. This has been included as a condition of approval. RECOMMENDATION: At this point and time, staff recommends the Planning and Zoning Commission require that the applicant revise their plans prior to proceeding to City Council. Specifically, staff recommends the applicant: • Eliminate or relocate units 5 and 6 from the site plan. • Revise the landscaping plan to consolidate the paved areas and eliminate the water feature. Provide more detailed information on the programming elements of the proposal. PROPOSED MOTION: "I move to approve Resolution # ~I N), Series 2009, approving 12 Affordable Housing Growth Management Allotments and Stream Margin, and recommending City Council approval of a Final Specially Planned Area (SPA), Final Planned Unit Development (PUD), Final Timeshare, 124 Multi-Year Lodge Growth Management Allotments, Rezoning, and Subdivision for the Aspen Club project." 13 Aspen Club P&Z 9.29.09 P14 Attachments: Exhibit A -SPA Review Criteria, Staff Findings Exhibit B - PUD Review Criteria, Staff Findings EXHIBIT C -Timeshare Review Criteria, Staff Findings EXHIBIT D -Growth Management Review Criteria, Staff Findings EXHIBIT E - Rezoning Review Criteria, Staff Findings ExHiBIT F -Stream Margin Review Criteria, Staff Findings EXHIBIT G -Subdivision Review Criteria, Staff Findings EXHIBIT H - DRC Comments EXHIBIT I -Housing Comments EXHIBIT J -Application (Bound) ExHtBIT K -Application Appendix (Bound) EXHIBIT L -Revised Transportation Demand Management (TDM) plan 14 Aspen Club P&Z 9.29.09 P15 RESOLUTION N0. 1 ~, (SERIES OF 2009) A RESOLUTION OF THE CITY OF ASPEN PLANNING AND ZONING COMMISSION APPROVING AFFORDABLE HOUSING GROWTH MANAGEMENT REVIEW, STREAM MARGIN REVIEW, AND RECOMMENDING THE CITY COUNCIL APPROVE A FINAL SPECIALLY PLANNED AREA (SPA), FINAL PLANNED UNIT DEVELOPMENT (PUD), FINAL TIMESHARE, MULTI-YEAR DEVELOPMENT GROWTH MANAGEMENT REVIEW, REZONING, AND SUBDIVISION, FOR THE DEVELOPMENT OF SUB-GRADE PARKING, TWENTY TIMESHARE UNITS, AND TWELVE AFFORDABLE HOUSING UNITS FOR THE PROPERTY LOCATED AT 1450 CRYSTAL LAKE ROAD (THE ASPEN CLUB) CITY OF ASPEN, PITKIN COUNTY, COLORADO. Parcel ID: 273 7-181-3Z-019 WHEREAS, the Community Development Department received an application from Aspen Club and Spa, LLC, represented by Sunny Vann of Vann Associates, LLC requesting approval of final Specially Planned Area (SPA), final Planned Unit Development (PUD), final Timeshare, Stream Mazgin, Affordable Housing Growth Management Allotments, Multi-Year Grow[h Management Allotments, Rezoning, and Subdivision, to develop a subgrade garage, twenty (20) timeshare units and twelve (12) affordable housing units, and to redesign existing commercial spaces; and, WHEREAS, the Applicant requests approval by the Planning and Zoning Commission for Stream Margin, and Affordable Housing Growth Management Allotments; and, WHEREAS, the Applicant requests a recommendation by the Planning and Zoning Commission to the City Council for final Specially Planned Area (SPA), final Planned Unit Development (PUD), final Timeshare, Multi-Year Growth Management Allotments, Rezoning, and Subdivision; and, WHEREAS, the property is located in the Callahan Subdivision and is zoned Rural Residential (RR) with a PUD Overlay; and, WHEREAS, upon initial review of the application and the applicable code standards, the Community Development Department recommended the Applicant amend the proposal to better comply with the requirements of a Specially Planned Area (SPA), a Planned Unit Development (PUD), and Timeshaze; and, WHEREAS, dwing a duly noticed public hearing on September 29, 2009, the Planning and Zoning Commission approved Resolution No. _, Series of 2009, by a to -~ vote, approving Stream Margin Review and twelve (12) Affordable Housing Growth Management Allotments, and recommending the Aspen City Council approve a 1 Resolution No,+..7 ,Series 2009 Page 1 of 8 P16 Final PUD, Final SPA, Final Timeshaze, Rezoning, one-hundred and twenty-four (124) Multi-Yeaz Lodge Growth Management Allotments, and Subdivision; and, WHEREAS, the Aspen Planning and Zoning Commission has reviewed and considered the development proposal under the applicable provisions of the Municipal Code as identified herein; and, WHEREAS, the Planning and Zoning Commission has reviewed and considered the development proposal under the applicable provisions of the Municipal Code as identified herein, has reviewed and considered the recommendation of the Community Development Director, the applicable referral agencies, and has taken and considered public comment; and, WHEREAS, the Planning and Zoning Commission fmds that the development proposal meets or exceeds all applicable development standards and that the approval of the development proposal, with conditions, is consistent with the goals and elements of the Aspen Area Community Plan; and, WHEREAS, the Planning and Zoning Commission finds that this resolution furthers and is necessary for the promotion of public health, safety, and welfaze. NOW, THEREFORE BE IT RESOLVED BY THE PLANNING AND ZONING COMMISSION OF THE CITY OF ASPEN, COLORADO THAT: Section 1: Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code, the Planning and Zoning Commission hereby approves Stream Mazgin Review and twelve (12) Affordable Housing Growth Management Allotments from the 2009 Growth Management Year, and recommends City Council approval of Final Specially Planned Area (SPA), Final Planned Unit Development (PUD), Final Timeshare, Rezoning, one- hundred and twenty-four (124) Multi-Year Lodge Growth Management Allotments [one- hundred and twelve (112) from the 2009 Growth Management Yeaz and twelve (12) from the 2010 Growth Management Year], and Subdivision. Section 2: Rezonine to include SPA Overlav Pursuant to the procedures and standards set forth in City of Aspen Land Use Code Section 26.310, Amendments to the Land Use Code and Official Zone District Map, the Planning and Zoning Commission hereby recommends that City Council rezone the Aspen Club Property (Lot 15 of the Callahan Subdivision) to include an SPA Overlay. Section 3: Engineerine The Applicant's design shall be compliant with all sections of the City of Aspen Municipal Code, Title 21 and all construction and excavation standards published by the Engineering Department. The proposal shall comply with the DRC comments from the Engineering Department regarding transportation, drainage, pedestrian improvements, Resolution No _, Series 2009 Page 2 of 8 P17 construction management, traffic studies, utilities and sight distances. The Applicant shall be subject to the Stormwater System Development Fee. The final application shall address how the construction management plan will address construction while the Club remains open, and shall address how all construction activities will not impact all trees that are remaining on the site. Aspen Club Trail access or use for any construction activities is prohibited at all times; this includes but is not limited to truck traffic, foot traffic, storage or materials. Prior to submittal of the final approval by City Council, the Applicant shall work with the Engineering Department and the Streets Department to ensure that any proposed Right- of-Way improvements, including speed bumps and crosswalks, meet all applicable standards. Section 4: Affordable Housing The 12 on-site, two-bedroom affordable housing units shall be deed restricted to Category 2, 3 and 4. The Certificate of Occupancy (CO) for the units shall be issued prior to or at the same time as the proposed fractional ownership units. The units shall be owned and managed by the Aspen Club and Spa. More detailed information regarding the management and maintenance of the units shall be provided to APCHA wide the proposed deed restriction prior to CO. The owner shall have the right to rent the units to qualified employees of the Club. If the owner cannot provide a qualified tenant, the units shall be rented through APCHA's normal advertising process. At no time shall the tenancy of the units during a lease period be tied to continued employment by the owner. Tenant leases, however, may be terminated for cause or at the end of the lease period upon termination of employment. Each tenant in the rental units shall be required to be requalified by APCHA on a yearly basis. The owner shall convey an undivided 1/10th of 1% ownership interest in the lot on which the units are situated to APCHA. The APCHA ownership interest shall be in perpetuity or until such time as the units are converted to ownership units. The deed restriction shall allow the units to become ownership units at such time as the owner (the Aspen Club and Spa) elects to condominiumize and sell the units, or at such time as APCHA determines one or more units aze found to be out of compliance for one year. If any of the units are found to be out of compliance for one year, or the owner elects to sell the units, the units shall be listed for sale with APCHA at the categories specified in the deed restriction. The sales price shall be as stated in the APCHA Guidelines in effect at the time of recordation of the deed restriction plus appreciation calculated at three percent (3%) per annum or the Consumer Price Index (simple appreciation not compounded), whichever is less, as of the listing date of the units. If the units aze being sold due to noncompliance, all of the units shall be sold through the lottery system. If the owner elects Resolution No _, Series 2009 Page 3 of 8 P18 to sell the units, the owner may choose 1/3`d of the initial buyers provided they qualify under APCHA's top priority for the unit. If the owner elects to sell the units, or they are required to be sold due to noncompliance, owner shall condominiumize the units and form a condominium association for the management and maintenance thereof. The affordable housing association shall be separate from the fractional ownership unit's association. In the event the rental units are required to become ownership units due to noncompliance, APCHA or the City may elect to purchase them for rental to qualified tenants in accordance with APCHA Guidelines. Section 5: Fire Mitieation All codes adopted by the Aspen Fire Protection District shall be met. This includes but is not limited to access (International Fire Code (IFC), 2003 Edition, Section 503), approved fire sprinkler and fire alarm systems (IFC, as amended, Section 903 and 907). The applicant shall provide an overall access plan for the site with the building permit submittal. The subgrade garage shall have adequate fire access. This shall be reviewed and approved by the Fire Mazshall. The proposed lawn pavers shall be engineered to support fire truck loads. Fire sprinklers and alazms are required and shall be included in the project, including in all structures. Section 6: Public Works The Applicant shall comply with the City of Aspen Water System Standards, with Title 25, and with the applicable standazds of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code, as required by the City of Aspen Water Department. Utility placement and design shall meet adopted City of Aspen standazds. Each of the units within the building shall have individual water meters. Nothing from the 1976 PUD water rights agreement may change as part of this current project. The recorded plat shall provide adequate easements for all utility lines. This shall be reviewed by engineering and the water department prior to recordation. Section 7: Sanitation District Requirements Since there is an existing Aspen Consolidated Sanitation District owned and maintained main sanitary sewer line currently running through the proposed development, the proposed relocation of this main ACSD sanitary sewer line must be approved by the District's consulting engineer and boazd of directors prior to the district committing to serve this application. The district will require a written verification from the applicant Resolution No _, Series 2009 Page 4 of 8 P19 that the revised sanitary sewer service for the Silver Lining Ranch is acceptable to the current owners of the Silver Lining Ranch property. Since it is apparent at this level of approval that the district's main sanitary sewer lines will be modified to serve the new proposed development, a line relocation request and collection system agreement are required. Both are ACSD Boazd of Director's action items. New easements will be required for the sanitary relocation according to standard district form. Additional access and maintenance easements may be required depending on the final sanitary sewer utility plans. Service is contingent upon compliance with the District's rules, regulations, and specifications, which aze on file at the District office. Section 8: Environmental Health The state of Colorado mandates specific mitigation requirements with regards to asbestos. Additionally, code requirements to be aware of when filing a building permit include: a prohibition on engine idling, regulation of fireplaces, fugitive dust requirements, noise abatement and pool designs. The Applicant must meet all applicable requirements associated with the new pool. Wildlife protection/enclosures for the hash and recycle area is required. Section 9: Exterior Li¢htin2 All exterior lighting shall meet the requirements of the City's Outdoor Lighting Code pursuant to Land Use Code Section 26.575.150, Outdoor lighting. No lighting shall be permitted in the stream margin area or in any area below the top of slope line. Section 10: Transportation A detailed Transportation Demand Management (TDM) plan shall be recorded as part of the final PUD/SPA/Subdivision documents. In addition to the TDM plan, the following standards regazding transportation shall be met by the applicant: 1. Shuttle Service a. The Aspen Club shall provide a minimum level of shuttle service as planned and approved in December 2003 (Number 4, below). Without this minimum level of service in place, the Club will be required to contribute a fee equal to 13 trips per day to the operation of the Cross Town Shuttle, based on calculations developed in 2003. b. The Club van shall be operated on a fixed route and schedule to create a continuity of service. c. A complete shuttle plan detailing the Club shuttle route(s), schedule and stops must be approved by the City of Aspen Transportation Department no later six months prior to the issuance of a Certificate of Occupancy. This plan must meet the conditions discussed above. d. Service to the airport must be provided separately from the scheduled in-town service in order to keep that service on a fixed schedule. In addition the airport service shall be provided on-demand only to avoid unnecessary trips. Resolution No _, Series 2009 Page 5 of 8 P20 2. Other TDM Measures a. A complete plan for the implementation of an on-site carshare program must be presented to and approved by the Transportation Department no later than six months prior to the issuance of a Certificate of Occupancy. This program must be owned and operated by the Aspen Club. The City of Aspen carshare program will not operate this vehicle. This plan must include, at a minimum: *purchase of vehicle(s) *type of vehicle(s) *parking location(s) *allowable customers *vehicle replacement plan *operations plan b. All other TDM measures discussed in the applicant's proposal must be implemented no later than six months after the date of issuance of the Certificate of Occupancy. c. Any modifications to or elimination of TDM measures from the proposed program must be presented to and approved by the Transportation Department. 3. Monitoring a. The Transportation Demand Management plan needs to state the traffic generation goal specifically. b. Based on the TDA plan which states that the project plans for "zero growth" in traffic, the Transportation Department recommends a goal of maintaining traffic levels at their stated baseline of 860 trips per day. AM peak trips should be limited to 70 per day. PM peak trips should be limited to 99 per day. c. Vehicle counts and surveys shall be undertaken in March and August annually as outlined in the plan, using an Engineering/Transportation firm or using standard traffic counting devices. Report shall be provided to Transportation Department by October 1 annually. The report must indicate both daily and hourly traffic counts. d. Annual surveys must be pre-approved by the Transportation Department. e. Should monitoring show that the zero growth goal is exceeded at any time, the Aspen Club will be required to develop a plan for approval by the Transportation Department to include a variety of the following suggested TDM measures: • additional transit service via Club shuttle • contribution to the Cross Town Shuttle as outlined in the Shuttle Service section above • additional restrictions on employee driving • additional rewards/incentives programs for employees and guests • paid parking for employees and guests • yeaz one and two and two of the following • additional restrictions on employee driving • more aggressive internal and external education • additional rewards/incentives programs for employees and guests • paid parking for employees and guests Resolution No _, Series 2009 Page 6 of 8 P21 • other measures as approved by the Transportation Department 4. Aspen Club Shuttle Minirnum Service Levels a. From December 15 through April I5, and from June 15 through September 30, the Aspen Club Shuttle shall run continuously from 8:30 am until 8:00 pm on Saturday and Sunday and until 9:00 pm on weekdays. b. From April 16 through June 14, and from October 1 through December 14, the Aspen Club Shuttle shall run twice per hour, on the 10 and 40 minute past the hour, during the same hours: Section I1: Parks Building permit plans shall include a detailed plan submitted for stream margin protection and stability of the hillside above the trail. The detailed plan shall identify; Location of silt fencing and erosion control along the hillside. The City can provide specifications if needed: minimum requirements include a silt fence and straw bales placed in a manner preventing erosion and protect the river from residual run-off. All of these detailed at the 15' set back from top of slope. Building permit plans shall include a detailed plan submitted for Construction staging. This plan shall detail how the construction will take place with staging, storage of materials and locations of vehicles so that trees remaining on site will not be impacted and remain protected. Building permit plans shall include a detailed plan submitted for Tree Protection. Tree protection fences must be in place and inspected by the city forester or his/her designee before any construction activities are to commence. No excavation, storage of materials, storage of construction backfill, storage of equipment, foot or vehicle traffic allowed within the drip line of any tree on site. There should be a location and standard for this fencing denoted on the plan. Current locations are identified above the 15' set back and along the side yard set backs. An approved tree permit is required before submission of the building permit set. Proper spacing and a detailed legend for new plantings and plantings around existing shall be reviewed by the Parks Department at building permit submittal. This legend shall include species name. Building Permit Plans shall detail the material and width of the footpath proposed within the stream margin area. This footpath shall be installed with hand excavation tools only and set around all trees to remain on site. The utilities located under the trail should be developed and installed with junction boxes so future repairs can be accomplished without the need to excavate the new trail. This trail shall not be used for or provide access for any construction activities. This includes but is not limited to truck traffic, foot traffic, storage or materials. Aspen Club Trail access or use for any construction activities is prohibited at all times. This includes but is not limited to truck traffic, foot traffic, storage or materials. Resolution No _, Series 2009 Page 7 of 8 P22 Section 12: Parkins No pazking is approved for Ute Ave or in the cul-de-sac. Section 13: All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awazded, whether in public hearing or documentation presented before the Planning and Zoning Commission or City Council, aze hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, unless amended by an authorized entity. Section 14: This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 15• If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED BY the Planning and Zoning Commission of the City of Aspen on this day of _, 2009. APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION: City Attorney LJ Erspamer, Chair ATTEST: Jackie Lothian, Deputy City Clerk Resolution No ~ Series 2009 Page 8 of 8 P23 ExxISIT a Chapter 26.440, SPECIALLY PLANNED AREA (SPA) Sec 26.440.030(A) Standards for Designation. Any land in the City may be designated Specially Planned Area (SPA) by the City Council if, because of its unique historic, natural, physical or locational characteristics, it would be of great public benefit to the City for that land to be allowed design flexibility and to be planned and developed comprehensively as a multiple use development. A parcel of land designated Specially Planned Area (SPA) shall also be designated on the City's Official Zone District Map with the underlying zone district designation which is determined the most appropriate. The underlying zone district designation shall be used as a guide, but not an absolute limitation, to the uses and development which may be considered during the development review process. Staff Finding: In order for an SPA designation to be approved, this "Standards for Designation" requirement must be met. That is, the City Council, after hearing a recommendation from the Planning and Zoning Commission, must determine that because of the site's "unique historic, natural, physical or locational characteristics, it would be of ereat public benefit to the City for that land to be allowed design flexibility and to be planned and developed comprehensively as a multiple use development". Staff believes that the SPA designation would create a public benefit. It will allow affordable housing to be developed on the parcel, which is not currently a pennitted use in the underlying zone district. This will enable the Club to house some of its employees that currently commute into Aspen, reducing impacts on the transportation system and the entrance to Aspen. Further, the timeshare development will enable to Club to continue to provide a home for many of the Valley's non-profits, and will enable specialized programming to be made available to the public. Staff finds this criterion to be met. Sec. 26.440.050. Review standards for development in a Specially Planned Area (SPA). A. General. In the review of a development application for a conceptual development plan and a final development plan, the Planning and Zoning Commission and City Council shall consider the following: 1. Whether the proposed development is compatible with or enhances the mix of development in the immediate vicinity of the parcel in terms of land use, density, height, bulk, architecture, landscaping and open space. Stuff Finding: The uses in the area are quite mixed, with commercial, single-family free market residential, multi-family affordable housing, and non-profit uses all on the adjacent properties. Along Ute Avenue, there are short term accommodations. as well as a variety of residential uses. Both single-family residential and multi-family residential are located across the river. In terms of architecture, the applicant has stated to staff that the proposed mass, scale, and materials are intended to convey a residential scale that is representative of the different buildings and uses in the area, while also being true to the Club's use. The applicant has done this by making the "townhome" units residential in character (a mix of pitched and flat roofs, Exhibit A -SPA Review Criteria Page 1 of 7 P24 materials palate of stone and wood that is similar to residential uses in the area, modulation typical of residential townhomes) and changing the existing blank fagade of the club to be more articulated and pedestrian friendly. The applicant made a number of changes to the site plan during conceptual approval in an attempt to open the site up and create a greater visual connection with the river (moving one unit from the lower "bench" to the upper "bench," reconfiguring the siting of the units, moving the Club entrance to an area that overlooks proposed open area between the townhome units). The applicant has proposed a water feature as part of the landscaping plan. This water feature is located in the middle of the site and runs from the lower bench to the upper bench. There are paths that run through the site to connect the timeshaze units to the Club and the parking areas. In addition, the applicant is providing a permanent trail easement for the path currently exists on site and connects the river area to the Club building and parking area. The applicant worked with planning staff and the fire department to come up with a way to provide adequate fire access without creating additional paved areas. The solution is the installation of grass pavers in portions of the upper bench azea. Staff continues to have concerns related to the scale and mass of the "townhouse" units on the lower bench of the site, and believes there is too much massing proposed on the site. Staff believes the elimination of units 5 and 6 would create a clearer connection to the riparian area and would provide a needed break in the proposed massing. In terms of landscaping and open space, staff finds that additional refinement is needed for the landscape plan. The site is located neaz the urban/rural fringe, and as such the area has a more rural feel than other areas of town. The elimination of units 5 and 6 on the lower bench will help create the open space staff finds is needed in this proposal. The current landscape plan includes a great deal of paving, and seems rather formal. Given the site's context, staff believes less formal landscaping and paving is needed. Additionally, the water feature cuts through the middle of the site and does not create the connection between the upper bench and the riparian area that is needed in this site. Staff finds that the proposed use mix will fit in with and is consistent with the variety of uses on the immediately adjacent parcels and the overall context of Ute Avenue. Staff believes the proposed health and wellness program will be a good addition to the existing Club services and to the community in general. Overall, staff finds this criterion to not be met. 2. Whether sufficient public facilities and roads exist to service the proposed development. Staff Finding: Sufficient public facilities and roads exist to serve the proposed development. The traffic engineering report provided in the application indicates that the' proposed development will not significantly alter the current service levels on Ute Avenue, or at the intersections between the Aspen Club and Cooper Avenue. The applicant has worked with city staff to create a set of Transportation Demand Management (TDM) tools that will help control the number of trips on Exhibit A -SPA Review Criteria Page 2 of 7 P25 Ute Avenue as a result of this development. The applicant has also committed to not increase the amount of traffic on Ute Ave as a result of this project. Further, the Applicant has agreed to upgrade the existing water service line and to relocate a sewer line to accommodate the proposed units. Staff finds this criterion to be met. 3. Whether the parcel proposed for development is generally suitable for development, considering the slope, ground instability and the possibility of mudflow, rock falls, avalanche dangers and flood hazards. Staff Firadin2: The Applicant has located all development outside the Roaring Fork River's mapped 100-year floodplain. No other natural hazards are believed to affect the lot. The applicant conducted an avalanche study as part of the final application, which found the affordable housing units are in the "blue zone." According to the study, "blue zone" avalanches have a return period of 30 to 100 years, or a 1% to 3% probability annually. The applicant and Engineering Department have agreed to have the mudflow risk evaluated by the Colorado Geologic Survey. Staff finds this criterion to be met at this time. 4. Whether the proposed development creatively employs land planning techniques to preserve signiticant view planes, avoid adverse environmental impacts and provide open space, trails and similar amenities for the users of the project and the public at large. Staff Finding: The proposal replaces existing tennis courts with lodging units, adds lodging units to the existing building, and adds affordable housing units to an under-utilized portion of the site. While there are no protected view planes in the vicinity, Staff believes it is important to retain the perception of the ripazian corridor throughout the site. During Conceptual Review, the Applicant made changes to the architecture and site plan to address Staff's concern. The applicant did move the club entrance to ensure views to the river were maximized. However Staff does not believe these changes go far enough to ensure the riparian area is made prominent in the design. Staff believes the elimination of units 5 and 6 will help open the site plan and make the ripazian area more prominent. The landscape plan submitted as part of the final design shows a water feature running from the lower bench to the upper bench. Staff finds this distracting to the overall design and does not believe it succeeds in creating the needed riparian connection. There is an existing path that crosses the Aspen Club property neaz the river. This path will be maintained in the proposal. Additionally, the applicant has committed to installing a sidewalk on their property along Ute Avenue to help complete a needed pedestrian connection. The applicant is also formally dedicating the trail running from the river to the parking area for the use and benefit of the public. The applicant has provided information from SGM Engineering stating there is adequate drainage on site. The Engineering Department has reviewed the application and is working with the applicant to ensure there is adequate documentation provided for the proposed drainage. Exhibit A -SPA Review Criteria Page 3 of 7 P26 Overall, Staff finds this criterion is not met. 5. Whether the proposed development is in compliance with the Aspen Area Comprehensive Plan. Staff Findinr: Staff believes that a number of the goals in the Aspen Area Community Plan are met, but has some concerns relating to other aspects of the AACP. The Application meets a number of AACP goals related to affordable housing, economic sustainability, and arts and culture, and has made changes since Conceptual Review to meet goals related to transportation. The Applicant has also made changes to the site plan, which Staff believes brings the project closer to meeting the goals related to community character & design, and open space & environment. Overall, Staff finds this review criterion to be met. Housine: The Applicant is providing 145% of the required Affordable Housing, which is an important step in helping the community meet the Affordable Housing goals outlined in the AACP. The Housing section of the AACP states the intent of affordable housing is to "create an affordable housing environment that is appropriately scaled and distributed throughout existing and new neighborhoods..." (Intent, pg 25). This development proposal mixes free-mazket commercial and free-market lodging with affordable housing. The affordable housing is scaled to relate to the adjacent Club building and other surrounding buildings. This section also states that, "when employees have the ability to live near where they work, their reliance on the automobile lessens and they have greater opportunities to become a part of the town's social fabric" (Philosophy, pg 26). This proposal would provide 12 new affordable housing rental units for Aspen Club Employees. A mix of category 2, 3, and 4 units are proposed, which will ensure the housing is accessible to a wide range of income levels. ManaeinQ Growth: The AACP Managing Growth Chapter lists one of the main goals of managing growth as "foster a well-balanced community through integrated design that promotes economic diversity, transit and pedestrian friendly lifestyles, and the mixing of people from different backgrounds." (Goal E, pg 19). The proposal will promote a mix of backgrounds through the Club use as well as the affordable housing residents and lodge visitors that will be on site. Additionally, a detailed transportation plan is proposed that promotes pedestrian access to the site and the use of alternative modes of transportation. Economic Sustainabilitv: Further, the Economic sustainability section of the AACP recognizes that "local ownership of business helps maintain our community's unusual character, tends to return more money to the local economy, and provides additional opportunities for upward mobility of people" and that "the community and its governments should support local ownership as well as externally-owned businesses that aze locally-serving and locally-involved" (Philosophy, pg 31). The Aspen Club is owned by a vaziety of locals and non-locals, but it is a locally operated business. The stated Exhibit A -SPA Review Criteria Page 4 of 7 P27 goal of this proposal is to provide a new health and wellness opportunity for residents and visitors, and to use the money raised through the timeshare sales to subsidize programs for locals. The Club currently provides services and events that are designed for locals, including the "Tuesdays with Michael" program that highlights a local non-profit and their activities every week in the summer, as well as periodic health lectures. Staff believes that the concept of this application is a good one, and will go a long way toward furthering the goals outlined Aspen Area Community Plan. The Economic Sustainability section also states that it is important to "encourage resource efficiency, envirorunental responsibility, and cultural and community sensitivity in local organizations and in construction" (Policies, pg 32). The applicant used the new LEED for Neighborhood standards in developing the proposal. This requires that development be done using enviromnentally friendly techniques. To that end, the applicant is investigating ways to minimize construction impacts, utilizing alternative renewable energies and various energy efficient materials. The applicant has committed to no net new energy use as a result of this project. Arts Culture. & Education: The AACP states that "...arts, culture, and education are acknowledged as essential to Aspen's thriving year-round economy, its vibrant international profile, and its future as a unique place to live, work, and learn" (Philosophy. Pg 45). The Aspen Club currently works to promote the Arts, Culture, and Education of the Aspen Area by supporting local non-profits through provision of office space and financial support, and by facilitating educational and wellness programs for Club members and community members at large. Parks Open Space & Environment: The Parks, Open Space, & Environment section of the AACP discusses the need to "preserve, enhance and restore the natural beauty of the environment of the Aspen Area" (Intent, pg 34). Staff believes the changes made to the application during conceptual review help the proposal move in the direction of enhancing the riparian area on the site, and bringing the riparian area into the site, however staff believes the current mass detracts from the natural beauty of the area. The removal of units 5 and 6 would further help the development meet this section of the AACP. This section also states that "All Developments should be in accordance with the Wildlife and Biodiversity map and the Parks, Open Space, and the Environment map to protect sensitive habitat areas (e.g. riparian corridor and Elk habitat)" (Policies, pg 35). The development is respecting the required stream margin setback and the applicant has worked with the Parks Department to ensure that construction methods will not negatively impact the riparian area. Design Quality: The Design Quality section of the AACP asks that development "retain and encourage an eclectic mix of design styles to maintain and enhance the special character of our community." The section also states that "we favor diversity tempered by context, sometimes historical, sometimes not, as opposed to arbitrariness. `Context' refers first to region, then town, neighborhood, and finally the natural and man made features joining a particular development Exhibit A -SPA Review Criteria Page 5 of 7 P28 site. Decisions regarding scale, massing, form, materials, texture, and color must be first measured by context. Contextual appropriateness transcends `style' alone" (Philosophy, pg 42). Staff believes the ideas put forward in the Application for a health and wellness facility are good goals, and that the site plan changes at Conceptual have moved the proposal in the direction of combining this goal with the proposed architecture. Further, Staff finds that the changes help ensure the development will "enhance the special character of our community." The Aspen Club site is unique, and this Application proposes a unique addition to the Club. Staff believes the changes to the site plan begin to reflect these opportunities. In terms of uses, the project does a good job of relating to the immediate context which is comprised of a variety of uses. In terms of massing, staff is concerned that there is too much mass on the site given its context of being on the urban/rural fringe. The elimination of units 5 and 6 would help better meet the Design Quality section of the AACP. Transportation: The AACP has a number of goals and policies related to Transportation, including a policy that new growth should be structured "on compact, mixed-use patterns that enable and support travel by foot, bicycle, and public transportation for all types of trips" (Policies, pg 22). Additionally, the Transportation Chapter includes goals to maintain and improve "the appeal of bicycling and walking...by adding sidewalk connections, replacing sidewalks, and requiring sidewalks as part of development approvals, where appropriate..." (Goal C, pg 22) and "the appeal of carpool or vanpooling for a wide variety of trip types" (Goal D, pg 22). The Transportation Chapter also includes a policy to "require all employment, school, social, recreation or other activities that generate demand for travel to mitigate traffic impacts through support of alternative transportation modes in proportion to trips generates." (Policies, pg 22) The applicant has worked with city staff to create a set of Transportation Demand Management (TDM) tools that focus on alternative forms of transportation, including carsharing, vanpools, carpooling, biking, and walking. The applicant has also committed to installing a new sidewalk along Ute Avenue to make walking and biking safer and more viable. The TDM plan includes a commitment to continue use of the Cross Town Shuttle and the use of coordinated vans and shuttles for employees as well as visitors who stay at other hotels but want to use the Aspen Club. Coordinated pick up service at the airport is also proposed for the timeshare users. Staff believes that the TDM plan meets the goals and policies of the AACP related to Transportation. 6. Whether the proposed development will require the expenditure of excessive public funds to provide public facilities for the parcel or the surrounding neighborhood. Staff Finding: The application states that all costs associated with public infrastructure improvements will be borne by the Applicant. This includes the realignment of a sewer line. The Applicant's new traffic study indicates that Ute Avenue can accommodate the proposal's traffic generation. In addition, the applicant has created a comprehensive TDM plan to encourage alternative modes of transportation for club users, club employees, affordable housing resident, and timeshare owners. A safety plan, which includes speed tables and humps, for Ute Ave has also been proposed to ensure the road is safer for pedestrians. The applicant has committed to zero growth in traffic as Exhibit A -SPA Review Criteria Page 6 of 7 P29 a result of this project. The applicant has hired consultants to assess the existing water flows to determine if adequate flows exist for fire safety. The preliminary report indicates there are. The applicant is working with the City Water and Fire Departments to confirm this. The applicant is also working with the Engineering Department to ensure adequate drainage exists on the site. While no net new track delivery traffic is anticipated as part of this project, it was found after Conceptual approval that the existing cul-de-sac does not have adequate pavement to meet city standards. Some improvements to the existing cul-de-sac pavement will be needed to accommodate truck traffic. The applicant is working with the Engineering Department to determine to what extent the applicant is responsible for the improvements. Staff finds this criterion to be met at this time. 7. Whether proposed development on slopes in excess of twenty percent (20%) meet the slope reduction and density requirements of Subsection 26.445.040.B.2. Staff Finding: The property's northern lot line lies in the Roaring Fork River, and then the property slopes up to meet Ute Ave on the south. There are slopes in excess of 20%, and the Applicant has made the appropriate slope reduction and density reductions. The total square footage on the lot is 215,232, but after slope reduction 171,047 square feet of land azea is available for floor azea calculations. The proposed development equals approximately 95,000 square feet, or an FAR of approximately 0.55:1. Staff finds this criterion to be met. 8. Whether there are sufficient GMQS allotments for the proposed development. Staff Finding: The Applicant has requested the necessary Affordable Housing and Lodge Growth Management Allotments. The proposal will decrease the amount of commercial space on site, so growth management allotments are not required. The applicant needs 12 affordable housing allotments and 124 lodge pillow allotments. In a single growth management year there are 112 lodge pillow allotments available. Because the applicant needs 12 more pillow allotments then are available in this growth management year, they have requested multi-year allotments. Staff finds this criterion to be met. B. Variations permitted. The final development plan shall comply with the requirements of the underlying zone district; provided, however, that variations from those requirements may be allowed based on the standazds of this Section. Variations may be allowed for the following requirements: open space, minimum distance between buildings, maximum height, minimum front yard, minimum rear yard, minimum side yard, minimum lot width, minimum lot area, trash access area, internal floor area ratio, number of off-street parking spaces and uses and design standazds of Chapter 26.410 for streets and related improvements. Any variations allowed shall be specified in the SPA agreement and shown on the final development plan. Staff Finding: There are no requests to vary the dimensional requirements as part of the SPA. These requests are made under the PUD request. Staff finds these criteria to not be applicable. Exhibit A -SPA Review Criteria Page 7 of 7 P30 EXHIBIT B Chapter 26.445, PLANNED UNIT DEVELOPMENT Sec. 26.445.050. Review Criteria conceptual, final, consolidated and minor PUD. A development application for conceptual, final, consolidated, conceptual and final or minor PUD shall comp]y with the following standazds and requirements. Due to the limited issues associated with conceptual reviews and properties eligible for minor PUD review, certain standazds shall not be applied as noted. The burden shall rest upon an Applicant to show the reasonableness of the development application and its conformity to the standards and procedures of this Chapter and this Title. A. General requirements. 1. The proposed development shall be consistent with the Aspen Area Community Plan. Staff Finding: Staff believes that a number of the goals in the Aspen Area Community Plan are met, but has some concerns relating to other aspects of the AACP. The Application meets a number of AACP goals related to affordable housing, economic sustainability, and arts and culture, and has made changes since Conceptual Review to meet goals related to transportation. The Applicant has also made changes to the site plan, which Staff believes brings the project closer to meeting the goals related to community character & design, and open space & environment. Overall, Staff finds this review criterion to be met. Housine: The Applicant is providing 145% of the required Affordable Housing, which is an important step in helping the community meet the Affordable Housing goals outlined in the AACP. The Housing section of the AACP states the intent of affordable housing is to "create an affordable housing environment that is appropriately scaled and distributed throughout existing and new neighborhoods..." (Intent, pg 25). This development proposal mixes free-market commercial and free-market lodging with affordable housing. The affordable housing is scaled to relate to the adjacent Club building and other surrounding buildings. This section also states that, "when employees have the ability to live neaz where they work, their reliance on the automobile lessens and they have greater opportunities to become a part of the town's social fabric" (Philosophy, pg 26). This proposal would provide 12 new affordable housing rental units for Aspen Club Employees. A mix of category 2, 3, and 4 units are proposed, which will ensure the housing is accessible to a wide range of income levels. Mana ine Growth: The AACP Managing Growth Chapter lists one of the main goals of managing growth as "foster a well-balanced community through integrated design that promotes economic diversity, transit and pedestrian friendly lifestyles, and the mixing of people from different backgrounds." (Goal E, pg 19). The proposal will promote a mix of backgrounds through the Club use as well as the affordable housing residents and lodge visitors that will be on site. Additionally, a detailed Exhibit B -PUD Review Criteria Page 1 of 18 P31 transportation plan is proposed that promotes pedestrian access to the site and the use of alternative modes of transportation. Economic Sustainability: Further, the Economic Sustainability section of the AACP recognizes that "local ownership of business helps maintain our community's unusual character, tends to return more money to the local economy, and provides additional opportunities for upward mobility of people" and that "the commtunity and its governments should support local ownership as well as externally-owned businesses that are locally-serving and locally-involved" (Philosophy, pg 31). The Aspen Club is owned by a variety of locals and non-locals, but it is a locally operated business. The stated goal of this proposal is to provide a new health and wellness opportunity for residents and visitors, and to use the money raised through the timeshare sales to subsidize programs for locals. The Club currently provides services and events that are designed for locals, including the "Tuesdays with Michael" program that highlights a local non-profit and their activities every week in the summer, as well as periodic health lectures. Staff believes that the concept of this application is a good one, and will go a long way toward furthering the goals outlined Aspen Area Community Plan. The Economic Sustainability section also states that it is important to "encourage resource efficiency, environmental responsibility; and cultural and community sensitivity in local organizations and in construction" (Policies, pg 32). The applicant used the new LEED for Neighborhood standards in developing the proposal. This requires that development be done using environmentally friendly techniques. To that end, the applicant is investigating ways to minimize construction impacts, utilizing alternative renewable energies and various energy efficient materials. The applicant has committed to no net new energy use as a result of this project. Arts Culture, & Education: The AACP states that "...arts, culture, and education are acknowledged as essential to Aspen's thriving year-round economy, its vibrant international profile, and its future as a unique place to live, work, and learn" (Philosophy. Pg 45). The Aspen Club currently works to promote the Arts, Culture, and Education of the Aspen Area by supporting local non-profits through provision of office space and financial support, and by facilitating educational and wellness programs for Club members and community members at large. Parks Open Space & Environment: The Parks, Open Space, & Environment section of the AACP discusses the need to "preserve, enhance and restore the natural beauty of the environment of the Aspen Area" (Intent, pg 34). Staff believes the changes made to the application during conceptual review help the proposal move in the direction of enhancing the riparian area on the site, and bringing the riparian area into the site, however staff believes the current mass detracts from the natural beauty of the area. The removal of units 5 and 6 would further help the development meet this section of the AACP. This section also states that "All Developments should be in accordance with the Wildlife and Biodiversity map and the Parks, Open Space, and the Environment map to protect sensitive habitat areas (e.g. riparian corridor and Elk habitat)" (Policies, pg 35). The development is Exhibit B - PUD Review Criteria Page 2 of 18 P32 respecting the required stream margin setback and the applicant has worked with the Parks Department to ensure that constmction methods will not negatively impact the riparian azea. Design Oualitv: The Design Quality section of the AACP asks that development "retain and encourage an eclectic mix of design styles to maintain and enhance the special character of our community." The section also states that "we favor diversity tempered by context, sometimes historical, sometimes not, as opposed to azbitrariness. `Context' refers first to region, then town, neighborhood, and finally the natural and man made features joining a particular development site. Decisions regarding scale, massing, form, materials, texture, and color must be first measured by context. Contextual appropriateness transcends `style' alone" (Philosophy, pg 42). Staff believes the ideas put forwazd in the Application for a health and wellness facility aze good goals, and that the site plan changes at Conceptual have moved the proposal in the direction of combining this goal with the proposed azchitecture. Further, Staff finds that the changes help ensure the development will "enhance the special character of our community." The Aspen Club site is unique, and this Application proposes a unique addition to the Club. Staff believes the changes to the site plan begin to reflect these opportunities. In terms of uses, the project does a good job of relating to the immediate context which is comprised of a variety of uses. In terms of massing, staff is concerned that there is too much mass on the site given its context of being on the urban rural fringe. The elimination of units 5 and 6 would help better meet the Design Quality section of the AACP. Transportation: The AACP has a number of goals and policies related to Transportation, including a policy that new growth should be structured "on compact, mixed-use patterns that enable and support travel by foot, bicycle, and public transportation for all types of trips" (Policies, pg 22). Additionally, the Transportation Chapter includes goals to maintain and improve "the appeal of bicycling and walking...by adding sidewalk connections, replacing sidewalks, and requiring sidewalks as part of development approvals, where appropriate..." (Goal C, pg 22) and "the appeal of carpool or vanpooling for a wide variety of trip types" (Goal D, pg 22). The Transportation Chapter also includes a policy to "require all employment, school, social, recreation or other activities that generate demand for travel to mitigate traffic impacts through support of alternative transportation modes in proportion to trips generates." (Policies, pg 22) The applicant has worked with city staff to create a set of Transportation Demand Management (TDM) tools that focus on alternative forms of transportation, including carshazing, vanpools, carpooling, biking, and walking. The applicant has also committed to installing a new sidewalk along Ute Avenue to make walking and biking safer and more viable. The TDM plan includes a commitment to continue use of the Cross Town Shuttle and the use of coordinated vans and shuttles for employees as well as visitors who stay at other hotels but want to use the Aspen Club. Coordinated pick up service at the airport is also proposed for the timeshaze users. Staff believes that the TDM plan meets the goals and policies of the AACP related to Transportation. 2. The proposed development shall be consistent with the character of existing land uses in the surrounding area. Exhibit B - PUD Review Criteria Page 3 of 18 P33 Staff Finding: The proposed development is consistent with the character of the area. The neighborhood consists of a variety of single-family and multi-family homes, as well as commercial, non-profit and lodging uses. The proposed affordable housing is consistent with the adjacent properties, which include a number of affordable housing projects. Additionally, adjacent parcels also include non-profit and commercial uses. Staff finds this criterion to be met. 3. The proposed development shall not adversely affect the future development of the surrounding area. Staff Finding: Staff believes that this development will not adversely affect the future development of the area. Most of the area is at or near build out, so there is not a great deal of future development opportunities. Staff finds this criterion to be met. 4. The proposed developnzerzt has either been granted GMQS allotments, is exempt from GMQS, or GMQS allotments are available to accommodate the proposed development and will be considered prior to, or in combination with, final PUD development plan review. Staf(Finding: The Applicant has requested the needed Affordable Housing and Lodge Growth Management Allotments. The proposal will decrease the amount of commercial space on site, so growth management allotments are not required. The applicant needs 12 affordable housing allotments and 124 lodge pillow allotments. In a single growth management year there are 112 lodge pillow allotments available. Because the applicant needs 12 more pillow allotments then are available in this growth management year, they have requested multi-year allotments. Staff finds this criterion to be met. B. Establis/rnzent of Dimensional Requirements: The fznal PUD development plans shall establish the dimensional requirements for all properties within the PUD as described in General Provisions, Section 26.445.040, above. The dimensional requirements of tl:e underlying zone district shall be used as a guide in determining the appropriate dimensions for the PUD. During review of the proposed dimensional requirements, compatibility with surrounding Aand uses arzd existing development patterns shat! be emphasized. Staff Finding: The PUD development plans establish dimensional requirements for all properties in a PUD. The proposed dimensional requirements are based on the proposed subdivision of the exiting lot into 5 new lots. The dimensional requirements are listed below. When listing the dimensional requirements, all front yard setbacks are the south side of the lots, all the reaz yazd setbacks aze on the north side of the lots, and all the side yazd setbacks are the east and west sides of the lots. Exhibit B -PUD Review Criteria Page 4 of 18 P34 RR Underlying Dimensional Proposed Dimensional Requirements Dimensional Requirements Zone District Requirement for subdivided lots based on fathering parcel Dimensional Re uirements Lot l: 3.702 acres or 161,259 sq. fr. Lot 2: N/A Total Lot Area: 4.941 acres, Minimum Lot Size Lot 3: 0.264 acres or 11,499 sq, ft. or 215 232 sq. ft. 2.0 acres Lot 4: 0.716 acres or 31,188 sq. ft. Lot Area after Slope Lot 5: 0.260 acres or 11,325 s . ft. Reduction: 171,047 sq. ft. Minimum Lot Multi-Family: Area per N/A N/A N/A dwellin unit Lodge: N/A Lot 1: 305 Feet Minimum Lot Lot 2: N/A Width Lot 3: 135 Feet 370 Feet 200 Feet Lot 4: 266 Feet Lot 5: 95 Feet Lot 1: 30 feet above grade, 5 feet below Minimum grade Front Yard Lot 2: N/A 7.5 Feet for Affordable 30 Feet Setback Lot 3: 10 feet Housing Units Lot 4: 0 feet Lot 5: 7.5 feet Lot 1: 0 feet above and below grade Minimum Side Lot 2: N/A 5 Feet on east side for Yard Setback Lot 3: 10 feet Affordable Housing Units. 20 Feet (East Side) Lot 4: 20 feet Lot 5: 5 feet Lot 1: 60 feet above grade for building, 20 feet above grade for garage access Minimum Side stair, 5 feet below grade 5 Feet on west side for Yard Setback Lot 2: N/A subgrade garage; 20 feet for 20 Feet (West Side) Lot 3: 20 feet timeshare Unit 1. Lot 4: 5 feet Lot 5: 0 feet Lot 1: 100 feet (15 feet from Top of Slope) Minimum Reaz Lot 2: N/A Yard Setback Lot 3: 10 feet 100 Feet 20 Feet Lot 4: 10 feet Lot 5: 10 feet Townhouse Units (Lots 3 & 4) Affordable Housing Unit Maximum Pitched Roofs (Units 1, 7, 14): 28 feet 1 I, Northwest Corner: 32 Height Flat Roofs (Units 2-5, 8-13): 28 feet feet 28 Feet Club Units (Lot 2): 28 feet Affordable Housing Unit Affordable Housing Units (Lot 5): 28 12, Northwest Corner: 41 Exhibit B - PUD Review Criteria Page 5 of 18 P35 Underlying RR Proposed Dimensional Requirements Dimensional Requirements Zone District Dimensional for subdivided lots based on fathering parcel Dimensional Requirement Re uirements feet with the following exceptions: feet Unit 11, Northwest Corner: 32 feet Affordable Housing Unit Unit 12, Northwest Corner: 41 feet 12, Southwest Comer: Unit 12, Southwest Corner: 31.25 feet 31.25 feet Aspen Club Building (Lot 1): 28 feet Minimum % N/A N/A N/A O en Space Total FAR:.55:1 Total FAR:.55:1 Total: 94,750 sq. ft. Multi-family (affordable Sin le-famil g y' Total: 94,750 sq. ft. housing units): 12,390 sq. ft. Same as R-15 zone district Allowable Multi-family (affordable housing units): Lodge: 50,490 sq. fr. Multi-family: Floor Area 12,390 sq. ft. Lodge: 50,490 sq. ft. (Townhouse Units: Townhouse Units: 34,410 080 sq. ; Club Units: 16 ft s N/A 34,410 sq. ft.; Club Units: 16,080 sq. ft.) , . q. ft) Lodge: N/A Commercial (Club): 31,870 sq. fr. Commercial (Club): 31,870 Commercial: N/A s . ft. Lodge: .5 spaces per key (20 132 spaces total: spaces) ] 32 spaces total: Lodge: 20 spaces Club and Spa: 1 Lodge: 20 spaces Aspen Club and Spa: 95 space per 1000 Minimum Off- Aspen Club and Spa: 95 spaces (60 spaces (60 spaces on Lot 1; sq. ft. of net Street Parking spaces on Lot 1; 35 spaces on Lots 14A 35 spaces on Lots 14A & leasable (43 & 14W) 14W) spaces) AH units: 17 spaces AH units: 17 spaces AH units: 1 space per unit (12 spaces) 1. The proposed dimensional requirements for the subject property are appropriate and compatible with the following influences on the property: a. The character of, and compatibility with, existing and expected future land uses in tlae surrounding area. Staff Finding: The uses in the azea are quite mixed, with commercial, single-family free market residential, multi-family affordable housing, and non-profit uses all on the adjacent properties. Along Ute Avenue, there aze short term accommodations as well as a variety of residential uses. The proposed uses are consistent with the use mix on the adjacent parcels as well as the overall use context of Ute Ave. Overall, the height of the proposal is consistent with the underlying zoning. The three exceptions aze to Exhibit B - PUD Review Criteria Page 6 of 18 P36 accommodate the affordable housing units. The affordable housing units are located in a portion of the upper bench of the site that is lower than the surrounding areas. It is lower than the existing club structure, the adjacent Silverlining Ranch, and lower than the Ute Avenue right of way. Staff believes the proposed heights will fit in the context of the development and neighborhood because the ground elevation is much lower than the surrounding ground elevations. Staff finds this criterion to be met. b. Natural or man-made hazards. Staff Finding: The Applicant has located all development outside the Roazing Fork River's mapped 100-year floodplain. No other natural hazards are believed to affect the ]ot. The applicant conducted an avalanche study as part of the final application, which found the affordable housing units are in the "blue zone." According to the study, "blue zone" avalanches have a return period of 30 to 100 years, or a 1% to 3% probability annually. The applicant and Engineering Department have agreed to have the mudflow risk evaluated by the Colorado Geologic Survey. Staff finds this criterion to be met at this time. c. Existing natural characteristics of the property and surrounding area such as steep slopes, waterways, shade, and signifecant vegetation and [andforms. Staff Finding: Most of the development proposed is within areas of the site that have already been impacted by development. The riparian area is being maintained through the fifreen (15) foot top of slope setback required by the Stream Mazgin portion of the Land Use Code. No development, including excavation, is permitted in this setback area. The applicant has worked with the Pazks Department on the relocation of the existing walkway that connects the Aspen Club Trail and the parking across the river to the club. Staff finds this criterion to be met. d. Existing and proposed man-made characteristics of the property and the surrounding area such as noise, traffic, transit, pedestrian circulation, parking, and historical resources. Staff Finding: The proposed TDM tools will assist in lowering the expected traffic impacts on Ute Ave as a result of this development. These tools include the use of carpooling and incentives for employees to use alternative modes of transportation, participation in the CazShaze program, the availability of bikes for use by affordable housing residents and timeshare users, and coordinated shuttle service for visitors. Additionally, the applicant is installing a sidewalk along Ute Ave to create a more pedestrian friendly environment. The applicant has also committed to zero growth in traffic as a result of this project. Exhibit B - PUD Review Criteria Page 7 of 18 P37 Staff finds this criterion to be met. 2. The proposed dimensional requirements permit a scale, massing, and quantity of open space mxd site coverage appropriate and favorable to the character of the proposed PUD and of the surrounding area. Staff Finding: No open space is currently proposed on-site. Staff recommends the Applicant look at ways to consolidate the paths that are used to access the individual timeshare units to help create more opportunities for open space. Further, Staff believes the elimination of units 5 and 6 will help created needed visual relief from the massing and will create better quality open space. Staff finds this criterion is not met. 3. The appropriate number of off-street parking spaces shall be established based on the following considerations: a. The probable number of cars used by those using the proposed developnent including any non-residential land uses. b. The varying tinxe periods of use, whenever joirxt use of conxnxon parking is proposed. c. The availability of public transit and other transportation facilities, including those for pedestrian access and/or the commitment to utilize automobile disincentive techniques in the proposed development. d. The proximity of the proposed development to Uie commercial core and general activity centers in the city. Staff Finding: The proposal includes 132 parking spaces divided as follows: 20 for the timeshare units (code required amount), 17 for the affordable housing units (code requires 12 spaces, and an additional 5 spaces that are being provided for short term use, i.e. for guest pazking or for grocery drop off), and 95 spaces for the club (this is 4 more spaces than was approved by City Council in 1996). The applicant examined locating more parking in the sub- grade garage to help reduce the amount of surface parking. The water table is located in such a way that additional subgrade parking cannot be accommodated on this site. The 20 timeshaze and 12 of the affordable housing spaces will be located in the subgrade garage. Employees of the Club will continue to use Lots 14A and 14W (located across the river) for their parking, which will make more onsite parking available for club users. In addition, the applicant has created a detailed TDM plan that employs a number of alternative transportation modes in an effort to reduce the project's dependence on the car and need for parking. No parking is permitted along Ute Ave. Staff finds these criteria to be met. Exhibit B -PUD Review Criteria Page 8 of 18 P38 4. The maximum allowable density within a PUD may be reduced if there exists insufficient infrastructure capabilities. Specifically, tl:e maximum density of a PUD may be reduced if.• a. There is not sufftcient water pressure, drainage capabilities or other utilities to service the proposed development b. There are not adequate roads to ensure fire protection, snow removal and road maintenance to the proposed development. Stall Finding: Adequate public facilities exist and will be upgraded at the owner's expense. This includes the realignment of a sewer line. The Applicant's new traffic study indicates that Ute Avenue can accommodate the proposal's traffic generation. In addition, the applicant has created a comprehensive TDM plan to encourage alternative modes of transportation for club users, club employees, affordable housing resident, and timeshaze owners. A safety plan, which includes speed tables and humps, for Ute Ave has also been proposed to ensure the road is safer for pedestrians. The applicant has committed to zero growth in traffic as a result of this project. The applicant has hired consultants to assess the existing water flows to determine if adequate flows exist for fire safety. The preliminary report indicates there aze. The applicant is working with the City Water and Fire Departments to confirm this. The applicant is also working with the Engineering Department to ensure adequate drainage exists on the site. Staff finds this criterion to be met at this time. 5. The maximum allowable density within a PUD may be reduced if there exists natural hazards or critical natural site features. Speciftcal[y, the maximum density of a PUD may be reduced if.• a. The land is not suitable for the proposed development because of ground instability or the possibility of mudflow, rock falls or avalanche dangers. b. The effects of the proposed development are detrimental to the natural watershed, due to runoff, drainage, soil erosion and consequent water pollution. c. The proposed development will have a pernicious effect on air quality in the surrounding area and the City. d. The design and location of any proposed structure, road, driveway or trail in the proposed development is not compatible wit/z the terrain or causes harmful disturbance to critical natural features of the site. Staff Finding: Staff does not find any significant natural hazards on the site that would necessitate a density reduction. For the most part, the proposed development is located in areas of the site that currently contain development. Based on the information provided in the application, Staff does not believe the proposal will involve a pemicious impact on the site's natural watershed. The applicant is working with engineering to ensure drainage into the watershed and Roazing Fork River is properly treated. Staff finds this criterion to be met at this time. Exhibit B -PUD Review Criteria Page 9 of 18 P39 6. The maximum allowable density within a PUD may be increased if there exists a significant community goal to be achieved through such increase and the development pattern is compatible with its surrounding development patterns and wit/t the site's physical constraints. a. The increase in derzsity serves one or more goals of the community as expressed irz the Aspen Area Community Plan (AACP) or a specific area plmz to wlziclt the property is subject. b. The site's physical capabilities can accommodate additional density mtd there exists rzo negative physical characteristics of the site, as identifced in Subparagraphs 4 and 5, above, those areas can be avoided or those characteristics mitigated. c. The increase in maximum density results in a development pattern compatible with and complimentary to, the surrounding existing and expected development pattern, land uses arzd clzarkcteristics. Notes: a. Lot sizes for individual lots within a PUD may be established at a higher or lower rate than specified in the underlying Zone District as long as, on average, the entire PUD conforms to the maximum density provisions of t/te respective Zorze District or as otherwise established as t/1e maxintunz allowable density pursuant to a final PUD Development Plan. b. The approved dimensional requirements jor al[ lots within the PUD are required to be reflected in the final PUD development plans. Staff Finding: There are no set density requirements for the Rural Residential (RR) zone district, so density is established by the PUD. Staff believes that the density on site is appropriate in terms of creating a critical mass for club services. Staff does have concerns related to the massing of the site, and would like to see units 5 and 6 removed, or at the very least relocated to another area of the site (say create additional club units). Staff finds this criterion to be met. C. Site Design. The purpose ojthis stmzdard is to ensure the PUD enhances public spaces, is complimentary to the site's natural and man-made features and the adjacent public spaces, and ensures the public's health and safety. The proposed development shall comply with the jo[lowirzg: I. Existing natural or man-made features of the site which are unique, provide visual interest or a specific reference to the past, or contribute to the identity of the town are preserved or enhanced in an appropriate mam:er. Staff Finding: The site has a great asset in the Roaring Fork River, which crosses the site. The Applicant will abide by all requirements for stream margin review, which will help preserve the riparian area. There is an existing path that crosses the stream margin area, and the applicant has worked with the Parks and Community Development Departments on a new location for the path that will minimize the impact to the hillside. The realigned path will also be formally dedicated through a trail easement. The proposed development and utilities are Exhibit B -PUD Review Criteria Page 10 of 18 P40 located outside of the stream mazgin area. However, staff does not believe that the site plan appropriately preserves or enhances this important natural feature. The elimination of units 5 and 6 would help alleviate staff's concerns. At this time, staff finds this criterion is not met. 2. Structures have been clustered to appropriately preserve significant open spaces and vistas. Staff Finding: No significant existing open spaces will be lost with this proposal, as the timeshare units are proposed where the tennis courts are currently located. During Conceptual approval the applicant amended the site plan to create a lazger open space on the lower bench of the property. Staff does not believe this has created a large enough area to preserve and enhance views of the river and riparian area. The elimination of units 5 and 6 would help alleviate staff's concerns. At this time, staff finds this criterion is not met. 3. Structures are appropriately oriented to public streets, contribute to the urban or rural context where appropriate, and provide visual interest and engagement of vehicular and pedestrian movement. StaflFinding: The timeshare units are not located along Ute Avenue because most of the street frontage is already used to accommodate the existing Club. The proposed affordable housing units are located adjacent to the street, and Staff believes these will contribute to the street character and neighborhood context. Additionally, the Club Units will help create a more pedestrian friendly environment by providing fenestration and interest to the exiting blank wall that exists as you enter the property from Ute Ave. The Applicant has agreed to provide an easement along the Ute Ave portion of the site to accommodate the eventual continuation of the Ute Ave trail. Additionally, a new bus stop/pull out and shelter aze proposed to better accommodate the Cross Town Shuttle. Most of these improvements are located in the public right of way, but easements are provided on the Subdivision Plat to accommodate the portions on site. While the landscaping plan outlines paths throughout the site, Staff believes a simplified plan is more appropriate in this context. This site is uniquely located in an area that is on the Urban/Rural fringe and adjacent to the Roazing Fork River. As such, there is an opportunity to provide unique structures that reflect the diverse settings. While there are multi-family and single-family homes in the area, Staff believes the mission of this development (wellness and personal growth) and it's unique location enable the design to be reflective of the surrounding residences while providing a different take on the design that reflects the Club's mission. Provision of more open areas on the site and the elimination of some of the mass would help the overall design better relate to the rural context. The elimination of units 5 and 6 would help alleviate staff s concerns. At this time, staff finds this criterion is not met. 4. Buildings and access ways are appropriately arranged to allow emergency and service vehicle access. Exhibit B - PUD Review Criteria Page 11 of 18 P41 Staff Finding: The City of Aspen Fire Marshal has reviewed the proposal, and has found it to be in compliance with all applicable life safety requirements. The Fire Marshall requested a staircase be added to the western side of the site to connect the upper and lower bench. This was added during the Conceptual review and resulted in the elimination of one parking space (the total # of parking spaces decreased from 133 at conceptual to ] 32 at final). The existing surface parking area accommodates fire truck turn arounds, and must be maintained. The applicant worked with the Fire and Community Development Departments to utilize grass pavers that can accommodate fire truck loads. This was done to reduce the amount of impervious surface on the site. Further, all structures will be required to include fire sprinkler systems, and fire alarm systems. The applicant will be required to ensure adequate fire access exists in the subgrade garage. Staff finds this criterion to be met. 5. Adequate pedestrian and handicapped access is provided. Staff Finding: According to the Application, the project will comply with all applicable requirements. This has been included as a condition in the Resolution. Two of the Club units are ADA Accessible, and a number of the other units include ADA bathrooms. As mentioned above, the Club will dedicate an easement for the future completion of the Ute Avenue trail. Staff finds this criterion to be met. 6. Site drainage is accommodated for the proposed development in a practical and reasonable manner and shall not negatively impact surrounding properties. Staff Finding: According to a letter submitted by the Applicant's engineer, site drainage will be handled with some drainage improvements to maintain historic runoff Further, the Applicant's engineer states that the timeshare units will have a similar footprint to the existing tennis courts, so an expansion of the impervious surface will be minimal. The Applicant will be required to pay the applicable Storm Water Fee assessed by the Engineering Department. If areas are re-paved as part of the redevelopment, Staff recommends that the re-paving utilize pervious paving materials. The applicant is working with the Engineering Department to ensure runoff is properly treated. Staff finds this criterion to be met. 7. For non-residential land uses, spaces between buildings are appropriately designed to accommodate arty programmatic functions associated with the use. Staff Finding: There is a significant grade difference between the proposed timeshare units near the river and the existing Club. The units that are located at the same grade as the Club do provide sufficient spacing. Staff would like to the elimination of units 5 and 6, which would increase the amount of space available for outdoor programming elements. Staff finds this criterion is not met at this time. Exhibit B - PUD Review Criteria Pale 12 of 18 P42 D. Landscape Plan. The purpose of this standard is to ensure compatibility of the proposed landscape with the visual character of the city, with surrounding parcels, and with existing and proposed features of the subject property. The proposed development shall comply with the following: 1. The landscape plan exhibits a well designated treatment of exterior spaces, preserves existing significant vegetation, and provides an ample quantity and variety of ornamental plant species suitable for the Aspen area climate. Staff Finding: The Applicant has provided a landscaping plan with a number of new plantings proposed. This has been reviewed by the Parks Department, who is working with the applicant to ensure proper native plants are used. Staff finds this criterion to be met. 2. Significant existing natural and man-made site features, which provide uniqueness and interest in the landscape, are preserved or enhanced in an appropriate manner. Staff FindinP: The Parks Department has requested a condition of approval to limit the construction of the trail through the riparian azea to hand tools. This condition has been included. No development is proposed in the protected riparian area. Staff finds this criterion to be met. 3. The proposed method of protecting existing vegetation and other landscape features is appropriate. Staff Findin;;: The Applicant has provided a landscaping plan with a number of new plantings proposed. This has been reviewed by the Patks Department, who is working with the applicant to ensure proper native plants are used. The landscape plan submitted as part of the final design shows a water feature running from the lower bench to the upper bench. Staff finds this distracting to the overall design because it appears to be an attempt to create a connection between the upper bench and the ripazian azea. Staff believes a better solution would be to eliminate the water feature that appears to serve no functional purpose and create additional open azeas on site that provide an actual visual and special connection to the river area. There is an existing path that crosses the Aspen Club property near the river. This path will be maintained in the proposal. Additionally, the applicant has committed to installing a sidewalk on their property along Ute Avenue to help completed a needed pedestrian connection. The applicant is also formally dedicating the trail running from the river to the parking area for the use and benefit of the public. Staff finds this criterion is not met. E. Architectural Character. 1. Be compatible with or enhance the visual character of the City, appropriately relate to existing and proposed architecture of the property, represent a character suitable for and indicative of the intended use and respect the scale and massing of nearby historical and cultural resources. Exhibit B - PUD Review Criteria Page 13 of 18 P43 Staff Finding: The Aspen Club site is unique, and this Application proposes a unique addition to the Club through the new health and wellness program. Staff believes the architecture should reflect these opportunities. In terms of architecture, the applicant has stated to staff that the proposed mass, scale, and materials are intended to convey a residential scale that is representative of the different buildings and uses in the area, while also being true to the Club's use. The applicant has done this by making the "townhome" units residential in character (a mix of pitched and flat roofs, materials palate of stone and wood that is similar to residential uses in the area, modulation typical of residential townhomes) and changing the existing blank facade of the club to be more articulated and pedestrian friendly. Staff has concerns related to the massing of the proposal. In addition, the proposal will be subject to final Commercial Design Review following approval of the final PUD/SPA application. Staff anticipates having concerns related to the specific Commercial Design Review Criteria, including Building Design and Articulation. The applicant has proposed a water feature as part of the landscaping plan. This water feature is located in the middle of the site and runs from the lower bench to the upper bench. There are paths that run through the site to connect the timeshare units to the Club and the parking areas. In addition, the applicant is providing a permanent trail easement for the Aspen Club Trail that currently exists on site. The applicant worked with planning staff and the fire department to come up with a way to provide adequate fire access without creating additional paved areas. The solution is the installation of grass pavers in portions of the upper bench area. The elimination of units 5 and 6 would help alleviate staff s concerns. At this time, staff finds this criterion is not met. 2. Incorporate, to the extent practical, natural heating artd cooling by taking advantage of tl:e property's solar access, shade and vegetation and by use ojnon- or less-intensive mechanical systems. Staff Finding: The site plan utilizes the north/south exposure on the lot, and is participating in the new LEED for Neighborhoods program. The applicant is also planning use of renewable energy, including a Growth Source Heat Pump loop for heating and cooling, as outlined in their Conceptual Energy & Mechanical Systems Plan. Staff finds this criterion is met. 3. Accommodate tl:e storage and shedding of snow, ice and water in a safe and appropriate manner that does not require significant maintenance. Staff Finding: The Applicant has included a detailed snow removal and storage plan as part of the final application. This plan includes snow melt systems and onsite storage of snow. In addition, the parking and fire access areas will be plowed. Staff finds this criterion to be met. Exhibit B -PUD Review Criteria Page 14 of 18 P44 F. Lighting. 1. The purpose of this standard to ensure the exterior of the development will be lighted in an appropriate manner considering both public safety and genera[ aesthetic concerns. 2. All exterior lighting shall in compliance with the outdoor lighting standards unless otherwise approved and noted in the final PUD documents. Up-lighting of site features, buildings, landscape elements and lighting to cal[ inordinate attention to tl:e property is prohibited for residential development. Staff Findine: The PUD will comply with all lighting regulations in place. There are currently 2 lights proposed in the stream margin area. These will need to be removed. Staff finds these criteria to be met. G. Common Park, Open Space, or Recreation Area. If the proposed development includes a common park, open space, or recreation area for tl:e mutual benefit of all development in the proposed PUD, the following criteria shall be met: 1. The proposed amount, location, and design of the common park, open space, or recreation area enhances the character of the proposed development, considering existing and proposed structures and natural landscape features of t/te property, provides visual relief to the property's built form, and is available to the mutual benefit of the various land uses and property users ojthe PUD. 2. A proportionate, undivided Interest in al[ common park and recreation areas is deeded in perpetuity (not jor a number of years) to each lot or dwelling unit owner within the PUD or ownership is proposed in a similar manner. 3. There is proposed an adequate assurance through a legal instrument for the permanent care and maintenance of open spaces, recreation areas, and shared facilities together with a deed restriction against future residential, commercial, or industrial development. Staff Findinr: There are no common spaces proposed as part of this application. Staff finds these criteria to be not applicable. H. Utilities and Public facilities. The purpose ojthis standard is to ensure the development does not impose an undue burden on tl:e City's infrastructure capabilities and that the public does not incur an unjustified ftnancial burden. The proposed utilities and public facilities associated with the development shall comply with the following: 1. Adequate public infrastructure facilities exist to accommodate the development. Exhibit B -PUD Review Criteria Page 15 of 18 P45 2. Adverse impacts on public infrastructure by the development will be mitigated by the necessary improvements at the sole cost of the developer. 3. Oversized utilities, public facilities, or site improvements are provided appropriately and where the developer is reimbursed proportionately for the additional improvement. Staff Finding: The application states that all costs associated with public infrastructure improvements will be borne by the Applicant. This includes the realignment of a sewer line. The Applicant's new traffic study indicates that Ute Avenue can accommodate the proposal's traffic generation. In addition, the applicant has created a comprehensive TDM plan to encourage alternative modes of transportation for club users, club employees, affordable housing resident, and timeshare owners. A safety plan, which includes speed tables and humps, for Ute Ave has also been proposed to ensure the road is safer for pedestrians. The applicant has committed to zero growth in traffic as a result of this project. The applicant has hired consultants to assess the existing water flows to determine if adequate flows exist for fire safety. The preliminary report indicates there are. The applicant is working with the City Water and Fire Departments to confirm this. The applicant is also working with the Engineering Department to ensure adequate drainage exists on the site. While no net new truck delivery traffic is anticipated as part of this project, it was found after Conceptual approval that the existing cul-de-sac does not have adequate pavement to meet city standards. Some improvements to the existing cul-de-sac pavement will be needed to accommodate truck traffic. The applicant is working with the Engineering Department to determine to what extent the applicant is responsible for the improvements. Staff finds this criterion to be met at this time. I. Access and Circulation. (Only standards I&2 apply to Minor PUD applications) The purpose of this standard is to ensure the development is easily accessible, does not unduly burden the surrounding road network, provides adequate pedestrian and recreational trail facilities and minimizes the use of security gates. The proposed access and circulation of the development shall meet the following criteria: 1. Each lot, structure, or other land use within the PUD has adequate access to a public street eUher directly or through an approved private road, a pedestrian way, or other urea dedicated to public or private use. Staff Finding: Staff believes that all structures and uses have appropriate access to a public street. The timeshare units, club, and affordable housing units have access from Ute Avenue, while the additional parking on Lot 14A is accessed from Highway 82. There is also pedestrian access available from the Aspen Club Trail located by the river. The trail that provides access from Lot 14A to the club will be formally dedicated for public use as part of this application. Staff finds this criterion to be met. Exhibit B -PUD Review Criteria Page 16 of 18 P46 2. The proposed development, vehicular access points, and parking arrangement do not create traffic congestion on the roads surrounding the proposed development, or such surrounding roads are proposed to be improved to accommodate the development. Staff Finding: The Applicant has submitted a Traffic Report that indicates the proposed parking configuration will not adversely impact traffic levels on Ute Avenue or the adjacent Intersections. The applicant has committed to no new traffic as a result of this development. Staff finds this criterion to be met. 3. Areas of historic pedestrian or recreational trail use, improvements of, or connections to, t/:e bicycle and pedestrian trail system, and adequate access to significant public lands and the rivers are provided through dedicated public trail easements and are proposed for appropriate improvements and maintenance. Staff Finding: The proposed development will not result in any changes to the existing Trail easements. The Applicant has also agreed to provide an easement along Ute Avenue to continue the Ute Avenue Trail. In addition a new trial easement will be provided for the trail that connects the river to the Club building. Staff finds this criterion to be met. 4. The recommendations of the Aspen Area Community Plan and adopted specific plans regarding recreational trails, pedestrian and bicycle paths, and transportation are proposed to be implemented in an appropriate manner. Staff Finding: The Applicant has agreed to provide an easement along Ute Avenue to continue the Ute Avenue Trail. In addition a new trial easement will be provided for the trail that connects the river to the Club building. Staff finds this criterion to be met. S. Streets in the PUD which are proposed or recommended to be retained under private ownership provide appropriate dedication to public use to ensure appropriate public and emergency access. Staff Finding: There are no internal streets proposed as part of this PUD. Staff finds this criterion to be met. 6. Security gates, guard posts, or other entryway expressions for the PUD, or for lots within the PUD, are minimized to the extent practical. Staff Finding: There are no gates or guard posts proposed as part of this PUD. Staff finds this criterion to be met. J. Phasing of Development Plan. (does not apply to Conceptual PUD applications) Exhibit B -PUD Review Criteria Page 17 of 18 P47 Tl:e purpose of this criteria is to ensure partially completed projects do not create an unnecessary burden on the public or surrounding property owners and impacts of art individual phase are mitigated adequately. If phasing of the development plan is proposed, each phase shafl be defined in the adopted final PUD development plan. Staff Finding: No phasing is proposed as part of this development. The development will take place approximately over a two (2) year period, however, the applicant has requested a seven (7) year vesting period because of the national economic outlook and the availability of funding for mixed use projects. Staff finds this criterion to be met, but recommends against the 7 year vesting period. Exhibit B -PUD Review Criteria Page 18 of 18 P48 EXHIBIT C Chapter 26.590, TIMESHARE DEVELOPMENT Sec. 26.590.070. Review standards for timeshare lodge development. An applicant for timeshare lodge development shall demonstrate compliance with each of the following standards, as applicable to the proposed development. These standards are in addition to those standards applicable to the review of the PUD and Subdivision applications. A. Fiscal impact analysis and mitigation. Any applicant proposing to convert an existing lodge to a timeshare lodge development shall be required to demonstrate that the proposed conversion will not have a negative tax consequence for the City. In order to demonstrate the tax consequences of the proposed conversion, the applicant shall prepare a detailed fiscal impact study as part of the final PUD application. The fiscal impact study shall contain at least the following comparisons between the existing lodge operation and the proposed timeshare lodge development: I. A summary of the sales taxes paid to the City for rental of lodge rooms during the prior five years of its operation. If the lodge has stopped renting rooms prior to the time of submission of the application, then the summary shall reflect the final five (5) years the lodge was in operation. The summary of past taxes paid shall be compared to a projection of the sales taxes the proposed timeshare lodge development will pay to the City over the first five (5) years of its operation. As part of this projection, the applicant shall specify the number of nights the applicant anticipates each timeshare lodge unit will be available for daily rental to visitors (that is, the annual number of nights when the unit will not be occupied by the owner or the owner's guests), the expected visitor occupancy rate for these units, the expected average daily cost to rent the unit and the resulting amount of sales tax that will be paid to the City. 2. An estimation of the real estate transfer taxes that would be paid to the City if the existing lodge were to be sold. If an actual sale of the property has occurred within the last twelve (12) months, then the real estate taxes paid for that sale shall be used. This estimation shall be compared to a projection of the real estate transfer taxes the proposed timeshare lodge development will pay to the City over the first five (5) years of its operation. This projection shall include a statement of the expected sales prices for the timeshare estates and the applicable tax rate that will be applied to each sale. 3. A summary of the City-portion of the property taxes paid for the lodge for the prior five (5) years of its operation and a projection of the property taxes the proposed timeshare lodge development will pay to the City over the first five (5) years of its operation. This projection shall include a statement of the Exhibit C -Timeshare Review Criteria Page I of 7 P49 expected value that will be assigned to the property by the Tax Assessor and the applicable tax rate. The fiscal impact study may also contain such other information that the applicant believes is relevant to understanding the tax consequences of the proposed development. For example, the applicant may provide information demonstrating there will be "secondary" or "indirect" tax benefits to the City from the occupancy of the timeshare units, in terms of increased retail sales and other economic activity in the community as compared to the existing lodge development. The applicant shall be expected to prove definitively why the timeshare units would cause such economic advantages that would not be achieved by a traditional lodge development. Any such additional information provided shall compare the taxes paid during the prior five (5) years of the lodge's operation to the first five (5) years of the proposed timeshare lodge's operation. If the fiscal impact study demonstrates there will be an annual tax loss to the City from the conversion of an existing lodge to a timeshare lodge in any of the specific tax categories (property tax, sales tax, lodging tax, RETT tax), then the applicant shall be required to propose a mitigation program that resolves the problem, to the satisfaction of the City Council. Analysis of the fiscal impact study shall compare existing tax revenues for a lodging property with anticipated tax revenues. The accepted mitigation program shall be documented in the PUD agreement for the project that is entered into between the applicant and the City Council. Staff Findiags: The proposal does not include any conversion of an existing lodge into a timeshare loge development. Staff finds this criterion to not be applicable. B. Upgrading of existing projects. Any existing project that is proposed to be converted to a timeshare lodge development shall be physically upgraded and modernized. The extent of the upgrading that is to be accomplished shall be determined as part of the PUD review, considering the condition of the existing facilities, with the intent being to make the development compatible in character with surrounding properties and to extend the useful life of the building. 1. To the extent that it would be practical and reasonable, existing structures shall be brought into compliance with the City's adopted Fire, Health and Building Codes. 2. No sale of any interest in a timeshare lodge development shall be closed until a Certificate of Occupancy has been issued for the upgrading. Staff Findings: The Applicant proposes an entirely new project, which does not include any conversion of an existing lodge into a timeshare loge development. The new development will be Exhibit C - Timeshaze Review Criteria Page 2 of 7 P50 required to meet all City health, fire, and building codes: Staff finds this criterion to not be applicable. C. Preservation of existing lodging inventory. An express purpose of these regulations is to preserve and enhance Aspen's existing lodging inventory. Therefore, any proposal to convert an existing lodge or other property that provides short-term accommodations to a timeshare lodge should, at a minimum, replace the existing number of units on the property in the planned timeshare lodge. If the applicant is unable to replace the existing number of units, then the timeshare lodge development shall replace the existing number of bedrooms on the property or the applicant shall demonstrate how the proposal complies with the purposes of these regulations, even though the planned timeshare lodge will not replace either the existing number of units or bedrooms. Stall Findings: The Applicant proposes an entirely new project, which does not include any conversion of an existing lodge into a timeshaze loge development. The new development will bring additional lodge rooms to the City's Lodging stock. Staff finds this criterion to not be applicable. D. Affordable housing requirements. I. Whenever a timeshare lodge development is required to provide affordable housing, mitigation for the development shall be calculated by applying the standards of the City's housing designee for lodge uses. The affordable housing requirement shall be calculated based on the maximum number of proposed lock out rooms in the development and shall also take into account any retail, restaurant, conference or other functions proposed in the lodge. Staff Findings: While this section requires affordable housing mitigation to be based on the number of lock-off rooms, updates to the land use code require mitigation be based on bedrooms. Section 26.470.050 of the Land Use Code requires projects to provide mitigation equal to 60% of the employees generated. Section 26.470.100.A.1 states that there aze .5 FTEs generated per lodging bedroom. This project's twenty (20) units include sixty-two (62) bedrooms, creating a generation of 31 FTEs (62 bedrooms * .5). Therefore, the mitigation requirement is 18.6 FTEs (31 FTEs * 60%). The applicant has proposed to provide housing for twenty-seven (27) FTEs onsite in twelve (12) 2-bedroom units. This exceeds the code requirement by nearly 145%. No mitigation is required as part of the Club remodel, as there is no increase in the amount of net leasable azea. Staff finds this criterion to be met. 2. The conversion of any multi-family dwelling unit that meets the de5nition of residential multi-family housing to timesharing shall comply with the Exhibit C -Timeshare Review Criteria Page 3 of 7 P51 provisions of Chapter 26.530, Resident Multi-Family Replacement Program, even when there is no demolition of the existing multi-family dwelling unit. There are currently no multi-family dwelling units on the property. Staff finds this criterion to not be applicable. E. Parking requirements. 1. The parking requirement for timeshare lodge development shall be calculated by applying the parking standard for the underlying zone district for lodge uses. The parking requirement shall be calculated based on the maximum number of proposed lock out rooms in the development. Staff Fir¢dirrgs: Pursuant to section 26.5 ] 5.030 of the Land Use Code, 0.5 parking spaces are required for each key in a lodge development. There are a maximum of forty (40) keys, resulting in a parking requirement of twenty (20) parking spaces for the timeshare units (40 * 0.5 = 20). The Applicant has provided twenty (20) spaces in the sub-grade parking garage for the timeshaze units. Staff finds this criterion to be met. 2. The timeshare lodge development shall also provide an appropriate level of guest transportation services, such as vans or other shuttle vehicles, to offer an alternative to having owners and guests using their own vehicles in Aspen. Staff Findings: The Applicant has provided a detailed Transportation Demand Management (TDM) plan as part of the final application. The TDM plan includes shuttle services to and from the airport for owners and guests of the timeshare units. This service will operate separate from their in town shuttle services. The Transportation Department recommends that the airport shuttle be provided on-demand only to avoid unnecessary trips. This has been included as part of the Resolution. Additionally, the sales and marketing materials will highlight the overall philosophy of the project (healthy living) as well as the transportation options available at the club. These include the use of the Car Share program, and on-site bikes. The applicant has also committed to having zero growth in traffic trips as part of this project. Staff finds this criterion to be met. 3. The owner of a timeshare estate shall be prohibited from storing a vehicle in a parking space on-site when the owner is not using that estate. Staff Findings: The timeshare owners will be prohibited from storing their cars in the garage when they are not staying in their unit. Staff finds this criterion to be tnet. F. Appropriateness of marketing and sales practices. The marketing and sale of timeshare estates shall be governed by the real estate laws set forth in Title 12, Article 61, C.R.S., as may be amended from time to time. The applicant and licensed Exhibit C -Timeshaze Review Criteria Page 4 of 7 P52 marketing entity shall present to the City a plan for marketing the timeshare development. 1. The following marketing and sales practices for a timeshare development shall not be permitted: a. The solicitation of prospective purchasers of timeshare units on any street, mall or other public property or facility; and b. Any unethical sales and marketing practices which would tend to mislead potential purchasers. 2. Giving of gifts to encourage potential purchasers to attend a sales presentation or to visit a timeshare development is permitted, provided the gift reflects the local Aspen economy. For example, gifts for travel to or accommodations in Aspen, restaurants in Aspen and local attractions (ski passes, concert tickets, rafting trips, etc.) are permitted. Gifts that have no relationship to the local Aspen economy are not permitted. The following gifts are also not permitted: a. Any gift for which an accurate description is not given; b. Any gift package for which notice is not given to the prospective purchaser that the purchaser will be required to attend a sales presentation as a condition of receiving the gifts; and c. Any gift package for which the printed announcement of the requirement to attend a sales presentation is in smaller type face than the information on the gift being offered. Staff Findings: The Applicant has committed to incorporating all the above requirements in the final timeshare instruments. These requirements are incorporated into the draft Disclosure document. The timeshare instruments will be recorded simultaneously with the PUD/SPA Agreement. Staff finds this criterion to be met. G. Adequacy of maintenance and management plan. The applicant shall provide documentation and guarantees that the timeshare lodge development will be appropriately managed and maintained in a manner that will be both stable and continuous. This shall include an identi5cation of when and how maintenance will be provided and shall also address the following requirements: 1. A fair procedure shall be established for the estate owners to review and approve any fee increases which may be made throughout the life of the timeshare development, to provide assurance and protection to timeshare owners that management/assessment fees will be applied and used appropriately. 2. The applicant shall also demonstrate that there will be a reserve fund to ensure that the proposed timeshare development will be properly maintained throughout its lifetime. Staff Findings: Exhibit C -Timeshare Review Criteria Page 5 of 7 P53 The Applicant has committed to incorporating all the above requirements in the final timeshare instruments. These requirements are incorpoiated into the draft Disclosure document. The timeshare instruments will be recorded simultaneously with the PUD/SPA Agreement. Staff finds this criterion to be met. H. Compliance with State Statutes. The applicant shall demonstrate that the proposed timeshare lodge development will comply with all applicable requirements of Title 12, Article 61, C.R.S.; Title 38, Article 33, C.R.S.; and Title 38, Article 33.3, C.R.S.; including the requirements concerning the five (5) day period for rescission of a sales contract and the procedures for holding deposits or down payments in escrow. StaFf Findings: The Applicant has committed to incorporating all the above requirements in the final timeshare instruments. These requirements are incorporated into the draft Disclosure document. The final timeshare instruments will be recorded simultaneously with the PUD/SPA Agreement. Staff finds this criterion to be met. I. Approval by condominium owners. If the development that is proposed to be timeshared is a condominium, the applicant shall submit written proof that the condominium declaration allows timesharing, that one hundred percent (100%) of the owners of the condominium units have approved the timeshare development, including any improvements to the common elements that the applicant may propose, that all mortgagees of the condominium have approved the proposed timeshare development and that all condominium units in the timeshare development will be included in the same sales and marketing program. Staff FindinQS: The project currently does not have condominium owners. Staff finds this criterion to not be applicable. J. Prohibited practices and uses. Without in any way limiting any requirement contained in this Chapter, it is unlawful for any person to knowingly engage in any of the following practices: 1. The creation, operation or sale of a right-to-use interest or any other timeshare concept which is not specifically allowed and approved pursuant to the requirements of this Section. Right-to-use timeshare concepts (e.g., lease-holds and vacation clubs) are considered inappropriate in Aspen and are not permitted. 2. Misrepresentation of the facts contained in any application for timeshare approval, timeshare development instruments or disclosure statement. 3. Failure to comply with any representations contained in any application for timesharing or misrepresenting the substance of any such application to another who may be a prospective purchaser of a timeshare interest. 4. Manage, operate, use, offer for sale or sell a timeshare estate or interest therein in violation of any requirement of this Chapter or any approval Exhibit C -Timeshare Review Criteria Pale 6 of 7 P54 granted pursuant hereto or cause or aid and abet another to violate any requirement of this Chapter or an approval granted pursuant to this Chapter. (Ord. No. 21-2002 § 1 (part), 2002; Ord. No. 13-2005, § 5) Staff Findings: The Applicant has committed that they will not knowingly engage in any of the above mentioned activities. Staff finds this criterion to be met. Exhibit C -Timeshare Review Criteria Page 7 of 7 P55 EXHIBIT D Chapter 26.470, Growth Management Quota System Sec. 26.470ASO.B. General requirements: All development applications for growth management review shall comply with the following standards. The reviewing body shall approve, approve with conditions or deny an application for growth management review based on the following generally applicable criteria and the review criteria applicable to the specific type of development: 1. Sufficient growt/r management allotments nre available to accommodate the proposed development, pursuant to Subsection 26.470.030.D. Applications for multi year development a[lotnxent, pursuant to Paragraph 26.470.090.1 shall rzot be required to meet this standard. Staff Firrdinp: The Application includes a request for multi-year allotment for the timeshare portion of the development and 12 allotments for affordable housing. This review criterion is not applicable to the timeshare portion of the applicant. There are sufficient affordable housing allotments available. Staff finds this criterion to be met. 2. The proposed development is consistent with the Aspen Area Community Plan. Staff Finding: Staff believes that a number of the goals in the Aspen Area Community Plan are met, but has some concerns relating to other aspects of the AACP. The Application meets a number of AACP goals related to affordable housing, economic sustainability, and arts and culture, and has made changes since Conceptual Review to meet goals related to transportation. The Applicant has also made changes to the site plan, which Staff believes brings the project closer to meeting the goals related to community character & design, and open space & environment. Overall, Staff finds this review criterion to be met. Housing: The Applicant is providing 145% of the required Affordable Housing, which is an important step in helping the community meet the Affordable Housing goals outlined in the AACP. The Housing section of the AACP states the intent of affordable housing is to "create an affordable housing environment that is appropriately scaled and distributed throughout existing and new neighborhoods..." (Intent, pg 25). This development proposal mixes free- market commercial and free-market lodging with affordable housing. The affordable housing is scaled to relate to the adjacent Club building and other surrounding buildings. This section also states that, "when employees have the ability to live near where they work, their reliance on the automobile lessens and they have greater opportunities to become a part of the town's social fabric" (Philosophy, pg 26). This proposal would provide 12 new affordable housing rental units for Aspen Club Employees. A mix of category 2, 3, and 4 Exhibit D - GMQS Review Criteria Page 1 of 1 ] P56 units aze proposed, which will ensure the housing is accessible to a wide range of income levels. Managing Growth: The AACP Managing Growth Chapter lists one of the main goals of managing growth as "foster awell-balanced community through integrated design that promotes economic diversity, transit and pedestrian friendly lifestyles, and the mixing of people from different backgrounds." (Goal E, pg 19). The proposal will promote a mix of backgrounds through the Club use as well as the affordable housing residents and lodge visitors that will be on site. Additionally, a detailed transportation plan is proposed that promotes pedestrian access to the site and the use of alternative modes of transportation. Economic Sustainability: Further, the Economic Sustainability section of the AACP recognizes that "local ownership of business helps maintain our community's unusual character, tends to return more money to the local economy, and provides additional opportunities for upward mobility of people" and that "the community and its governrnents should support local ownership as well as externally-owned businesses that are locally-serving and locally-involved" (Philosophy, pg 31). The Aspen Club is owned by a variety of locals and non-locals, but it is a locally operated business. The stated goal of this proposal is to provide a new health and wellness opportunity for residents and visitors, and to use the money raised through the timeshare sales to subsidize programs for locals. The Club currently provides services and events that are designed for locals, including the "Tuesdays with Michael" program that highlights a local non-profit and their activities every week in the summer, as well as periodic health lectures. Staff believes that the concept of this application is a good one, and will go a long way towazd furthering the goals outlined Aspen A;ea Community Plan. The Economic Sustainability section also states that it is important to "encourage resource efficiency, environmental responsibility, and cultural and community sensitivity in local organizations and in construction" (Policies, pg 32). The applicant used the new LEED for Neighborhood standards in developing the proposal. This requires that development be done using environmentally friendly techniques. To that end, the applicant is investigating ways to minimize construction impacts, utilizing alternative renewable energies and various energy efficient materials. The applicant has committed to no net new energy use as a result of this project. Arts, Culture, & Education: The AACP states that "...arts, culture, and education are acknowledged as essential to Aspen's thriving yeaz-round economy, its vibrant international profile, and its future as a unique place to live, work, and learn" (Philosophy. Pg 45). The Aspen Club currently works to promote the Arts, Culture, and Education of the Aspen Area by supporting local non- profits through provision of office space and financial support, and by facilitating educational and wellness programs for Club members and community members at large. Pazks, Open Space, & Environment: Exhibit D - GMQS Review Criteria Page 2 of 11 P57 The Pazks, Open Space, & Environment section of the AACP discusses the need to "preserve, enhance and restore the natural beauty of the environment of the Aspen Area" (Intent, pg 34). Staff believes the changes made to the application during conceptual review help the proposal move in the direction of enhancing the riparian area on the site, and bringing the riparian area into the site, however staff believes the current mass detracts from the natural beauty of the area. The removal of units 5 and 6 would further help the development meet this section of the AACP. This section also states that "All Developments should be in accordance with the Wildlife and Biodiversity map and the Parks, Open Space, and the Environment map to protect sensitive habitat areas (e.g. riparian corridor and Elk habitat)" (Policies, pg 35). The development is respecting the required stream margin setback and the applicant has worked with the Parks Department to ensure that construction methods will not negatively impact the riparian area. Design Quality: The Design Quality section of the AACP asks that development "retain and encourage an eclectic mix of design styles to maintain and enhance the special character of our community." The section also states that "we favor diversity tempered by context, sometimes historical, sometimes not, as opposed to arbitrariness. `Context' refers first to region, then town, neighborhood, and finally the natural and man made features joining a particular development site. Decisions regarding scale, massing, form, materials, texture, and color must be first measured by context. Contextual appropriateness transcends `style' alone" (Philosophy, pg 42). Staff believes the ideas put forward in the Application for a health and wellness facility are good goals, and that the site plan changes at Conceptual have moved the proposal in the direction of combining this goal with the proposed architecture. Further, Staff finds that the changes help ensure the development will "enhance the special character of our community." The Aspen Club site is unique, and this Application proposes a unique addition to the Club. Staff believes the changes to the site plan begin to reflect these opportunities. In terms of uses, the project does a good job of relating to the immediate context which is comprised of a variety of uses. In terms of massing, staff is concerned that there is too much mass on the site given its context of being on the urban rural fringe. The elimination of units 5 and 6 would help better meet the Design Quality section of the AACP. Transnortatton: The AACP has a number of goals and policies related to Transportation, including a policy that new growth should be structured "on compact, mixed-use patterns that enable and support travel by foot, bicycle, and public transportation for all types of trips" (Policies, pg 22). Additionally, the Transportation Chapter includes goals to maintain and improve "the appeal of bicycling and walking...by adding sidewalk connections, replacing sidewalks, and requiring sidewalks as part of development approvals, where appropriate..." (Goal C, pg 22) and "the appeal of carpool or vanpooling for a wide variety of trip types" (Goal D, pg 22). The Transportation Chapter also includes a policy to "require all employment, school, social, recreation or other activities that generate demand for travel to mitigate traffic impacts Exhibit D - GMQS Review Criteria Page 3 of 11 P58 through support of alternative transportation modes in proportion to trips generates." (Policies, pg 22) The applicant has worked with city staff to create a set of Transportation Demand Management (TDM) tools that focus on alternative forms of transportation, including cazsharing, vanpools, carpooling, biking, and walking. The applicant has also committed to installing a new sidewalk along Ute Avenue to make walking and biking safer and more viable. The TDM plan includes a commitment to continue use of the Cross Town Shuttle and the use of coordinated vans and shuttles for employees as well as visitors who stay at other hotels but want to use the Aspen Club. Coordinated pick up service at the airport is also proposed for the timeshare users. Staff believes that the TDM plan meets the goals and policies of the AACP related to Transportation. 3. T/:e development conforms to t/re requirements and limitations of the zone district. Staff Finding: The application is For an SPA and PUD to vazy the underlying dimensional and use requirements for this site. The project will comply with all dimensional and use requirements that are established as part of the final PUD/SPA review. Staff finds this criterion to be met. 4. The proposed development is consistent with the Conceptual Historic Preservation Commission approval, the Conceptual Commercial Design Review approval and the Conceptual Planned Unit Development approval, as applicable. Staff Finding: The project received conceptual commercial design review approval and conceptual PUD approval. The final application is consistent with both those approvals. Staff finds this criterion to be met. 5. Unless otherwise specified in this Chapter, sixty percent (60%) of the employees generated by the additional commercial or lodge development, according to Subsection 26.470.IOO.A, Employee generation rates, are mitigated through the provision of affordable housing. The employee generation mitigation plan shall be approved pursuant to Paragraph 26.470.070.4, Affordable housing, at a Category 4 rate as deftned in the Aspen/Pitkin County Housing Authority Guidelines, as amended. An applicant may choose to provide mitigation units at a lower category designation. Staff Finding: The applicant has committed to meeting the 60% employee mitigation number for the Growth Management Review, which is the highest mitigation Ieve1 outlined in the code for lodge development. The lodge development includes 62 bedrooms (ten 3-bedroom units, four 4-bedroom units, four 3-bedroom units, and two 2-bedroom units). Land Use Code section 26.470.100.A.1 states that there are .5 FTEs per lodging bedroom. Therefore, the employee generation is 31 Exhibit D - GMQS Review Criteria Page 4 of 1 I P59 FTEs (62 lodge bedrooms * .5 FTEs = 31 FTEs). At a mitigation level of 60%, the required mitigation for the project is 18.6 FTEs (31 FTEs * 60% = 18.6 FTEs}. The applicant is providing twelve 2-bedroom affordable housing units. Land Use Code section 26.470.100.A.2 states that each 2 bedroom unit houses 2.25 FTEs. Therefore, the proposed 12 affordable housing units will house 27 FTEs (12 two-bedroom units * 2.25FTEs = 27 FTEs). This is approximately 145% of the required affordable housing mitigation. Staff finds this criterion to be met. 6. Affordable housing net livable area, for which the frnished floor level is at or above natural or finished grade, whichever is higher, shall be provided in an amount equal to at least t/tirty percent (30%) of the additional free-market residential net livable area, for which the frnished floor level is at or above natural or frnished grade, whichever is higher. Affordable housing shall be approved pursuant to Paragraph 26.470.070.4, Affordable housing, a~ad be restricted to a Category 4 rate as defined in the Aspen/Pitkin County Kousing Authority Guidelines, as amended. An applicant may choose to provide mitigation units at a lower category designation. Affordable housing units that are being provided absent a requiren¢ent ("voluntary units") may be deed-restricted at any level of affordability, including residential occupied. Staff Finding: No free-market residential development is proposed as part of this application. Staff finds this criterion is not applicable. 7. The project represents minimal additional demand on public infrastructure, or such additional demand is mitigated through improvement proposed as part of the project. Public infrastructure includes, but is not limited to, water supply, sewage treatment, energy and communication utilities, drainage control, fire and police protection, solid waste disposal, parking and road and transit services. (Ord. No. 14, 2007, §1) Staff Finding: Adequate public facilities exist and will be upgraded at the owner's expense. This includes the realignment of a sewer line. The Applicant's new traffic study indicates that Ute Avenue can accommodate the proposal's traffic generation. In addition, the applicant has created a comprehensive TDM plan to encourage alternative modes of transportation for club users, club employees, affordable housing resident, and timeshare owners. A safety plan, which includes speed tables and humps, for Ute Ave has also been proposed to ensure the road is safer for pedestrians. The applicant has committed to zero growth in traffic as a result of this project. The applicant has hired consultants to assess the existing water flows to determine if adequate flows exist for fire safety. The preliminary report indicates there are. The applicant is working with the City Water and Fire Departments to confirm this. The applicant is also working with the Engineering Department to ensure adequate drainage exists on the site. Staff finds this criterion to be met at this time. Exhibit D - GMQS Review Criteria Page 5 of 11 P60 Sec. 26.470.070.Minor Planning and Zoning Commission applications. The following types of development shall be approved, approved with conditions or denied by the Planning and Zoning Commission, pursuant to Section 26.470.110, Procedures for review, and the criteria for each type of development described below. Except as noted, all growth management applications shall comply with the general requirements of Section 26.470.050. Except as noted, the following types of growth management approvals shall be deducted from the respective development ceiling levels but shall not be deducted from the annual development allotments. Approvals apply cumulatively. 26.470.070.4. Affordable housing. The development of affordable housing deed-restricted in accordance with the Aspen/Pitkin County Housing Authority Guidelines shall be approved, approved with conditions or denied by the Planning and Zoning Commission based on the following criteria: a. The proposed units comply with the Guidelines of the AspenlPitkin County Housing Authority. A recommendation from the Aspen/Pitkin County Housing Authority shall be required for tltis standard. The Aspen/Pitkin County Housing Authority may choose to hold a public hearing with the Board of Directors. Staff Finding: The proposed units have been reviewed by APCHA and comply with their guidelines. Nine of the units will contain a minimum of 955 sq. ft. while the other 3 units will contain a minimum of 860 sq. ft. The applicant is proposing the units be rental units so their employees can live near their work. The units are proposed to be a mix of category 2, 3, and 4 units. Staff finds this criterion to be met. b. Affordable housing required for mitigation purposes shall be in tl~e form of actual newly built units or buy-down units. Off-site units shall be provided within the City limits. Units outside tl:e City limits may be accepted as mitigation by the City Council, pursuant to Paragraph 26.470.090.2. If the mitigation requirement is less than one (I) full unit, acash-in-lieu payment may be accepted by the Planning and Zoning Commission upon a recommendation from the Aspen/Pitkin County Housing Authority. Ij the mitigation requirement is one (I) or more units, acash-in-lieu payment shall require City Council approval, pursuant to Paragraph 26.470.090.3. Required affordable housing may be provided through a mix of these methods. Staff Finding: The applicant is proposing built units on the development site. No off-site units or cash in lieu is proposed. Staff finds this criterion to be met. c. Eac/: unit provided shall be designed such that the finis/:ed floor [eve[ ojffty percent (SO%) or more of the unit's net livable area is at or above natural or finished grade, whichever is higher. Exhibit D - GMQS Review Criteria Page 6 of I 1 P61 Staff Finding: All of the affordable housing units are located above grade. Underground storage is provided for the units. Staff finds this criterion to be met. d. The proposed units shall be deed-restricted as 'for sale" units and transferred to qualified purchasers accorditzg to the Asperz/Pitkirz County Housing Authority Guidelines. T/te owner may be entitled to select the first purchasers, subject to the aforementioned qualifrcations, with approval from the AsperalPitkln County Housing Authority. The deed restriction shall authorize t/te Aspen/Pitkirt County Housing Authority or the City to own the unit and rent it to qualified renters as defzrzed in the Affordable Housing Guidelines established by the Aspen/Pitklrz Country Housing Authority, as amended. The proposed units nzay be rental units, irzc(uding but not limited to rental units owned by an employer or nonprofit organization, if a legal instrument in a form acceptable to tl:e Ciry Attorney ensures perntar:ent affordability of the units. The Ciry encourages affordable /rousing units required for lodge developrttent to be rental units associated with the lodge operation acid contribufing to the long-term viability of the lodge. Units owned by the Aspert/Pitkin County Housing Authority, t11e City of Aspect, Pitkirz County or other similar governmental or quasi-municipal agency shall not be subject to tIris mandatory ' for snle" provision. Staff Finding: The affordable housing units are proposed to be owned by the Aspen Club and Spa and rented to qualified employees of the club. APCHA reviewed the application and had the following comments that will be included as conditions of approval: "If the owner cannot provide a qualified tenant, the units shall be rented through APCHA's normal advertising process. At no time shall the tenancy of the units during a lease period be tied to continued employment by the owner. Tenant leases, however, may be terminated for cause or at the end of the lease period upon termination of employment." As a lodging operation, the city encourages the affordable housing units to be rental and staff supports the request. Staff finds this criterion to be met. Sec. 26.470.090.City Council applications. The following types of development shall be approved, approved with conditions or denied by the City Council, pursuant to Section 26.470.110, Procedures for review, and the criteria for each type of development described below. Except as noted, all growth management applications shall comply with the general requirements of Section 26.470.050. Except as noted, all City Council growth management approvals shall be deducted from the respective annual development allotments and development ceiling levels. 26.470.090.1. Multi-year development allotment. The City Council, upon a recommendation from the Planning and Zoning Commission, shall approve, approve with conditions or deny a multi-year development allotment request based on the following criteria: Exhibit D - GMQS Review Criteria Page 7 of 11 P62 a. The proposed development is considered "exceptional" considering the following criteria: (Note: A project need not meet all of the following criteria, only enough to be sufficiently considered "exceptional. ") 1) The proposal exceeds the minimum affordable housing required for a standard project. Staff Finding: The applicant is providing housing for 27 FTEs, when housing for 18.6 FTEs is required by the code. This represents housing at 145% of the requirement. Staff finds this criterion to be met. 1) TI¢e proposed project represents an excellent historic preservation accomplishment. A recommendation from the Historic Preservation Officer shall be considered for this standard. Staff Finding: The proposed development does not include a historic preservation element. The property is not designated and is not on the Ordinance 48 list of potentially significant structures. Staff finds this criterion is not applicable. 3) The proposal furthers affordable housing goals by providing units established as priority through the current Aspen/Pitkin County Housing Authority Guidelines and provides a desirable mix of affordable unit types, economic levels and lifestyles (e.g., singles, seniors, families, etc.). A recommendation from the Aspen/Pitkin County Housing Authority shall be considered for this standard. Staff Finding: The applicant has proposed a mix of Category 2, 3, and 4 units, although the land use code only requires the provision of Category 4 units. Category units that are below Category 4 are priority units for AHCPA. The mix of categories will enable a variety of income levels to rent housing near where they work. The income requirements for these categories are: Maximum Income for Rental Units Cateaory Cateeorv Cateeorv No. of Adults 2 3 4 1 Adult $49,000 $79,000 $129,000 2 Adult $73,000 $119,000 $193,000 3 Adult $85,000 $139,000 $225,000 Net Assets not in Excess of: $125,000 $150,000 $175,000 Staff finds this criterion to be met. Exhibit D - GMQS Review Criteria Page 8 of I 1 P63 4) The proposal minimizes impacts on public infrastructure by incorporating innovative, energy-saving techniques. Staff Finding: The applicant is committing to a project that will contain no net new energy usage. This is being done through upgrades to the existing Club building (insulation, drainage, etc) and energy efficient building techniques, like radiant floors, energy efficient materials, etc. In addition, the applicant is contemplating the use of solar panels, and has committed to the use of Ground Source Heat Pumps (GSHP). The project is participating in the LEED-ND program, and will exceed the City's adopted energy codes. Staff finds this criterion to be met. 5) The proposal minimizes co~astruction impacts to the extent practicable both during acrd after construction. Staff Finding: The applicant has provided a preliminary construction management plan, which indicates the project will meet all applicable city code requirements related to construction. Amore detailed plan will be submitted at the time of the building permit application. Staff would like more detail on construction types. For instance, the applicant indicated during the conceptual review that modular construction might be used in an effort to decrease construction impacts. There is no information on the final application regarding this issue. At this time staff finds this criterion is met. 6) The proposal maximizes potential public transit usage and minimizes reliance on the automobile. Staff Finding: The applicant has submitted a detailed Transportation Demand Management (TDM) plan and traffic study that commits to a zero growth project in terms of traffic. The TDM plan includes specific measures to reduce the reliance on the automobile and increase use of alternative modes, including carpooling, biking, walking, and using shuttles. Specific measures are proposed for Aspen Club employees, those living in the affordable housing units, owners and guests of the timeshare units, and members and guests of the Aspen Club & Spa. The plan has been reviewed by the Transportation Department. Staff finds this criterion is met. 7) The proposal exceeds minimum requirements of the Efftcient Building Code or for LEEDS certification, as applicable. A recommendation from the Building Department shall be considered for this standard Staff Finding: Exhibit D - GMQS Review Criteria Page 9 of 11 P64 The applicant is participating in the LEED-ND pilot program, which requires specific measures be taken to reduce the overall environmental footprint of the development. The Applicant worked with Resource Engineering Group to do an energy use study of the proposal (see Exhibit 2 in the Application Appendix D). The Applicant's goal is to have the entire energy use on site after the development be equal to or less than the energy used on site today. To do that, the applicant will use a Ground Source Heat Pump (GSHP) loop for heating and cooling, improved insulation and HVAC systems on the club building, and the use of radiant floors for efficient heating in the timeshaze and affordable housing units. The applicant has also committed to exceeding the City's current energy code. Staff finds this criterion to be met. 8) The proposal promotes sustainability of the local economy. Staff Finding: One of the applicant's stated goals with this project is to ensure that the Aspen Club and Spa remain an economically viable business. The timeshare units will help subsidize improvements to the Club and new programming opportunities. The Aspen Club is a business that currently serves both locals and visitors, and the improvements envisioned for the club will help ensure it is attractive to locals and visitors in the future. Additionally, the provision of rental affordable housing for club employees will provide opportunities for employees to put roots in the community. The timeshare units will be subject to the Real Estate Transfer Tax (RETT) when they are sold, creating tax revenue. Staff finds this criterion to be met. 9) The proposal represents a desirable site plan and an architectural design solution. Staff Finding: The site has a great asset in the Roaring Fork River, which crosses the site. The Applicant will abide by all requirements for stream mazgin review, which will help preserve the riparian area. However, staff does not believe that the site plan appropriately preserves or enhances this important natural feature. During Conceptual approval the applicant amended the site plan to create a larger open space on the lower bench of the property. Staff does not believe this has created a large enough area to preserve and enhance views of the river and riparian area. In terms of architecture, the applicant has stated to staff that the proposed mass, scale, and materials aze intended to convey a residential scale that is representative of the different buildings and uses in the area, while also being true to the Club's use. The applicant has done this by making the "townhome" units residential in character (a mix of pitched and flat roofs, materials palate of stone and wood that is similar to residential uses in the area, modulation typical of residential townhomes) and changing the existing blank far~ade of the club to be more articulated and pedestrian friendly. Staff has concerns related to the massing of the proposal. In addition, the proposal will be subject to final Commercial Design Review following approval of the final PUD/SPA application. Staff anticipates having concerns related to the specific Commercial Design Review Criteria, including Building Design and Exhibit D - GMQS Review Criteria Page 10 of I 1 P65 Articulation. However the applicant has time to refine the design between now and the future review. The applicant has proposed a water feature as part of the landscaping plan. This water feature is located in the middle of the site and runs from the lower bench to the upper bench. There are paths that run through the site to connect the timeshare units to the Club and the parking areas. In addition, the applicant is providing a permanent trail easement for the trail running from the river to the Club building and parking area. The applicant worked with planning staff and the fire department to come up with a way to provide adequate fire access without creating additional paved areas. The solution is the installation of grass pavers in portions of the upper bench area. The elimination of units 5 and 6 would help alleviate staff's concerns. At this time, staff finds this criterion is not met. 10) The proposed development is compatible with the character of tl:e existing lmzd uses in the surrounding area and the purpose of the underlying zone district. Staff Finding: The uses in the azea are quite mixed, with commercial, single-family free market residential, multi-family affordable housing, and non-profit uses all on the adjacent properties. Along Ute Avenue, there are short term accommodations as well as a variety of residential uses. Staff finds that the proposed use mix will fit in with and is consistent with the variety of uses on the immediately adjacent parcels and the overall context of Ute Avenue. Staff believes the proposed health and wellness program will be a good addition to the existing Club services and to the community in general. Overall, staff finds this criterion is met. b. The project complies with all other provisions of tl:e Lmzd Use Code and bas obtained all necessary approvals from the Historic Preservation Conzrnission, the P[anrzing and Zoning Commission arzd the City Council, as applicable. Staff Finding: The Growth Management Reviews aze part of a larger application. Assuming these reviews are approved by the Planning and Zoning Commission and City Council, this criterion is met. c. The Community Development Director shall be directed to reduce the applicable amzual development allotments, as provided in Subsection 26.470.030.D, in subsequent years as determined appropriate by the Ciry Council. Staff Finding: The Community Development Director will reduce the annual development allotments as applicable. Staff finds this criterion to be met. Exhibit D - GMQS Review Criteria Page 11 of 11 P66 EXHIBIT E Chapter 26.310, Amendments to the Land Use Code and Official Zone District Map Sec. 26.310.040. Standards of review. In reviewing an amendment to the text of this Title or an amendment to the Official Zorie District Map, the City Council and the Planning and Zoning Commission shall consider: A. Whether the proposed amendment is in conflict with any applicable portions of this Title. Staff Finding: Through the review criteria outlined in the exhibits, staff believes the requirements of the code are met, although some minor changes are suggested. Overall, staff finds this criterion to be met. B. Whether the proposed amendment is consistent with al[ elements of the Aspen Area Community Plan. Staff Finding: Staff believes that a number of the goals in the Aspen Area Community Plan are met, but has some concerns relating to other aspects of the AACP. The Application meets a number of AACP goals related to affordable housing, economic sustainability, and arts and culture, and has made changes since Conceptual Review to meet goals related to transportation. The Applicant has also made changes to the site plan, which Staff believes brings the project closer to meeting the goals related to community character & design, and open space & environment. Overall, Staff finds this review criterion to be met. Housing: The Applicant is providing 145% of the required Affordable Housing, which is an important step in helping the community meet the Affordable Housing goals outlined in the AACP. The Housing section of the AACP states the intent of affordable housing is to "create an affordable housing environment that is appropriately scaled and distributed throughout existing and new neighborhoods..." (Intent, pg 25). This development proposal mixes free-market commercial and free-market lodging with affordable housing. The affordable housing is scaled to relate to the adjacent Club building and other surrounding buildings. This section also states that, "when employees have the ability to live near where they work, their reliance on the automobile lessens and they have greater opportunities to become a part of the town's social fabric" (Philosophy, pg 26). This proposal would provide 12 new affordable housing rental units for Aspen Club Employees. A mix of category 2, 3, and 4 units are proposed, which will ensure the housing is accessible to a wide range of income levels. Managing Growth: The AACP Managing Growth Chapter lists one of the main goals of managing growth as "foster a well-balanced community through integrated design that promotes economic diversity, transit and pedestrian friendly lifestyles, and the mixing of people from different backgrounds." (Goal E, pg 19). The proposal will promote a mix of backgrounds through the Club use as well as the Exhibit E -Rezoning Review Criteria Page 1 of 5 P67 affordable housing residents and lodge visitors that will be on site. Additionally, a detailed transportation plan is proposed that promotes pedestrian access to the site and the use of alternative modes of transportation. Economic Sustainability: Further, the Economic Sustainability section of the AACP recognizes that "local ownership of business helps maintain our community's unusual character, tends to return more money to the local economy, and provides additional opportunities for upward mobility of people" and that "the community and its governments should support local ownership as well as externally-owned businesses that are locally-serving and locally-involved" (Philosophy, pg 31). The Aspen Club is owned by a variety of locals and non-locals, but it is a locally operated business. The stated goal of this proposal is to provide a new health and wellness opportunity for residents and visitors, and to use the money raised through the timeshaze sales to subsidize programs for locals. The Club currently provides services and events that are designed for locals, including the "Tuesdays with Michael" program that highlights a local non-profit and their activities every week in the summer, as well as periodic health lectures. Staff believes that the concept of this application is a good one, and will go a long way toward furthering the goals outlined Aspen Area Community Plan. The Economic Sustainability section also states that it is important to "encourage resource efficiency, environmental responsibility, and cultural and community sensitivity in local organizations and in construction" (Policies, pg 32). The applicant used the new LEED for Neighborhood standards in developing the proposal. This requires that development be done using enviromnentally friendly techniques. To that end, the applicant is investigating ways to minimize construction impacts, utilizing alternative renewable energies and various energy efficient materials. The applicant has committed to no net new energy use as a result of this project. Arts Culture. & Education- The AACP states that "...arts, culture, and education are acknowledged as essential to Aspen's thriving year-round economy, its vibrant international profile, and its future as a unique place to live, work, and learn" (Philosophy. Pg 45). The Aspen Club currently works to promote the Arts, Culture, and Education of the Aspen Area by supporting local non-profits through provision of office space and financial support, and by facilitating educational and wellness programs for Club members and community members at large. Parks Open Space & Environment: The Pazks, Open Space, & Environment section of the AACP discusses the need to "preserve, enhance and restore the natural beauty of the environment of the Aspen Area" (Intent, pg 34). Staff believes the changes made to the application during conceptual review help the proposal move in the direction of enhancing the riparian azea on the site, and bringing the riparian azea into the site, however staff believes the current mass detracts from the natural beauty of the area. The removal of units 5 and 6 would further help the development meet this section of the AACP. This section also states that "All Developments should be in accordance with the Wildlife and Biodiversity map and the Parks, Open Space, and the Environment map to protect sensitive Exhibit E-Rezoning Review Criteria Page 2 of 5 P68 habitat azeas (e.g. ripazian corridor and Elk habitat)" (Policies, pg 35). The development is respecting the required stream mazgin setback and the applicant has worked with the Pazks Department to ensure that construction methods will not negatively impact the riparian azea. Design Quality: The Design Quality section of the AACP asks that development "retain and encourage an eclectic mix of design styles to maintain and enhance the special character of our community." The section also states that "we favor diversity tempered by context, sometimes historical, sometimes not, as opposed to arbitraziness. `Context' refers first to region, then town, neighborhood, and finally the natural and man made features joining a particular development site. Decisions regarding scale, massing, form, materials, texture, and color must be first measured by context. Contextual appropriateness transcends `style' alone" (Philosophy, pg 42). Staff believes the ideas put forwazd in the Application for a health and wellness facility are good goals, and that the site plan changes at Conceptual have moved the proposal in the direction of combining this goal with the proposed architecture. Further, Staff finds that the changes help ensure the development will "enhance the special character of our community." The Aspen Club site is unique, and this Application proposes a unique addition to the Club. Staff believes the changes to the site plan begin to reflect these opportunities. In terms of uses, the project does a good job of relating to the immediate context which is comprised of a vaziety of uses. In terms of massing, staff is concerned that there is too much mass on the site given its context of being on the urban/rural fringe. The elimination of units 5 and 6 would help better meet the Design Quality section of the AACP. Transnortation: The AACP has a number of goals and policies related to Transportation, including a policy that new growth should be structured "on compact, mixed-use patterns that enable and support travel by foot, bicycle, and public transportation for all types of trips" (Policies, pg 22). Additionally, the Transportation Chapter includes goals to maintain and improve "the appeal of bicycling and walking...by adding sidewalk connections, replacing sidewalks, and requiring sidewalks as part of development approvals, where appropriate..." (Goal C, pg 22) and "the appeal of carpool or vanpooling for a wide vaziety of trip types" (Goal D, pg 22). The Transportation Chapter also includes a policy to "require all employment, school, social, recreation or other activities that generate demand for travel to mitigate traffic impacts through support of alternative transportation modes in proportion to trips generates." (Policies, pg 22) The applicant has worked with city staff to create a set of Transportation Demand Management (TDM) tools that focus on alternative forms of transportation, including cazsharing, vanpools, carpooling, biking, and walking. The applicant has also committed to installing a new sidewalk along Ute Avenue to make walking and biking safer and more viable. The TDM plan includes a commitment to continue use of the Cross Town Shuttle and the use of coordinated vans and shuttles for employees as well as visitors who stay at other hotels but want to use the Aspen Club. Coordinated pick up service at the airport is also proposed for the timeshare users. Staff believes that the TDM plan meets the goals and policies of the AACP related to Transportation. Exhibit E -Rezoning Review Criteria Page 3 of 5 P69 C. Whetlzer the proposed amendment is compatible with surrounding zone districts and (and uses, considering existing land use artd neighborhood c/zaracteristics. Staff Findine: The proposed development is consistent with the character of the area. The neighborhood consists of a variety of single-family and multi-family homes, and while the proposal is for new timeshare lodge units it will function in a more residential nature than a typical lodge downtown. The proposed affordable housing is consistent with the adjacent properties, which include a number of affordable housing projects. Additionally, adjacent parcels also include non-profit and commercial uses. Staff finds this criterion to be met. D. The effect of the proposed amendment on traffic generation and road safety. Staff Findirt~: The Applicant's new traffic study indicates that Ute Avenue can accommodate the proposal. In addition, the applicant has created a comprehensive TDM plan to encourage alternative modes of transportation for club users, club employees, affordable housing resident, and timeshare owners. A safety plan, which includes speed tables and humps, for Ute Ave has also been proposed to ensure the road is safer for pedestrians. The applicant has committed to zero growth in traffic as a result of this project. Staff finds this criterion to be met. E. Whether and the extent to which the proposed anzendnzent would result in demands on public facilities arzd whether and the extent to which the proposed amendment would exceed the capacity of such public facilities including, but not limited to, transportation facilities, sewage facilities, water supply, parks, drainage, schools and emergency medical facilities. Staff Findine: The applicant has agreed to pay for any extension or improvement of utilizes if any aze needed. The Applicant has contracted with a consulting firm to determine available water flows for the site. That study has indicated that there is enough water capability for required fire needs. The applicant is working with the ACSD on a realignment of the sewer. The proposal is currently being reviewed by the board of directors. According to a letter submitted by the Applicant's engineer, site drainage will be handled with some drainage improvements to maintain historic runoff. Further, the Applicant's engineer states that the timeshare units will have a similar footprint to the existing tennis courts, so an expansion of the impervious surface will be minimal. The Applicant will be required to pay the applicable Storm Water Fee assessed by the Engineering Department. If areas of the site are re- paved as part of the redevelopment, Staff recommends that the re-paving utilize pervious paving materials. The Engineering Department has reviewed the application and is working with the applicant to ensure there is adequate drainage onsite. At this time, staff does not finds this criterion is met. F. Whether and the extent to which the proposed amendment would result in signifcanUy adverse impacts on the natural environnxenG Exhibit E -Rezoning Review Criteria Page 4 of 5 P70 Statf Finding: The applicant has committed to ensuring the new development uses no more energy than the existing development. This will be done through increased energy efficiency of the Aspen Club building and the use of a GSHP loop. There are some trees that need to be removed, but the applicant has worked with the Parks Department to ensure the trees are properly mitigated for. In addition, the applicant is abiding by all stream mazgin requirements. Staff finds this criterion to be met. C. Whether the proposed amendment is consistent and compatible with the community character in the City. Staff Finding: The Rezoning is required because of the SPA designation (the SPA designation is required to allow Affordable Housing and Lodging on the site). Other parcels in the immediate area are also zoned with an SPA overlay (Silverlining Ranch and the Benedict Building). The proposed development is consistent with the chaacter of the area, as outlined in Review Criteria C, above. Both Affordable Housing and Lodging aze uses that are located throughout town and aze integral to the functionality of "Aspen the Resort" and "Aspen the Community". The city has a number of small neighborhood lodges that are scattered throughout residential areas. This proposal is similaz to those lodges in term of size and character. Staff finds this criterion to be met. H. Whether there have been changed conditions affecting the subject parcel or the surrounding neighborhood w/rich support the proposed amendment. Staff Finding: The neighborhood already contains a mix of uses and the lodging component would add to that diversity. In addition, there have been no recent changes in the area or to the land use code that address this kind of development. Staff finds this criterion is not applicable. I. Whether the proposed amendment would be in conflict with the public interest and whether it is in harmony with tl:e purpose and intent of this Title. Staff Finding: There is no known conflict regarding this application. There aze a number of parcels with SPA overlays in the area, and an SPA on this site would enable the creation of additional affordable housing, which is a goal of the Aspen Area Community Plan. Staff believes that the SPA designation would create a public benefit. It will allow affordable housing to be developed on the parcel, which is not currently a permitted use in the underlying zone district. This will enable the Club to house some of its employees that currently commute into Aspen, reducing impacts on the transportation system and the entrance to Aspen. Further, the timeshaze development will enable to Club to continue to provide a home for many of the Valley's non-profits, and will enable specialized programming to be made available to the public. Staff finds this criterion to be met. Exhibit E -Rezoning Review Criteria Page 5 of 5 P71 )EXHIBIT F Sec. 26.435.040. Stream margin review. C. Stream margin review standards. No development shall be permitted within the stream margin of the Roaring Fork River unless the Community Development Director makes a determination that the proposed development complies with all requirements set forth below: L It can be demonstrated that any proposed development which is in the Special Flood Hazard Area will not increase tl:e base flood elevation on the parcel proposed for development. This shall be demonstrated by an engineering study prepared by a professional engineer registered to practice ira the State which shows that the base flood elevation will not be raised, including, but not limited to, proposing mitigation techniques on or off-site which compensate for arry base flood elevation increase caused by the developnre:at; mrd Staff Finding: There is no development proposed in a Special Flood Hazard Area. Staff finds this criterion is met. 2. The recommendations of the Aspen Area Community Plan: Parks/Recreation/Open Space/Trails Plmr and the Roaring Fork River Greenway Plarr are implemented in the proposed plan for development, to the greatest extent practicable. Areas of historic public use or access shall be dedicated via a recorded easement for public use. A fisherman's easement granting public ftsltirrg access within the high water boundaries of the river course shall be granted vin a recorded "Fishermmr's Easement; "and Staff Finding: There are no specific mentions of this area in the AACP or the Greenway Plan. The applicant is maintaining the existing Aspen Club trail that crosses the property, and is creating a new trial easement that connects the river area to the Club building and the parking area. There is an existing path that is being reconfigured (after consultation with the Parks Department) and will be in the new trail easement. Only hand tools will be used in the stream margin are for this path. In addition, the applicant is creating a fisherman's easement. Staff finds this criterion to be met. 3. There is no vegetation removed or damaged or slope grade changes (cut or fill) made outside of a specifcally defined building envelope. A building envelope shall be designated by this review and said envelope shall be designated by this review and said envelope shall be recorded on a plat pursuant to Subsection 26.435.040.F.1; and Staff Finding: There is vegetation being removed on site in consultation with the Parks Department. The landscaping will be consistent with the native vegetation. There will be grade changes to "repair" the damage cause by the existing tennis courts and to move and dedicate to the public the exiting trail that crosses the stream margin. Any activity in the stream margin will Exhibit F -Stream Margin Review Criteria Page 1 of 4 P72 be required to be done using hand tools and will be done in conjunction with the Parks Department. Staff finds this criterion to be met. 4. The proposed development does not pollute or interfere with the natural changes of the river, stream or other tributary, including erosion and/or sedimentation during construction. Increased on-site drainage shall be accommodated within the parcel to prevent entry into the river or onto its banks. Pools or /tot tubs cannot be drained outside of the designated building envelope; and Staff Finding: The proposal will not have an impact on the natural changes to the Roaring Fork River. The applicant is working with the Engineering Department to ensure the drainage is properly handled on site. Staff finds this criterion to be met at this time. 5. Written notice is given to the Colorado Water Conservation Board prior to any alteration or relocation of a water course and a copy of said notice is submitted to tl:e Federal Emergency ManagementAgency; and Staff Finding: No alteration or relocation of the Roaring Fork River is proposed as part of this application. Staff finds this criterion to not be applicable. 6. A guarantee is provided in the event a water course is altered or relocated, that applies to the developer and his heirs, successors and assigns that ensures that the flood carrying capacity on the parcel is not diminished; and Staff Finding: No alteration or relocation of the Roaring Fork River is proposed as part of this application. Staff finds this criterion to not be applicable. 7. Copies are provided of all necessary federal and state permits relating to work within the 100 year flood plain; and Staff Finding: There is no work taking place within the mapped 100 year floodplain. Staff finds this criterion to be met. 8. There is no development outer than approved native vegetation planting taking place below the top of slope or within fifteen (1 S) feet of the top of slope or the high waterline, whichever is most restrictive. This is an effort to protect the existing riparian vegetation and bank stability. New plantings (including trees, shrubs, flowers and grasses) outside of the designated building envelope on the river side shall be native riparian vegetation as approved by the City. A landscape plan will be submitted with all development applications. The top of slope and IOO year flood plain elevation of the Roaring Fork River shall be determined by tl:e Stream Margin Map located in Exhibit F -Stream Margin Review Criteria Page 2 of 4 P73 the Community Development Department and filed at the City Engineering Department; and Staff Finding: There is vegetation being removed on site in consultation with the Parks Department. The landscaping will be consistent with the native vegetation. There will be grade changes to "repair" the damage cause by the existing tennis courts and to move and dedicate to the public the exiting trail that crosses the stream margin. Any activity in the stream margin will be required to be done using hand tools and will be done in conjunction with the Parks Department. The current lighting plan includes 2 lights in the areas protected by stream margin review. These will not be allowed and will need to be removed from the final lighting plan. Staff finds this criterion to be met. 9. All development outside the fifteen (1 S) foot setback from the top of slope does not exceed a lzeigltt delir:eated by a line drawn at a forty-five (45) degree angle froth growzd level at the top of slope. Height shall be measured and determined by the Comnzurzity Development Director using the defirzitiorz for lteigbt set forth at Section 26.04.100 and method of calculating height set forth at Section 26.575.020 as shown in Figure "A' ;and Staff Finding: The applicant has provided documentation indicating the proposed development will not encroach into the 45 degree plane. Staff has asked for additional information on this requirement. At this time, staff finds this criterion to be met. 10. All exterior lig/acing is low and downcast with no liglat(s) directed toward the river or located down tl:e slope and shall be in compliance with Section 26.575.150. Alighting plan will be submitted with all development applications; and Staff Finding: The applicant has provided a lighting plan that meets the lighting code. However, 2 lights will need to be removed from the plan as they are located in the protected stream margin area. These will not be allowed and will need to be removed from the final lighting plan. Staff finds this criterion to be met. Exhibit F -Stream Margin Review Criteria Page 3 of 4 P74 11. There has been accurate identification of wetlands and riparian Zones. Staf(Findinp: The townhome units will be located in areas that currently house tennis courts. No wetlands or riparian aeeas will be disturbed by the townhome development. All activity taking place in the riparian area (stream margin area) will be done with hand tools and is approved because it involves the dedication of a trail for public use and benefit. All work done will be in conjunction with the Parks Department. Staff finds this criterion to be met. Exhibit F -Stream Margin Review Criteria Page 4 of 4 P75 EXHIBIT G, SUBDIVISION Chapter 26.480, SUBDIVISION Section 26.480 of the City Land Use Code provides that development applications for Subdivision must comply with the following standards and requirements. A. Cenerai Requirements 1. The proposed subdivision sltaii be consistent with the Aspen Area ComprelTensive Plan. Staff Finding: Staff believes that a number of the goals in the Aspen Area Community Plan are met, but has some concerns relating to other aspects of the AACP. The Application meets a number of AACP goals related to affordable housing, economic sustainability, and arts and culture, and has made changes since Conceptual Review to meet goals related to transportation. The Applicant has also made changes to the site plan, which Staff believes brings the project closer to meeting the goals related to community character & design, and open space & enviromnent. Overall, Staff finds this review criterion to be met. Housin¢: The Applicant is providing 145% of the required Affordable Housing, which is an important step in helping the community meet the Affordable Housing goals outlined in the AACP. The Housing section of the AACP states the intent of affordable housing is to "create an affordable housing environment that is appropriately scaled and distributed throughout existing and new neighborhoods..." (Intent, pg 25). This development proposal mixes free- market commercial and free-market lodging with affordable housing. The affordable housing is scaled to relate to the adjacent Club building and other surrounding buildings. This section also states that, "when employees have the ability to live near where they work, their reliance on the automobile lessens and they have greater opportunities to become a part of the town's social fabric" (Philosophy, pg 26). This proposal would provide 12 new affordable housing rental units for Aspen Club Employees. A mix of category 2, 3, and 4 units are proposed, which will ensure the housing is accessible to a wide range of income levels. ManaQlria Growth: The AACP Managing Growth Chapter lists one of the main goals of managing growth as "foster awell-balanced community through integrated design that promotes economic diversity, transit and pedestrian friendly lifestyles, and the mixing of people from different backgrounds."' (Goal E, pg 19). The proposal will promote a mix of backgrounds through the Club use as well as the affordable housing residents and lodge visitors that will be on site. Additionally, a detailed transportation plan is proposed that promotes pedestrian access to the site and the use of alternative modes of transportation. Economic Sustainability: Further, the Economic sustainability section of the AACP recognizes that "local ownership of business helps maintain our community's unusual character, tends to return more money Exhibit G -Subdivision Review Criteria Page 1 of 6 P76 to the local economy, and provides additional opportunities for upward mobility of people" and that "the community and its governments should silpport local ownership as well as externally-owned businesses that are locally-serving and locally-involved" (Philosophy, pg 31). The Aspen Club is owned by a variety of locals and non-locals, but it is a locally operated business. The stated goal of this proposal is to provide a new health and wellness opportunity for residents and visitors, and to use the money raised through the timeshare sales to subsidize programs for locals. The Club currently provides services and events that are designed for locals, including the "Tuesdays with Michael" program that highlights a local non-profit and their activities every week in the summer, as well as periodic health lectures. Staff believes that the concept of this application is a good one, and will go a long way toward furthering the goals outlined Aspen Area Community Plan. The Economic Sustainability section also states that it is important to "encourage resource efficiency, environmental responsibility, and cultural and community sensitivity in local organizations and in construction" (Policies, pg 32). The applicant used the new LEED for Neighborhood standazds in developing the proposal. This requires that development be done using environmentally friendly techniques. To that end, the applicant is investigating ways to minimize construction impacts, utilizing alternative renewable energies and various energy efficient materials. The applicant has committed to no net new energy use as a result of this project. Arts, Culture, & Education: The AACP states that "...arts, culture, and education are acknowledged as essential to Aspen's thriving year-round economy, its vibrant international profile, and its future as a unique place to live, work, and learn" (Philosophy. Pg 45). The Aspen Club currently works to promote the Arts, Culture, and Education of the Aspen Area by supporting local non- profits through provision of office space and financial support, and by facilitating educational and wellness programs for Club members and community members at large. Parks, Open Snace, & Environment: The Parks, Open Space, & Environment section of the AACP discusses the need to "preserve, enhance and restore the natural beauty of the environment of the Aspen Area" (Intent, pg 34). Staff believes the changes made to the application during conceptual review help the proposal move in the direction of enhancing the ripazian azea on the site, and bringing the riparian area into the site, however staff believes the current mass detracts from the natural beauty of the azea. The removal of units 5 and 6 would further help the development meet this section of the AACP. This section also states that "All Developments should be in accordance with the Wildlife and Biodiversity map and the Parks, Open Space, and the Environment map to protect sensitive habitat azeas (e.g. ripazian corridor and Elk habitat)" (Policies, pg 35). The development is respecting the required stream margin setback and the applicant has worked with the Parks Department to ensure that construction methods will not negatively impact the riparian area. Design Oualitv: The Design Quality section of the AACP asks that development "retain and encourage an eclectic mix of design styles to maintain and enhance the special character of our Exhibit G -Subdivision Review Criteria Page 2 of 6 P77 community." The section also states that "we favor diversity tempered by context, sometimes historical, sometimes not, as opposed to arbitrariness. `Context' refers first to region, then town, neighborhood, and finally the natural and man made features joining a particular development site. Decisions regarding scale, massing, form, materials, texture, and color must be first measured by context. Contextual appropriateness transcends `style' alone" (Philosophy, pg 42). Staff believes the ideas put forward in the Application for a health and wellness facility are good goals, and that the site plan changes at Conceptual have moved the proposal in the direction of combining this goal with the proposed architecture. Further, Staff finds that the changes help ensure the development will "enhance the special character of our community." The Aspen Club site is unique, and this Application proposes a unique addition to the Club. Staff believes the changes to the site plan begin to reflect these opportunities. In terms of uses, the project does a good job of relating to the immediate context which is comprised of a variety of uses. In terms of massing, staff is concerned that there is too much mass on the site given its context of being on the urban/rural fringe. The elimination of units 5 and 6 would help better meet the Design Quality section of the AACP. Transportation: The AACP has a number of goals and policies related to Transportation, including a policy that new growth should be structured "on compact, mixed-use patterns that enable and support travel by foot, bicycle, and public transportation for all types of trips" (Policies, pg 22). Additionally, the Transportation Chapter includes goals to maintain and improve "the appeal of bicycling and walking...by adding sidewalk connections, replacing sidewalks, and requiring sidewalks as part of development approvals, where appropriate..." (Goal C, pg 22) and "the appeal of carpool or vanpooling for a wide variety of trip types" (Goal D, pg 22). The Transportation Chapter also includes a policy to "require all employment, school, social, recreation or other activities that generate demand for travel to mitigate traffic impacts through support of alternative transportation modes in proportion to trips generates." (Policies, pg 22) The applicant has worked with city staff to create a set of Transportation Demand Management (TDM) tools that focus on alternative forms of transportation, including carsharing, vanpools, carpooling, biking, and walking. The applicant has also committed to installing a new sidewalk along Ute Avenue to make walking and biking safer and more viable. The TDM plan includes a commitment to continue use of the Cross Town Shuttle and the use of coordinated vans and shuttles for employees as well as visitors who stay at other hotels but want to use the Aspen Club. Coordinated pick up service at the airport is also proposed for the timeshare users. Staff believes that the TDM plan meets the goals and policies of the AACP related to Transportation. 2. The proposed subdivision slrall be consistent with the character of existing land uses in the area. Staff Firidinp The proposed development is consistent with the character of the area. The neighborhood consists of a variety of single-family and multi-family homes, as well as commercial, non- profit and lodging uses. The proposed affordable housing is consistent with the adjacent Exhibit G -Subdivision Review Criteria Page 3 of 6 P78 properties, which include a number of affordable housing projects. Additionally, adjacent parcels also include non-profit and commercial uses. Staff finds this criterion to be met. 3. The proposed subdivision shall not adversely affect the future development of surrounding areas. Staff Finding: Staff believes that this development will not adversely affect the future development of the area. Most of the area is at or near build out, so there is not a great deal of future development opportunities. Staff finds this criterion to be met. 4. Tl:e proposed subdivision s/:all be in compliance with al[ applicable requirements of this Title. Staff Finding Through the review criteria outlined in the exhibits, staff believes the requirements of the code are met, although some minor changes are suggested. Overall, staff finds this criterion to be met. B. Suitability of Land for Subdivision a. Land suitability. The proposed subdivision shall not be located on land unsuitable for development because offlooding, drainage, rock or soil creep, mudJlow, rocks[ide, avalanche or snowslide, steep topography or any other natural hazard or other condition that will be harmful to the healtlT, safety, or welfare of the residents in the proposed subdivision. Staff Finding: The Applicant has located all development outside the Roaring Fork River's mapped 100-year floodplain. The applicant conducted an avalanche study as part of the final application, which found the affordable housing units are in the "blue zone." According to the study, "blue zone" avalanches have a return period of 30 to 100 yeazs, or a 1% to 3% probability annually. The applicant and Engineering Department have agreed to have the mudflow risk to be evaluated by the Colorado Geologic Survey. Staff finds this criterion to be met at this time. b. Spatial pattern effcient The proposed subdivision shall not be designed to create spatial patterns that cause inefficiencies, duplication or premature extension of public facilities and unnecessary public costs. Staff Finding Staff believes that the property is suitable for subdivision and development. There are existing public utilities and services (including transportation) in the area. Any cost associated with utility upgrades will be borne by the applicant. Staff finds this criterion to be met. Exhibit G -Subdivision Review Criteria Page 4 of 6 P79 C. Improvements. The improvements set forth at Chapter 26.580 shall be provided for the proposed subdivision. These standards may be varied by special review (See, C1:apter 26.430) if the following conditions have been nzet: 1. A unique situation exists for tl:e deve[opnzent where strict adherence to the subdivision design standards would result in irzconzpatibility with the Aspen Area Comprehensive Plan, the existing, neighboring development areas, and/or the goals of the community. 2. The applicant shall specify each design standard variation requested and provide justification for each variation request, providing design recommendations by professional engineers as necessary. Staff Finding The Applicant has consented in the application to meet the applicable required improvements pursuant to Section 26.580. Staff finds this criterion to be met. D. Affordable lzousing. A subdivision which is comprised of replacement dwelling units shall be required to provide affordable lzousirzg in compliance with the requirements of Chapter 26.520, Replacement Housing Progrmzz. A subdivision which is comprised of new dwelling units shall be required to provide affordable /:Dosing in compliance with the requirements of Chapter 26.470, Growth Management Quota System. Staff Finding The applicaz~t is providing 12 affordable housing units to mitigate the new timeshare lodge units. No mitigation is required for the Club remodel. Further, more affordable housing than is required is provided by this proposal. Staff finds this criterion to be met. E. Sc/zoo/ Larzd Dedication. Compliance with the Sc/zoo/ Land Dedication Standards set forth at Chapter 26.630. Staff Finding The proposed subdivision is required to meet the School Land Dedication Standards pursuant to Land Use Code Section 26.630. The Applicant has. proposed to pay cash-in-lieu of providing land. The Applicant has consented to paying the applicable school land dedication fee at the time of building permit issuance for development within the subdivision. Staff finds this criterion to be met. F. Growth Managenzerzt Approval. Subdivision approval may only be granted to applications for which all growth management development allotments have been granted or growth management exemptions have been obtained, pursuant to Chapter 26.470. Subdivision approval may be granted to create a parcel(s) zoned Affordable Housing Planned Unit Development (AH-PUD) without first obtaining growth management approvals if the newly created parcel(s) is required to obtain such growth management approvals prior to development through a legal instrument acceptable to t/ze City Attorney. (Ord No. 44-2007, § 2) Staff Finding Exhibit G -Subdivision Review Criteria Page 5 of 6 P80 The application has requested the necessary growth management allocations for the proposed development. Staff finds this criterion to be met. Exhibit G -Subdivision Review Criteria Page 6 of 6 P81 MEMORANDUM To: Development Review Committee From: Jessica Garrow, Long Range Planner Date: September 9, 2009 Re: Aspen Club and Spa Final PUD/SPA/Timeshare Review The Development Review Committee (DRC) was asked to review the proposed Aspen Club and Spa Final PUD/SPA/Timeshare at our June 3, 2009 meeting. The Applicant has worked with a number of departments throughout the summer and some revised comments have been made. This summary includes the most recent comments received from all departments. Attendees: Jessica Garrow, Long Range Planner; Trish Aragon, Engineering; Phil Overeynder, Public Works; Lee Cassin, Environmental Health; Lynn Rumbaugh, Transportation; John Kruger, Transportation; Tom Bracewell, ACSD; Denis Murray, City Building; Ed VanWalraven, AFPD; Brian Flynn, City Parks; Michael Fox, Aspen Club; Sunny Vann, Vann Assoc.; Richard de Campo, Poss Architecture. Transportation (Lyme Rumbaugh & John Kruger): Transportation requests the following information and has the following comments: Comments on Proposed Transportation Demand Management Tools 1. Shuttle Service a. The Aspen Club will be required to provide a minimum level of shuttle service as planned and approved in December 2003 (Number 4, below). Without this minimum level of service in place, the Club will be required to contribute a fee equal to 13 trips per day to the operation of the Cross Town Shuttle, based on calculations developed in 2003. b. In addition, as part of this new development, staff recommends that the Club van be operated on a fixed route and schedule to create a continuity of service. c. A complete shuttle plan detailing the Club shuttle route(s), schedule and stops must be approved by the City of Aspen Transportation Department no later six months prior to the issuance of a Certificate of Occupancy. This plan must meet the conditions discussed above. d. Service to the airport (described in the owners and guests section of the plan) must be provided separately from the scheduled in-town service in order to keep that service on a fixed schedule. Staff recommends that airport service be provided on-demand only to avoid unnecessary trips. 2. Other TDM Measures a. A complete plan for the implementation of an on-site carshare program must be presented to and approved by the Transportation Department no later than six months prior to the issuance of a Certificate of Occupancy. This program must be owned and operated by the Exhibit H -DRC Comments Page 1 of 10 P82 Aspen Club. The City of Aspen cazshare program will not operate this vehicle. This plan must include, at a minimum: *purchase of vehicle(s) *type of vehicle(s) *pazking location(s) *allowable customers *vehicle replacement plan *operations plan b. The remainder of the TDM measures discussed in the applicant's proposal must be implemented no later than six months after the date of issuance of the Certificate of Occupancy. c. Any modifications to or elimination of TDM measures from the proposed program must be presented to and approved by the Transportation Department. 3. Monitoring a. The Transportation Demand Management plan needs to state the traffic generation goal specifically. b. Based on the TDA plan which states that the project plans for "zero growth" in traffic, the Transportation Department recommends a goal of maintaining traffic levels at their stated baseline of 860 trips per day. AM peak trips should be limited to 70 per day. PM peak trips should be limited to 99 per day. c. Vehicle counts and surveys should be undertaken in March and August annually as outlined in the plan, using an Engineering/Transportation firm or using standazd traffic counting devices. Report should be provided to Transportation Department by October 1 annually. The report should indicate both daily and hourly traffic counts. d. Annual surveys should be pre-approved by the Transportation Department. e. Should monitoring show that the zero growth goal is exceeded at any time, the Aspen Club will be required to develop a plan for approval by the Transportation Department to include a variety of the following suggested TDM measures: • additional transit service via Club shuttle • contribution to the Cross Town Shuttle as outlined in the Shuttle Service section above • additional restrictions on employee driving • additional rewards/incentives programs for employees and guests • paid parking for employees and guests • year one and two and two of the following • additional restrictions on employee driving • more aggressive internal and external education • additional rewards/incentives programs for employees and guests • paid parking for employees and guests • other measures as approved by the Transportation Department 4. Aspen Club Shuttle Minimum Service Levels a. From December 15 through April 15, and from June 15 through September 30, the van will run continuously from 8:30 am until 8:00 pm on Saturday and Sunday and until 9:00 pm on weekdays. Exhibit H - DRC Comments Page 2 of 10 P83 b. From April 16 through June 14, and from October 1 through December 14, the van will run twice per hour, on the 10 and 40 minute past the hour, during the same hours. Fire (Ed Van Walraven): The Aspen Fire Protection District requests the following information acrd has the following comments: • Need an overall access plan for the site • Lawn pavers must be engineered to support fire truck loads Need fire truck access to the subgrade garage • Fire sprinklers and alarms are required. 1. Approved fire sprinkler systems shall be provided through out the entire project, this includes all structures. 2. Approved fire alarm systems shall be provided through out the entire project, this includes all structures. 3. Adequate fire department appazatus access shall be provided and approved by the Fire Marshal's office. Plannin¢ (Jessica Garrow): City Planning requests the following information and has the following comments: 1. Need a copy of the most current SketchUp model before proceeding to P&Z. Engineering Department (Trish Aragon): Engineering requests the following information and has the following comments. 1. Geologic Hazazds: a. The avalanche hazard area needs to be depicted on the improvement survey [Not Addressed] b. Mudflow: the potential for mudflow must be analyzed at a minimum with two dimensional computer models. The application must show how the development will impact the mudplain. [Addressed with a letter, not modeling will need to complete modeling prior to Recording Final PUD. Would be willing to have application referred to Colorado Geologic Survey for a third opinion.] c. This application will be referred to Colorado Geologic Survey for their review on the geologic hazards to the site. 2. Transportation Facilities a. The minimum radius of the Cul de sac at Ute must be 100 feet (it's currently 85'). The current cul de sac will not be able to accommodate future service deliveries, bus service, or construction traffic. [Plan shows 450 sf of pavement required for the cul de sac and a relocation of approx. 7 feet of a retaining wall. If the Exhibit H - DRC Comments Page 3 of 10 P84 development does not improve the cul de sac the city will be burdened with the improvement.] b. The sidewalk /trail along Ute avenue does not extend to the club. The traffic plan specifically relies on bike and pedestrian traffic however there is not adequate facilities to accommodate this. 3. Drainage a. The City at this time is unable to determine if the project does not have an adverse environmental impact. A comprehensive drainage plan will need to be submitted. Refer to the attached checklist. [Not Addressed] b. Dewatering of the excavation for footers and foundations may be required. A construction site dewatering plan should be developed that includes water quantity concerns for the river. [Not Addressed] 4. General a. The utility easements need to match proposed easements. Widths need to be set as specified in section. [Partially addressed, not cleaz on all utilities.] Parks Department (Brian Flynn): The Pazks Department requests the following information and has the following comments: 1. Building permit plans shall include a detailed plan submitted for stream margin protection and stability of the hillside above the trail. The detailed plan shall identify; Location of silt fencing and erosion control along the hillside. The City can provide specifications if needed: minimum requirements include a silt fence and straw bales placed in a manner preventing erosion and protect the river from residual run-off. All of these detailed at the 15' set back from top of slope. 2. Building permit plans shall include a detailed plan submitted for Construction staging. This plan shall detail how the construction will take place with staging, storage of materials and locations of vehicles so that trees remaining on site will not be impacted and remain protected. 3. Building permit plans shall include a detailed plan submitted for Tree Protection. • Tree protection fences must be in place and inspected by the city forester or his/her designee (920-5120) before any construction activities are to commence. • No excavation, storage of materials, storage of construction back£11, storage of equipment, foot or vehicle traffic allowed within the drip line of any tree on site. • There should be a location and standard for this fencing denoted on the plan. Current locations are identified above the 15' set back and along the side yard set backs. 4. An approved tree permit is required before submission of the building permit set. Contact the Pazks Department for permit, 920-5120. Exhibit H - DRC Comments Page 4 of 10 P85 5. Conceptual landscape is not approved as drawn. A landscape plan will need to be reviewed by the Parks Department. Proper spacing and a detailed legend for new plantings and plantings around existing will be reviewed by the Parks Department. This legend shall include species name. 6. Plans should detail the material and width of the footpath proposed within the stream margin area. This footpath shall be installed with hand excavation tools only and set around all trees to remain on site. The utilities located under the trail should be developed and installed with junction boxes so future repairs can be accomplished without the need to excavate the new trail. 7. Aspen Club Trail access or use for any construction activities is prohibited at all times. This includes but is not limited to truck traffic, foot traffic, storage or materials, etc.... o. After receiving conceptual approval from City Council the develop team shall meet with the Parks and Engineering departments to design this pedestrian and vehicular access. 9. Parks requests that the ownership group locate and include in the future packets the trail easement language for the existing Aspen Club Trail located on the North side of the property. Utilities/Public Works Comments (Phil Overeynder): The Public Works Department requests the following information and has the following comments: 1. The Water Dept would like a loop feed from across the bridge to ensure there are adequate fire flows. The applicant needs to work with the Water Department to ensure adequate water flows are available for the proposal. 2. Larger easements would be needed for the internal service loop Buildin>r Department (Denis Murray): The Building Department requests the following information and has the following comments: 1. Prior to permit submittal Poss or the architect of record will provide the following ; determine the type of construction for the existing stmcture. 2. Determine the allowable area for building and addition based on the type of construction and modifications. 3. Develop a means of egress plan. 4. A plan to show an accessible route throughout the site and units. 5. If the Club is intending to operate while under construction, a plan to maintain exits and separation from construction activity will be required. 6. The City of Aspen building department may adopt new building codes in the spring of 2010. The department is willing to discuss which addition of the codes the design of this project is to be completed under. Exhibit H - DRC Comments Page 5 of 10 P86 ACSD (Tom Bracewell): The Aspen Consolidated Sanitation District requests the following information and has the following comments: 1. Since there is an existing Aspen Consolidated Sanitation District owned and maintained main sanitary sewer line currently running through the proposed development, the proposed relocation of this main ACSD sanitary sewer line must be approved by the District's consulting engineer and boazd of directors prior to the district committing to serve this application. 2. The district will require a written verification from the applicant that the revised sanitary sewer service for the Silver Lining Ranch is acceptable to the current owners of the Silver Lining Ranch property. 3. A sanitazy sewer flow study shall be required of the applicant's civil engineer. 4. Since it is appazent at this level of approval that the district's main sanitary sewer lines will be modified to serve the new proposed development, a line relocation request and collection system agreement aze required. Both aze ACSD Board of Director's action items. 5. New easements will be required for the sanitary relocation according to standard district form. Additional access and maintenance easements may be required depending on the final sanitazy sewer utility plans. 6. Service is contingent upon compliance with the District's rules, regulations, and specifications, which aze on file at the District office. 7. ACSD will review the approved Drainage plans to assure that clear water connections (roof, foundation, perimeter, patio drains) are not connected to the sanitary sewer system. The district will require that the applicant verify that the existing building's roof drains do not discharge the sanitazy sewer system. 8. On-site utility plans require approval by ACSD. 9. Oil and Grease interceptors (NOT traps) aze required for all food processing establishment. Locations and specifications of the interceptor shall be identified prior to building permit. 10. Oil and Sand separators are required for parking garages and vehicle maintenance establishments. 1. Driveway entrance drains must drain to drywells. 2. Elevator shafts drains must flow thru o/s interceptor 11. Old service lines must be excavated and abandoned at the main sanitary sewer line according to specific ACSD requirements. Exhibit H - DRC Comments Page 6 of 10 P87 12. Below grade development may require installation of a pumping system. 13. One tap is allowed for each building. Shared service line agreements may be required where more than one unit is served by a single service line. 14. Permanent improvements are prohibited in sewer easements or right of ways. Landscaping plans will require approval by ACSD where soft and hard landscaping may impact public ROW or easements to be dedicated to the district. 15. All ACSD fees must be paid prior to the issuance of an excavation foundation or access/infrastructure permit. Peg in our office can develop an estimate for this project once detailed plans have been made available to the district. 16. Where additional. development would produce flows that would exceed the planned reserve capacity of the existing system (collection system and or treatment system) an additional proportionate fee will be assessed to eliminate the downstream collection system or treatment capacity constraint. Additional proportionate fees would be collected over time from all development in the area of concern in order to fund the improvements needed. 17. Where additional development would produce flows that would overwhelm the planned capacity of the existing collection system and or treatment facility, the development will be assessed fees to cover the costs of replacing the entire portion of the system that would be overwhelmed. The District would fund the costs of constructing reserve capacity in the area of concern (only for the material cost difference for larger line). 18. The applicant will need to provide plans showing that the pool drain sizes conform to district regulations. 19. Applicant will be required to deposit funds with the district for plan review fees, construction observation fees, fees to clean and televise the new main sewer line extension into the project. 20. The Applicant will have to pay 40% of the estimated tap fees for the anticipated building stubouts prior to building permit. 21. The glycol heating and snow melt system must be designed to prohibit and discharge of glycol to any portion of the public and private sanitary sewer system. The glycol storage areas must have approved containment facilities. 22. The district will be able to respond with more specific comments and requirements once detailed building and utility plans are available. 23. Soil Nails are not allowed in the public ROW above ASCD main sewer lines and within 3 feet vertically below an ACSD main sewer line. Exhibit H - DRC Comments Page 7 of 10 P88 Parkin¢ Department (Rich Ryan): The Parking Department requests the following information and has the following comments: 1. No parking is approved for Ute Ave or in the cul-de-sac. Environmental Health Department (Lee Cassin): The Environmental Health Department requests the following information and has the following comments: AIR QUALITY: Air pollution emissions resulting from this development will occur both during construction and afterward as a result of the additional traffic generated. Using the Institute of Transportation Engineers Trip Generation Report, the development will generate an additional 242 trips per day without mitigation measures (afrer construction). This would result in 34 grams of PM-10 pollution per day, in addition to other criteria pollutants such as carbon monoxide and ozone. During construction, the applicant should take special caze to eliminate dust since the facility will continue to be occupied during construction. To comply with the requirements of the land use code, the development must not impose an undue burden on the City's infrastructure capabilities, the public must not incur an unjustified financial burden, and adequate public infrastructure facilities must exist to accommodate the development. Adverse impacts on public infrastructure by the development must be mitigated by the necessazy improvements at the sole cost of the developer. The relevant city infrastructure includes mass transit service (since vehicle trips are the cause of almost all of Aspen's air pollution), TDM programs like cazshare, and the pedestrian/bicycle system. Demands on the existing mass transit system will occur both to RFTA (downvalley workers and guests), and in-town transit. To accommodate the added trips, both RFTA and city transportation will have to carry more passengers if trips are not to increase. The present negligible use of transit to access the facility is evidence that changes need to be made to divert trips from single occupant vehicles to transit or pedestrian bike access. In order for these adverse impacts on public transit to be mitigated by necessary improvements at the sole cost of the developer, the applicant should pay to have RFTA and City Transportation carry a portion of the 242 trips being generated, and the applicant should implement a list of TDM measures to reduce the remaining trips. If the developer were to try to operate its own shuttle service, there would be three sepazate services serving the azea, which is obviously extremely inefficient and would result in many more empty vehicles than if the developer contributed to the city's system. For any trip reduction measures to work, at final submission, staff needs detailed programs in order to determine the impacts on air quality and related infrastructure. As of this deadline, this department does not have that information. Examples of measures with Exhibit H - DRC Comments Page 8 of 10 P89 quantifiable effects, if adequately spelled out, include parking cash-out, unbundled parking, reduced parking, reduced rates for arrivals by other than SOV, trail improvements, as well as contributing to the added RFTA and in-town transit demands and shared shuttle service. Council has directed staff to support measures that do not require long-term staff monitoring and that cannot be eliminated in the future if ownership or management changes. That further supports the recommendation for contributing to RFTA and in- town shuttle service as primary trip and pollution reduction measures. If only 10% of added trips were to be mitigated in this way, each new unit would contribute $16,500 to RFTA to carry the resulting added trips it will have to carry over the 30-year life of the project, and an equal amount to City Transportation for the in-town transit that it will be required to provide. Otherwise, these public entities will have to absorb the added costs of carrying the additional passengers. To the extent that a variety of other TDM measures may be approved, staff recommends the following: • The 242 additional trips be compared to current average daily trips, using a calculation method determined by the City Engineer. A cap on additional trips should be agreed on as part of the approval. To meet the code requirements, this number would have to be very small. Obviously, this requires traffic counts at the entrances to the Club, to avoid disputes about traffic going to other sites. • If this traffic volume is exceeded in any year, the owners would be required to add trip reduction measures sufficient to meet the cap, with these measures approved by City Engineering, Environmental Health and Transportation. • The point at which added traffic on Ute Avenue constitutes a "tipping point" in traffic volumes needs to be addressed. • Given the ineffectiveness of the present system, partly due to the challenge of serving this facility, and partly because the shuttle service does not run on a schedule, it should be determined whether the existing conditions of approval are being complied with, so any needed modifications can be made in conjunction with this new approval. • For the shuttle system to be used, it must run on a schedule. It will not be used if people do not know when it will pick them up or return. However, running three separate systems ensure there will be many empty vehicles. The recommended solution would be use of the city system, rather than creating a duplicative system. • Trips could be reduced by providing less parking instead of adding spaces. • "Various tools the Club proposes to use" should be changed to firm commitments at this point of final submission. Items that need to be specified include: o Precise level of shuttle service, what "regular shuttle pickups" means, and whether this will be part of the city's existing system. o "Implement an incentive program" needs to be replaced with the specific incentives that are proposed. o Requiring employees to use mass transit is excellent. How this will be enforced needs to be determined. However, in the Exhibit I, the submittal Exhibit H - DRC Comments Page 9 of 10 P90 states that "employees will be encouraeed to" use mass transit. This needs to be clazified. Since employee parking is to be provided, it appears that the proposal is to "encourage", not "require" employees to alternate commute. If so, the incentives need to be described: will employees be given free bus passes, as is done by other major employers? Will they be given parking cashouts, etc. o How many electric vehicles, who will use them, how effective will they be? o How many bikes in bike sharing program, who will use them, how will it work? Will employees be re uired to use these bikes? o How will they participate in the cazshare program? What will they contribute, how many memberships? o What will the "preference" be for onsite employees who don't' park a car there? • The annual report should not "suggest improvements" that could be undertaken. Rather, these measures should offset [he 90% of trips not offset by RFTA and City Transportation. If trips increase over the agreed-on number, alternative measures agreed to by the city, should be required to replace those that are not working. 2. TRASH AND RECYCLING AREA: The additional development will create added trash and recycling. The applicant should make sure that the trash storage area has adequate wildlife protection. Recycling space needs to be adequate as well, since haulers are required to include recycling of cardboard, newspaper, office paper, and co-mingled materials. Space for all of these commodities should be conveniently located for all users to encourage recycling. Environmental Health staff can provide assistance in designing recycling set-ups in the new azeas so recycling can be as effective as possible. Exhibit H - DRC Comments Page 10 of 10 P91 MEMORANDUM TO: Jessica Garrow FROM: Cindy Christensen, Housing DATE: August 6, 2009 RE: ASPEN CLUB FINAL PUD/SPA/TIMESHARE Parcel ID No. ISSUE: The applicant is proposing a redevelopment of the Aspen Club to create a healthy living community by providing 20 fractional ownership units, 12 affordable housing units, and remodel portions of the Club. BACKGROUND: The Board reviewed the final application on July 1, 2009 and recommended that the applicant work with staff on the conditions for the redevelopment. The developer has the option of the units being "for sale" units or rental units and would prefer rental units. MITIGATION: Based on the requirements of Section 26.470.100.A.1., below is the mitigation requirement: 10 3-bedroom townhouse units = 30 bedrooms 4 4-bedroom townhouse units = 16 bedrooms 4 3-bedroom club units = 12 bedrooms 2 2-bedroom club units = 4 bedrooms 62 Total Bedrooms X 0.5 Employees/Bedroom = 31 Employees 31 Employees X 60% = 18.6 Employees The 12 on-site two-bedroom affordable housing units will provide mitigation for 27 employees, 87% of the total 31 employees being generated by the development.. Two additional two-bedroom units or one three-bedroom unit would provide mitigation at 100%. Nine of the units will contain a minimum of 950 square feet of net livable and the other three will contain at least 860 square feet of net livable area. The minimum requirements in he Guidelines for Category 3 and 4 is 950 net livable squaze feet and a minimum of 850 net livable squaze feet for Category 1 and 2. The applicant is recommending that the units be categorized as 2, 3 and 4. Twelve pazking spots (or one per unit) will be provided for the 12two-bedroom units. t P92 RECOMMENDATION: The applicant is proposing mitigating at 87% whereby 60% is required under the Land Use Code. The Boazd reviewed the application at their regular meeting held August 5, 2009 and recommend approval of the application with the following conditions: 1. The 12 on-site, two-bedroom affordable housing units shall be deed restricted to Category 2, 3 and 4 with the final category mix approved by APCHA in connection with the final approval. The CO for the units shall be issued prior to or at the same time as the proposed fractional ownership units. 2. The units shall be owned and managed by the Aspen Club and Spa. More detailed information regazding the management and maintenance of the units shall be provided to APCHA with the proposed deed restriction prior to CO. 3. The owner shall have the right to rent the units to qualified employees of the Club. If the owner cannot provide a qualified tenant, the units shall be rented through APCHA's normal advertising process. At no time shall the tenancy of the units during a lease period be tied to continued employment by the owner. Tenant leases, however, may be terminated for cause or at the end of the lease period upon termination of employment. 4. Each tenant in the rental units shall be required to be requalified by APCHA on a yearly basis. 5. The owner shall convey an undivided 1/10`h of ]% ownership interest in the lot on which the units aze situated to APCHA. The APCHA ownership interest shall be in perpetuity or until such time as the units are converted to ownership units. 6. The deed restriction shall allow the units to become ownership units at such time as the owner (the Aspen Club and Spa) elects to condominiumize and sell the units, or at such time as APCHA determines one or more units are found to be out of compliance for one yeaz. If any of the units aze found to be out of compliance for one yeaz, or the owner elects to sell the units, the units shall be listed for sale with APCHA at the categories specified in the deed restriction. The sales price shall be as stated in the APCHA Guidelines in effect at the time of recordation of the deed restriction plus appreciation calculated at three percent (3%) per annum or the Consumer Price Index (simple appreciation not compounded), whichever is less, as of the listing date of the units. If the units are being sold due to noncompliance, all of the units shall be sold through the lottery system. If the owner elects to sell the units, the owner may choose 1/3`d of the initial buyers provided they qualify under APCHA's top priority for the unit. 7. If the owner elects to sell the units, or they are required to be sold due to noncompliance, owner shall condominiumize the units and form a condominium association for the 2 P93 management and maintenance thereof The affordable housing association shall be separate from the fractional ownership unit's association. 8. In the event the rental units are required to become ownership units due to noncompliance, APCHA or the City may elect to purchase them for rental to qualified tenants in accordance with APCHA Guidelines. P94 ~hil~i~ Aspen Club ~ Spa PROPOSED TRAFFIC SAFETY TRANSPORTATION DEMAND MANAGEMENT TOOLS The goal of Aspen Club Living is to create both a safer Ute Avenue as well as limit any growth in traffic on Ute Avenue due to this project. To achieve these goals we have consulted with the City of Aspen Transportation staff and engaged TDA, Inc of Seattle and Denver, respected traffic engineers who have been used by the City of Aspen, to help us create a set of traffic safety & management tools. This will be a living, evolving program reinforcing the actions that work effectively and weeding out those measures that are not effective. Baseline conditions have been established via high season traffic counts at key locations in the vicinity, including Ute Avenue and the Club entrance. We understand that this process of creating a safer street is a continual work in progress. To manage this process, the Club will have a designated Transportation Coordinator who will manage all of these programs as a function of their job description. In addition, the Aspen Club will remain an active member of the Transportation Options Program with a designated transportation contact for the City. Envisioned Traffic Management Measures As stated above we believe we can create a traffic management plan that limits any growth in traffic on Ute Avenue due to this project. We would do this through a flexible set of tools used to reduce overall traffic. Through the insights of city staff, we have developed a management plan that breaks down traffic by different groups of users of the Club. We would further propose that we implement our plan in phases starting with those things that potentially have both the greatest impact on traffic creation, are the easiest to implement and utilize existing resources as much as possible. Along with our management tools we will continue our seasonal monitoring program where we can track the impact of our program on actual traffic. The target groups break out as follows: • Employees Commuting to the Club • Employees Living On-Site in Aspen Club Affordable Housing 1 P95 • Members of the Club Guests of the Club • Aspen Club Living Owners The initial set of traffic management tools per group would be: Emplovees Commuting to the Club 1. Employees will be encouraged to carpool, shuttle or ride the bus to the Club. Employee parking will be limited to the Crystal Lake Parking lot. This will be enforced by the designated Transportation Coordinator. The Club currently has a transportation coordinator and is an active participant in TOP. It is envisioned that that Transportation Coordinator role will continue to be part of the responsibilities of our HR department. Employee parking is not currently allowed in our Ute Avenue parking lot in high seasons. This is currently monitored by our facilities staff and Club managers, and employees who break this policy are written up and in some cases fined. We would envision continuing to do this when the project is completed. We would also envision having preferential parking spots for carpoolers in the Crystal Lake Parking lot when the project is completed. 2. The Aspen Club will provide reduce priced bus passes for employees to use RFTA. The Club currently subsidizes 50% of employee's bus passes and we envision we will continue to do so when the project is completed. 3. At all new hire orientations, the Aspen Club will provide information on all the different employee options for commuting to the Club and reducing fraffic on Ute Avenue. The Club will put together orientation material for our employees with the assistance of the Transportation Department when the project is completed. 4. The Aspen Club will organize carpools for employees who have to commute to the Aspen Club. We will prioritize matching employees with other Aspen Club employees, but if necessary, we will look outside of the company as well to create carpools. The Club will work with the city to put this together through the City's employer outreach program. 5. Shared bicycles for employee to take trips to town will be available at the Club. 2 P96 a. Initially, up to ten bicycles will be available. This will be increased if justified by demand. 6. Bicycles will be maintained by the Club's maintenance staff c. A check out / check in system such as using electronic ID card will be implemented for use. d. We will expand the program as needed based on usage and ongoing needs of our employees. 6. The Aspen Club will create incentive plans for carpoolers, bikers, walkers and RFTA riders potentially consisting of gift cards, punch cards, prize drawings or end of season raffles. We will start an incentive plan for employees one month after project is operating and run for one year to see how effective these types of incentives are. If program is not working, we will stop and focus elsewhere. 7. The Aspen Club will provide shuttle service to and from the Club at regularly scheduled intervals. These would augment the Cross Town Shuttle services and serve Ruby Park (or a spot near Ruby Park) and set points in town to make commuting easier for our employees. a. Shuttle vehicles will be reduced emissions or zero-emission. This service is envisioned to be provided from 7 AM to 9 PM every day during the peak summer and winter seasons. It is envisioned that service will run every half hour. These hours may be increased or decreased depending on actual demand experience. During shoulder seasons and before 7 AM and after 9 PM, service will determined by demand so as not to be running an empty shuttle. Today we would expect to pick up and drop off at our major hotel partners, Ruby Park (or a spot near Ruby Park and one or two high traffic areas in town. An initial route and a schedule will be developed and coordinated with the City Transportation Department as the opening date for the project gets closer and will be updated with the Transportation Department on an annual basis for the first three years of operation. b. Signs and other information identifying the routes and times will be posted at the Club, and, if permitted, at Ruby Park and in town. c. The shuttle will be publicized in Club marketing materials and inside the facIlity. d. The shuttle service will look to coordinate pickups and drop offs at Ruby Park (or near Ruby Park) to coincide with RFTA bus arrival and departure times. 3 P97 e. The shuttle service will look to coordinate with our hotel partners to minimize total shuttle trips to the Aspen Club. f. Employees will also be allowed to ride on the shuttle vehicles for errands they have in town. g. There will be no charge for the service. S. As a member of TOP ,the Aspen Club will work with the City in implementing an Emergency Ride Home Program for employees who take the bus to work, but for one reason or another (e.g. -sick child) need to get home in a hurry. This will give employees a sense of comfort that they can take the Bus into town but get home quickly if they need to. As we are planning to use the City's ERH program, we will work with them to set some limits on the extent of that use in terms of cost. If the Club use of the ERH program services is more than an amount agreed upon with the Ciry's Transportation Department, the Club will help to subsidized the service. Em~yees Living On-Site in Aspen Club Affordable Housing 1. Preference for access to On-Site Affordable Housing would be given to employees who agree not to park a car at the Aspen Club. The Club will work with the City Transportation Dept staff to produce move-in packets that will provide information on all alternative transportation programs provided in Aspen. 2. The Aspen Club will provide shuttle service to and from the Club at regularly scheduled intervals. These would serve the points in town mentioned above to make not having a car on-site easier for our employees who live on-site. a. Shuttle vehicles will be reduced emissions or zero-emission. b. This service is envisioned to be initially provided from 7 AM to 9 PM every day during the peak summer and winter seasons. These hours may be increased or decreased depending on actual demand experience. During shoulder seasons and before 7 AM and after 9 PM, service will be on-call. c. The shuttle will be available for errands such as grocery shopping trips into town. d. Signs and other information identifying the routes and times will be posted at the affordable housing units. 4 P98 e. Employees living on site will be encouraged to use the Shuttle for errands they have in town. f. There will be no charge for the service. 3. Car sharing vehicle will be available, on-site, for employees living in affordable housing. a. We will work with Roaring Fork Valley Vehicles to have a car share car stationed at the Aspen Club. b. Prior to opening of the project, we will determine how to best structure this program. c. Together the Aspen Club and RFW will develop an operating plan for the car sharing program at the Club. Issues to be agreed upon by Aspen Club and RFW include: i. Whether the Aspen Club will buy the car and contribute it to Car to Go or the Aspen Club will own the car and have it operated by Car to Go or a car already in the program will be put at the end of Ute Avenue to be used by anyone in the Car to Go program, including the Club. ii. Whether the car program will be open to the public or will be exclusive to Aspen Club employees, members and guests; iii. Who will be responsible for insurance, maintenance and ongoing upkeep of the vehicle. d. Employees living in the on-site affordable housing will have access to the car share program. e. The vehicle will remain on-site overnight. f. Electronic ID cards or monitoring method then in place by RFW will be utilized. 4. Shared bicycles for employees to ride to town will be available at the Club. a. Initially, up to ten bicycles will be available. This will be increased if justified by demand. b. Bicycles will be maintained by the Club's maintenance staff c. A check out /check in system such as using electronic ID card will be implemented for use. 5 P99 d. We will expand the program as needed based on usage and ongoing needs of our employees. 5: Arrangements will be made with a local car rental company for discounted car rentals. a. The Club will arrange for discounted car rentals for our employees who live on- site. b. Employee living on-site will be able to use these vehicles to take trips outside of Aspen. c. Trips will be charged at the negotiated discounted car rental rates. Members of the Club 1. The Aspen Club will provide shuttle service to and from the Club at regularly scheduled intervals. These would serve the points in town mentioned above to make it easy for our members who live or work in town to take our shuttle. a. Shuttle vehicles will be reduced emissions or zero-emission. b. Information on this service will be provided in membership materials. c The service is envisioned to be provided from 7 AM to 9 PM every day during the peak summer and winter seasons. It is envisioned that service will run every half and hour. These hours may be increased or decreased depending on actual demand experience. During shoulder seasons and before 7 AM and after 9 PM, service will determined by demand so as not to be running an empty shuttle. Today we would expect to pick up -and drop off at our major hotel partners, Ruby Park (or a spot near Ruby Park) and one or two high traffic areas in town. An initial route and a schedule will be developed and coordinated with the City Transportation Department as the opening date for the project gets closer and will be updated with the Transportation Department on an annual basis for the first three years of operation. d. Signs and other information identifying the routes and times will be posted at the Club, and, if permitted, at Ruby Park and in town. e. The shuttle will be publicized in Club marketing materials and inside the facility. f. There will be no charge for the service. 2. The Aspen Club will create an incentive system for members who walk, ride their bikes or take either our shuttle or the Cross Town Shuttle to and from the Club. 6 P100 a. Information on this incentive system will be provided in membership materials. b. Members will have a punch card system to track their use of alternative transportation. c. Incentives will potentially consisting of gift cards, prize drawings or end of season raffles for prizes and rewards. d. We will start the incentive plan one month after project is operating and run for one year to see how effective these types of incentives are. If program for members is not working, we will stop and focus elsewhere. Guests of the Club 1. The Aspen Club will provide shutt]e service to and from the Club for guests at regulazly scheduled intervals. a. These would serve the points in town mentioned above, to make it easy for our guest who are visiting town to take our shuttle. b. Shuttle vehicles will be reduced emissions or zero-emission. c. Information on this service will be provided in guest materials. d. The Club will work with Hotel partners in town pick to up their guests in a timely manner and minimize the number of shuttle trips coming to the Club. e. This service will run as described above. f. There will be no charge for the service. 2. Most guests today arrive by hotel shutt]es. Currently, Club staff visits our hotel partners and specifically their concierges on a regular basis to share information and improve overall guest service. The Aspen Club will continue to work with our hotel partners once the project is completed to make the Aspen Club shuttle services known and minimize shuttle trips to the Club while maximizing shuttle utilization. Owners and Guests 1. Aspen Club Shuttle service to and from the Airport will be provided for owners and guests. 7 P101 a. Information on this service will be provided in reservation materials and recommended to all incoming owners and guests. Also included will be information on all alternative transportation programs provided in Aspen. b. Service will be at the airport at the scheduled arrival time. A phone request for service will not be required, but acell-phone contact will be provided in case of schedule changes. c. Low-emission vehicles will be used. d. There will be no charge for this service. 2. The sales and reservations program will emphasize the overall philosophy of the project and our alternative transportation beliefs. 3. Owners and guests staying at the Club will have access to the Car Share vehicle on site. 4. Shared bicycles for owners and guests to ride to town will be available at the Club. a. Initially, up to ten bicycles will be available. This will be increased if justified by demand. b. Bicycles will be maintained by the Club's maintenance staff c. A check out / check in system such as using electronic ID card will be implemented for use. d. We will expand the program as needed based on usage and ongoing needs of our owners and guests. 5. Arrangements will be made with a local car rental company for discounted caz rentals. a. The Club will arrange for discounted car rentals for our owners and guests who want to take longer hips while they are in town. b. Owners and guests on-site will be able to use these vehicles to take trips outside of Aspen. c. Trips will be charged at negotiate discounted car rental rates. Phasing 8 P102 The above represents a comprehensive set of Traffic Demand Management tools. We will continue to do ongoing monitoring and surveying of traffic. If traffic is not hitting our targets, we will add the addition demand management tools below. There are additional tools we can add to our Demand Management planning on an as needed basis depending on the results we are seeing in our Monitoring program below. Additional Traffic Demand Management tools might include: Additional Shuttle Service More aggressive internal advertising for Club's Transportation Options Better rewards program foz employees and members who take alternative transportation to the Club Additional Restrictions on Employees Driving to the Club Additional Restrictions on car ownership for residents in Club Affordable Housing. Paid Parking at the Club Monitoring Program The effectiveness of the program wffl be measured in several ways: 1. Vehicle counts have been performed at Ute Avenue and at the Club and will continue twice a year during March and August starting for five years after the project is completed. 2. Survey of above target groups to ensure their knowledge of the programs. 3. Results will be summarized in Memorandum form complete with tabulations and charts so that year-to-year trends are readily apparent. 4. A Year in Review TDM technical report will be prepared by Club management. The report will identify overall conformity with trip reduction goals and suggest improvements that could achieve better compliance and intended success. This report will be shared with the City staff each year so that together we can address issues before a formal review. 5. If additional phases of traffic management tools are needed, we will phase them in over time. 9 P103 6. Two years after completion of project, results will be submitted and reviewed by city staff. Should staff see the need for program improvements, City Council will be consulted. Another review will occur five years after completion of the project. 7. If all else fails, we will implement a shame and beratement program in which we will taunt and throw rotten eggs at drivers on Ute Avenue. Envisioned Ute Avenue Safety Plan One of the main issues today for the Aspen Club and its neighbors is safety along Ute Avenue. With a few improvements, Ute Avenue today could be made into a much safer street. We would propose: 1. SPEED HUMPS with CROSSWALKS -Three of these are shown on the schematic below: one at Aspen Alps, one at the Gant tennis courts and one at the Ute Trail. Their characteristics include: a. Smooth transition to and from a flat crosswalk about 3 inches above the existing pavement surface b. Designed to encourage speeds not exceeding 25 mph c. Pavement markings and advance signs in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). Please see the example attached. d. We may have to work out some special design details when terminating at a curb on the north side of Ute Avenue, to meet the requirements of the City of Aspen. This will affect the two most westerly speed humps, 2. SPEED HUMP without CROSSWALK -One is shown in the vicinity of the Cemetery. Its characteristics include: a. Smooth transition to and from a height about 3 inches above the existing pavement surface, with no flat crosswalk b. Designed to encourage speeds not exceeding 25 mph. c. Pavement markings and advance signs in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). i~ P104 3. SPEED HUMP SUMMARY -Together this layout provides a speed hump about every 450 feet, with a bit longer spacing between the Gant tennis courts and the cemetery. 4. NEW SIDEWALK -The Aspen Club will install a new sidewalk to the south side of the Aspen Club. It is our understanding that the City is exploring the feasibility of putting a sidewalk on the south side of the Benedict Building that would connect to the Aspen Club Trail and to the Aspen Club. Fgure 39-3f1. ~xampfes of Pavement Markings for Speed Fables or Speed Humps with Crosswalks OPTION A :.~ U Rca~~r,y 1 4 n, ~ Typr,~al ..S Ifs i'r.~ir;r al '~rtrn(I ~•:n i ~ r I ~ e ~ A sr is T : + j _ _ y~ 5 dCB'~illttt 7 1 B U y. ~ y C Y ~ r{ !Y F ' F- W+SV~ yM~ Y*~:~3,~ <+~ MFR _ f I~~~y r ~ F .. F ~ 3x 7~ y i 1 . ~5~ T u C^ ~ r 1 I 1 J~ ~ ~I 3UC _~m i'~.2 in) YVIv'w f&nrk~n;75 i ,- 9GG avn i!21n1 WhIIP 4t=rking~ Source: Manual on Uniform Traffic Control Devices, 2003, FHWA _tg~n:s OPTION B -- p.rec 6::n ul Iravrl 11 ^ P105 r O 7 ~I U N N ~~ ~P 0 0 m N u~o~ r7 v A siuual ~ue~ x Y ^~ 3 IG~ ~ r1 U ~/ r 1 F5N O~ N ICI F a = d ~ U n v W y ~ xu 1 ~ U w ~ ~ sd~y ~ n uadsy ~ W z U W o ~~ W rn ~ a ~ c ~ s > V a ~ z° 11~ ~ ~ ~ V ~Q N O I W m Q U i N 6PIB ~alPauag Y N N J * N ~ w ~/ o ~ ~ V N t n ~ -- E N - - ~ _ - x jl a ~I v ~I h _ ~ I ~ .~ ° ~- I I 1 f~ t- N E I f X ~ ~ Z w ~ l Y n ______. ~ Q ~ 6 m m a d L ~ N 0 ~ ~~ .~- 0 c m m h m ,~ E VI ~ U ' n n 5 E U = o Z 0 n N R M \ a a U 3 0 U Z 1 V k H 5~ F F xi C OF ~. A O 1 O Z ri O V_ ai N E R 0 6 m c u C Y N y Q ~ d m J m m 1° ~ m N Q1 N R ry~~ W G ~ z f--}--