Loading...
HomeMy WebLinkAboutresolution.hpc.015-2018 RECEPTION#: 652125, R: $23.00, D:$0.00 DOC CODE: RESOLUTION Pg 1 of 3, 11/21/2018 at 03:43:11 PM Janice K.Vos Caudill, Pitkin County,CO A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION APPROVING DEMOLITION, CONCEPTUAL MAJOR DEVELOPMENT, CONCEPTUAL COMMERCIAL DESIGN, TRANSPORTATION AND PARKING MANAGEMENT, AND GROWTH MANAGEMENT FOR 304 E. HOPKINS AVENUE, UNITS 1-5, THE SEGUIN BUILDING CONDOMINIUMS, CITY AND TOWNSITE OF ASPEN, COLORADO RESOLUTION #15, SERIES OF 2018 PARCEL ID: 2737-073-75-001 to -005, 2737-073-75-800 WHEREAS, the applicant, Hillstone Restaurant Group, represented by BendonAdams, submitted an application requesting Demolition, Conceptual Major Development, Conceptual Commercial Design,Transportation and Parking Management, and Growth Management approval for 304 E. Hopkins Avenue, Units 1-5, The Seguin Building Condominiums, City And Townsite Of Aspen, Colorado; and WHEREAS, Community Development Department staff reviewed the application for compliance with the applicable review criteria, considered the input of other City Departments provided at a Development Review Committee meeting on May 9, 2018, and recommended continuance of the project for restudy at HPC hearings held on June 13, 2018 and July 25, 2018. Applicant revisions provided for review at an HPC hearing on September 26, 2018 were supported by staff with conditions of approval; and, WHEREAS, the Aspen Historic Preservation Commission reviewed and considered the development proposal under the applicable provisions of the Municipal Code, reviewed and considered the recommendation of the Community Development Director and invited public comment at duly noticed public hearings on June 13, 2018, July 25, 2018 and September 26, 2018; and WHEREAS, on September 26, 2018 the Historic Preservation Commission approved the proposal with conditions by a vote of 7 to 0. NOW, THEREFORE, BE IT RESOLVED: That HPC grants Demolition, Conceptual Major Development, Conceptual Commercial Design, Transportation and Parking Management, and Growth Management as represented in the application reviewed by HPC on September 26, 2018, with the following conditions: 1. HPC approves variations from the following Commercial, Lodging and Historic District Design Standards: PA1.6, 2.1, 2.9, and 2.11. 2. HPC approves the provision of 378 square feet of on-site Pedestrian Amenity Space and cash-in-lieu mitigation of 376 square feet of Pedestrian Amenity Space pursuant to Section 26.412.070.D. HPC approves the construction of a porch overhang covering a portion of the Pedestrian Amenity Space, finding Commercial, Lodging and Historic District Design Standard PA1.5 to be met. 3. Per Section 26.412.080.A of the Aspen Municipal Code, Second Tier Commercial Space Applicability, no portion of Second Tier Commercial Space may be used as storage, office, and the like, for another commercial space. 4. Per Section 26.412.080.B.3, Second Tier Commercial Space, Requirement, of the Aspen Municipal Code, issuance of the Certificate of Occupancy or Letter of Completion for ground floor commercial space is contingent upon the issuance of the Certificate of Occupancy or Letter of Completion for all second tier space located within the development. An agreement, acceptable to the City Attorney, outlining the process for completion and occupancy of ground floor and second tier commercial space,to be signed by the Community Development Director, shall be required as part of the Development Documents, and shall be required prior to issuance of a core and shell or tenant finish building permit. 5. Per Section 26.412.080.D of the Aspen Municipal Code, Second Tier Commercial Space Auditing, the Community Development Director may require periodic operational audits of Second Tier Commercial Space to ensure compliance with the Land Use Code. 6. Mitigation for demolition of the existing deed-restricted affordable housing units will be in the form of affordable housing credits equivalent to 2.5 FTEs at Category 1. Because the two mandatory occupancy deed restricted affordable housing units located in the existing building have been taken out of use, the affordable housing credits replacing these units shall be provided to the Community Development Department within 180 days of conclusion of notice to City Council and call up as described at Section 26.415.120 of the Municipal Code. The presentation and extinguishment of the affordable housing credits in connection with the foregoing requirements is conditioned upon the approval by City Council of a Resolution releasing the Declarations of Covenants, Restrictions and Conditions for the Seguin Building (a Condominium) recorded in Book 444 at page 472 of the real property records of Pitkin County, Colorado. HPC recommends that said covenants be released by Council. 7. The applicant must secure a Special Review approval for the Trash and Recycling area from Environmental Health, prior to Final HPC Review. 8. For Final HPC Review, demonstrate compliance or resolution of the conditions of approval recommended by the Development Review Committee,found in Exhibit D of the September 26, 2018 HPC packet. Identify conditions which cannot be resolved before Building Permit review. Approval of the two required Transportation Demand Management measures will be coordinated with the Engineering Department during building permit review. 9. For Final HPC Review, demonstrate provisions for adequate drainage between the historic structure at 302 E. Hopkins and the proposed new structure at 304 E. Hopkins to ensure the historic resource will not be damaged. 10. For Final HPC Review, provide plans and elevations indicating the size and placement of all exterior mechanical equipment and vents to the applicant's best estimation at that time. 11. All dimensional calculations will be verified at the time of Building Permit review. 12. A cash-in-lieu payment for mitigation of parking will be calculated and paid at Building Permit review. 13. A development application for a Final Development Plan shall be submitted within one (1) year of the date of approval of a Conceptual Development Plan. Failure to file such an application within this time period shall render null and void the approval of the Conceptual Development Plan. The Historic Preservation Commission may, at its sole discretion and for good cause shown, grant a one- time extension of the expiration date for a Conceptual Development Plan approval for up to six (6) months provided a written request for extension is received no less than thirty (30) days prior to the expiration date. APPROVED BY THE COMMISSION at its regular meeting on the 26th of September, 2018. Appro �d as t or Approved as to content: An rea n, As City A#amey Gretc Gr e ood, Chair tt t: Nicole Henning, DepLhy City Clerk