HomeMy WebLinkAboutresolution.council.038-10RESOLUTION #
(Series of 2010)
A RESOLUTION APPROVING AN AGREEMENT BETWEEN THE CITY OF
ASPEN, COLORADO, AND ASPEN CONSOLIDATED SANITATION
DISTRICT SETTING FORTH THE TERMS AND CONDITIONS REGARDING
BURLINGAME RANCH PHASE II SEWER DESIGN SERVICES AND
AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT
WHEREAS, there has been submitted to the City Council an agreement
between the City of Aspen, Colorado, and Aspen Consolidated Sanitation District,
a copy of which agreement is annexed hereto and made a part thereof.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO:
Section 1
That the City Council of the City of Aspen hereby approves that agreement
between the City of Aspen, Colorado, and Aspen Consolidated Sanitation District
regarding Burlingame Ranch Phase II Sewer Design Services for the city of
Aspen, a copy of which is annexed hereto and incorporated herein, and does
hereby authorize the City Manager of the City of Aspen to execute said contract
on behalf of the City of Aspen.
4
Dated: < y
u
~' s
~ . ' . .. ~~. 4 ~ ,~
MiL'hael C. Ireland, Mayor
I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City
Council of the City of Aspen, Colorado, at a meeting held, May 24, 2010
Kat n S. Koch, City Clerk
Aspen Consolidated Sanitation District
Michael Kelly • Chair Stoney Davis
John Keleher • Vice Chair Joe Zarin
Roy Holloway • Sec/Treas Bruce Matherly • Mgr
LINE EXTENSION REQUEST
Service Area: Burliar[ame II Affordable Houaia~
The undersigned hereby request that the Aspen Consolidated Sanitation District
provide such necessary collection line extension so as to provide sewer service to the
undersigned. The undersigned further state and represent as follows:
1. That the proposed service area which said line extension would serve is more
fully described in the study plan attached and marked "Exhibit A".
2. That the undersigned are landowners within the boundaries of such proposed
service area.
3. That the Exhibit A attached hereto also contains a proposed design for such
line extension; preliminary cost estimates therefor; a description of existing development
and future possible development within the proposed service area; an estimate of the total
sewer taps to be served by the line extension, expressed in terms of single family residential
taps or their equivalent; and a preliminary estimate of the unit cost per single family
residential tap or its equivalent. We the undersigned agree to pay to the District any
engineering fees incurred by the District to assist in developing the attached Exhibit A.
We, the undersigned, do hereby express our intent to the Aspen Consolidated
Sanitation District to connect to the District sewer system when such system becomes
available to serve the above described property. We offer this assurance to the District so it
can plan to provide such service based on the needs and desires of the anticipated users.
We further understand that this request does not bind the District to provide immediate
service, but in the event the request is granted, we agree to pay such line extension fee for
the use of such line as may be ultimately calculated pursuant to the regulations of the
District.
We also understand that should an easement be required by the District through
lands owned by the undersigned, we will each grant such an easement executed and
recorded on the standard District easement form and we recognize that if other landowners
within the proposed service area shown on Exhibit A do not agree to furnish such
easements on the same basis, the acquisition cost of such easements within the proposed
service area will be duectly borne by the landowners within such area and the costs
therefor reflected in the line extension fee.
We, the undersigned, agree to pay the District for the District Engineer's plan and
profile review fee and construction observation fee, and for the District's cost to televise the
completed line extension.
We, the undersigned, are submitting with this Request for Line Relocation a check
for $10,000 as a partial payment for engineering design costs as described in "Exhibit B"
and we agree to pay the District for the cost of the line relocation.
565 N. Mill St., Aspen, CO 81611 / (970)925-3601 /FAX (970)925-2537
We, the undersigned, also agree: to pay any and all additional line and/or total
connection chazges prior to connecting to the District's sanitary sewer line; to pay the
District for the District's costs to relocate the District's main sanitary sewer line; to provide
easements and a bill of sale on the standard District form of the line relocation, which shall
be executed and recorded with the Pitkin County Clerk; and to abide by all District rules,
regulafions and specifications.
We, the undersigned, understand that this request and its representations aze
contingent upon the undersigned executing a standard Collection System Agreement" with
the district.
Leal Description of Property:
See attached exhibit A.
BurliatCame II Affordable Housia¢
~~
Signature Title
Attest: Frint Name Date
~,
Title
STATE OF COLORADO. )
ss:
COUNTY OF PITHIN )
The foregoing strument was acknowledge~d/~ subscribed, d sw rn to before me
day of~ ~ ~~--~~r-' ~5~',4"' by ~J~i~. A~f11/~as
~~
My commission expires (,5
Notary Public
z
a ~~
J
~~
~~
w
H ~
N
Q
..~~
~ ~ a
,~ f
~,, ~~.,_
•'S ~ ~'
.. ~ ~ ~ ~.
# _ ~
,ti
i :` v~.
~~ Y
~~
a : ~ -~.
N r
I X
v' ~ ~ 4~
~Lj +
u r ~ ~~ F •i ~ y x ~~~ ~r + ~~
t
~.. ..
`~~ ~ ~~~
`~ ~,a.. __.._.._.._..._..
e~ ~~
~~
~ ' OC J '
-'-r ~ ~~'I i r
d b~ a ,
~ i e.
~~ i~ R
„ ~.Y ~ '~
~~ o ; .
o ~-- r ~`~. 't
a ~, . - i
~~,
`,~ 1
~- • f - _ ~
~~ ~ ~ 1 !
,~ o~ ~ ~ .
i+~'f ° ~
o ,
~ ~r ~
^~ ~:
' oo r ' t
bh '~.
O~h~ ~ j ~ t - __..
'~ i
•
~ i
f
_'~ /
`~\ z
i
..' ~ + `°
• ~ ,,I rte,
.. _•. _ -
~ ~ ~
~ ~~
.~~ ~.
C,` ~ ^~
'i e/ ~r.
.. %~,;~.
k ;. ~+; 4;. ''q
{ ,. ~
~. `~ : ``
- y-~.
N ,.
~'
'; N o
4
2
V
Z
NS
C
~~
a
s
w
z
W
J LL
t
Q ~
H 2
z
c?
w
D
v
aR
I
CD
J
!_
J,
Q
'r
U
Page 1 of 1
tom~aspensan com
From: "Kevin O'Connell" <oconnel1~68west.com>
To: "'Tom Bracewell"' <toml~aspensan.com>
Sent: Tuesday, May 11, 2010 1:22 PM
Subject: Bulingame Ranch, Phase III retainer
Dear Tom,
We have received the conceptual design information from Alpine Engineering for Burlingame Ranch, Phase III. It is our
understanding that you would like 68West Engineering to prepare plans and specifications, and perform construction
observation services for sanitary sewer main extensions of approximately 900 feet in order to accommodate the new
development. Based on our review of the material provided to us at this time, we recommend a retainer in the amount of
$30,000 against which our design and construction services may be billed. We will only bill actual time spent working on
the tasks, as directed by the District. Because of the changing nature of these types of projects and the nature of
construction it is possible that the actual fee will be less, or more, than the retainer amount.
Our estimated fee is based on the following:
I. Plans and Specifications
Prepare preliminary design based on base and field data provided by Alpine Engineering (Alpine}
• Coordinate with District and Alpine for Final Design
• Prepare Plans and Specifications and bid package based on District Standards
• Accept Proposals from District pre-qualified Contractors
• Evaluate Proposals and make recommendation to District
• Assume one iteration between Preliminary Design and Bid Set; and, Bid Set and Construction Set
Construction Phase
• Prepare Construction Drawings
• Attend pre-construction meeting
• Provide project staking
• Provide on site construction observation
• Assume 10 day construction time
• Prepare Record Drawing of completed project
As always, if another District related project is being constructed concurrently with the Burlingame Ranch project the
construction observation costs would be split between the projects.
Thanks,
Kevin
f-BWest
;Engineering, Inc.
Kevin O'Connell, P.E.
Projed Manager
68west Engineering, Inc.
1860 Blake Street, Suite 200
Derner, CO 80202
p 303.295.6806 • f. 303.295.6807
oconnell~68west com
,v_,v,v_ r?;VJes! com
"By accepting this e-file and the information contained within, the Recipient will indemnrfy, to the fullest extent permitted by law, 68v1kst Engineering, Inc., its officers, directors,
empbyees and sutxonsuttants against all damages, liabilities or costs, including reasonable attorneys fees and defense ~, for the use or misuse of the information
provided. In adddlon, the Reapient is solety responsible for the use or misuse of the provided information by others to which this information may be transmitted or used, and
For any unauthorized changes, and the resulting damages that may occur as a result of the unauthorized use or changes. If you do not agree with the above Hold-harmless
paragraph, you shall notify 68west Engineering, Inc. immediately. Consequences resulting from the unauthorized use of the attached electronic data shall be the sole
responsibility of the recipient"
5/11/2010