HomeMy WebLinkAboutordinance.council.003-11 Exhibit D
Ordinance No. 3
Series of 2011
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF ASPEN,
COLORADO, AMENDING THE MUNICIPAL CODE OF THE CITY OF ASPEN TO
CREATE ENGINEERING DEVELOPMNET FEES
WHEREAS, The City Council has adopted a policy of requiring consumers and
users of the miscellaneous City of Aspen programs and services to pay fee that fairly
approximate the costs of providing such programs and services; and
WHEREAS, the City Council has determined that certain fees currently in effect
do not raise revenues sufficient to pay for the attendant costs of providing said programs
and services.
.NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CIPY OF ASPEN, COLORADO;
Section 1.
That Section 2.12.100 of the Municipal Code of the City of Aspen, Colorado, which
section sets forth International Building and Residential Code Permit fees, is hereby
amended to include the following additional section:
2.12.100 (0 Engineering Development Fees
Engineering Review Fee
This fee structure shall apply to all permits submitted on or after July 1, 2011
Affected Area Fee
Basic review* = 200 - 500 sq.ft. $530.00
Minor Review ** = 501 - 1000 sq.ft. $1325.00
Major Review = 1001 — 15,000 sq.ft. $1,590.00 + $2 per square foot over 2,000
Above 15,000 $1,590.00 + $2 per square foot over 2,000
and up to 15,000 + .10 per square foot over
15,000
*The Basic will not be fully implemented at this time, as a result this fee will be
discounted by 75%
** The Minor Review will not be fully implemented at this time, as a result this fee will
be discounted by 50%
Additional plan review required by changes, additions, revisions to plans $265/hr
(Minimum charge 'A hr)
Construction Mitigation Fee
This fee structure shall apply to all permits submitted on or after July 1, 2011
400 - 15,000 square feet - $1.00 x gross square footage of project.
Above 15,000 square feet - $1.00 x gross square footage of project up to 15,000 sq.ft. +
$.05 per square foot of project over 15,000 sf.
Note: Fifty percent of the construction mitigation fee will be collected at permit
submission and the remaining upon permit issuance.
Incentive: For those sites that are clean for the duration of construction, a 10% refund of
the Construction Mitigation Fee will be credited to the site when the certificate of
occupancy is issued
Section 2:
This Ordinance shall not affect any existing litigation and shall not operate as an abatement of any
action or proceeding now pending under or by virtue of the ordinances repealed or amended as
herein provided, and the same shall be construed and concluded under such prior ordinances.
Section 3:
If any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason
held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a
separate, distinct and independent provision and shall not affect the validity of the remaining
portions thereof.
Section 4:
A public hearing on the ordinance shall be held on the N ia- day of . ltCZ in the City
Council Chambers, Aspen City Hall, Aspen, Colorado.
INTRODUCED, READ AND ORDERED PUBLISHED as provided by law,
by the City Council of the City of Aspen on the 14' day of __ ..t[_
i 347
Mick Ire and, Mayor
Attest:
• .G. iLr - .i _ • 4 ri t -
athryn S. K . S, , City Clerk
FINALLY, adopted, passed approved, /�` L�
assed and a roved, this,�� day of ✓/ ��= ��" /
Mickick / �d, Mayor
Attest:
e vict) Lig"
Exhibit A
2011 Engineering Department Cost per Billable Hour Calculation
S a Pi:troll 41
Non
Compensation Recoverable Recoverable
Payroll $596,259 $389,233 $207,025
jl• OWatiritExPthditterrs
Non
Avg. Expense Recoverable Recoverable
Administration (15000) $260,930 $170,330 $90,600
Remodel Depreciation $120,000 $78,340 $41,660
Total Operating $380,930 $248,670 $132,260
Overhead
Non
Expense Recoverable Recoverable
Overhead (IT and GF) $225,540 $147,230 $78,310
Total
Recoverable Non
Type Total Expense Recoverable
Payroll $596,259 $389,233 $207,025
Operating Expenditures $380,930 $248,670 5132,260
Overhead $225,540 5147,230 578,310
Total $1,202,729 $785,133 $417,595
Billable Hours 2,954
Cost/Hour $265.82
Exhibit B
Proposed Engineering Development Fee Structure
Engineering Review Fee
This fee structure shall apply to all permits submitted on or after July 1, 2011
Affected Area Fee
Basic review* = 200 - 500 sq.ft. $530.00
Minor Review ** = 501 - 1000 sq.ft. $1325.00
Major Review = 1001 — 15,000 sq.ft. $1,590.00 + $2 per square foot over 2,000
Above 15,000 $1,590.00 + $2 per square foot over 2,000
and up to 15,000 + .10 per square foot over
15,000
*The Basic will not be fully implemented at this time, as a result this fee will be
discounted by 75%
** The Minor Review will not be fully implemented at this time, as a result this fee will
be discounted by 50%
Additional plan review required by changes, additions, revisions to plans $265/hr
(Minimum charge '/2 hr)
Construction Mitigation Fee
This fee structure shall apply to all permits submitted on or after July 1, 2011
400 - 15,000 square feet - $1.00 x gross square footage of project.
Above 15,000 square feet - $1.00 x gross square footage of project up to 15,000 sq.ft. +
$.05 per square foot of project over 15,000 sf.
Note: Fifty percent of the construction mitigation fee will be collected at permit
submission and the remaining upon permit issuance.
Incentive: For those sites that are clean for the duration of construction, a 10% refund of
the Construction Mitigation Fee will be credited to the site when the certificate of
occupancy is issued
Exhibit C
Revenue Estimate
Fee Total Proposed Revenue Existing Revenue Proposed General Fund Proposed Stormwater
Construction Mitigation Fee $156,240 $0 $156,240 $0
Land Use Engineering Review $212,000 $6,000 $184,800 $21,200
Building Permit Engineering Review $342,600 $0 $239,900 $102,700
ROW & Enc Fees $90,943 $90,943 $0 $0
(Total $801,783 $96,943 $580,940 $123,900
Note: This is a full year of estimated revenue so only two- thirds might be recognized in 2011. The amount above,
maybe the amount expected for 2012. Additionally because 50% of the construction mitigation fee is collected up
front, the revenue may be less than what is shown. It all depends on the completion of the project which could
extend into multiple out years.
IuC,i w IV,suII ••• •••••••' •• •
_ 6184217 0-4 3, Lam/ l/
Ad Ticket #5 l
C //
Acct: 1013028 Name: Aspen (LEGALS) City of
Phone: (970)920 -5064 Address: 130 S Galena St
E-m ANGELA SCOREY
Client:
Caller: Kathryn Koch Ci ty: Aspen
Receipt State: CO Zip: 81611
Ad Name: 6184217A Original Id: 0
Editions: 8ATI /8ATW/ Class: 0990
Start: 02/20/11 Stop: 02/20/11
Color: Issue 1
Copyline: 6184217 atw Ordinance #3 R AT Legals
LEGAL NOTICE
Lines: 20 ORDINANCE #3, 2011, PUBLIC HEARING
Depth: 1.68 Ordinance #3, Series of 2011. was adopted on
Columns: 1 first reading at the City Council meeting February
Discount: 0.00 14. 2011. This ordinance. if adopted. will increase
engineering fees. The public hearing on this
Commission: 0.00 ordinance is scheduled for February 28, 2011 at 5
PM. City hall. 130 South Galena.
Net: 0.00
0.00 To see the entire text. go to the city's legal notice
Tax: website http: //www.aspenpitkin.comi
Total 10.12 Depanments /Clerk/Lega!- Notices)
If you would like a copy FAXed or e- mailed to you.
Payment 0.00 call the city clerk's office. 429 -2686.
Published in the Aspen Times Weekly on February
20.2011. [6184217]
Ad shown is not actual print size
. _
a 5
b < pa c o 0 o o _ 0 o of � y ti � i
n n "� � ` Y " ¢' n m r ^, O ' y � v
^ ^ n O n n N O n rt rt
� , 7 , T , C Cr) � y
I'1'1 a ¢' dJ y G m h .y• ro W O ¢.
CA P- m II '. ru p R 5 E. TS
P r � a
n k O O :.' to w O N N O O t 'O P• rt a I-11
o M Pert- p. c g, o p 2 ro P o n !Ta 77
C W N p O CD pa cr
Q. N n n0 "y N ' `C 0 'TI
w 0
W G m N v, ° m 0 rP • 0
o� `°^ �~ w c O P te.. rt m P FL n W
1aY\ m .,a � x a E- ' na p
Q p L 1 p n o. , , c s 0 ,- : 0
P = b P a. 0 H rt 0 rt O n `p n FO c 7' i I
O / N a cr N N fD p 'p "p O "'^ '1 O IC z
2 , N rt O- .+, in Y. v O rt r b isk
of
[., o
ni o p., '0 0 0 E0 Z
C a N p ry C O rD
a
P ° ry C • " 'y . p P r o
p 0
rt O 0 a P✓ :T' m O M ch
o
F-'3. . r �+ n "0 oo n a'
Lc' = m mi.".-,•0
11 ? *g 0'3.-5 c
._° a E 3a E:1. s
2 _ m -
-n ?m 3 �a 'm �Nr m
mm .9 m
=a � �
--41 N _ sail r
a � -• s ,°- -te g o
f ro � ,m' mo dll.! m °
1 r
m :nm e. :11, =
m
a 3�
0
< m U?P <o