HomeMy WebLinkAboutcoa.lu.sm.Owen Lot 1 Shoaf.1983 MEMORANDUM
TO: Aspen City Council
FROM: Colette Penne, Planning Office
RE: Owen Subdivision Exception
Date: April 11, 1983 APPROVED AS TO FORM: d 4„_i
Zoning:
R -1S ill
Location:
Shoaff's Waterfall Subdivision, Lot 1 (Neale Street above Herron
Park)
Appliant's Request:
On January 4, 1983, approval was given by the Planning and Zoning
Commission for a stream margin review on this property with the
following conditions. The applicant is now requesting a subdivision
exception to enable him to add the conditions of the stream margin
review to a recorded plat as an amendment. In order to file the
amended plat, Council must review the request through the sub-
division exception process, outlined in Section 20 -19 of the Code.
The first step in the process is review by the Planning and Zoning
Commission, which occurred on March 22, 1983, and a recommendation
for approval was forwarded. The Code does not permit changes to
be made to a recorded plat without this review process.
Since the changes to be• made on the plat have been required by an
earlier one -step review, we recommend that you approve them ex-
peditiously. Specifically, they are as follows:
1. Provision of a roadway and construction easement for the
future widening of Neale Street.
2. Language added to the plat that the applicant agrees to join
a special improvement district in the event one is formed.
3. Placement of a building envelope which reflects the location
approved through the Stream Margin Review process.
Council Action:
The appropriate motion is as follows:
"I move to grant subdivision exception for the purpose of
amending the Owen Subdivision Plat, to reflect the conditions
of the prior Stream Margin Review by the Planning and Zoning
Commission subject to:
1. Approval of the Final Plat form by the City Engineering
Department prior to recordation.
2. Approval of the plat language by the City Attorney's
office prior to recordation."
C D
MEMORANDUM
TO: Aspen Planning and Zoning Commission
FROM: Colette Penne, Planning Office
RE: Owens Stream Margin Review
DATE: January 4, 1983
Location: Lot 1, Shoaf's Waterfall Subdivision (Neal Street above Herron
Park).
Zoning: R -15.
Applicant's
Request: The applicant is requesting special approval to construct a
single family residence within 100 feet of the high water line
of the Roaring Fork River.
Referral
Comments: Engineering Department
Having reviewed the above application and having made a
site inspection, the Engineering Department has the following
comments:
1. The applicant should be required to dedicate the trail
easement shown to public use.
2. All construction should be undertaken in a manner so
as to create the least disturbance to the flood zone.
Planning Office
Review: Section 24 -6.3 of the Municipal Code sets review criteria for
stream margin reviews, which are required for all land and air
space within 100 feet of the high water line of the Roaring Fork
River. The six criteria are as follows:
1. No building shall be located so as to be within a flood
hazard area designated by the U. S. Corps of Engineers
Flood Plain Report for the Roaring Fork River.
2. In the event there is a trail designated by an approved
trail plan within the development site, such trail shall
be dedicated for public use.
3. All attempts should be made to implement the recommendations
of the Roaring Fork Greenway Plan prepared by the Roaring
Fork Greenway Committee.
4. Vegetation shall not be removed nor any slope grade
changes made that may produce erosion of the stream bank.
5. There shall be permitted no changes to the stream channel
or its capacity, and no activity shall be allowed which will
increase stream sedimentation and suspension loads.
6. All efforts must be made to reduce stream pollution and
interference with the natural changes of the stream, and
to enhance the value of the stream as an important natural
feature.
The location of the house is not in a designated flood hazard
area, nor will it interfere with the Roaring Fork Greenway. A
condition of approval will be the dedication of the trail for
public use. The design of the structure makes use of the
grade changes that the site offers and does not propose changes
in grade which could affect the stream bank through erosion. The
house site is further separated from the bank of the stream
by a group of boulders surrounded by a stand of cottonwoods.
Memo: Owens Stream Margin Review
Page Two
January 4, 1983
Attached is a copy of the assessment of existing vegetation,
which is described as being in "great abundance" and being
retained to a large degree on the site. In fact, all of the
existing cottonwoods are being retained. The stream channel
is not being tampered with in this plan. A small drainage
stream exists on the north side of the proposed house which
disburses at the flood plain line and makes the lower section
of the property swampy. This proposal includes a rock rein-
forcement of this drainage stream bank to return the water to
its original bed, which will enhance the property and should
be of minimal impact to the stream.
The most important fact to note in this application is that
although it appears that the deck encroaches in the flood
plain, there are no structural members of the house physically
within the floodplain. The deck actually is off the living
room at the second level. The support columns will be located
out of the flood plain also. The lower level of the house is
at least 10 feet from the boundary of the floodplain at all
points.
In anticipation of the likely expansion of Neal Street, the
applicant has designed the house so that the additional 10
feet necessary for a wider right -of -way can be accommodated.
The garage and greenhouse are at the back of the house and the
living area is oriented toward the river. In a situation
like this, the applicant had to deal with the road widening
and the floodplain of the river and has designed the house with
evidence of considerable research and sensitive thought.
Planning Office
Recommendation:
The Planning Office recommends approval of the stream margin
review as presented for the Owen residence on Lot 1 of Shoaf's
Waterfall Subdivision with the following conditions:
1. Dedication of the trail easement to public use.
2. Construction undertaken with efforts made to minimize
floodzone disturbance. IO , \ \o }'
� �
. i
3. Dedication of an easement for the necessary additional
area to widen Neal Street and acceptance of same by
the City Attorney.
.
i
5 , 1 1, 2- � < < El
1(� - I " Y :1.) , `G 1Y i *i
l v \
Kenneth A. Owen
990 E. Hyman
Aspen, CO 81611
November 15, 1982
Planning and Zoning Commission
City of Aspen
Aspen, Colorado
RE: Stream Margin Review
Lot 1, Shoafs' Waterfall Subdivision
Aspen, Pitkin County, Colorado
This document is to request a stream margin reveiw,in compliance with
Sec. 24 -6.3of the Zoning Ordinance, for the development of Lot 1.
Shoafs' Waterfall Subdivision. The applicant wishes to construct a
single family residence on the referenced property. Submitted with this
letter are the following:
I. A Site Development Plan showing:
24-6.3b(1) 1. The boundaries of the property and project including
a 20' public trail easement.
24- 6.3b(2) 2. Contour at two (2) foot intervalsfor the entire site
with a statement of accuracy from James E. Reser, the
surveyor.
24.6.3b(3) 3. Proposed improvements (there are no existing improvements
on the property).
24- 6.3b(5) 4. Existing trees and shrubs.
24- 6.3c(1) 5. One hundred (100) year projected flood plain area as
designated by the U.S. Corp. of Engineers.
II. A set of Design Development Drawings consisting of five sheets showing
the plans and construction procedures to be used.
III. A letter and drawing from Aspen Landscaping identifying the existing
plantspecies, recommending a designapproachtotheexisting site and
outlining a proposed landscape design to enhance the structure's rela-
tionship with the site and street.
Aspen Planning & Zoning Commission
November 13, 1982
Page Two
IV. I would like to enumerate and briefly explainlhe design considerations
involved in the development of the property.
1. The structure is designed to blend with the hillside. The primary
views will be to the river with the secondary view to Aspen Mountain.
This consideration allows a lower structure stepping down and fol-
lowing the natural contour of the site.
2. The structure is situated and oriented along the existing contours
thus reducing the necessary land cut and allowing south orientation
for an active solar system,with a bank of solar collectors located
above the garage.
3. The plan configurations, profile and placement of the
structure within the building envelope, will result in no removal
of any of the existing cottonwood trees. This is an important
consideration as the site is to be left in its natural state as
much as possible, following the recommendations contained in the
landscape architects letter.
4. The placement of the structure is well away from the existing drainage
stream. The north edge of the stream, between the 7916 and 7910
(plus or minus) contours will be reinforced with rock to return the
water flow to its original bed.
5. The lower floor of the structure is located a minimum of ten (10)
feet above the flood plain. Railroad tie cribbing will be placed
along this slope to facilitate the transition from the structure
to the existing grade.
6. The raised wooden deck is located off of the main living area at the
second level with an elevation of approximately 7908.5. The wooden
support columns will be located out of the flood plain which is located
at approximately the 7890'contour.
7. The driveway and raised wooden deck project beyond the building'
envelopment,(a covenant between the subdivision property owners
and not a requirement of the City). These projections do not violate
the building envelopment as the envelope only restricts the placement
of roofed structures.
8. The structure will be constructed of wood siding with concrete
retaining walls stepping down the hill. The concrete walls, where
exposed will be faced with rock to blend with the natural setting
of the site.
Aspen Planning & Zoning Commission
November 13, 1982
Page Three
9. The Floor Area Ratio in Ordinance 11 allows 4,492.5 sq.ft. to
be built on Lot 1 which contains 14,985 sq.ft. and is zoned R -15.
The building contains the following square footage, calculated in
compliance with Section 4 of Ordinance 11:
Enclosed Living Space: 2,866 sq.ft.
Covered Porch: 55 sq.ft.
Raised Wooden Deck: 273 sq.ft.
Total Square Footage = 3,194 sq.ft.
F.A.R. Allowance:
Section 8, Ordinance 11 = 4,492 sq.ft.
10. During the design process I have had on -site consultation with
Robert Patillo, structural engineer, Jerry Gerbaz, excavation
contractor, Jerry Fulton, building contractor and David Osann,
landscape designer. They have all made constructive suggestions
that have been incorporated in the design and proposed techniques
that will be used during construction to insure compliance with
the provision and intent of the stream margin review.
r.
� `° ' a
4. Aspen Landscaping, Inc. 303i963-3136
BOX 803, CARBONDALE, COLORADO 81623
November 10, 1982
To Whom It May Concern:
I have been asked by Mr. genneth Owen to site examine his building
site located on Lot #1, Shoaf's Water Fall Subdivision, on Neale Street
in Aspen, Colorado. He had requested that I identify the existing plant
species and also give a professional recommendation on a landscape design.
The existing plant species that are present on his property at
this time are as follows:
Common " Botanical
Narrowleaf Cottonwood Populus A
Service Berry Amelanchier Laevis
Native Willow Salix
Wild Rose Rosa Rugosa
Sage Salvia
Oregon Grape, Creeping Mahonia Repens
Kinnickinnick Uva -Ursi
All of the above are in great abundance on his property, and I
cannot foresee any detrimental impact on the continued existence if a
structure were to be added to the site.
Ps'. Owen asked me to advise him on how to make the lower part
of his property (between the house and river) a usable piece of land.
My first recommendation is that we do not try to change it, but rather
improve on what already exists. The water flow that runs along the
north side of the house disperses when it reaches the flood plain
boundary and creates a swamp. If this water could be controlled and ,
directed to run straight to the Roaring Fork River, the Owenls bottom
land would have an opportunity to dry up. Also; by directing the water
to the river, less water would be exposed to ground and air evaporation.
If the water was controlled (i.e. surface water), then the native foliage
would have a better opportunity to take root. Access to the bottom area
could now be possible by means of a simple pathway, which would be created
by hand, so it would not disturb the existing plant life. If the water
was controlled, only a few simple bridges would be necessary to allow
total access to the property. By controlling the water, we are not
intending to impede or change the direction of the flow, only create
a more direct route to the river.
We have discussed the plant life that inhabits the lower area of
(-0--) �.,,1 D SC4 p
Aspen Landscaping, Inc.
d
�. 303/963 -3136
BOX 803, CARBONDALE, COLORADO 81623
the property and our mutual interest is to enhance the natural
growth that presently exists.
The new structure blends well into the hillside, with the emphasis
on living in a house with a view of the river as opposed to a taller
structure with a view of Aspen Mountain, Therefore, the landscaping
design and plant material used for the front of the house is of
importance so that the entire project blends well with the existing
enviroment. The native trees that will be used should seem as if
they were coming up from the river and folding around the house.
Hence, Cottonwoods are to be planted on the southern and northern
sides.of the house. The ground cover would be a High Altitude grass
that would match, or blend with, the existing foliage. In orderto
create a feeling of privacy, a contoured berm, that lends itself to
the total landscape plan, would be built on the northeastern corner
of the property. Again, it is my feeling to stay with native plants
for the berm. At the entrance to the driveway, to delineate it, other
species may be used. To show a more exact description, my ideas are
proposed on a landscape drawing.
Sincerel
V )_ David Osann, Pres.
Aspen Landscaping, Inc.
ceo
- 2 -
1
MEMORANDUM
TO; City Attorney
City Engineer
Building Department
PLANNER: Colette Penne
RE: Owen Stream Margin Review
DATE: November 18, 1982
Attached is an application requesting a stream margin review for the development
of Lot 1, Shoaf's Waterfall Subdivision.
Please review the material and return your comments to the Planning Office by
December 6, as the item is scheduled to go before the Aspen P &Z at its second
meeting in December.
•
Thank you.
MEMORANDUM
TO: Colette Penne, Planning Office
FROM: Jay Hammond, Engineering Office
DATE: December 3, 1982
RE: Owen Stream Margin Review
Having reviewed the above application, and made a site
inspection, the Engineering Department has the following
comments:
1. The applicant should be required to dedicate the
trail easement shown to public use.
2. All construction should be undertaken in a manner
so as to create the least disturbance to the flood zone.
MEMORANDUM
TO: Gary Esary, Assistant City Attorney
Colette Penne, Planning Office
FROM: Jay Hammond, City Engineering
DATE: January 4, 1983
RE: Owen Stream Margin Review
Just to confirm our discussion of yesterday regarding the Owen
Stream Margin application. The City Engineering Department
is in agreement with regard to the following items:
1. That the applicant provide for the improvement of Neale
Street through granting of an easement instead of actual
right -of -way.
2. That the owner be required to join any improvement district
formed on Neale.
It is my understanding that Gary will be providing language
specific to these items.
JH /co
Enclosure
1
CITY OF ASPEN
130 south galena street
aspen, colorado 81611
303-925-2020
MEMORANDUM
DATE: January 4, 1983
TO: Jay Hammond, Engineering
FROM: Gary Esar}7
RE: Owen Stream Margin Review
Jay, we've discussed the problem of the right -of -way acquisition
on Neale Street and Mr. Owen's concerns about a later condemnation
making his property non - conforming.
If the Engineering Department is satisfied with a perpetual ease-
ment for municipal purposes, as opposed to an outright dedication,
I suggest that you write a supplemental referral memo on the
above- referenced application, recommending the following condi-
tions (I've included the standard condition requiring joining an
improvement district, which should be in almost all land -use
approvals):
1. In order to avoid later problems with non - conformity should
the City condemn a wider Neale Street right -of -way, applicant
voluntarily grants a perpetual, irrevocable, assignable, exclusive
easement to the City, without compensation therefor, for roadway,
utility and other municipal purposes. Such grant shall be in-
cluded on plat at cost of applicant.
2. The standard improvement district condition:
"In the event that any municipal improvement or improvements of a
kind contemplated in Section 20 -16 of the Municipal Code of the
City of Aspen, as amended, become, in the sole judgment or discre-
tion of the City Council of the City of Aspen, necessary or desir-
able to the area of the applicant's property, Applicant (and his
successors and assigns) will make no objection to any special
assessment or special tax or proceeding therefor on the basis that
the property is adequately served by existing improvements and /or.
on the basis that the premises will not be served or benefited by
the improvement or improvements proposed. Applicant further
agrees to join, upon the demand therefor by the City, any improve-
ment district formed for the construction of such improvements
(including, without limitation, drainage, underground utilities,
paving, planting, curbs, gutters, sidewalks, street lights, etc.)
in the area of the subject property or to reimburse the City of
Aspen directly upon demand therefor if the City should choose to
construct these improvements without the formation of such a dis-
trict."
GSE /mc
Recorded at _ r• . __ o'clock — M., ___ -. - _ __ _ _spy - ,
Reception No. ' __ _ - _ Rcr<'it C ��`E
Tuts DEED, Made this i day of March ' 't 0 IFIf.I] STAMP
hetween Parker Quillen and Joan F. Quillen
l.O: ETTA BAU:OER
of the County of and State F;TKII- CTY. RECORDER
Colorado, of the first part, and Kenneth Owen and Jane Owen, as
`, Joint Tenants, )f _ t
r
ra rtZi 10 54 8Z
L- ;? whose legal address is #2, 990 E. Hyman, Aspen, Colorado 81611
• C of the County of Pitkin and State of
Colorado, of the second part:
DJ �,
G. r.cJ R'ITNESSETH, that the said party of the first part, for and in consideration of the sum of
- - TEN DOLLARS and other good and valuable consideration
NO t�
(:} -. t ' and other good and valuable considerations to the said party of the first part in hand paid by the said parties of the
(0 second part, the receipt whereof is hereby confessed and acknowledged, has granted, bargained, sold and conveyed, and
r
ry by these presents does grant, bargain, sell, convey and confirm unto the said parties of second part, their heirs and
1;..� assigns forever, not in tenancy in common but in joint tenancy, all the following described lot or parcel of
land, situate, lying and being in County of Pitkin and State of Colorado, to wit:
r . �
1 '-a Lot 1
SHOAF'S WA'1'ERFATT SUBDIVISION, as recorded
O in Book 8 at Page 37 and as amended in Book r .
13 at Page 3. ; ,. i,. . :, - .!;l 'Et
Pp 0 t )
also known as street and number 7 5
Q •)
TOGETHER with all and singular the hereditaments and appurtenances tlfereunto belonging, or in anywise apper-
01 taining and the reversion and reversions, remainder and remainders, rents, issues and profits thereof; and all the
IJ estate, right, title, interest, claim and demand whatsoever of the said party of the first part, either in law or equity, of, in
r and to the above bargained premises, with the hereditaments and appurtenances.
a TO HAVE AND TO HOLD the said premises above bargained and described, with the appurtenances, unto the said
t ' parties of the second part, their heirs and assigns forever. And the said party of the first part, for himself, his heirs,
e'
executors, and administrators, does covenant, grant, bargain and agree to and with the said parties of the second part,
their heirs and assigns, that at the time of the ensealing and delivery of these presents, he is well seized of the premises
above conveyed, as of good, sure, perfect, absolute and indefeasible estate of inheritance, in law, in fee simple, and has
good right, full power and lawful authority to grant, bargain, sell and convey the same in manner and form aforesaid,
and that the same are free and clear from all former and other grants, bargains, sales, liens, taxes, assessments and
encumbrances of whatever kind or nature soever,
EXCEPT taxes for the year 1982, payable in 1983; SUBJECT to easement recorded in
Book 365 at Page 822 of the records of Pitkin County, Colorado; United States
Patent reservations recorded in Book 185 at Page 69 of the records of Pitkin
County, Colorado.
and the above bargained premises in the quiet and peaceable possession of the said parties of the second part, the
survivor of them, their assigns and the heirs and assigns of such survivor, against all and every person or persons
lawfully claiming or to claim the whole or any part thereof, the said party of the first part shall and will WARRANT AND
FOREVER DEFEND. The singular number shall include the plural, the plural the singular, and the use of any gender
shall be applicable to all genders.
IN WITNESS WHEREOF the said party of the first part has reurto set his hand and seal the day and year first
above written. ` / J
Signed, Sealed and Delivered in the Presence of ', , " 1SEALI
Parker Quillen -
1 9 �
- T ( A ((' L L , ISEAL]
I. Joan F. Quillen
[SEAL)
C
STtS'1'E OF COLORADO
I ss.
' - ' , ,-- County of Pltkln
The.oregoing ilistruznent was acknowledged before me this 7) (2 } day of March ,102 ,
b y :Parker Qui • . and Joan F. Quillen
�.S
My Commission expires .- : : - ( ` ' ,19 C:— . Witness my hand and official seal.
Notary Public
No. 921A. WARRANTY DEED.—To Joint Tenants.—Bradford Publishing Co., 182416 Stout Street, Denver, Colorado 1523- 6011) -7.77
♦.4 t
Lot 1 Description
Lot 1, Shoaf's Waterfall Subdivision, as recorded in Book 8, Page 37
and as amended in Book 13, Page 3.
A tract of land situated in the Southwest ! of Section 7, Township 10
South, Range 84 West of the 6th P.M., Pitkin County, Colorado. Be more
fully described as follows:
Beginning at a point on the westerly Right -of Way of
Neal Street, whence the South ' corner of said
Section 7 bears South 7' 54' 30" East 416.60 feet;
- Thence N 53' 14' 00" W 132.59 feet
- Thence N 20' 55' 18" E 156.59 feet
- Thence N 21' 35' 00" W 130.99 feet
- Thence N 65' 51' 21" W 54.19 feet
- Thence S 24' 19' 50" W 30.26 feet
- Thence s 33' 08' 25" W 63.85 feet
•
4r
-_� -. I , ,
i •I f , a • j 4
3
•
I , `
F
•
A k, 2-- I i • ) F
j _, I ,). , . ' i
C -
//)— , ■ k 1•,_
1 I r {
C-:-0 j J � 1
ail --\ (00 0_ i a .4{•
',c,. Ci €1. . r kill- 0 _ P 1, -. fp7. ( ,- X-
1
1
; l
1 2 '
4 1 i i( r
Z
- Oar , _ ).
1
0
t
. I k. 1 _:
:
(I) /\,P 4 _I. ! 7 ., 2 - 4:' 7. % i Y19 __ _ (0n / I' , V 1 ,. i 1 ,.
— PI ' — I ff
�_ 1 I ) Y fr-UP' , 't _ _ i r
2) _ - T.
i
I 1
y
I
y .
( / ' � , _ _ � ` .� d y'� i �. ✓6'1 � � --- (0 1 s y � �. _ C i
f
111 I - �� ti r `,1. ..,1' T � . HIV �- } "J)� :
( {- , i
;mot' ! G . 9
i1 d `
�� it
Vy � � I j ', 3 S�!�� /1� _ .t �_ 424_ ('�" `�J � { `�. )I: .J11 �
1
v
`' 1,.6. _ Ci 7 1 i^, `,,.� _J11 _ '1`A <, O . V U r
( t 1 '
0 a 0 Y \ o\ ''y ' ;> f ice e a ; . . > - 4 , V
T %
)
y �II
t .a_ 1
C 1 1 `__ - C-'k.(' , st•A IO e✓.' • ''\:9 AI[ H.