Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
coa.lu.tu.845 meadows rd. 0009.2010
THE CITY OF ASPEN City of Aspen Community Development Department CASE NUMBER 0009.2010.ASLU PARCEL ID NUMBERS 2735 121 29 008 PROJECTS ADDRESS 845 MEADOWS ROAD PLANNER BEN GAGNON CASE DESCRIPTION TEMP & SEASONAL USE REPRESENTATIVE JIM CURTIS DATE OF FINAL ACTION 6.7.10 CLOSED BY ANGELA SCOREY ON: 12.30.11 1 6v," vitto MEMORANDUM TO: Mayor Ireland and Aspen City Council FROM: Ben Gagnon, Special Projects Planner /1 I THRU: Chris Hendon, Community Development Director) DATE OF MEMO: May 31, 2010 \„JJVV11{{II�II//" MEETING DATE: June 7, 2010 RE: Temporary Use for Overflow Parking at Aspen Institute Tennis Courts on Meadows Road Resolution No. 41 / 41A, Series of 2010 APPLICANT /OWNER: STAFF RECOMMENDATION: Aspen Institute There are three options for City Council: 1) Approve the application without REPRESENTATIVE: requiring a traffic study. This option is Jim Curtis reflected in Resolution No. 41; 2) Approve the application, including a LOCATION: required traffic study. This option is 1000 N. Third Street r ected in Resolution No. 41A; 3) De y the application. CURRENT ZONING & USE Specially Planned Area (SPA) Staff recommends that Council approve the application, including a condition requiring a PROPOSED LAND USE: professional traffic study. The outcome of this Applicant seeks a Temporary Use study would allow staff to properly evaluate permit allowing for the use of two whether the Institute's proposal meets public tennis courts on Meadows Road for 46 policy goals of limiting vehicle traffic, and parking spaces to accommodate special encouraging alternative methods of travel. This events. These new parking spaces study would also form the basis for a future would be limited to High - Occupancy- decision on whether to make the tennis court Vehicles (HOV) with two or more parking permanent, via a Specially Planned occupants. As part of its transportation Area (SPA) Amendment to the Aspen strategy, the applicant also proposes to Meadows Master Plan. eliminate 23 parking spaces on Meadows Road, and expand existing SUMMARY: shuttle service. Applicant requests that City Council determine that the Temporary Use application meets applicable criteria. r^ LAND USE REQUEST AND REVIEW PROCEDURES: The applicant is requesting the following land use approvals from City Council: • Temporary Use — An application for Temporary Use, pursuant to Land Use Code Section 26.450, requires the City Council, at a public hearing, to determine if the application meets the applicable criteria. The City Council is the final decision - making body. - i \ x r r it me HLMEAD S S A (— � '�' rive s r d 1 a a 4 „a ham ' ° z. , /I ? ° ' r a n i , _ "0 i i/ ' u r BU' l ' "J � / E F_ v - tom" C -' _,.., ,,,,- - , r - -_, ' li n < x c—I rm . 1/4. -,,‘ >1/4,,= N- 2 BACKGROUND: The topic of using some of the tennis courts on Meadows Road for overflow parking was first mentioned in The Aspen Institute's 2004 application for the development of the Doerr- Hosier Center. The 2004 application requested 46 "overflow parking spaces” on two tennis courts to handle 5 -7 events a year. The City Council did not grant this request as part of the development approval, preferring a `wait and see' approach. DISCUSSION: The current Temporary Use application request to "experiment with overflow parking" in 2010 and 2011, including summer season events, as well as specific events such as weekly Rotary meetings and Christmas parties — not to exceed 180 days per year, as limited by the Land Use Code. The application states that after 2011, the Institute would "evaluate the experiment and decide how to proceed on a longer term basis." 2 Staff agreed that a Temporary Use process was appropriate because it would allow a period of time to experiment with changes to the Institute's transportation strategies, followed by an evaluation and an informed decision for the long -term. However, staff expressed concern that the application did not include some kind of formal study that could be used to properly evaluate the proposed overflow parking. Staff suggested a study should include data gathering of existing conditions (without any changes to current operations), as well as data gathering following the implementation of the tennis court parking. Staff suggested that a formal study would provide reliable information so that a long -term strategy could be adopted through an amendment to the SPA. At a May 14 meeting with Aspen Institute representative Jim Curtis and Institute President Amy Margerum, City staff said the Institute has done an excellent overall job in implementing a variety of Transportation Demand Management (TDM) measures over the years, but remained concerned that the proposed overflow tennis court parking would make it easier for people to drive to events. Making parking more convenient appears to be in conflict with the city's public policy goal of limiting vehicle trips and encouraging alternative modes of transportation. On this subject, the Institute's April 19 Supplemental Memorandum (see Exhibit B) had stated: " ... overflow parking is a convenience for the event user and is not an incentive to increase automobile traffic to the events ... overflow parking is simply trying to better manage the traffic which is already occurring." Staff also cited two policies contained in the 1991 Aspen Meadows Master Plan, which continues to serve as the governing document for this Specially Planned Area: • Policy: Limit, to the maximum degree feasible, the use of the automobile on the campus. Provide parking, as needed, either underground or at the periphery of the campus. • Policy: Require improved transit service to be provided for all significant functions on the campus and create improved opportunities for non -auto access. At the May 14 meeting, staff requested that the Institute come back with ideas to limit vehicle trips and encourage the use of alternative transportation in other ways — to offset the impact of additional parking. On May 18, the Institute submitted a memo with the following new proposals: • Eliminate 23 parking spaces along Meadows Road in order to offset overall vehicle trips. • Restrict the tennis courts to HOV parking, requiring at least two occupants, to be verified by an attendant posted at Meadows Road and 8 Street. • A shuttle reservation option for any large group attending an event, including Rotary. At a follow -up meeting with Institute representative Jim Curtis on May 21, staff expressed interest in the new proposals. The City Engineer agreed that the parking spaces should be eliminated, but based her agreement more on issues of fire truck access on the 3 .r 23 -foot wide Meadows Road. However, staff remained concerned that without a formalized traffic study, the effectiveness of the proposals would be impossible to measure. It was the consensus of staff, including representatives from Community Development, Engineering, Transportation and Environmental Health, that the Institute should engage a professional traffic planner. A formalized study would gather data points on existing conditions, prior to any changes, as well as gathering data once the new proposals are in place. City staff would have to evaluate and approve the study before it is launched, including an exact determination of the number of parking spaces to be eliminated in cooperation with the Parking Department. Ultimately, city staff would be in a position to evaluate the outcome of the study, and be able to make well - informed judgments on a permanent amendment to the Aspen Meadows SPA. There are three options for City Council: 1) Approve the application without requiring a traffic study. This option is reflected in Resolution No. 41. 2) Approve the application, including a required traffic study. This option is reflected in Resolution No. 41A. 3) Deny the application. RECOMMENDATION: Staff recommends that Council approve the application, including a condition requiring a professional traffic study. The outcome of this study would allow staff to properly evaluate whether the Institute's proposal meets public policy goals of limiting vehicle traffic, and encouraging alternative methods of travel. This study would also form the basis for a future decision on whether to make the tennis court parking permanent, via a Specially Planned Area (SPA) Amendment to the Aspen Meadows Master Plan. CITY MAN •• GER COMM TS: RECOMMENDED MOTION: "I move adoption of Resolution No. 41A, Series of 2010, on Second Reading." ATTACHMENTS: Exhibit A — Aspen Institute's initial application Exhibit B — Aspen Institute's Supplemental Memorandum Exhibit C — Aspen Institute's "Parking & Traffic Mitigation Measures" Exhibit D — Staff findings for Temporary Use 4 'al •uadst+ `s,wopeami uadsd plied ;anon sgaa J, 1€ sMopeap.J dsd ay,I, - a ;n ;i;sul uadsd aqI � NI n a 0 d 3 1 A 1 \ s ' a- { S ze \.i'� r. I `� o I r C I 1 li , 7 , , :, . ., g - - - 4 -, - i 7-- I • 19 / / / / / / 41‘:4 111 I savdsS 41/14 , _ I \ O I ;„ r' _ ,8T \ f f t ' Z % r f I s w • a o a ~ F LI R \ n om . A l„ xl `I s . T 13`1 0 , I Q \ {a s Q p 0 \ `Y7 .#' r w ■ SS ]Yds o1 \ I � Z ', I I 1 I 2 I Z 1 ~ t a , 4 1 1 d Y t. A Di I� =c ! a \ , fi r N Y� . r r 1 . —.� ' I g =? �, . N -1 N N j�'� 7// " 41 i ,,, ,, . 'N. :4 1 ' 6, N I 7. :---4 ,..--.?: 14.:* - ' N N 4. w ' 1 it z -- zw gi ..,:N, , : 1 c \'� w JAS �� = ;70,,„--,-.11 �± 1 'N') r , v?... . A j ....,, ,,... ., jili .,..,,, \,.,,, i 11. ' . . ... . . . -,.. . .. / .• . 1,. . . - . . - .7. ' . .. - _ .. 1 .4 ! • ti 1 • , . 1 1 a , .. . 4 - 2-- , 74-- 40 • , ) . ‘ _.. •ig,•-•-- , _...... - • • • • I . , *:1 '• , I 3 .111. L . r .—... . \ :i ....,..„,... .., . _._-.„.. . . . .7 ,-./. ,. ....._ . - .. ,......., . s .--....,... i, ,, ves, . ... _,:._ - - .....-- ...,. - 7)- - - ' • - -..: — .,... ' ' e . ' ' ,....... 're ... -.--.'•: . ''''' -. . . • t . 1 c . ......4 ... ' • . i . , .. ' 1 . ,,. . .... 11 4 f ■ ..:' ± - ' -...\'',. ',. 1 1 l? .., , P!' ik 10:4 ■ , 1 • % ... Vit :::, , ,. .... :tad* .: - ...- 1 ' A ,/j1. 1 -t --- , 1 • 11 Z 1.740 i tl'.'' .'- ' 7 fig ,i 4 :' r ' I , . , . _. . .::: ..Y.1: , . 're-43tt - --- -- , Weli,,,A*Iii ■ -4., ., , ...- . • . -,.... 0 400 . 11•Weig, - ... , , . , . , A - ' , './' ,.*/ Apr 3*, ■ c. . • , . /40 lka - '-, s„ ',... • .. ., ... . t_ , - :, • , / ... ..- • , , ExU 14 A ASPEN INSTITUTE PROPERTY CONVERSION OF TWO TENNIS COURTS TO OVERFLOW PARKING TEMPORARY & SEASONAL USE PERMIT APPLICATION RF C Aspen Institute Property Sikfr 845 Meadows Road /114R 3 0 Lot 1 -A, Aspen Meadows Subdivis 0 2010 Parcel # 2735- 121 -29008 411 70 0 Submitted To: Jennifer Phelan � Yuc "�M City of Aspen Community Development Office 130 South Galena Street Aspen, Colorado 81611 970 - 920 -5095 Owner /Applicant: The Aspen Institute c/o Amy Margerum Executive Vice - President 1000 North Third Street Aspen, Colorado 81611 970 -544 -7906 Architect: n/a Planner: Mr. Jim Curtis Curtis & Associates 300 East Hyman Avenue Aspen, Colorado 81611 970 - 920 -1395 Date: March 30, 2010 TABLE OF CONTENTS I. Application Summary II. Temporary & Seasonal Use Permit - Sec. 26.450 LIST OF DRAWINGS 1. Location Map 2. Site Plan & Parking Plan Detail 3. Photograph of Existing Conditions EXHIBITS Exhibit 1 - Land Use Application Form Exhibit 2 - Dimensional Requirements Form Exhibit 3 - Owner's Consent & Authorization Letter Exhibit 4 - Proof of Ownership Exhibit 5 - Fee Agreement Exhibit 6 - Adjacent Property Owners Exhibit 7 - Pre - Application Conference Summary I. APPLICATION SUMMARY This proposal is for an OVERFLOW PARKING EXPERIMENT: 1. To test the proposal to see how well it works, 2. To be a straight forward, relatively low -cost parking experiment, 3. To test the impacts and benefits both to the Aspen Institute and the neighborhood. This application is to covert 2 of 6 tennis courts to overtlow parking as shown on the attached plans. The 2 tennis courts are the southern most courts above the parking garage and would add approximately 46 parking spaces for overflow parking. The 4 remaining tennis courts would remain "as is" and the Aspen Institute feels the 4 courts are sufficient to meet their tennis demands. The existing cyclone fencing and green tennis netting enclosing the 2 tennis courts would remain "as is" to screen the overflow parking. Converting the 2 tennis courts to parking is easily accomplished by adding stripping and mobile barriers /curb stops, and a small ramp into the parking. Structural engineers have confirmed the parking garage can handle the proposal. The request is to experiment with overflow parking for the summer season and specific events, like weekly Rotary meetings or large Christmas parties, but not to exceed 180 days in the calendar year. The Aspen Institute would like to start the experiment this Summer, 2010, by around mid -June, and continue with the experiment next year, 2011. Then it can evaluate the experiment and decide how to proceed on a longer term basis. The Aspen Institute will also experiment with the operations of the overflow parking. The parking will be signed, but for larger events, the Aspen Institute will likely place an attendant at Meadows Road to direct guests to the parking, and/or the Aspen Institute could also use valet parking for the overflow parking for the largest events. Realistically, it will be a mix of various options based on the specifics of the event. With the success of the Doerr- Hosier Center, which opened in June, 2007, and other Aspen Institute activities it is felt the overflow parking is necessary. Overflow parking currently occurs along Meadows Road, a public road, and the Aspen Institute feels adding additional parking will not only benefit its operations, but also the neighborhood. During the City's review of the Doerr- Hosier Center in 2004 and 2005, the Aspen Institute requested that two tennis courts be converted to overflow parking at that time. The City directed the Aspen Institute not to convert the two tennis courts to overflow parking and to evaluate the situation once the Doerr- Hosier Center was opened and operating. The Doerr- Hosier Center opened in June, 2007, and has proven to be very successful for meetings, seminars, conferences and events, and the Aspen Institute is also hosting more "locally" oriented events in the Reception Center. Temp& SeasPerm itAppTennisCts03290 1 As expected, the overflow parking problem is mainly "locals" who drive to the events and overflow park in the neighborhood. The overflow parking problem is not guests or groups lodging at the Aspen Meadows. Surveys have shown most guests arrive by plane and are shuttled to the Aspen Meadows, or when guests drive, they park in the parking garage. The Aspen Institute /Aspen Meadows handles parking in several ways as follows: 1. The Aspen Meadows parking garage contains 97 spaces and is adequate for most day to day operations. Expanding the parking garage to accommodate overflow parking, estimated for only 20 — 30 times a summer and for limited non - summer events, would be very expensive. On a very preliminary basis, the Aspen Institute estimates $30,000 - $40,000 /per car to expand the parking garage or $1,380,000 - $1,840,000 total to accommodate the 46 spaces which could be provided by converting the two tennis courts. 2. In the past, the Aspen Meadows has experimented with valet parking by parking cars off -site in the MAA big lot (257+ spaces). This is workable, but has several problems, i.e. the MAA big lot is not always available due to MAA events, the cost of hiring a valet service, the turnaround time and distance to shuttle cars back and forth from Doerr- Hosier to the MAA big lot, and the "line -up and wait- time" for guests to get their cars on leaving an event. The Aspen Meadows has never experimented with valet parking using the Paepcke parking lot (96± spaces) because it would have even greater turnaround time and distance problems than using the MAA big lot. 3. The Aspen Meadows also follows the "Traffic Mitigation Plan" approved as part of the 1991 Specially Planned Area Plan (SPA Plan) for the Meadows Campus recorded in Book 667 at Page 731. The 1991 Traffic Mitigation Plan for the Aspen Meadows facilities deals almost exclusively with mitigating the impacts of guests and groups using the lodging facilities of the Aspen Meadows. The 1991 Plan does not address the "locals" problem of locals driving to events. Temp &SeasPermitAppTennisCts03290 2 rte. II. TEMPORARY & SEASONAL USE PERMIT, CODE SECTION 26.450.030 Code Section 26.450.030 is addressed below. A. The location, size, design, operating characteristics and visual impacts of the proposed use. As described herein. Applicant feels this is a straight forward, relatively low -cost experiment to test the effectiveness, operations and impacts of providing overflow parking for the Aspen Institute and the neighborhood. B. The compatibility of the proposed temporary use with the character, density and use of structures and uses in the immediate vicinity. Applicant feels the proposed temporary use is compatible with the immediate vicinity and is an experiment to test the impacts and benefits both to the Aspen Institute and the neighborhood. C. The impacts of the proposed temporary use on pedestrian and vehicular traffic and traffic patterns, municipal services, noise levels, and neighborhood character. Applicant feels the proposed temporary use is an experiment to test the impacts and benefits both to the Aspen Institute and the neighborhood. D. The duration of the proposed temporary use and whether a temporary use has previously been approved for the structure, parcel, property or location as proposed in the application. As described herein, the duration of the proposed temporary use is not to exceed 180 days either in 2010 or 2011. No temporary use has previously been approved for overflow parking. E. The purposes and intent of the zone district in which the temporary use is proposed. The zone district is set by the 1991 SPA Plan and all uses are site specifically approved by the 1991 SPA Plan and amendments thereto. Temp &SeasPermitAppTennisCts03290 3 r F. The relation of the temporary use to conditions and character changes which may have occurred in the area and zone district in which the use is proposed. As described herein, with the success of the Doerr- Hosier Center and other Aspen Institute activities, the need for limited overflow parking has grown. As noted, the Aspen Institute proposed adding overflow parking during the City's review of the Doerr- Hosier Center, but the City directed the Aspen Institute to take a "wait and see" approach. G. How the proposed Temporary Use will enhance or diminish the general public health, safety or welfare. Applicant feels the Temporary Use will enhance the general public, health, safety or welfare by creating additional parking to handle overflow events.. At a minimum, applicant feels the experiment should be tested to evaluate its effectiveness and impacts. Temp &seasPermitAppTennisCts03290 4 M 1 \\ i • „r . l t , ff1 \ �\ \ . f LOT 4• `` ' j�� \ \` `. ill .} 2Nn Td.rumm Urdu /' 1 ',: '': : :,- ' 'gilt ,V1 i�J /� g AAAAAA, .. •a..rvw.. • a.� , ► , I" I 1 231•11.01.. \ Li' *•".":;' \ `w 7„,,E.,-;‘, Mom I. tV� \ \... — _ \ \ \\ \ Nomokled aam t Ra�t aunat i ., .. ) eamaoP � �+.� L C `` -, .n \ — . , TNo Tn.S.ss ll i . - .M.. LOT 1 \ '. T±r rou 1 �� ' i \ � +-_�' ["t n i l > oW \\ � � L I :al I : Site j � J � jr ` i `� ` �S, Paepcke Aud 11 1 �. ) !i 4 4 , ate Vi V\ i.. Y \,1 %�C l� / � r / �( � r ._ ��\.. f I' ' n ,1 i _ R ace'Track . { . ..,� A 12 --_1_ ".' \ � it a t i. ' l • ; i , yd � 1;.. I ` %y ..\ \, - > Pa(mm Feud. ' a i l _ I , ,r , ',/,// 1 . i II , \ ' P s,ca Ce nter I{O�I\ �2 y "it ���� - I • � % Ne.1 Tm, t.muor • 1 i i i; ./ 1 r \.i /y Ll .Ir —' IyO PU b = asp �:(Qay tlo srym/ 1 _ / v im t i . I Ncr nmmaom70 SJW1 /1-.�� - I . r I. RECEIVED APR 19 2010 SUPPLEMENTAL MEMORANDUM CITY OF ASS To: Ben Gagnon, Aspen Community Development Department From: Jim Curtis, Owner Representative The Aspen Institute Date: April 19, 2010 Re: Parking & Traffic Management Memo Overflow Parking Temporary Use Permit Application The Aspen Institute Comm. Deve. Case # 0009.2010.ASLU OVERVIEW & SUMMARY 1. Due to the success of the Doerr- Hosier Center, which opened in June, 2007, The Aspen Institute feels it needs to provide overflow parking for the larger events. As part of the Doerr- Hosier Center SPA Application in 2004, The Aspen Institute proposed overflow parking, at that time, but the City directed The Aspen Institute to take a "wait & see approach" after the opening and operation of the Doerr- Hosier Center. The Aspen Institute has had 2'h years to evaluate the situation in addition to its on -going mitigation measures described herein & illustrated in the Exhibits. 2. Based on the need for overflow parking, The Aspen Institute proposes to experiment with converting 2 of 6 tennis courts to overflow parking which would add approximately 46 spaces for overflow parking. This is the same overflow parking proposal requested in 2004 as part of the Doerr- Hosier Center SPA Application. The existing cyclone fencing and green tennis net screening the 2 tennis courts would remain "as is" to screen the overflow parking. 3. The overflow parking experiment is requested for the 2010 & 2011 Summer Seasons (mid -June to mid - September) and other non - summer larger events (ex. weekly Rotary, Aspen Environmental Forum, Christmas parties, etc.) Park &TrafficMgntSuppMemo04 120 1 of 3 4. Overflow parking presently occurs along Meadows Road, which is a public road. The Aspen Institute feels parking should continue along Meadows Road. 5. The overflow parking is predominately needed for the "locals & valley residents" attending the larger events at the Doerr- Hosier Center. The Aspen Meadows parking garage contains 97 spaces and is adequate for most day to day operations and for the guests and groups staying at the 98 lodge rooms of The Aspen Meadows. 6. The larger events at the Doerr- Hosier Center typically range from 150 -300 people with 3 -5 events being 300+ people. Typical larger events are Aspen Ideas Festival, Aspen Environmental Forum, Food & Wine Hospitality Night, AREDAY Forum, Rocky Mtn. Institute Forums, etc. Other events would be weekly Rotary, Challenge Aspen Benefit, Duck Unlimited Benefit, etc. The number, type & size of larger events vary from season to season. 7. The Aspen Institute has experimented with valet parking by parking cars off -site in the MAA big lot (257± spaces). This is workable, but has several problems, i.e. the MAA big lot is not always available, the turnaround time and distance to shuttle cars back and forth is longer than desired, the `line- up and wait - time" for guests to get their car on leaving an event is longer than desired, and the cost of the valet service. 8. The Aspen Institute feels providing overflow parking is a convenience for the event user and is not an incentive to increase automobile traffic to the events. The traffic to the events is governed by the size of the event and the capacity of the Doerr - Hosier Center to handle the event. Providing overflow parking is simply trying to better manage the traffic which is already occurring. 9. In summary, The Aspen Institute proposes to experiment with providing overflow parking on the tennis courts for 2 years, evaluate the impacts and benefits of the overflow parking, and then decide how to proceed thereafter with review by the City. Park &TrafficMgntSuppMemo04120 2 of 3 y Fqy II. PARKING AND TRAFFIC MITIGATION MEASURES 1. The Aspen Institute shall designate Staff Personnel to coordinate traffic mitigation communications and plans with the MAA & City. The 3 parties will prepare a Master Calendar of Events for the Summer Season and will prepare mitigation plans for the major events. This coordination meeting is scheduled for April 28 for this season. This coordination will continue annually and a post- season meeting will occur each fall to review the previous season and discuss potential improvements. 2. The Aspen Institute in coordination with the MAA & City will strive to schedule to minimize overlapping events and especially overlapping larger events. 3. The Aspen Institute will continue its on -going mitigation measures for larger events as illustrated in the Exhibits attached. Mitigation measures include information packages describing alternative transit to events, information on free shuttle services to events, providing shuttle services in addition to RFTA services, coordinating shuttle services with other lodges, experimenting with fun rickshaw services, etc. The Aspen Institute examples from the 2009 Summer Season are given in the Exhibits. 4. The Aspen Institute will experiment with the operations of the overflow parking. The overflow parking will be signed, and for larger events The Aspen Institute will place attendants at Meadows Road and the tennis courts to direct the parking operations and/or use valet parking. The operations of the overflow parking will vary based on the type & size of the event. 5. The Aspen Institute will continue to direct employees to take alternative transportation to get to work during the larger events as illustrated in the Memo to Staff in the Exhibits. Park &TrafficMgntSuppMemo04120 3 of 3 . ... _ r INFoRmATIO: ...... BUS SCHEDULE FESTIVAL BOOKSTORE is your on-campus provided by RFTA is available throughout Aspen. bookstore for the Aspen Ideas Festival. XI ORE' —_, Every 30 minutes, the RFTA Cross-Town Shuttle provides FREE . .../ transportation to and from downtown Aspen to the Aspen In- -2 ,—.J..--■ liOL)K stitute campus and Music Tent. The bus stop is under the blue awning at the main Music Tent parking lot. In the library in the Paepcke Building (Aspen Meadows Campus) ' Z From Rubey Park (downtown Aspen) to Harris Hall at the Books authored by presenters. Aspen Institute campus at :06 and :36 past each hour. books recommended by presenters, and book signings UPS Shipping available; major credit cards accepted From Harris Hall atThe Aspen Institute campus to Rubey Park at :15 and :45 past each hour. . . Running on a continuous loop to the Aspen Institute campus HOTL1P4E (970) 544-7960 reit fi each morning starting across the street from Rubey Park Bus Please call If you have any questions during — tt Terminal with pick ups at Limelight Lodge, Hotel Jerome, and the Aspen Ideas Festival. 4 F , grid Annabelle Inn. From the Aspen Institute Campus each evening .... returning to hotels and Rubey Park. See transportation flyer ' 0 I I 'Ind for more detailed information. . , Routh Hu the Viaihire. 4 es tom lu Urn 1... 0 l'. Z — "-; '.. ..!S e , . 1 ... , ''•-'14,410Th • ' , .., • i/. \1/4 . . . • t..- •:,' '' ‘ — '''''''- 0 0 ?Lae , , . .,., r .,....... 'GE K'R<AL`Ti1 FORMATION BUS SCHEDULE FORUM 8OOX,.IonF FREE CROSS SHUTTLE Explore Booksellers is your on- canoes bookstore BUS SERVICE for the Aspen Health Forum . provided by RFIA is available throughout Aspen. ITTOr y T (1)QE - 7 :24 AM - 11:06 PM DAILY p Every 30 minutes, the RFTA Cross-Town Shuttle t SC)C 110111I',RcS provides FREE transportation to and from downtown LOCATIO Doerr -I- ?osier Center, Aspen to the Aspen Institute campus and Music Tent. Murdock Lounge The bus stop is under the blue awning at the main Music Tent parking lot. SERVICES Books authored by presenters, OUTBOUND books recommended by presenters, and book signings From Rubey Park (downtown Aspen) to Harris Hall at , the Aspen Institute campus at :06 and .36past HOURS; 9:00 AM — 6;00 PM each hour _._..._.___... .. _. __.. INBOUND HAKE; Lit s_ a ..x = -1) 7:15 AM From Harris Hall at The Aspen Institute campus to loin us for a morning hike on July 25, 26 or 27 Meet Rubey Park at :15 and :45 past each hour. your hike leader, Beth Slater, in front of the Aspen • HEALTH FORUM SHUTTLE Meadows Reception Center at lam for a hike on Running on a continuous loop to the Aspen the Walking Trail to Castle Creek and the Roaring Institute campus each morning starting across the Fork River. The trail connects via a bridge to the Rio Grande Trail along the Roaring I o f street from Rubey Park Bus Terminal with pick ups 7 Ik Rivet at Limelight Lodge, Hotel Jerome, and Annabelle - .{ Inn. From the Aspen Institute Campus each k•UTLJNE (97 evening returning to hotels and Rubey Par k. See Please tali if you have any nuestions during the _ transportation flyer for more detailed Information. Aspen health F nnu n. i i i i. • 311. k Sri[ x 111 on ir J Er O p f . R am . .,; " m 3 m .} o e z • 1111 ,yPFV II1:Ul111,s:1U %! 1)1 GENERAL INFORMATION „ _ ; ,, r 0 �� n Q / r, �' ( Ill 1, In ti1111;12L5 f "``� , 1. 7 Forum Bookstore by Explore Booksellers Books authored by presenters and books recommended by presenters will be available for purchase at Explore i Booksellers' on- campus book store in the Doerr - Hosier Center. Book signings will take place throughout the : Forum. SHUTTLE CARS -- , GM has provided Chevrolet Tahoe Hybrid vehicles as shuttle cars throughout the Forum. t:„. ' t IVIdis i C TD ;GCMG POINT bG 1 I ' T y F CREEKI s* +• A a EAST � i Mll .# f.P�E s N �V OFA , ' O I114 R "' t' I 4 � i CEMEN I ASE PTION OWS t: UMTr �� OFC[RION LFNid �Y � G1TC ^ f :m N!5V � : ' ��t � i �� .-, -�- NRESGE i yP y STNNCtUNEI 1l ENTRANCE L ` 'It c,A ��\ AVAIL �' �P.DgPlll° fOgK NIVFN SEMINAR ROOM LOCATIONS . . i 03 FoOTPNMH ANBERSOP ■ '' '-. ASPEN MEAOOWB RECEPTION CENTER PARK ROARI IG� tv BERNHARD. XEFNER FORK RAII 5 ,. DOERR HOSIER CENTER riL MTNULTY. NAUFMAN . CATTO NDCn SENlflgq > t x , ;i KRESGE BUILDING M[ECNE OUILOIOG HINES MEMORIAL NKOMO ISU ADPRMWU 9 ^ �`7 .1 KOCHSEMINARBUIOLINO muumuu t,r� ++ S LAUOER.STRA 8002 ALLEN HA 4�u: T t J + j 4 PAEPCKE MEMORIAL BUILDING AUDITORIUM . INFORMATION. ADELSON GALLERY -I �I ) 1 BENEOIttMUSIC TENT + r 1I HARRIS CONCERT NALL L 0E1 1 E 0 10 �,�.:, . ( i 111.9.:1 BOETTCRBVILDINO -r q �,�g f10 . H >RRIS HE pINGMAN C OM MONS 11 °As + � i3t t1 1. S EEII NFAOY +S ' ^ y STVBCET TH PO5O0 tl BOETTCHER i. a BENINAR 6 n `` BUILDING A ” X » • I HARRIS XALL . 3 A TO ASPEII G A AG RI ''' + - SEPTET ' O �� -" TI I R AT S GILLESPIE .,..M A 2 - I . • 'v. .J•uN... r ; V .�.. Al Powering the Planet: Energy for the Long Run • :� March 25 -28, 2009 / Aspen, Colorado RA 4' Aspen Environment Forum Shuttle Transportation WEDNESDAY, MARCH 25 OUTBOUND from Doerr Hosier To and From Aspen and Doerr Hosier 4:15 pm — 6:15 pm continuously 2:00 pm — 6:00 pm continuously Service from the Doerr Hosier building to Rubey Park Departing Rubey Park and Doerr Hosier with stops at with stops at the Annabelle Inn, Hotel Jerome, Little Nell, Limelight Lodge, Hotel Jerome and the Limelight Lodge, and the Little Nell. Annabelle Inn. Additional stops at the Gondola Plaza for uploading EVENING EXCHANGE SHUTTLE to the Sundeck. Uploading begins at 6:OOpm. TO: 8:00 pm — 8:30 pm continuously Doerr Hosier to Wheeler Opera House , OUTBOUND from Gondola Plaza to Hotels FROM 9:45 pm — 10:00 pm continuously 9:00 pm — 11:00 pm Wheeler Opera House to Aspen Meadows /Hotels THURSDAY, MARCH 26' SATURDAY, MARCH 28 INBOUND from Aspen INBOUND from Aspen Morning Service 7:30 am — 9:30 am continuously Morning Service 7:30 am — 9:30am continuously Departing Rubey Park with stops at Little Nell, Departing Rubey Park with stops at Little Nell, Limelight Lodge, Hotel Jerome and the Annabelle Inn. Limelight Lodge, Hotel Jerome and the Annabelle Inn. OUTBOUND from Doerr Hosier OUTBOUND from Doerr Hosier 4:15 pm — 6:15 pm continuously 4:45 pm — 8:45 pm continuously Service from the Doerr Hosier building to Rubey Park Service from the Doerr Hosier building to Rubey Park with stops at the Annabelle Inn, Hotel Jerome, continuously with stops at the Annabelle Inn, Hotel Limelight Lodge, and the Little Nell. Jerome, Limelight Lodge, and the Little Nell. Cross -Town Shuttle EVENING EXCHANGE SHUTTLE Free RFTA 7:24 am -9:80 pm daily TO: 8:00 pm— 9:00 pm continuously Every 311 minutes. the RFTA Cross -Town Shuttle provides Aspen Meadows to Wheeler Opera House free transportation to and from downtown Aspen to the FROM: 9:30 pm — 10:00 pm Aspen Institute Campus. The bus stop is in the Nlusic Tent Wheeler Opera House to Aspen Meadows parking lot at the Aspen Institute. OUTBOUND'- from Rubey Park to Music Tcnt parking FRIDAY MARCH 27 lot at :06 and :36 past each hour. INBOUND from Aspen INBOUND - from music Tent to Rubey Park at :15 and :45 P past each hou. Morning Service 7:30 am — 9:30 am continuously Departing Rubey Park with stops at Little Nell, ..see map on back Limelight Lodge, Hotel Jerome and the Annabelle Inn. ASPEN 1 MEADOWS RESORT HOME OF THE ASPEN INSTITUTE A DOLL@ RESORT' To: ALL ASPEN MEADOWS ASSOCIATES There will be NO employee parking in the parking garage on Wednesday, April 7th prior to 2pm We encourage you to take public transportation (RFTA) to and from work or park in the Boettcher parking lot. Thank you for your cooperation. 7 1 wa, ASPEN \0EAS E EST \N A� 1 NJ_1, %.,.JLL Morning Service: 7:1 5am — 9:15am loop Departing Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge. Hotel Jerome. Hotel Aspen. Annabelle Inn, and the Paepcke building at the Aspen Institute. Mid -day Service: 12:OOpm — 3:OOpm continuous loop Departing from the Paepcke building with stops at the Limelight Lodge. Rubey Park Bus Terminal, Hotel Jerome, Hotel Aspen, and the Annabelle Inn. *Free RFTA Cross - Town Shuttle: 7:24 am — 11:06 pm daily Every 30 minutes, free transportation to /from downtown Aspen to the Aspen Institute Campus. Call 970.925.8484 for more information. OUTBOUND — from Rubey Park to Music Tent parking lot at :06 and :36 past each hour. INBOUND — from Music Tent to Rubey Park at :15 and :45 past each hour. Aspen Meadows Shuttle (for guests staying at the Meadows): 7am — llpm daily OUTBOUND — Departs from the Aspen Meadows every 30 minutes, on the hour and half hour. INBOUND - Departs Rubey Park at :05 and :35 past each hour. Departs Gondola Plaza at :08 and :38 past each hour. TAXI: Aspen High Mountain Taxi: 970.925.8294 . ASPEN IDEAS FESTIVAL TEL 970.544.7960 FAX 970.541.7939 W1110 . AIPESTIVAL.ORG XhIb ►fC PARKING & TRAFFIC MITIGATION MEASURES TO: Ben Gagon, Aspen Community Development Department FROM: Jim Curtis, Owner Representative The Aspen Institute DATE: May 18, 2010 RE: Parking & Traffic Mitigation Measures Overflow Parking Temporary Use Permit Application, Dated March 30 The Aspen Institute I. OVERVIEW On March 30 The Aspen Institute submitted an application for overflow parking using 2 tennis courts for overflow parking on an as needed basis. This would add 46 parking spaces for overflow events. The objective of the overflow parking is: 1. To provide closer and move convenient parking for people attending larger events, primarily at the Doerr- Hosier Center, when overflow parking is needed. 2. To better consolidate and manage the overflow parking for larger events on The Aspen Institute property and reduce the parking impacts on the surrounding neighborhood. 3. To concurrently experiment with traffic mitigation measures to balance overflow parking needs and traffic management in the surrounding neighborhood. II. TRAFFIC MITIGATION MEASURES At a May 14 meeting with City Staff, it was requested The Aspen Institute outline traffic mitigation measures the Institute would experiment with as part of the overflow parking proposal. These measures are outlined below and are in addition to the extensive mitigation measures The Aspen Institute already undertake: 1. The Aspen Institute recommends the City eliminate on- street parking on the east side of the lower portion of Meadows Road from the speed bump at the Meadows Tennis Center to the Meadows entrance sign (see attached drawing). Approximately 10 cars would be eliminated from Meadows Road parking. On- street parking on the west side would continue as is. 2. The Aspen Institute recommends continuing the existing "2 Hour Parking" on both sides of Meadows Road from the Meadows entrance sign to the stop sign at the intersection of Meadows Road & 8 Street. Approximately 19 cars per side or 38 cars total would continue with the existing "2 Hour Parking." 1 3. The Aspen Institute recommends "No Parking (Except D Permits)" along the northeast side of Meadows Road from the intersection of Meadows Road at 8 Street to the intersection at 7 Street. Approximately 13 cars of on- street parking would be eliminated from Meadows Road parking. On- street parking on the southwest side would continue as is. 4. The proposed 46 overflow parking spaces on the tennis courts would be restricted to HOV parking of 2 or more occupants per car to encourage car pooling. The 2 or more occupancy standard is consistent with the HOV standard used elsewhere in the City and Highway 82. An Aspen Meadows guest service employee would be posted at the intersection of Meadows Road and 8 Street to control the HOV parking. 5. The Aspen Institute — Aspen Meadows will expand its existing shuttle bus service as follows: a. Establish an on- demand shuttle reservation option for Rotary. b. Establish an- demand shuttle reservation option for any large group attending an event. The above measures are in addition to the extensive mitigation measures The Aspen Institute —Aspen Meadows already undertake as follows: 1. An extensive shuttle bus service 2. "Transit" promotional & informational materials for its larger events 3. Employee bus passes and restrictive employee parking policy 4. Free bicycle fleet for guests 5. Bicycle racks located throughout the campus. SUMMARY 1. The Aspen Institute is proposing adding 46 spaces of overflow parking at the tennis courts while recommending eliminating approximately 23 spaces of on- street parking on Meadows Road. 2. The 46 spaces of overflow parking at the tennis courts will be restricted to HOV 2 or more occupants per car resulting in potentially a 23 cars or less parking reduction. 3. Additional shuttle service will be provided. The Aspen Institute feels the benefit of the overflow parking is consolidating parking on its own property while trying to reduce the parking and traffic impacts on the surrounding neighborhood. The Aspen Institute feels the net impact will be better or even with the current status. 2 \. 1 Exhibit D Staff Findings for Temporary Use Sec. 26.450.030. Criteria applicable to all temporary uses. When considering a development application for a temporary use or an insubstantial temporary use, the Community Development Director or City Council shall consider, among other pertinent factors, the following criteria as they or any of them, relate thereto: A. The location, size, design, operating characteristics and visual impacts of the proposed use. Staff Finding: Staff finds there are no significant visual impacts, as the tennis court fencing shields the proposed overflow parking from view. However, the location and operating characteristics of the proposed overflow parking appears in conflict with the 1991 Aspen Meadows Master Plan, which includes a policy as follows: "Limit, to the maximum degree feasible, the use of the automobile on the campus. Provide parking, as needed, either underground or at the periphery of the campus." B. The compatibility of the proposed temporary use with the character, density and use of structures and uses in the immediate vicinity. Staff Finding: Staff finds the proposed temporary use is generally compatible with the character density and use of structures in the vicinity. However, it appears in conflict with the 1991 Aspen Meadows Master Plan, which includes a policy to provide parking "either underground or at the periphery of the campus." C. The impacts of the proposed temporary use on pedestrian and vehicular traffic and traffic patterns, municipal services, noise levels and neighborhood character. Staff Finding: Staff does not have the data necessary to draw a conclusion regarding this criteria. In order to determine how the proposed overflow parking would affect "pedestrian and vehicular travel and traffic patterns," staff recommends that Council adopt a condition of the temporary use permit, requiring that the Aspen Institute hire a professional traffic engineering firm in order to propose a formal traffic study. This study would include baseline data gathering for a range of events at the Institute without the use of the tennis courts for overflow parking, as well as subsequent data gathering with HOV parking for 46 spaces at the tennis courts, the elimination of 23 parking spaces on Meadows Road and expanded shuttle service. The outcome of this study would allow staff to properly evaluate whether the Institute's proposal meets public policy goals of limiting vehicle traffic, and encouraging alternative methods of travel. D. The duration of the proposed temporary use and whether a temporary use has previously been approved for the structure, parcel, property or location as proposed in the application. . -de d ;J Staff Finding: Staff finds that the duration of the temporary use, including the 2010 and 2011 summer seasons, is appropriate only if the conditions suggested by staff is adopted by Council (please see staff finding for criteria C, above). E. The purposes and intent of the zone district in which the temporary use is proposed. Staff Finding: Aspen Meadows is governed by the 1991 Aspen Meadows Master Plan, in the form of a Specially Planned Area (SPA). The 1991 Aspen Meadows Master Plan includes two policies that are relevant to this application: • Policy: Limit, to the maximum degree feasible, the use of the automobile on the campus. Provide parking, as needed, either underground or at the periphery of the campus. • Policy: Require improved transit service to be provided for all significant functions on the campus and create improved opportunities for non -auto access. While staff wants to be clear that The Aspen Institute has done an excellent job over the years of implementing a variety of Transportation Demand Management (TDM) strategies, the proposal for overflow parking appears in conflict with the policy to limit parking to "the periphery of the campus." For this reason, staff is requesting a formal traffic study that can help provide information on whether this proposal will ultimately meet the city's public policy goals of limiting vehicle trips and encouraging alternative modes of transportation. There has been no previous temporary use application for the tennis courts. F. The relation of the temporary use to conditions and character changes which may have occurred in the area and zone district in which the use is proposed. Staff Finding: The applicant's request for a temporary use relates to the increased use of the Aspen Meadows campus after the construction of the Doerr - Hosier Center. Due to this changed condition, staff believes it is reasonable to require a traffic study that will evaluate substantial changes to the Aspen Meadows transportation strategies. G. How the proposed temporary use will enhance or diminish the general public health, safety or welfare. Staff Finding: Staff finds that including a condition requiring a traffic study will help the city meet its public policy goals of limiting vehicle trips and encouraging alternative modes of transportation. #340937 01/24/92 16:13 $400.00 BK 667 P6 791 Silvia Davis. Fitkin Cnty Clerk. Doc $.0 EXHIS14. 'S" THE ASPEN MEADOWS TRAFFIC MITIGATION PLAN February, 1991 #340937 01/24/92 16:13 Rec $400.00 BK: 667 PG 782 Silvia Davis, Pitkin Cnty Clerk. Doc $.00 THE ASPEN MEADOWS TRAFFIC MITIGATION PLAN This plan has been prepared by the following individuals: CQmm ittee Members: King Woodward, The Aspen Institute Kim Johnson, Aspen /Pitkin County Planning Office Dan Blankenship, Roaring Fork Transit Agency George Vicenzi, West End Resident Robert Harth, Ed Sweeney, Music Associates of Aspen Don Swales, West End Resident Roger Hunt, Aspen Planning and Zoning Commission and West End Resident Perry Harvey, R.J. Gallagher, Hadid Aspen Holdings, Inc. Bob Felsburg, Felsburg Holt & Ullevig Other Particle. nu: John Goodwin, Aspen Police Chief Chuck Roth, Aspen Public Works Department Jan Collins, West End Resident Amy Margerum, Aspen /Pitkin County Planning Office #340937 01/24/92 16:13 Rec $400.00 BI; 667 PG 783 • Silvia Davis, Pitkin Cnty Clerk, Doc $.00 Introduction During the late summer of 1989 the City of Aspen began the preparation of a Master Plan for the Aspen Meadows property. This plan, completed in January 1990, was formulated within the framework of four goals. Two of the goals, which are directly related to the traffic and transportation aspects of the plan, were stated as follows: Goal 3: Mitigate, to the maximum extent feasible, the effects of the devel- opment on neighboring properties. Goal 4: Mitigate, to the maximum extent feasible, the project's impacts on the overall community. From a transportation standpoint, the Master Plan included a number of physical elements in the site plan which were directed at achieving these goals. These included creating a new primary access point to the West Meadows via Seventh Street, constructing a new trail system linking both the East Meadows and the West Meadows to the City's trail system. and improving the MAA parking Tots to better serve automobiles and transit interface. However, the Master Plan went even further and identified a number of mitigation measures, many of which are operational in nature, which should be explored. These included such measures as controls on delivery vehicles; plans for smaller, non - diesel transit vehicles; shuttle service to /from the Meadows; parking controls; and emphasis on pedestrian and bicycle access. To respond to this concern, in October 1990 the Consortium formed a committee to further evaluate mitigation measures and to develop a traffic mitigation plan for the Aspen Meadows project. This committee was comprised of representatives of the owners and users of the property, West End residents, the manager of the Roaring Fork Transit Agency (RFTA), representatives of the Aspen /Pitkin County Planning Office, a member of the Aspen Planning and Zoning Commission, and a professional transportation consul- tant. The committee held seven meetings between October 30, 1990 and February 5, 1991 to discuss mitigation measures and to prepare this plan. In addition to committee mem- bers, other residents and City employees participated in these meetings. Early in the process, the committee formulated the following goal statement which directed the committee's efforts: "To develop mitigation measures for the Aspen Meadows facilities to reduce automobile use and it's impact on the West End neighborhood and the community at large, and to make the Meadows facilities more accessible to residents and guests in environmentally sound ways," The resulting plan has been developed in two components. Because the characteristics associated with the lodge, restaurant, and health club facilities on the western portion of the property differ significantly from those of the MAA facilities on the eastern portion, the mitigation measures appropriate to each portion also differ. Therefore, the following sections provide a series of mitigation measures for each of the areas of the property. With each measure are provided a brief description of the action, the suggested phasing for implementation of the measure, and identification of the responsible party. 1 #340937 01/24/92 16:1., Rec $400.00 BK 667 PG 784 Silvia Davis, Pitkin Cnty Clerk, Doc $.04 In developing and implementing this or any mitigation plan, it is important to understand that the plan must be evolutionary. While the goal of the plan must remain steadfast, the mitigation measures and the details of their implementation must be flexible, requiring monitoring and fine tuning over the years. It is recommended that the City undertake a program to review the effectiveness of the mitigation measures on a regular basis and to work with the Consortium to modify the details of the measures to ensure effective, yet efficient, implementation. 2 #3499.37 91/24/92 16:13 het $490.00 EF, 667 PG 785 Silvia Davis, Pitkin Cnty Clerk, Doc S.00 I1. Mitigation Plan for West Meadows Facilities A. Background Currently, the residential units on the western portion of the Aspen Meadows property include 60 lodge units and eight townhouses. The conceptual SPA approval included the addition of four single family residences, ten new three - bedroom townhomes, and 50 lodge units. The purpose of these additional facilities is primarily to better serve the group activities sponsored by the members of the Consortium. During the summer months, use will be almost exclusively by these groups. During the winter season, it is anticipated that the lodge may be operated for public use. Furthermore, the restaurant will be renovated, but will not be expanded. Finally, the health club, used primarily by guests of the West Meadows, will be enlarged slightly. In developing the mitigation plan, the committee considered measures that ad- dressed each of the primary user groups of the West Meadows facilities: guests, employees, and users of the restaurant or health club who are not staying on the grounds. Furthermore, a mitigation plan usually includes auto disincentives and incentives to use other modes of transportation. Auto disincentives are restrictive measures that discourage individuals from using their automobiles. The second element is comprised of measures that make it attractive and convenient to use alternatives to the automobile. As will be highlighted by the list of measures described in the following section, this mitigation plan includes a wide range of both auto disincentives and alternative mode incentives. How effective will this plan be? While it is very difficult to project exactly how much trip reduction will occur as a result of this plan, the committee believes that it has the potential to significantly mitigate the effects of additional traffic due to the new development. The following table presents a summary of trip generation which might be expected from the West Meadows based on trip rates typical of the Aspen area if no specific mitigation program is implemented. As shown, the existing residential and restaurant facilities could generate about 750 vehicle trips per day. The proposed additional residential units could generate another 340 trips per day, bringing the total trip estimate to nearly 1,100 vehicles per day. Thus, a 30 percent trip reduction would result in total traffic generation with the expanded facilities equal to that which could be generated by the existing facilities without a mitigation plan. Because of the nature of the users of the West Meadows and the broad -based character of the mitigation plan, it is believed that, when properly implemented, the proposed plan will achieve these results. 3 #340937 01/24/92 16:13 = $400.00 BK 667 PG 786 Silvia Davis, Pitkin Cnty Clerk, Doc $.00 co a 4 R 0 c es u v 4 . 4r 1 1s • Q ON , O en b O v o eo O O N a. V! T Is 8 7 F C Y ' a C a N C A d N N ta M OI '1 a N . E Q N W u C h M r Q .1 O IN ✓ G C O 0. m H N b O O 1 trf 71 r CD a a L O to L p O . r C W co O O 0) '41. A RI I- F. 6 Q o W u ,^, a. e N a Ci a _ a O I; .. o c • ` ` v E v u u S .. ca N vi 2 a F — C ] 8 ;, $ E F G 0 e` v o a = N N h h N 7 ? . • �, 3 N ao N N a O F y ° — i r E `° a y °' ca ^ e x y p Y _ 0 S = 7 T N C N 2 — x 0 r 4 o ` ° R a u. e u F u i y+ N > w as ;0 .O. y, 6 �E. v N 'O 7 C v N 4 F N f [= a a a H 4 • 4340937 01/24/92 16:13 ReL 43400.00 BK 667 PG 787 Silvia Davis, Pitkin Cnty Clerk, Doc 3.00 B. Elements of Mitigation Plan The following elements of a traffic mitigation plan directed at West Meadows related traffic have been identified. Airport Van Service Description: A free van service to and from the airport will be provided for guests and residents of the West Meadows. Because it is antici- pated that most of the guest visits wilt be prearranged, the lodge will dispatch the van (a vehicle with an approximate capacity of 12 -16 passengers) to pick up guests based on their flight schedule. Similarly, departures will also be able to be prearranged. All guests will be encouraged to use this convenient, yet efficient, service. Phasinv: This service will be initiated upon opening of the renovated lodge. Responsible Party: Lodge operator through agreement with Aspen Institute. 2. Van Service to/ from Town Description: A free van service will be operated between the West Meadows and downtown Aspen. This service will be available to all guests, residents, and employees of the West Meadows, including users of the restaurant, tennis courts, and health center. The ser- vice will utilize a relatively small vehicle, seating approximately 12- 16 passengers. The service will be a regularly scheduled service with frequent headways. During the high season, this route will run from early morning to late evening on one -half hour headways. The schedule will be adjusted for applicability to each season, and may be provided on an "on demand" basis during certain seasons. Phasing: The basic service described above will be initiated with the opening of the renovated lodge. Its usage will be monitored, and the service will be adjusted as necessary to meet the demand of the patrons. Jtesoons(ble Party: Lodge operator through agreement with Aspen Institute. 3. Chartered Vehicles for Group Activities Description: When appropriate, group activities either leaving or coming to the West Meadows will be served by chartered vehicles arranged by the management of the West Meadows. By providing this service, management will be better able to control the number and /or size of vehicles serving the participants in such activities. Furthermore, encouragement of the use of this service will discourage the use of private automobiles by participants. 5 340937 01/24/92 16:13 Rec 400.00 Pk: 667 PG 788 Silvia Davis, Pitkin Cnty Clerk, Doc $.00 Pinang: This service will be provided with the first organized groups using the West Meadows. Rest nnsible Party Lodge operator. 4. Guest Parking Descrintiop: No parking for the lodge units will be provided adjacent to the units. Instead, parking for these units will be located in a parking structure under the tennis courts. Thus, even if guests bring vehi- cles to the campus, their vehicles will not be immediately available to them. Furthermore, guests will need to walk past the van service in order to get to their vehicles. It is hoped that this concept will encourage guests to use the van service rather than their private automobiles. phasin See construction schedule. Responsible Party: Aspen Institute 5. Trail System Description: Site planning has provided for on- campus trails that connect to the extensive city -wide pedestrian and bike trail system adjacent to the Meadows property. Thus, the Meadows trail system has been designed to complement the City's efforts in developing pedestrian and bicycle trails, thus encouraging guests of the Meadows to use these modes of transportation. Phasing: The on -site trail systems will be phased through the City's trail construction program. jtesoonsible Party: City and the Consortium. 6. Bicycle Facilities Description: Bicycles will be made available for use by guests of the lodge at a minimal fee designed to cover maintenance, replacement, and administrative costs. Furthermore, bicycle racks will be provided at those facilities which may be used by persons not lodged at the West Meadows (for example, at the health center and at the tennis courts). Phasing: It is expected that this program will begin with 25 -30 bicycles available. The program will be monitored and the supply of bicy- cles will be increased accordingly. Responsible Party: Lodge operator. 6 ,-, #340937 01/24/92 16:13 Rec s400.00 BK 667 F'S 789 Silvia Davis, Pitkin Cnty Clerk, Doc 3.00 7. Promotional Materials Description: All promotional materials for the West Meadows lodge will emphasize the availability of the van service, will encourage walk- ing and bicycle use, and will discourage the need for personal automobiles. The focus of this mitigation measure is to precondi- tion the guest so that he or she chooses not to even rent a car upon arrival in Aspen. Phasing: This message will be included in all promotional materials published for the renovated lodge. Responsible Party. Lodge operator and Aspen Institute. 8. Employee Parking Description: Limited employee parking will be provided on -site. This parking will be available only for employees for whom vehicles are essential for the execution of their jobs and for employee carpools of 3 or more persons. A ride matching service will be available through management to encourage the formation of carpools. Furthermore, employees will be provided with their choice of subsidized transit passes or subsidized parking at the Rio Grande parking garage. A shuttle service will be provided for employees from the Rio Grande garage either in conjunction with the regular- ly scheduled van service to Town or as a separate operation. Phasing: This measure will be implemented with the opening of the renovated lodge. Responsible Party: Lodge operator and Aspen institute. 9. Coordination with Potential Rail Service Description: If passenger -rail service does materialize on the Rio Grande right -of -way, a transit stop will be encouraged in a location which would allow access to the Meadows via the pedestrian bridge on the Roaring Fork River. Phasing: To be implemented with the initiation of rail service. Responsible Party: Applicant and Rail Service Operator 7 .340937 01/24/92 16:13 Rec .400.00 DK 667 PG 790 Silvia Davis, Pitkin Cnty Clerk, Doc $.00 10. Delivery Truck Restrictions Description: Because of the expected infrequency of large vehicle deliveries to the West Meadows property (approximately 4 to 5 per day), it is recommended that truck restrictions be focused on time of day and route restrictions. It is recommended that deliveries will be limited to the hours of 9:00 - 11:00 A.M. and 2:00 - 4:00 P.M. Thus, the noise impacts of delivery vehicles will not occur during the most sensitive time periods. Furthermore, all deliveries to the West Meadows will be restricted to use of Seventh Street only between the Meadows and SH 82. These restrictions will be implemented through operator agreements. Phasing; The time of day and route restrictions will be implemented upon opening of the renovated lodge. Responsible Party: Lodge operator and Aspen Institute. 8 #340937 01/24/92 16:13 Rec 3400.00 BI' 667 PG 791 Silvia Davis, Pitkin Cnty Clerk, Doc $.40 III. Mitigation Plan for MAA Facilities A. Background The MAA facilities, located on the eastern portion of the property, will include rearranged seating in the tent and a new rehearsal facility to accommodate rehears- als and small performances. It is important to note that the modifications to the performance tent will not increase the size of the audiences; they will simply improve the seating conditions for the audiences. Although there are students and faculty associated with traffic related to the MAA facilities, the majority of concerns expressed by neighbors are related to the impacts created by concert - goers. Therefore, most of the mitigation measures included in this plan are focused on these users. Principally, these measures are directed at encouraging concert -goers to walk, bike, or ride the transit system rather than driving their automobiles to the concert. This part of the plan particularly will be evolutionary in nature. Efforts to reduce auto use have already been undertaken in recent years by the MAA in conjunction with West End residents. The elements discussed in the following section are a further expansion of these earlier efforts. As the program is implemented and evaluated, it is expected that even further refinements will be appropriate. B. Elements of Mitigation Plan In developing a mitigation plan to address MAA traffic, the program focuses on several measures. `,' 1 Promotional Materials pescriation: Promotional materials (including maps distributed by MAA will encourage use of transit, bicycles, or walkways to access the concert site. Phasing: These efforts have already been initiated and will be continued. Responsible Party: MAA 2. Pedestrian /Bicycle Ways pescriotion: An enhanced system of routes exclusively designated for use by pedestrians and bicyclists to access the concert area will be implemented. This system will include: o Continued designation of the Lake Avenue pedestrian /bicycle way. 9 *340937 01/24/92 16:13 Re. $400.00 DK 667 PG 792 Silvia Davis, Pitkin Cnty Clerk, Doc $.00 o Fourth Street will be closed to automobile traffic from Gillespie Street to Main Street for approximately one hour before and one hour after major concerts. Prior to concerts, the street will be for pedestrian /bicycle use only. After the concerts, it will used for pedestrian /bicycle traffic and for buses leaving the MAA grounds. Allowing buses to use this route after concerts will separate the buses from automobile traffic, thereby decreasing the delay experienced by the buses and thus providing an incentive for using the transit service. This closure will include barricades and appropriate signing at both ends of Fourth Street and will require Tem- porary warning signs at each cross street to ensure the safety of pedestrians and bicyclists. Furthermore, the proposed design of the MAA parking lot provides for a continuation of the pedestrianway from Fourth Street to the music tent. o Facilities for bicycle storage during concerts will be pro- vided in the vicinity of the tent. Imolementatlon: It is anticipated that the Fourth Street closure will be implemented during the next concert season. The bicycle storage facilities will be provided with the improvements to the MAA parking lot. Responsible Party. MAA and City. 3. Enhanced Transit Service pescriotion: Transit service to the MAA grounds will continue to be improved and emphasized. This includes elements affecting the city -wide system, circulation through the neighborhood, and on -site operation: ' o All city -wide RFTA bus routes serving the West End, as well as the special MAA bus runs, will continue to provide service. Enhanced signing and bus service information will be provided at the Rio Grande parking garage to direct patrons to the bus stop on Main I Q Street. 1XM ' o Prior to a scheduled concert, large buses (unless carrying a greater number of passengers than can be accommodated by the circulating shuttle or during inclement weather) will unload all passengers at , the intersection of Fourth /Main. Concert goers will then be en t o�"� couraged to walk on Fourth Street to the tent or to use the smaller p _ vehicle shuttle which will be circulating on Main, Fifth, Gillespie, and Third Streets. This vehicle will be a compressed natural gas powered vehicle and will operate for approximately one -half to one LJ \IVAik hour before the concert. IG Following concerts, buses will stand by on Fourth Street or at the transit stop in the parking lot to transport concert goers back to the center of town. 0066 r N� G 10 • AA e 40937 01/24/92 16:13 Rec $- ,00.00 BK 667 PG 793 F Silvia Davis, Pitkin Cnty Clerk, Doc $.00 o The MAA parking lot has been designed to provide a location for buses to load and unload passengers while removed from Gillespie $ Street. This location is on the south end of the parking lot and would allow good clockwise circulation of the buses from Fifth Street into the parking lot and back out onto the street system at Fourth and Gillespie. Phasing: It is anticipated that this improved transit service will be provided during the next concert season. The program will be monitored and the service will be adjusted accordingly. Resnonsible Party; The transit service will be the responsibility of RFTA. The transit improvements in the parking lot will be the responsibility of the MAA. 4. Truck Restrictions Description: Although the number of' large vehicle deliveries to the MAA facilities is very limited, it is recommended that all such vehicles will be restricted to using Third Street only between the MAA grounds and Main Street. MAA will enforce this limitation with their vehicle drivers. Phasing: These restrictions will be implemented during the next concert season. Responsible Party: MAA 5. Residential Parking Permit Program Description: A residential parking permit program is still under consideration. This program would prohibit all parking on streets from Mill Street to Eighth Street and from Main Street to the Roaring Fork River other than for residents or their guests during the concert season. The MAA would institute naId in their lots in connection with this plan. Permit parking may require issuance of' vehicle stickers for a fee, installation of appropriate signage, and City enforcement. Phasing: It is recommended that the residential parking permit program be instituted after the effectiveness of the remainder of the mitigation plan has been evaluated. Because of the significant impacts of such a program on the residents of the West End, further input from the residents should be incorporated into an implementation plan for this program. Resnonsible Party: MAA, City and West End residents. L 11 f ,w" N904 OAS FESTIV Al GENERAL SHUTTLE TRANSPORTATION `iO lDA1', ,Ji/N1', 29 Afternoon Service: 3:OOpm — 5:OOpm continuous loop Departing Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge. Hotel Jerome, Hotel Aspen, Annabelle lnn, and Paepcke building at the Aspen Institute for Registration. Evening Service: 6:45pm — 10:30pm continuous loop Departing Doerr Hosier Center and traveling to Aspen District Theatre. Return transportation from Aspen District Theatre to the Limelight Lodge, Rubey Park Bus Terminal. Sky Hotel, Hotel Jerome, Hotel Aspen, Annabelle lnn, and Meadows Resort. Morning Service 7:15am — 9:15am continuous loop Departing Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge, Hotel Jerome. Hotel Aspen, Annabelle Inn, and Paepcke building at the Aspen Institute. Off - site Lunch Service: 11:30pm — 1:30am loop Departing in front of Paepcke building with service to the Hotel Jerome and back. Afternoon Service: 5:30pm — 7:30pm continuous loop Departing in front of the Paepcke building with stops at Limelight Lodge, Rubey Park Bus Terminal. Sky Hotel, Hotel Jerome, Hotel Aspen, and the Annabelle Inn. Evening Service: 7:30pm — 10:30pm continuous loop Departing from the Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge, Hotel Jerome, Hotel Aspen, Annabelle Inn, Paepcke Auditorium, and the Doerr Hosier Center. !W }V`91). ": :$..;o a ° i . Morning Service: 7:1 5am — 9:15am loop Departing Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge, Hotel Jerome. Hotel Aspen, Annabelle Inn, and the Paepcke building at the Aspen Institute. Off - site Lunch Service: 1 1:30am — 1:1 5pm loop Departing in front of the Paepcke building with service to and from the Limelight Lodge and the Hotel Jerome. Afternoon Service: 5:30pm — 7:30pm continuous loop Departing in front of the Paepcke building with stops at Limelight Lodge, Rubey Park Bus Terminal, Sky Hotel, Hotel Jerome, Hotel Aspen, and the Annabelle Inn. Evening Service: 7:30pm — 10:30pm continuous loop Departing from the Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge. Hotel Jerome, Hotel Aspen, Annabelle Inn, and the Paepcke Auditorium. ASPEN IDEAS FESTIVAL TEL 970.544 ,7960 FAX 970 544 7989 \ \' \\.AIFESTIVAL.ORO a ASPEN as FES1 M Al , ., Morning Service: 7:1 5am — 9:1 5am loop Departing Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge, Hotel Jerome, Hotel Aspen, Annabelle Inn, and the Paepcke building at the Aspen Institute. Mid -day Service: 1 1:30am — 2:OOpni continuous loop Departing from the Paepcke building with stops at the Limelight Lodge. Rubey Park Bus Terminal, Hotel Jerome. Hotel Aspen, and the Annabelle Inn. Afternoon Service: 5:30pm — 8:OOpm continuous loop Departing in front of the Paepcke building with stops at Limelight Lodge. Rubey Park Bus Terminal, Sky Hotel. Hotel Jerome, Hotel Aspen, and the Annabelle Inn. Evening Service: 8:45pm — 1 1:45pin continuous loop Departing from the Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge. Hotel Jerome, Hotel Aspen, Annabelle Inn, and Meadows Resort with service to and from the Aspen District Theatre. Morning Service: 7:15am — 9:1 5am loop Departing Sky Hotel with stops at Rubey Park Bus Terminal, Limelight Lodge, Hotel Jerome, Hotel Aspen, Annabelle Inn, and the Paepcke building at the Aspen Institute. Off -site Lunch Service: 1 1:30am — 1:1 5pm loop Departing in front of the Paepcke building with service to and from the Hotel Jerome. Afternoon Service: 5:30pm — 7:30pin continuous loop Departing in front of the Paepcke building with stops at Limelight Lodge, Rubey Park Bus Terminal, Sky Hotel, Hotel Jerome. Hotel Aspen, and the Annabelle Inn. Evening Service: 7:30pm — 10:30pm continuous loop Departing from the Doerr Hosier Center with stops at Limelight Lodge, Rubey Park Bus Terminal, Sky Hotel, Hotel Jerome, Hotel Aspen, and the Annabelle Inn. � ., .... Morning Service: 7:1 5am — 9:1 5am loop Departing Sky Hotel with stops at Rubey Park Bus Terminal. Limelight Lodge. Hotel Jerome, Hotel Aspen, Annabelle Inn, and the Paepcke building at the Aspen Institute. Afternoon Service: 5:30pm — 7:30pm continuous loop Departing in front of the Paepcke building with stops at Limelight Lodge, Rubey Park Bus Terminal, Sky Hotel, Hotel Jerome, Hotel Aspen, and the Annabelle Inn. Evening Service: 8:30pnm — 10:30pm continuous loop Departing from the Meadows Reception Center with service to the Hotel Jerome and back. ASPEN IDEAS FESTIVAL TEL 970.5417960 FAX 9 \\\Y\V.AIFESTIVAL. ORO psi ^A . b _.. te 4 C ` ASPEN ...I HEALTH ''' FORUM General Shuttle Transportation FRIDAY, JULY 24 Afternoon Service: 2:OOpm — 4:00pm continuous loop Departing Rubey Park Bus Terminal with stops at Limelight Lodge, Hotel Jerome, Annabelle Inn, and Doerr Hosier Center at the Aspen Meadows for Registration Evening Service: 8:45pm — 9:45pm continuous loop Departing Doerr Hosier Center with stops at Annabelle Inn, Molly Gibson, Hotel Jerome, Limelight Lodge, Rubey Park Bus Terminal, and Sky Hotel. SATURDAY, JULY 25 Morning Service: 7:30am — 9:30am continuous loop Departing Rubey Park Bus Terminal with stops at Limelight Lodge, Hotel Jerome, Annabelle Inn, and Meadows Reception. Early Evening Service: 5:30pm — 6:30pm continuous loop Departing Doerr Hosier Center with stops at Annabelle Inn, Hotel Jerome, Limelight Lodge, and Rubey Park Bus Terminal. Evening Service: 7:45pm — 8:45pm continuous loop Departing Rubey Park Bus Terminal with stops at the Limelight Lodge, Hotel Jerome, Annabelle Inn, and Doerr Hosier Center. Late Evening Service: 9:30pm — 10:30pm continuous loop Departing Doerr Hosier Center with stops at Annabelle Inn, Hotel Jerome, Limelight Lodge, and Rubey Park Bus Terminal. SUNDAY, JULY 26 Morning Service: 7:30am — 9:30am continuous loop Departing Rubey Park Bus Terminal with stops at Limelight Lodge, Hotel Jerome, Annabelle Inn, and Meadows Reception Evening Service: 5:30pm — 8:30pm continuous loop Departing Doerr Hosier Center with stops at Annabelle Inn, Hotel Jerome, Limelight Lodge, and Rubey Park Bus Terminal and to Paepcke building. (Continued on reverse) Late Evening Service: 9:30pm — 10:30pm continuous loop Departing Paepcke building with stops at Annabelle Inn, Hotel Jerome, Limelight Lodge, and Rubey Park Bus Terminal. MONDAY, JULY 27 Morning Service: 7:30am — 9:30am continuous loop Departing Rubey Park Bus Terminal with stops at Limelight Lodge, Hotel Jerome, Annabelle Inn, and Meadows Reception Afternoon Service: 1:30pm — 2:30pm continuous loop Departing Doerr Hosier Center with stops at Annabelle Inn, Hotel Jerome, Limelight Lodge, and Rubey Park Bus Terminal. OTHER TRANSPORTATION INFORMATION Free RFTA Cross -Town Shuttle: 7:24 am — 11:06 pm daily Every 30 minutes, free transportation to /from downtown Aspen to the Aspen Institute Campus. OUTBOUND — from Rubey Park to Music Tent parking lot at :06 and :36 past each hour. INBOUND — from Music Tent to Rubey Park at :15 and :45 past each hour. Call 970.925.8484 for more information. Aspen Meadows Shuttle (for guests staying at the Meadows): lam — 11pm daily OUTBOUND — Departs from the Aspen Meadows every 30 minutes, on the hour and half hour. INBOUND - Departs Rubey Park at :05 and :35 past each hour. Departs Gondola Plaza at :08 and :38 past each hour. TAXI: Aspen High Mountain Taxi: 970.925.8294 4.> nett Hu. e. Ccrler ns J Aspen ll aJC ' _ it :99!lc. Center 0 Route for the Walking Tall( fo the Music Teet r +eh¢I u _e a P I la 6 a el ,g',}a ] d 1060mdaily ad .ma, ... n::. l r t' a o Sr 1ple OUT900NC . s c ., Y •• .10l r ' 1 I60cUNY I G . g5 \t 11 970 925 84 94f forma n 'C. " � aau'++ Pt. illn SI I I I -. 0 AFFIDAVIT OF PUBLIC NOTICE REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE ADDRESS OF PROPERTY: /DO" ihted revk , Aspen, CO SCHEDULED PUBLIC HEARING DATE: 20 +0_ STATE OF COLORADO ) ss. County of Pitkin ) . (name, please print) being or represenng an Applicant to the City of Aspen, Colorado, hereby personally certify that I have complied with the public notice requirements of Section 26.304.060 (E) of the Aspen Land Use Code in the following manner: p ublication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen at least fifteen (15) days prior to the public hearing. A copy of the publication is attached hereto. Posting of notice: By posting of notice, which form was obtained from the Community Development Department, which was made of suitable, waterproof materials, which was not less than twenty -two (22) inches wide and twenty -six , (26) inches high, and which was composed of letters not less than one inch in height. Said notice was posted at least fifteen (15) days prior to the public hearing, and was continuously visible from the day of 200, to and including the date and time of the public hearing. A photograph of the posted notice (sign) is attached hereto. Mailing of notice. By the mailing of a notice obtained from the Community Development Department, which contains the information described in Section 26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior to the public hearing, notice was hand delivered or mailed by first class postage prepaid U.S. mail to all owners of property within three hundred (300) feet of the property subject to the development application. The names and addresses of property owners shall be those on the current tax records of Pitkin County as they appeared no more than sixty (60) days prior to the date of the public hearing. A copy of the owners and governmental agencies so noticed is attached hereto. (continued on next page) Mineral Estate Owner Notice. By the certified mailing of notice, return receipt requested, to affected mineral estate owners by at least thirty (30) days prior to the date scheduled for the initial public hearing on the application of development. The names and addresses of mineral estate owners shall be those on the current tax records of Pitkin County. At a minimum, Subdivisions that create more than one lot, Planned Unit Developments, Specially Planned Areas, and COWAPs are subject to this notice requirement. Rezoning or text amendment. Whenever the official zoning district map is in any way to be changed or amended incidental to or as part of a general revision of this Title, or whenever the text of this Title is to be amended, whether such revision be made by repeal of this Title and enactment of a new land use regulation, or otherwise, the requirement of an accurate survey map or other sufficient legal description of, and the notice to and listing of names and addresses of owners of real property in the area of the proposed change shall be waived. However, the proposed zoning map shall be available for public inspection in the planning agency during all business hours for fifteen (15) days prior to the public hearing on such amendments. Signature The foregoing "Affidavit of Notice" was acknowledged before me this stcday of il , aft by ihnnc)c� 5r � - e • - mitra PE RERMIT : ASPEN INSTITUTE TEMPORARY USE WITNESS MY HAND AND OFFICIAL SEAL NOTICE IS HEREBY GIVEN that a public hearing will be held on Monday, June 7, 2070, at a meeting to begin at 5:00 p.m. before the Aspen City Council, Council Chambers, City Hall, 130 S Galena y J i urli to consider an application sub- My commission expires: �� G t Lute, r requesting a Tempo Temporary Use Perrnl 10 allow I for the use of two tennis courts on Meadows Road to us allow evenr for 46 the overflow summe parking spaces during vari- s property is located d of 2010 a at 1000 N Third nd 2011. The ` _ _ y subject tr Aspen, 1. Cityof her iniormation contact Notary Public Ben Gagnon gnon at at the City of Aspen Community De. velopment Department, 130 S. Galena St, Aspen, CO 970.629.2755 D (or by email s.AMieheet I ke or Asp Clty Council 2010. PublisX50521031 hed in the Aspen Times Weekly on May 23, ATTACHMENTS AS APPLICABLE: • COPY OF THE PUBLICATION • PHOTOGRAPH OF THE POSTED NOTICE (SIGN) • LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED BY MAIL • APPLICANT CERTIFICATION OF MINERAL ESTAE OWNERS NOTICE AS REQUIRED BY C.R.S. §24 -65.5 -103.3 AFFIDAVIT OF PUBLIC NOTICE REQUIRED BY SECTION 26.304.070 AND CHAPTER 26.306 ASPEN ,n SPEEN LAND USE CODE � ADDRESS OF PROPERTY: vv t �' " " � A Aspen, CO STATE OF COLORADO ) ) ss. County of Pitkin ) 1 � (name, please print) being or represent rig an Applicant to the City of As n, Colorado, hereby personally certify that I have complied with the public notice requirements of Section 26.304.060 (E) or Section 26.306.010 (E) of the Aspen Land Use Code in the following manner: Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen no later than fourteen (14) days after final approval of a site specific development plan. A copy of the publication is attached hereto. Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen no later than fifteen (15) days after an Interpretation has been rendered. A copy of the publication is attached hereto. ignature The foregoing "Affidavit of Notice" was acknowled_ed before me this Zfday of /401 , 200 Q , by PUBLIC NOTICE WITNESS MY HAND AND OFFICIAL SEAL `Of DEVELOP%ENT APPROVAL Notice is hereby given to the general public of the 1 approval of a site spe@e9ltic development plan, and F I the creation of a ves t property right pursuant to My commission expires: t '""i the Land Use Code of the City of Aspen and t Title 24, Adicle 68, Color Revised Statutes, pedain- 1011 273512467002, by Ordinance lMock the Aspen L 0.111P City Council numbered 7, Series of 2010. The Ap- Notary Public plicant received approval of a Subdivision. Final PUD and Zone District Map Amendment, rezoning the propeay from R -15 to AN/PUD. The approvals allow the applicant to replace an existing four-unit free market residential structure with larger structure containing eight units of deed-restricted Ben at hn ni%De velopment Dept t 13 0 C S. i o Aspe Ga lena St. Commu Aspen, Celo- ATTACHMENTS: rado (970) 429 -2755. >ti UT_ft_olAntr Publish in The Aspen Times Weekly on May 23, 2010. (5052149] COPY OF THE PUBLICATION AFFIDAVIT OF PUBLIC NOTICE 6lI-- REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE ADDRESS OF PROPERTY: el `p. , Aspen, CO SCHEDULED PUBLIC HEARING DATE: v , } 1 , STATE OF COLORADO ) VVV ) ss. Count of Pitkin ) . ^ � � 1 A d i frbe l v me, please print) reprresentin an Applic the Cityy -- of ffl Aspen, Colorado, hereby personally certify that I have representing complied with the public notice requirements of Section 26.304.060 (E) of the Aspen Land Use Code in the following manner: Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen at least fifteen (15) / days prior to the public hearing. A copy of the publication is attached hereto. ✓ Posting of notice: By posting of notice, which form was obtained from the Community Development Department, which was made of suitable, waterproof materials, which was not less than twenty-two (22) inches wide and twenty-six (26) inches high, and which was composed of letters not less than one inch in height. Said notice was posted in a conspicuous place on the subject property at least fifteen (15) days prior t the public hearing and was continuously visible from the a day of , 2424triefflo and including the date and time of the public hearing. A photograph of the posted notice (sign) is attached hereto. ✓ / +An/,,i f 1 ,62 Mailing of notice. By the mailing of a notice obtained from the Community II ' S lll vv Development Department, which contains the information described in Section 26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior the public hearing, notice was hand delivered or mailed by first class, postage prepaid U.S. mail to all owners of property within three hundred (300) feet of the property subject to the development application, and, at least fifteen (15) days prior to the public hearing, notice was hand delivered or mailed by first class postage prepaid U.S. mail to any federal agency, state, county, municipal government, school, service district or other governmental or quasi - governmental agency that owns property within three hundred (300) feet of the property subject to the development application. The names and addresses of property owners shall be those on the current tax records of Pitkin County as they appeared no more than sixty (60) days prior to the date of the public hearing. A copy of the owners and governmental agencies so noticed is attached hereto. ✓ (continued on next page) Rezoning or text amendment. Whenever the official zoning district map is in any way to be changed or amended incidental to or as part of a general revision of this Title, or whenever the text of this Title is to be amended, whether such revision be made by repeal of this Title and enactment of a new land use regulation, or otherwise, the requirement of an accurate survey map or other sufficient legal description of, and the notice to and listing of names and addresses of owners of real property in the area of the proposed change shall be waived. However, the proposed zoning map has been available for public inspection in the planning agency during all business hours for fifteen (15) days prior to the public hearing on such am ndments. A P S , f e/ti iN The fore oing "Affidavit of Notice" was acknowledged before me this? d of - 2000 , by lT //)1 ( ,'l -P] ZS • • WITNESS MY HAND AND OFFICIAL SEAL - My co ission expir- : . .. 1 0 _,�,//LA i< Notary Public PµY Pie` Z• .. .0 � . ALLISON K. e PERRY ? % yam, 8 ATTACHMENTS: � 4 y p r ft ■Tmmissioo Expires 0112112012 COPY OF THE PUBLICATION PHOTOGRAPH OF THE POSTED NOTICE (SIGN) LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED BY MAIL 1. d r �� v PUBLIC NOTICE RE: ASPEN INSTITUTE TEMPORARY USE PERMIT NOTICE IS HEREBY GIVEN that a public hearing will be held on Monday, June 7, 2010, at a meeting to begin at 5:00 p.m. before the Aspen City Council, Council Chambers, City Hall, 130 S. Galena St., Aspen, to consider an application submitted by Jim Curtis, on behalf of The Aspen Institute, requesting a Temporary Use Permit to allow for the use of two tennis courts on Meadows Road to allow for 46 overflow parking spaces during various events in the summer of 2010 and 2011. The subject property is located at 1000 N Third Street, Aspen, CO 81611. For further information, contact Ben Gagnon at the City of Aspen Community Development Department, 130 S. Galena St., Aspen, CO 970.429.2755, (or by email beng @ci.aspen.co.us). s /Michael Ireland, Mayor Aspen City Council Published in the Aspen Times on May 23, 2010 City of Aspen Account 630 MEADOWS COLORADO TRUST 650 MEADOWS ROAD LLC 675 MEADOWS RD KKC CIO GOULD & RATNER/JXC 101 FIRST ST #508 0124 TOTTERDOWN RD 222 N LASALLE ST SUITE 800 LOS ALTOS, CA 94022 ASPEN, CO 81611 CHICAGO, IL 60601 810 W SMUGGLER LLC 810 W SMUGGLER LLC 8TH ONE LLC 411 E MAIN ST #208 -209 C/O WALDEN CAPITAL CORP 98 SAN JACINTO BLVD ASPEN, CO 81611 4040 NE 2ND AVE #414 AUSTIN, TX 78701 MIAMI, FL 33137 ANTHONY JULIE KATHLEEN ASPEN CENTER FOR PHYSICS ASPEN THIRD STE INC 655 MEADOWS RD 700 E GILLESPIE ASPEN, CO 81611 ASPEN, CO 81611 ASPEN, CO 81611 AULD ROBERT H & CAROL C BAIRD STEPHEN W & SUSAN MERRITT BARABE CAROLYN TRUSTEES 790 CASTLE CREEK DR 730 W SMUGGLER AVE 120 S LASALLE ST ASPEN, CO 81611 ASPEN, CO 81611 CHICAGO, IL 60603 BEAR ALLEY LLC CERISE JAMES M CHOUMAS JOHN JAMES & PATRICIA G C/O BENJAMIN HARRIS 790 CASTLE CREEK DR BLDG 300 BAYS 313 -314 160 RIVERSIDE DR., APT. 14-A ASPEN, CO 81611 1601 E OLYMPIC BLVD NEW YORK, NY 10024 LOS ANGELES, CA 90021 CITY OF ASPEN LE RAY 422 ESTANTE & R W TRST ATTN FINANCE DEPT COLLATE S DIGIGLIA JOHN WILLIAM 130 S GALENA ST LOS ALAMOS, NM 87544 PO BOX 4305 ASPEN, CO 81612 ASPEN, CO 81611 DITTMER THOMAS H TRST DML REALTY LLC FELDER RICHARD & DEBORAH LIV C/O STEVEN SPECTOR LLC TRUST PO BOX 305 11498 E CAROL WAY 150 S WACKER DR #1200 CHAVIES, KY 41727 CHICAGO, IL 60606 SCOTTSDALE, AZ 85259 -2620 FERGUSON JAMES & ESTHER FORD MERRILL M GANTZEL STEEN GIFFORD QPRT PO BOX 895 51 MEADOWS RD #5 705 MEADOWS RD CHARLESTON, SC 29402 ASPEN, CO 81611 ASPEN, CO 81611 GOLDRICH REV TRUST MELINDA GOLDSBURY CHRISTOPHER JR REV HANSEN SALLY TRUST PO BOX 9343 630 W HALLAM ST C/O ASSESSMENT TECHNOLOGIES LTD ASPEN, CO 81612 ASPEN, CO 81611 -1173 121 INTERPARK BLVD STE 308 SAN ANTONIO, TX 78216 HARRIS JOAN W REV TRUST 50% HOFFMAN LARRY J & DEBORAH HOLMES ROBERT & AUDREY HARRIS JOAN W QPR TRUST 50% 1221 BRICKELL AVE 45 BERMUDA RD 209 E LAKE SHORE DR MIAMI, FL 33131 WESTPORT, CT 00880 CHICAGO, IL 60611 JACKSON LAND COMPANY KENROSS LUX S A JOHNSON CHRISTOPHER W C/O FRANNIE DITTMER & STEVEN C/O HANK HOLT 834 5TH AVE 3765 CHAMPION BLVD SPECTOR LLC NEW YORK, NY 10065 WINSTON- SALEM, NC 27115 150 S WACKER DR STE 1200 CHICAGO, IL 60606 LPRP RIVER LLC 50% LRM LIMITED PARTNERSHIP LAMM RICHARD D QPRT 1/2 LPRP MILL LLC 50% 8540 SOUTHWEST 52ND AVE 5401 E DAKOTA #20 1100 BLACK BIRCH DR MIAMI, FL 33143 DENVER, CO 80246 ASPEN, CO 81611 MARKALUNAS JAMES J & RAMONA I MEADOWS NORTH LLC MORRIS JOHN S JR 624 W NORTH ST 675 MEADOWS RD PO BOX 8991 ASPEN, CO 81611 ASPEN, CO 81611 ASPEN, CO 81612 MUSIC ASSOCIATES OF ASPEN INC NICHOLS ROBERT & BEVERLY PA W MAN ALLEN G REV TRUST 2 MUSIC SCHOOL RD 3318 BEVERLY DR ASPEN, CO 81611 -8500 DALLAS, TX 75205 ASPEN, CO 81611 PITKIN COUNTY REED PRESLEY 0 & PATRICIA RIVER ONE LLC 530 E MAIN ST #302 375 BELLEVUE DR PO BOX 19019 ASPEN, CO 81611 BOULDER, CO 80302 ATLANTA, GA 31126 ROSE ALLAN V SARPA JOHN G & JAN JONES SARPA SHERMAN HARRIS D 1/2 ONE EXECUTIVE BLVD 71 MEADOWS #7 685 S WILLIAMS ST YONKERS, NY 10701 ASPEN, CO 81611 DENVER, CO 80209 SMITH VICTORIA LEA SMOOKE BARRY ASPEN TRUST 50% STRICKLAND MARCIA D 1160 PARK AVE SMOOKE JULIE ASPEN TRUST 50% 1991 E ALAMEDA AVE #9 155 5TH ANITA DR DENVER, CO 80209 NEW YORK, NY 10128 LOS ANGELES, CA 90049 VEST AMERICA INC WALDECK VIVIAN G WESTVIEW HOLDINGS LLC 3102 N OAKLAND ZION RD 915 W NORTH ST PO BOX 460567 FAYETTEVILLE, AR 72703 ASPEN, CO 81611 -1171 SAN ANTONIO, TX 78266 WF CASTLE CREEK LLC WING KAREN J WRIGLEY WILLIAM JR RES TRST PO BOX 1444 PO BOX 3303 400 N MICHIGAN AVE #1100 CARBONDALE, CO 81623 SPRING, TX 77383 CHICAGO, IL 60611 Colorado `" ce Mountain College Aspen Campus 0255 Sage Way Aspen Colorado 81611 970.925.7740 June 3, 2010 To Whom ft May Concem: I have overseen the Colorado Mountain College Aspen Meadows tennis classes for more than 20 years. My records indicate a dramatic and consistent in in enrollment over the past five years. We have served over 50% more students since 2005. Classes have fl'hled with substantial waiting lists. Please consider these local, working folks who are able to enjoy this activity at a reasonable price. You can call me at your convenience if you want any more information. nk you for y - on, il l ,,'/,. y di Eileen Hin Division Director LEADING Thwarcr+ LEARNING C c 14 l �(� P4,5/°Ge ) 7&3 _ 3 /PcC ? S( eeti- i tee,e e°cC°oPis at'O cor2 tc,3A3 s PEE cj l ')') s fec)co ✓5PPeo (O ° ?O ooae f /C e1-Sr Reon r -SCa C - /ham Ri S jl-I C r40 ceA % C t(N LCS /? T c_cy05 si-trvj iI'1 f - It c c t ry e e t r efl E' - tee A-s 2 YC' S CJt r4 C J,'`K [ ACS / %Y�,0L_s Cote 2 FS 5)7✓ C_)(xsYycte P % c3 F f3©o CoOsIS 3c,,e PC'1/4-lc r,tcs ( 1 Z Lynn, The Aspen Institute has submitted an application for the Temporary Use of two tennis courts for approximately 46 spaces of overflow parking for the 2010 & 2011 summer /fall seasons. The stated intent is basically to experiment or test this new parking configuration to handle overflow parking for events and determine whether they would like to make it a permanent condition. The position of ComDev staff is that if we are to recommend a Temporary Use approval to City Council, the experiment should be a true experiment. We would like the Institute to choose a mid -sized event such as the Rotary Meeting, and a large 3 -day event, and gather a variety of relevant data without the overflow parking at the tennis courts. With this baseline, or "control" data in place, we're asking the Institute to then use the tennis courts for overflow parking for at least one mid -sized event and at least one large 3 -day event, and gather the same data in order to determine the impacts of using the tennis courts with regard to transportation and parking. Staff wants to take this approach so we will have some data to evaluate what impacts the overflow parking would have, if the Institute does decide it wants a permanent amendment to The Aspen Meadows Master Plan. This is where you come in. Having spoken to Jim Curtis, it isn't entirely clear at this point whether the Institute is in agreement about staff's suggestion for a true experiment. This letter is going to Jim as well, and he will be in touch with you shortly. I am looking for your input on two things: • Does ComDev's position re: setting up a true experiment make sense to you; • If so, can you identify the data that should be collected as part of the experiment when you talk with Jim. 1 wanted to include two policy statements contained in The Aspen Meadows Master Plan, which you are probably already familiar with, as context for this issue. • Policy: Limit, to the maximum degree feasible, the use of the automobile on the campus. Provide parking, as needed, either underground or at the periphery of the campus. • Policy: Require improved transit service to be provided for all significant functions on the campus and create improved opportunities for non -auto access. Because I am out of town through May 10, I am cc:ing this to Jennifer Phelan. After you meet with Jim Curtis on this, Lynn, can you let Jennifer know your position on how to proceed, in other words: a) We don't need an experiment as described above, or b) Yes, there out to be a reliable experiment, including a "control" and data gathering, that shows us what impacts the overflow parking might have, or c) Some combination of a + b that you are comfortable with. Jennifer will take it from there in terms of making sure that a planner prepares a memo to City Council in time for the hearing, which is scheduled for May 24. Thanks very much. Ben Gagnon Special Projects Planner Community Development Department Hi All: Tricia and I met with Jim Curtis this morning. Below are Transportation's comments on the Institute's request for additional parking. Transportation Comments 1. Because the 46 parking spaces requested by the Institute are in addition to the existing on- street parking, new trips will be generated by this proposal. 2. It is my understanding that this parking is only to be used for specific events. In keeping with the policy statements regarding provision of transit and limiting traffic to the maximum degree feasible, staff would like to see a TDM plan for the events at which the new parking spaces are requested. 3. Staff is concerned that this request conflicts with Council's recent direction to focus effort and funding on reducing traffic in the West End neighborhood this summer. Environmental Health, Engineering and Transportation are in agreement that an experiment is concerning because: 1. Typically we require an applicant to undertake a traffic study and propose measures to mitigate /track traffic impact, rather than approve a project and then study it. 2. It would be difficult to create an apples to apples experiment due to all of the variables involved. 3. It's pretty well established that creating new, free parking will increase vehicle trips. Please let me know if you want to discuss further. Lee, John and Trish — please add anything I may have left out. Thanks, Lynn Rumbaugh Transportation Programs Manager City of Aspen 130 South Galena Street Aspen, CO 81611 voice: 970-920-5038 fax: 970 -544 -9447 Lynn, I would just add that I can't see any way around the Aspen Meadows Master Plan policies, i.e. any way that adding 46 spaces is not in direct conflict with those policies: • Policy: Limit, to the maximum degree feasible, the use of the automobile on the campus. Provide parking, as needed, either underground or at the periphery of the campus. • Policy: Require improved transit service to be provided for all significant functions on the campus and create improved opportunities for non -auto access. Adding parking spaces is the opposite of "limiting the use of the automobile on campus to the maximum degree feasible ". Reducing available parking spaces would be consistent with these policies. Regarding the "experiment ", I would suggest that an apples to apples comparison is not possible, due to the large number of variables that can't be controlled. Lee ( 55111 L rvdronmertal Director ( ;h,,)1 At-pc n rtii)br I 4V/ n,y Director IV. TRAFFIC AND PARKING A. Traffic A Traffic and Parking Report by Schmueser, Gordon, Meyers, Engineers, is given in Exhibit 4. The report has the following main findings: 1. On a comparative basis, the Meeting Hall will generate less traffic than the 12 "unbuilt" lodge units approved under the 1991 SPA Plan. This is because the Meeting Hall is an accessory use to the existing 98 lodge units and "in and of itself" is not a significant traffic generator because it is not increasing the bed base of the Meadows. 2. The Aspen Meadows has done an excellent job of implementing the recommendations of the Traffic Mitigation Plan of the 1991 SPA Plan. Because of the excellent job of the Meadows and the fly -in characteristics of its conferences, groups and events business, this has resulted in an overall reduction of traffic generated by the Meadows operations. The traffic mitigation measures of the Meadows are outlined in the Traffic Report in Exhibit 4. 4 3. Even considering Items 1 & 2 above, it is expected there will be a slight increase in the overall traffic at the Meadows because it is hoped the Meeting Hall will result in an higher occupancy of the 98 lodge units. However, the overall traffic impact of 110 lodge units was considered and approved by City Council as part of the 1991 SPA Plan. Therefore, the • slight increase in traffic resulting from an higher occupancy of the 98 lodge . , units would still be less than the traffic impact of the 110 lodge units which were approved. As outlined in the Traffic Report, the traffic at the Aspen Meadows can generally be classified into two categories: 1. Out -of -town guests for conferences, groups or events. Out -of -town guests nf generate very little traffic at the Aspen Meadows. Aspen Meadows management estimates approximately 75% of the Aspen Meadows out -of- town guests fly -in and are met at the airport by the Aspen Meadows shuttle vans. Of the remaining 25% guests, management estimates an approximate 50 -50% split between guests who fly -in and rent a car and guests who do MeadowsSPAAmend 14 q q. 1 1 not fly -in but drive -in. The Aspen Meadows operates 5 shuttle vans with seating capacities between 10 — 15 people each. More importantly, when reservations are taken for conferences and groups, Aspen Meadows management tell their guests a car is not necessary and promote their car free setting and shuttle service. The Aspen Meadows does an excellent job of promoting and providing a car free visit for its guests. 2. Locally oriented conferences, groups or events. Locally oriented events generate most of the Aspen Meadows traffic. Examples would be the Thursday morning Rotary, local homeowners attending Institute events, local weddings, events like the Bob George or Tom Peirce memorials, and 1 general local traffic. These are locally oriented events where locals either drive, bike or walk to the event. The Aspen Meadows has very little control over how people choose to come to these events. ■ It is important to distinguish between the two types of traffic because attaining higher occupancy of the 98 lodge units will have minimal increase in traffic because these are predominately out -of -town guests who fly -in and use the Aspen Meadows van service. Concurrently, the number of locally oriented events will probably not significantly change or increase simply due to the new Meeting Hall. Therefore, the applicant is confident the overall traffic will only increase slightly or basically remain the same as the current operations. Moreover, because the bed base is not being increased, any increase in traffic due to the higher occupancy of the 98 lodge units was taken into account in the approval of the 1991 SPA Plan. As also noted in the Traffic Report, the Aspen Meadows has done an excellent job of implementing the recommendations of the Traffic Mitigation Plan of the 1991 SPA Plan. The Traffic Report outlines the traffic mitigation measures of the Meadows. Because of the fly -in characteristics of its conference, groups and events business, and its excellent mitigation measures, traffic at the Meadows seem well within the parameters of the 1991 SPA Plan. B. Parking Day -to -day parking at the Aspen Meadows is simply not a problem. As part of the 1991 SPA Plan, the Aspen Meadows constructed a 97 car parking garage under the tennis courts. On a day -to -day basis, the parking garage is rarely full. Again, this is due to the high percentage of out -of -town guests who fly -in and use the Aspen Meadows shuttles, and do not rent a car. MeadowsSPAAmend 15 4 ✓ The parking issue at the Aspen Meadows is strictly infrequent peak parking overflow. Approximately 5 - 7 times a year, the Aspen Meadows will have keynote events or larger locally oriented events where overflow parking is a problem, and people sometime park along Meadows Road. To handle these infrequent peak parking times, the Aspen Meadows proposes to convert the existing two clay tennis courts to overflow parking as shown on the Parking Plan herein. The two tennis courts will accommodate approximately 46 cars. As shown r on the Parking Plan, the Aspen Meadows also proposes to upgrade this area by r extending the row of street trees along Meadows Road, removing the 10 -foot tall r cyclone tennis fence and replacing it with a low wood fence, and doing low landscape screening in -front of the new wood fence. This will create a much nicer entrance along Meadows Road, will have less visual impact to the neighbors across the street, and the overflow parking will probably be used not more than 5- 7 times a year. V. EARLY EXCAVATION, FOUNDATION AND UTILITIES WORK Applicant requests the flexibility to do early excavation, foundation and utilities work in April —May 2005. This work would be contingent on recording an Amended SPA Plat and Development Agreement but prior to issuance of a - full" Building Permit. Flexibility to do early work in April -May is desirable for all parties to minimize the start-up construction impacts of the project on the Aspen Meadows summer season, Music Association summer season, and the adjoining neighbors. Start-up excavation, foundation and utilities is typically the messiest and noisiest part of construction, and April -May is the perfect time to do this work prior to the start of the summer season. Early work would also allow the applicant to get a head start on the project and allow on -going construction during the summer and winter of 2005 with occupancy by June 1, 2006. Pursuant to the 1991 SPA Plan, applicant is meeting with the Music Association to ensure construction will have minimal "noise" impact on the Music Tent and MAA summer season. VI. COMBINED REVIEWS, CODE SECTION 26.304.060(B) Code Section 26.304.060(B) is addressed below: r r (B). 1. Combined reviews. The procedures for reviewing development r plans and applications where more than one development approval is being r sought simultaneously may be combined or modified whenever the MeadowsSPAAmend 16 s, • THE CITY OF ASPEN Land Use Application Determination of Completeness Date: April 5, 2010 Dear City of Aspen Land Use Review Applicant, We have received your land use application and reviewed it for completeness. The case number and name assigned to this property is 0009.2010.ASLU — Temporary Use. The planner assigned to this case is Ben Gagnon. ❑ Your Land Use Application is incomplete: We found that the application needs additional items to be submitted for it to be deemed complete and for us to begin reviewing it. We need the following additional submission contents for you application: Please submit the aforementioned missing submission items so that we may begin reviewing your application. No review hearings will be scheduled until all of the submission contents listed above have been submitted and are to the satisfaction of the City of Aspen Planner reviewing the land use application. ❑ Your Land Use Application is complete: If there are not missing items listed above, then your application has been deemed complete to begin the land use review process. 1) Please submit a supplement with regard to traffic management at your earliest convenience. Other submission items may be requested throughout the review process as deemed necessary by the Community Development Department. Please contact me at 429 -2759 if you have any questions. Th. •• You, _l1 -nnifer P , Deputy Director City of Aspen, Community Development Department For Office Use Only: Qualifying Applications: Mineral Rights Notice Required SPA PUD COWOP Yes No X Subdivision (creating more than 1 additional lot) GMQS Allotments Residential Affordable Housing Yes No )( Commercial E.P.F. r~ l ATTACHMENT 2 —LAND USE APPLICATION APPLICANT: �j/��� /� Name: v� M i����l r eai ' Location: i1 (Indicate street addre s, lot & block nu b r, Iega descrip ion wi -re appropriate) Parcel ID # (REQUIRED) 21756 - Vi •' r rV — REPRESENTATIVE: � /] Name: / IJ/IJ ► j/ � r I A4 " Is, '• ef ' Address: , jf� .1 / Phone #: � i 1 iI I / Awn I - n 4616 � . VKi PROJECT: ; \ i A. , A.:. Name: es ..f , . ► ea m a '✓ Address: b dr r I i�� Phone #: / rafi / TYPE OF APPLICATION: (please check all that apply): ❑ Conditional Use ❑ Conceptual PUD ❑ Conceptual Historic Devt. ❑ Special Review ❑ Final PUD (& PUD Amendment) ❑ Final Historic Development ❑ Design Review Appeal ❑ Conceptual SPA ❑ Minor Historic Devt. ❑ GMQS Allotment ❑ Final SPA (& SPA Amendment) ❑ Historic Demolition ❑ GMQS Exemption ❑ Subdivision ❑ Historic Designation ❑ ESA — 8040 Greenline, Stream ❑ Subdivision Exemption (includes ❑ Small Lodge Conversion/ Margin, Hallam Lake Bluff, condominiumization) Expansion Mountain View Plane ❑ Lot Split [Temporary Use ❑ Other: ❑ Lot Line Adjustment ❑ Text/Map Amendment EXISTING q DITI� : script n of exi t� ng buildings, us s, previous approvals, etc.) PROPOSAL: (d- cription of proposed build' • • s uses, moo ifications, etc.) Havejou attached the following? FEES DUE: S [LyP '4pplication Conference Summary �achment I. Signed Fee Agreement onse to Attachment #3, Dimensional Requirements Form esponse to Attachment #4, Submittal Requirements- Including Written Responses to Review Standards All plans that are larger than 8.5" x 11" must be folded and a floppy disk with an electronic copy of all written text (Microsoft Word Format) must be submitted as part of the application. ATTACHMENT 3 /� 1��6 D DIIMENSIONAL REQUIREMENTS den' ri l S ORM ry ��" 1 - Project: / e � v(� 1/�i� 'fr / I Applicant: U s W. • l 'J Location: ��:{A� r !AP Aires r.�1J /� /!'I/ Zone District: kiwi Lot Size: i ,g Lot Area: (for t a purposes of calculating Floor Area, Lot Area may be reduced for areas within the high water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: Proposed: `) Number of residential units: Existing: Proposed: ° Number of bedrooms: Existing: Proposed: ,a Proposed % of demolition (Historic properties only): ✓lA DIMENSIONS: Floor Area: Existing: Allowable: Proposed: AA Principal bldg. height: Existing: Allowable: Proposed.:'f"C Access. bldg. height: Existing: Allowable: Proposed: __r On -Site parking: Existing: Required: Proposed:;____ % Site coverage: Existing: Required: Proposed: �J{" % Open Space: Existing: Required: Proposed: ✓(T� Front Setback: Existing: Required: Proposed: ',PA Rear Setback: Existing: Required: Proposed: ',A Combined F /R: Existing: Required: Proposed: [ A Side Setback: Existing: Required: Proposed '' .: Side Setback: Existing: Required: Proposed: A 6 ' C. Combined Sides: Existing: Required: Proposed. � Distance Between Existing Required: Proposed ��f'� Buildings Existing non - conformities or encroachments: ViaYe' Variations requested: Y es\ March 26, 2010 Ms. Jennifer Phelan Community Development Office City of Aspen 130 South Galena Street Aspen, CO. 81611 Re: Owner Authorization & Consent Aspen Institute Property Conversion of Two Tennis Courts to Overflow Parking Temporary Use Permit Application Dear Jennifer, I hereby authorize & consent to the filing of the above referenced Land Use Application. Jim Curtis is authorized to represent the application. Re .e fully, y gerum Exec ti e Vice - President The Aspen Institute o,,.,.+ Pitkin County Assessor /Treasurer Parcel Detail Information Assessor /Treasurer Property Search 1 Assessor Subset Query 1 Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics 1 Tax Information Parcel Detail I Value Detail 1 Sales Detail 1 Residential /Commercial Improvement Detail Land Detail 1 Photographs Tax Area I Account Number I Parcel Number 1 2008 Mill Levy I 001 I R014027 1 273512129008 Owner Name and Address ASPEN INSTITUTE INC 11000 NORTH THIRD ST 'ASPEN, CO 81611 Legal Description 'Subdivision: ASPEN MEADOWS Lot: 1 -A Location Physical Address: 1000 N THIRD ST ASPEN Subdivision: ASPEN MEADOWS Land Acres: 0 Land Sq Ft: I0 407002 f. ,_,,, \ '''' ..."‘ , \ , ,i E i t: PIP ( li P" i Pitkin Res ' e 40700'1,1 -11111).,::, ,s16.1671-6.,1....,' , 71 \ 4015 1 407003 di ll • i L ./‘ ' ' \\ 11111.1w. : , Illtttc Ai , ea tk_.._( ../..., .... .. ,,, - Atifw • . 11_0114, ..\ p I ' .- '■.. 1 N NI ,..... ‘ ‘ 11. . . • 10.0 , r \ 7 -----;-- - "- - ; . — pen M t \ eadows . . .... r _ i x. s ., 231003 1 1 0 129008 + 1 1 , O. „-_- , • ‘,‘, 2 _„...., " Illall 235 - ,.... 1 i QH .. , A wen Mead g • - _ P al j ''------_„____-,,,,,_ ____,,, ,, .. d 20 2 1 ' I , I I \ Ben Dean Split :, 235006 23 - , 2120L6 I 1 . ado . A01 L4 II' - IP Aetippippii , '', " AluslAssocatei (If Aspen St -101111 . , 201(el , ki R., ‘ (2 Or i • _ _ Fri 1 j ■ • ,,_ SI • 0 01 ine. —a Cake2; i ‘ 4 2 - 0oas _ . , 3 ___I , ._ r 1290 ac9 :,,:. ., f7, I hit • 1.4 Ay • n Cen le I .:......„.... ' 129006 t. O At' 1 1 r ' 3 / 4 4., &....*I'S,„!...........\, 129005 .1„ l, t s ? Tag.- - i ,-"!----"7,_-__-, \ --ail- '\ / _ _ 129004 - ik:r._ _„ gal SPE O. VE rit„) 0 rti .m- Add ion / 205001 227001 : , , ,fp. /__r ,,herer. - - 1 - - - a APrPri. r feSt. Iftrilm■Ilimi"...- "SFr ` MNIEFtraN g"_ a . CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT Agreement for Payment �off City of AAsppen�De�v lo i j / nt Applicatio Fe s 11 /61 31 C 391 / 0 CITY OF ASPEN (hereinafter CITY) and I•"' lr t/ v/ p I v i ( t r 4 r / wr (hereinafter APPLICANT) AGREE AS FOLLOWS: J \ N ` / ri friC0 6p �bmi�ted toIT� an a ica (hereinafter, THE PROJECT). ' 2. APPLICANT understands and agrees that City of Aspen Ordinance No. 57 (Series of 2000) establishes a fee structure for Land Use applications and the payment of all processing fees is a condition precedent to a determination of application completeness. 3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. APPLICANT and CITY further agree that it is in the interest of the parties that APPLICANT make payment of an initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis. APPLICANT agrees additional costs may accrue following their hearings and/or approvals. APPLICANT agrees he will be benefited by retaining greater cash liquidity and will make additional payments upon notification by the CITY when they are necessary as costs are incurred. CITY agrees it will be benefited through the greater certainty of recovering its full costs to process APPLICANT'S application. 4. CITY and APPLICANT further agree that it is impracticable for CITY staff to complete processing or present sufficient information to the Planning Commission and/or City Council to enable the Planning Commission and/or City Council to make legally required findings for project consideration, unless current billings are paid in full prior to decision. 5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect full fees prior to a determination of application completeness, APPLICANT shall pay an initial deposit in the amount of $ which is for hours of Community Development staff time, and if actual recorded costs exceed the initial deposit, APPLICANT shall pay additional monthly billings to CITY to reimburse • the CITY for the processing of the application mentioned above, including post approval review at a rate of $220.00 per planner hour over the initial deposit. Such periodic payments shall be made within 30 days of the billing date. APPLICANT further agrees that failure to pay such accrued costs shall be grounds for suspension of processing, and in no case will building permits be issued until all costs associated with case processing have been paid. CITY OF ASPEN APPLICANT By: By: i wi "v Chris Bandon 2 �O Community Development Director Date: Mailing Add� kr ill/ W• OM( g: \support \forms \a grpayas. do c 1/10/01 630 MEADOWS COLORADO TRUST 650 MEADOWS ROAD LLC 675 MEADOWS RD KKC C/O GOULD & RATNER/JXC 101 FIRST ST #508 0124 TOTTERDOWN RD 222 N LASALLE ST SUITE 800 LOS ALTOS, CA 94022 ASPEN, CO 81611 CHICAGO, IL 60601 810 W SMUGGLER LLC 8TH ONE LLC 810 W SMUGGLER LLC C/O WALDEN CAPITAL CORP gg SAN JACINTO BLVD 411 E MAIN ST #208 -209 4040 NE 2ND AVE #414 AUSTIN, TX 78701 ASPEN, CO 81611 MIAMI, FL 33137 ANTHONY JULIE KATHLEEN ASPEN CENTER FOR PHYSICS ASPEN THIRD ST INC 655 MEADOWS RD 700 E GILLESPIE ASPEN, CO 81611 ASPEN, CO 81611 ASPEN, CO 81611 AULD ROBERT H & CAROL C BAIRD STEPHEN W & SUSAN MERRITT BARABE CAROLYN TRUSTEES 790 CASTLE CREEK DR 730 W SMUGGLER AVE 120 S LASALLE ST ASPEN, CO 81611 ASPEN, CO 81611 CHICAGO, IL 60603 CHOUMAS JOHN JAMES & PATRICIA G BEAR ALLEY LLC CERISE JAMES M BLDG 300 BAYS 313 -314 C/O BENJAMIN HARRIS 790 CASTLE CREEK DR 1601 E OLYMPIC BLVD 160 RIVERSIDE DR., APT. 14-A ASPEN, CO 81611 NEW YORK, NY 10024 LOS ANGELES, CA 90021 CITY OF ASPEN COLLATE S A & R W TRST DIGIGLIA LE RAY DIGIGLIA JOHN WILLIAM ATTN FINANCE DEPT 422 ESTANTE PO BOX 4305 130 S GALENA ST LOS ALAMOS, NM 87544 ASPEN, CO 81612 ASPEN, CO 81611 DITTMER THOMAS H TRST DML REALTY LLC FELDER RICHARD & DEBORAH LIV 0/0 STEVEN SPECTOR LLC TRUST PO BOX 305 11498 E CAROL WAY 150 S CHICAGO, IL 60606 DR #1200 GRAVIES, KY 41727 SCOTTSDALE, AZ 85259 -2620 CHICAGO, IL 60606 FERGUSON JAMES & ESTHER FORD MERRILL M GANTZEL STEEN GIFFORD QPRT PO BOX 895 51 MEADOWS RD #5 705 MEADOWS RD CHARLESTON, SC 29402 ASPEN, CO 81611 ASPEN, CO 81611 GOLDSBURY CHRISTOPHER JR REV HANSEN SALLY GOLDRICH REV TRUST MELINDA TRUST PO BOX 9343 630 W HALLAM ST 0/0 ASSESSMENT TECHNOLOGIES LTD ASPEN, CO 81612 ASPEN, CO 81611-1173 121 INTERPARK BLVD STE 308 • SAN ANTONIO, TX 78216 HARRIS JOAN W REV TRUST 50% HOFFMAN LARRY J & DEBORAH HOLMES ROBERT & AUDREY HARRIS JOAN W OPR TRUST 50% 1221 BRICKELL AVE 45 BERMUDA RD 209E LAKE SHORE DR MIAMI, FL 33131 W ESTPORT, CT 00880 CHICAGO. IL 60611 JACKSON LAND COMPANY KENROSS LUX S A C/O FRANNIE DITTMER & STEVEN JOHNSON CHRISTOPHER W C/O HANK HOLT SPECTOR LLC 834 5TH AVE 3765 CHAMPION BLVD 150 S WACKER DR STE 1200 NEW YORK, NY 10065 WINSTON- SALEM, NC 27115 CHICAGO, IL 60606 LAMM RICHARD D QPRT 1/2 LPRP RIVER LLC 50% LRM LIMITED PARTNERSHIP 5401 E DAKOTA #20 LPRP MILL LLC 50% 8540 SOUTHWEST 52ND AVE DENVER, CO 80246 1100 BLACK BIRCH DR MIAMI, FL 33143 ASPEN, CO 81611 MARKALUNAS JAMES J & RAMONA I MEADOWS NORTH LLC MORRIS JOHN S JR 624 W NORTH ST 675 MEADOWS RD PO BOX 8991 ASPEN, CO 81611 ASPEN, CO 81611 ASPEN, CO 81612 MUSIC ASSOCIATES OF ASPEN INC NICHOLS ROBERT & BEVERLY PARELMAN ALLEN G REV TRUST 2 MUSIC SCHOOL RD 3318 BEVERLY DR 734 W SMUGGLER ASPEN, CO 81611 -8500 DALLAS, TX 75205 ASPEN, CO 81611 PITKIN COUNTY REED PRESLEY 0 & PATRICIA RIVER ONE LLC 530 E MAIN ST #302 375 BELLEVUE DR PO BOX 19019 ASPEN, CO 81611 BOULDER, CO 80302 ATLANTA, GA 31126 ROSE ALLAN V SARPA JOHN G & JAN JONES SARPA SHERMAN HARRIS D 1/2 ONE EXECUTIVE BLVD 71 MEADOWS #7 685 S WILLIAMS ST YONKERS, NY 10701 ASPEN, CO 81611 DENVER, CO 80209 SMITH VICTORIA LEA SMOOKE BARRY ASPEN TRUST 50% STRICKLAND MARCIA D 1160 PARK AVE SMOOKE JULIE ASPEN TRUST 50 % 1991 E ALAMEDA AVE #9 NEW YORK, NY 10128 155 5TH ANITA DR DENVER, CO 80209 LOS ANGELES, CA 90049 VEST AMERICA INC WALDECK VIVIAN G WESTVIEW HOLDINGS LLC 3102 N OAKLAND ZION RD 915 W NORTH ST PO BOX 460567 FAYETTEVILLE, AR 72703 ASPEN, CO 81611 -1171 SAN ANTONIO, TX 78266 WF CASTLE CREEK LLC WING KAREN J WRIGLEY WILLIAM JR RES TRST PO BOX 1444 PO BOX 3303 400 N MICHIGAN AVE #1100 CARBONDALE, CO 81623 SPRING, TX 77383 CHICAGO, IL 60611 CE jV R / � CITY OF ASPEN kw 6v0 PRE - APPLICATION CONFERENCE SUMS gY `� 2 OF A SH DATE: 3/29/10 PLANNER: Jennifer Phelan, 429 -2759 � /)/ PROJECT: Aspen Institute, Specially Planned Area (SPA) Pileipl REPRESENTATIVE: Jim Curtis TYPE OF APPLICATION: Temporary Use DESCRIPTION: The Aspen Institute is considering temporarily changing two existing tennis court, located atop the parking garage, to overflow parking along Meadows Road. An application for Temporary Use is required to go before City Council for approval of the request. Temporary Uses cannot exceed 180 days from the date that the City Council approves the use. As traffic mitigation has been raised in other institute applications, staff recommends that the application discuss traffic management and all of the TDM measures the institute implements. Land Use Code Section(s) 26.304 Common Development Review Procedures 26.450 Temporary and Seasonal Uses Review by: Staff for complete application Referral agencies for technical considerations City Council (Final Decision making body) Public Hearing: Yes at P & Z and City Council Planning Fees: $1,470.00 Deposit for 6 hours of staff time (additional staff time required is billed at $245 per hour) Referral Fees: Parks ($212) Total Deposit: $1,682.00 Total Number of Application Copies: 12 To apply, submit the following information: 1. Total Deposit for review of application. 2. Applicant's name, address and telephone number, contained within a letter signed by the applicant stating the name, address, and telephone number of the representative authorized to act on behalf of the applicant. 3. Street address and legal description of the parcel on which development is proposed to occur, consisting of a current certificate from a title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner's right to apply for the Development Application. 4. Completed Land Use Application. 5. Signed fee agreement. 6. Pre - application Conference Summary. 7. An 8 1/2" x 11" vicinity map locating the subject parcels within the City of Aspen. 8. Proof of ownership. 9. Existing and proposed site plan, landscaping plan, and parking plan. 10. A site improvement survey that includes all existing natural and man -made site features. 12. A written description of the proposal and a written explanation of how a proposed development Page 1 of 1 complies with the review standards relevant to the development application. 13. All other materials required pursuant to the specific submittal requirements. 14. Applications shall be provided in paper format (number of copies noted above) as well as the text only on either of the following digital formats. Compact Disk (CD)- preferred, Zip Disk or Floppy Disk. Microsoft Word format is preferred. Text format easily convertible to Word is acceptable. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. CITY OF ASPEN PRE - APPLICATION CONFERENCE SUMMARY PLANNER: Jennifer Phelan, 429 -2759 DATE: 3/29/10 PROJECT: Aspen Institute, Specially Planned Area (SPA) REPRESENTATIVE: Jim Curtis TYPE OF APPLICATION: Temporary Use DESCRIPTION: The Aspen Institute is considering temporarily changing two existing tennis court, located atop the parking garage, to overflow parking along Meadows Road. An application for Temporary Use is required to go before City Council for approval of the request. Temporary Uses cannot exceed 180 days from the date that the City Council approves the use. As traffic mitigation has been raised in other institute applications, staff recommends that the application discuss traffic management and all of the TDM measures the institute implements. Land Use Code Section(s) 26.304 Common Development Review Procedures 26.450 Temporary and Seasonal Uses Review by: Staff for complete application Referral agencies for technical considerations City Council (Final Decision making body) Public Hearing: Yes at P & Z and City Council Planning Fees: $1,470.00 Deposit for 6 hours of staff time (additional staff time required is billed at $245 per hour) Referral Fees: Parks ($212) Total Deposit: $1,682.00 Total Number of Application Copies: 12 To apply, submit the following information: 1. Total Deposit for review of application. 2. Applicant's name, address and telephone number, contained within a letter signed by the applicant stating the name, address, and telephone number of the representative authorized to act on behalf of the applicant. 3. Street address and legal description of the parcel on which development is proposed to occur, consisting of a current certificate from a title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner's right to apply for the Development Application. 4. Completed Land Use Application. 5. Signed fee agreement. 6. Pre - application Conference Summary. 7. An 8 1/2" x 11" vicinity map locating the subject parcels within the City of Aspen. 8. Proof of ownership. 9. Existing and proposed site plan, landscaping plan, and parking plan. 10. A site improvement survey that includes all existing natural and man-made site features. 12. A written description of the proposal and a written explanation of how a proposed development Page 1 of 1 complies with the review standards relevant to the development application. 13. All other materials required pursuant to the specific submittal requirements. 14. Applications shall be provided in paper format (number of copies noted above) as well as the text only on either of the following digital formats. Compact Disk (CD)- preferred, Zip Disk or Floppy Disk. Microsoft Word format is preferred. Text format easily convertible to Word is acceptable. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. Y cvvte, Z7 3S'• 12.;.2q.(".0g oioR• ASUii Eile Wit Board WWI Fgm Ran Farmat It Eau F, o * <�f11 ®� n0rml la.mm►'r,1+wWs Ir+et IPv4 !piing *blob lAtiataris lRataignine IrtittbaralY I 3j Pent Type laslu _faspen Land Use Pent S10009.2010.AaU Adder 1845AFPDOWS RD AE c11145PDI State4CO J zy e1GU J 1j Pont - Wound= Master Permt Rang Queue 07 Appied Project I z State WD ig Approved I-- Deesben TENNIS caws ABOVE PARKING GARAGE PROPOSAL, CONVERSION OF TWO Issued TM -.1 TENNIS COURTS TO OVERFLOW ARM • MC PM SEASONAL USE p'-- J ai Fnel swatted Pm CLRT6 92013% y,t- - - _ �— I J aodr I s rt I Ewes /2011 J Last Nero IASPENAbTIME Frst Nave l 1000 NTHIRD ST Atone 0970)925 -7010 ASPEN C081611 A Omens Is *kart? Last Nero ASPEN INSTITUTE J FrR Wes l 1000 N IHIRD ST Phone k970) 925.7010 Cust1�5 �' ASIE C0AI611 tulle Last Nero I Frst Nene I Phone �— i Entede peel lend= phonemm6a A>Dddbl � ', Rxad 1 of 1 — at 10230 � � � kw —w-�- t 62 .0 ° 212- - c 4� c 2.u. AJ „ _..(off( - A - 2-1421 L f" Kt• ( 4 1 it 7o • au \ fI b- I 4:1101 \‘ Cy � � � 1 1 ° L xl-t21 �(h"" w- 6/7,-LC