HomeMy WebLinkAboutcoa.lu.sm.Han.34-83 • MEMORANDUM
TO: Aspen Planning and Zoning Commission
FROM: Colette Penne, Planning Office
•
RE: Han /Eastern Winds Stream Margin Review
DATE: August 16, 1983
Location: • Lot 2, Parry Subdivision (the first lot north of
Castle Creek on Sneaky Lane, across from the City
Shop Building).
Zoning: R -30 PUD.
Applicant's
Request: Special review approval to construct a dwelling
unit within 100 feet of the high water line of the
Roaring Fork River.
Referral
Comments: No comments were received from the City Attorney's
Office.
The Engineering Department reviewed the application
and made a site inspection and has several suggested
plat changes. Stream margin review does not require
the filing of a plat, however. A new development
plan must be submitted showing the 100 year flood -
plain. No existing vegetation within the 100
year floodplain shall be removed or disturbed in
the course of construction, and no construction
techniques shall be employed which could contribute
sediment to the stream.
Planning
Office
Review: The building site is very flat and will require
almost no grading. All existing vegetation is being
retained. There will be no effect on the stream
channel or sediment loads in the stream. The site
• grade will not alter existing grade points of the
lot, so the existing drainage conditions will be
retained.
A pedestrian easement is shown on the plat along the
river's edge, useable for fisherman and hiking pur-
poses.
The criteria of Section 24 -6.3 are as follows:
(1) No building shall be located so as to be
within a flood hazard area designated by the
U. S. Corps of Engineers Flood Plain Report
for the Roaring Fork River.
This proposal is outside the flood hazard area.
It is no closer than approximately 30 feet to
the 100 year floodplain line.
(2) In the event there is a trail designated by
an approved trail plan within the development
site, such trail shall be dedicated for public
use.
There is no trail in the trail plan that involves •
this property and the easement along the river bank
is indicated on the plat.
Memo: Han /Eastern Winds
Page Two
August 16, 1983
(3) All attempts should be made to implement the
Roaring Fork Greenway Plan.
This property is along Castle Creek and is not
. affected by the Roaring Fork Greenway Plan.
(4) Vegetation shall not be removed nor any
slope grade changes made that may produce
• erosion of the stream bank.
As mentioned earlier, all existing vegetation is
being retained and site grades will not be altered.
(5) There shall be permitted no changes to the
stream channel or its capacity, and no activity
shall he allowed which will increase stream
sedimentation and suspension loads.
Again, the house is being built on an open, flat
area of the lot. Grading will be very minimal,
with no effect on the stream channel or sediment
load.
(6) All efforts must be made to reduce stream
pollution and interference with the natural
changes of the stream, and to enhance the
value of the stream as an important natural
feature.
This is a very buildable lot with all vegetation
located away from the building site and near the
stream bank. The stream is not being adversely
affected in any apparent way and the provision of
pedestrian access will allow more than just the
property owners to enjoy this segment of Castle
Creek.
Planning Office
Recommendation:
The Planning Office recommends approval of construction
of this single family house on Lot 2 of the Parry
Subdivision as presented with the condition:
1. Compliance in the construction phase with the
criteria of Section 24 -6.3.
•
H
CASELOAD SUMMARY SHEET
City of Aspen
No. '�l c�
2 J
Staff: ./.:, r ♦a_
PROJECT NAME: i-174 Acetyl ii ijA 'Pi't y? S eL- r✓t ":
APPLICANT: 7)44/ 1/1471--- Phone:
REPRESENTATIVE: / -t `-- Y(d2 /mist - Phone: 6/ S (5
TYPE OF APPLICATION: (Fee)
I. GMP /SUBDIVISION /PUD (4 step)
1. Conceptual Submission ($1,840)
2. Preliminary Plat ($1,120)
3. Final Plat ($ 560)
II. SUBDIVISION /PUD (4 step)
1. Conceptual Submission ($1,290)
2. Preliminary Plat ($ 830)
3. Final Plat ($ 560)
III .EXCEPTION /EXEMPTION /REZONING (2 step) ($1,010) ote kV ED
IV. SPECIAL REVIEW (1 step) ($ 465) 4e 46' ;
1. Special Review G
2. Use Determination g�c' �
3. Conditional Use
REFERRALS: Date Referred: r/
J Attorney Sanitation District School District
1 Engineering Dept. Mountain Bell Rocky Mtn. Nat
Housing Parks State Hgwy. Del
Water Holy Cross Electric Fire Chief
City Electric Fire Marshall /Building Dept. Other
FINAL ROUTING: Date Routed:
A ttorney /Engineering
�uilding Other
•
•
DISPOSITION:
i i • t�\ - ' ♦. . II.
CITY P�L REVIEW: 6 '
P93./ cienAs".)i of a Q� - o C
as rfe_c1 l,v - k k o C,o -,ncl i- R
1. Ccr,tevvl a /
( 4 k c.s -, Q oc- St-CI Zi-lam• 3
CITY COUNCIL REVIEW:
0
Ordinance No.
CITY P &Z REVIEW:
CITY COUNCIL REVIEW:
Ordinance No. •
O , f ir /'-
)_
/ �•
1 4030 12 . �3 14 —�
R _ _ ,
1 s 097 1 7 M 764792 !
.c,o„ ».,�, 8 389.50
11 112
` IRST SPECIAL CH ARGE (CREDIT) SECOND S-- PE --CIAL CHARGE (CREDIT) 11 13
», GE ICR EOI T) THIRD SPECIAL CHARGE (CREDIT)
*`^ .. F
`^
14 m. +.our..
15 16 .... ,,,oU ».
17 18
19 20
Al TA OWNER'S POLICY - Amended 10/17/]0
C5 /kc /1 /
SCHEDULE A
Order No.: 11060
Policy No.: 0 357563
Date of Policy: October 29, 1982 at 4:12 PM
Amount of Insurance: $ 185,000.00
1. Name of Insured:
David Han and Chen Lang Jang
2. The estate or interest in the land described herein and which is covered by this policy is:
ice Simple
3. The estate or interest referred to herein is at Date of Policy vested in:
David Han and Chen Lang Jang
4. The land referred to in this policy is described as follows:
Lot 2,
PARRY SUBDIVISION, according to the Map thereof recorded in Plat Book 6
at page 124.
County of Pitkln
State of Colorado „
. .
D
0
fr
r
..._
e .<: uw
SCHEDULE 8
Cider No. 111160
This policy does not insure against loss or damage by reason of the follows g• 0 357563
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a
correct survey and inspection of the premises would disclose and which are not shown by
public records.
4. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed
by law and not shown by the public records.
S. Any and all unpaid taxes and aseessments.
6. The effect of inclusion in any general or specific water conservancy,
fire protection, soil conservation or other district or inclusion in any
water service or street isproven:ertt area.
7. The right of the proprietor of a vein or lode to extract and remove his
ore therefrce, should the same be found to penetr t
prunises, as reserved in United States Patent tern or intersect k 55 at Page
the
32 and in Sook 55 ac Page 35. d la Smolt
A. A U; foot easettent for waterline, to
the cuurse of said easee.ent for maaint ter with the rr ht to
in teed to the City of enter along
eu and repair, is described
at Page 320, Ten recorded ceuber 10, 1954 in Book 18?
1 • An easement for s 15 foo
195E in B dvav as reserved in deed recorded January 27
IEJ at Page
Di. A right uP y for i
dery recor ugress and egress 40 feet In width as described in
F' bruary 18, 1963 in Book 201 at Page 180.
11. A 2f) foot easement for road purposes as set forth in deed recorded August 19,
1%4 in /lout 208 st rage 512.
14. Fasesout granted to As
in instrugat pen Metropolitan Sanitation District as set forth
recorded May 17, 1978 in Book 348 at Page 112.
13. k A DPW of trust .
ny; Jan T t ltoveeher 1, 1982, executed by nand
Le
f , og�1 p
to he Public Trustee of Pitkin County, to *4* inn Chen
o $l8O , : , in favor of The Fitzgerald K enure 1 r e c o rded f
s
9 1982 in Zook 434 at Page 409 ass Receptip .2 4451 pays. .acedad
4
y
1 lyy ' -Y 1 44 ,,
Awm ..y, � r h , X1 ,6" �~
rn. ..�.� ..k`r YrfIlY.141n'.!'§^d4, . v ♦ l
LAW OFFICES OF
GIDEON I. KAUFMAN
A PROFESSIONAL CORPORATION
BOX 10001
GIDEON I. KAUFMAN 611 WEST MAIN STREET
ASPEN, COLORADO 81611 TELEPHONE
DAVID G. EISENSTEIN AREA CODE 303
925 -8166
July 6, 1983
Alan Richman
Planning Office
130 S. Galena St.
Aspen, CO 81611
Re: David Han /Eastern Winds - Lot 2, Parry
Subdivision Application for Stream Margin
Review
Dear Alan:
This letter constitutes an application for special
review approval under Section 24 -6.3 of the Municipal Code
of the City of Aspen, providing for stream margin review.
Enclosed herewith please find the following:
1. Site plan indicating boundaries of the
property for which the building is requested, contour lines,
existing trees and shrubs and the location for proposed
improvements.
2. Outline of construction procedure.
The property is currently vacant and unimproved.
This application should be approved because it fulfills all
the criteria set forth in Section 24 -6.3 (c) of the Code.
1. No building is located within a flood
hazard area.
2. There is no trail designated by an
approved trail plan within the development site and thus no
trail needs to be dedicated for public use.
3. The Roaring Fork greenway plan does not
affect this property.
4. No vegetation will be removed and no
slope grade changes will be made which will produce erosion
of the stream bank.
5. There will be no changes to the stream
channel or its capacity and no activity will take place
Alan Richman
July 7, 1983
Page 2
which will increase stream sedimentation and suspension
loads.
6. This development plan will cause no
stream polution and will not interfere with the natural
changes of the stream. This development plan will enhance
the value of the stream as an important natural feature.
The proposed site plan does not disturb any
existing trees and shrubs; the site now is an open field.
There is an existing driveway to the property and building
site and thus no additional driveway cuts will be necessary.
The site grade of 103 will not change existing grade points
of the lot and thus the present drainage conditions will be
retained. It would be impossible to build on the lot and
maintain the 100 foot setback due to the easements placed on
the lot previously. A greater setback could be achieved but
only with a consequent cutting into the grove of Aspen
trees. There will be no polution impact at all to Castle
Creek because the project will be supplied with City sewer
and water.
This development plan as contemplated fulfills the
intensions stated in Section 24 -6.3. The proposed
improvements will be safe from flooding, the natural water
flow will not be impeded in any way, the designated natural
water courses are protected and preserved as important
natural features and appropriate use of the land is
encouraged. As you can see below we are concurrently
submitting a copy of this letter along with the enclosed
site plan and outline of construction procedure to the
Building Department as per the requirements of Section
24 -6.3 (b). We would request that this application be
placed on the next available Planning and Zoning Commission
agenda. Thank you for your attention to this matter.
Very truly yours,
LAW OFFICES OF GIDEON I. KAUFMAN,
a Professional Corporation
By
ideon ufman
GK /ks
Enclosure
cc: David Han (w /o enclosures)
Building Inspector,
Aspen Building Department (w /enclosures)
OUTLINE OF CONSTRUCTION PROCEDURE
Excavate 3' - 0" crawl space grade of dig 100.
Finish ?ade of foundation wall 103 8" block foundation.
Use existing road to access.
Drainage to follow natural contour of property.
Drainage will flow towards Aspen Grove and creek at 1/2" per
linear foor from 103 to 102 grade.
All decks will be on 8' on center 2' X 2' concrete
footings.
MEMORANDUM
TO: Colette Penne, Planning Department
FROM: Chuck Roth, Engineering Department eta_
DATE: August 3, 1983
RE: Han /Eastern Winds Stream Margin Review
Having reviewed the above application and having made a
site inspection, the Engineering Department has the following
comments:
1. There is a pond which is not shown on the development
plan. The pond may be situated on the adjacent property
(Lot 1, Parry Subdivision), however no pond is indicated
on the final plat of the Parry Subdivision. There is a
ditch which flows into the pond, which ditch appears to be
on the applicants' property. The ditch is supplied by an
approximate 8" diameter corrugated metal pipe from Castle
Creek. If the ditch is in fact on the applicants' property,
it must be indicated on the development plan, and the
contour lines must be corrected accordingly.
2. The development plan must show the 100 -year floodplain
to verify that the building is not situated therein.
3. The development plan must show all easements recorded
on the final plat of the Parry Subdivision.
4. The development plan does not show the entirety of the
property boundary. The development plan should show the
complete boundaries of the property. There is a non - exclusive
easement for public right -of -way which is not shown across
the southern portion of the property. If any building is to
be undertaken on any portion of the property not shown on the
development plan, an additional development plan must be
provided for that portion of the property.
5. No existing vegetation within the 100 -year flood plain shall
be removed or disturbed in the course of construction, and
no construction techniques shall be employed which could
contribute sediment to the stream.
CR /co
W .r
MEMORANDUM
TO: City Attorney
\ pity Engineer
PLANNER: Colette Penne
RE: Han /Eastern Winds Stream Margin Review
DATE: July 14, 1983
Attached is a letter of application for stream margin review for
property located on Lot 2, Parry Subdivision.
Please review the application and plat, and return your comments
to Colette at the Planning Office by August 1.
Thank you.