HomeMy WebLinkAboutcoa.lu.gm.Herndron.Sub. Parcel D -18-83 CASELOAD SUMMARY SHEET
City of Aspen
No. �/yY�� /? G
-
Staff: eel, La; 114.7 l'1 Q /
PROJECT NAME: I II 4 A ` er / n / — / , G./ - .. i/ ✓Ii
• APPLICANT: !T 4 Phone:
REPRESENTATIVE: 4,;14451)77 Phone: 7,--;h — 9/6.0
TYPE OF APPLICATION: (Fee)
I. GMP /SUBDIVISION /PUD (4 step)
• 1. Conceptual Submission ($1,840)
2. Preliminary Plat ($1,120)
3. Final Plat ($ 560)
II. SUBDIVISION /PUD (4 step)
1. Conceptual Submission ($1,290)
2. Preliminary Plat ($ 830)
` 3. Final Plat ($ 560)
1 / III .EXCEPTION /EXEMPTION /REZONING (2 step) ($1,010)
re IV. SPECIAL REVIEW (1 step) ($ 465)
1. Special Review
2. Use Determination
3. Conditional Use
REFERRALS: Date Referred: 1 7 1 :24 - e.3
Attorney Sanitation District School District
Engineering Dept. Mountain Bell Rocky Mtn. Nat.Gas
t/ Housing Parks State Hgwy. Dept.
Water Holy Cross Electric Fire Chief
City Electric Fire Marshall /Building Dept. Other
FINAL ROUTING: Date Routed: (rag _x- 3
✓Attorney Engineering
✓ Building ✓ Othe S US;in ry > .4[10
( \
• • •
•
: ,`/ /8 3 /�1! �
—r R / ,-;
1 co-r" ►n�r<d ec1 0 /cz
U tz_ on KA— c-l° - a I ; le iv\ctkzcn w _ 11 c
U
� OC.C' ,),:\n, v\c �k�� 3dti0 t r J RZ.
• �/�
Ito a'\� s' 4'�'-e e;- ':Qar t(&t
+k it I 's aed orSc>2 _ or - re p►'dJ��2
3 11.,_._ f +✓ ; t �; -' • - 6,--f (etc 4{toly, a } .- O.
1 e �c.r_I
}b r F-c_ vim. I I o ✓- L p -u -c_ {-_O.'.= n_. -- ; e" 1n 0 n 'J YD V Q
It ✓ O c L.,. 0.h .Ca.
4 — \\ U 1 �� c n �.yf0✓
CITY COUNCIL REVIEW: 2 33 �a r .,a 1 . f . ` i .. GJf
• C A n i r Q t H di a , " . N)r-j n' -,,, r -1 'al c f i r -i / o 0. d PS A 0_ ��
C. I r
i Q. • 1 _. .• WA; 0 O. L, I< 1f\ .,. 0 t osic
bo rtk 4 . " 5 0..2.3-1 1 4` C y V \ C.. , ,o • c-k ,- `1. P ! \ ft
•.. 4 1& -VO 0 .414& ‘" l: '1 D
Ordinance No.
CITY PR REVIEW:
•
CITY COUNCIL REVIEW:
•
Ordinance No.
•
•
•
0 • •
.r
4 C 61
•
, f _ r p
f y K S ..L,2
MEMORANDUM r'
•
TO: City Attorney
1/City Engineer
Housing Office, Jim Hamilton
PLANNER: Colette Penne •
RE: Curton Employee Units - y b ' on Exemption Cute
DATE: April 28, 1983
Attached is a letter of application requesting an exemption of an employee unit
from the requirements of the GMP for the City, since the lot where this unit is
to be constructed was split pursuant to n exemption from the GMP.
Please review the application and return your comments to the Planning Office
no later than May 6, as the item is scheduled to go before P &Z on the 17th of
May.
Thank you for your expeditious handling of this item.
� $t C °/
7�
� 1�, ,
LAW OFFICES OF
GIDEON 1. KAUFMAN
A AROFESS:ONAL CORPORATION
a0x 10001
611 WEST MAIN STREET
GiDEON I. KAUFMAN TELEPHONE
ASPEN, COLORADO 81611
-- AREA CODE 303
DAVID G. EISENSTEIN
925.8166
March 31, 1983
Alan Richman
, Aspen /Pitkin Planning Office
130 South Galena Street
Aspen, CO 81611
Re: Donna Curton Employee Unit
Dear Alan,
Please consider this letter an application on behalf of
Donna Curton for an exemption of an employee unit from the
requirements of the Growth Management Plan quota system for
the City of Aspen.
Donna Curton owns Parcel B, Herndon Subdivision. This
lot is a duplex lot containing 21,950 square feet. However,
because the lot was split pursuant to an exemption from the
growth management quota system, all that is permitted on
this lot is a single family unit without further growth
management approval.
Pursuant to Aspen City Code, Section 24 -11.2,
Exceptions, a unit of employee housing constructed pursuant
to Section 24 -11.10 may be exempt from the growth management
quota system provided it gets the approval of City Council
upon the recommendation of the Planning and Zoning
Commission. The one requirement is the showing of community
need considering the number of units, the type of units and
the rental mix. I have been in contact with the Housing
Director, Jim Hamilton, who has given us his support for the
type of unit we would like to construct.
Donna would like to construct a duplex on the site,
containing one free market unit which is allowed by right
and another unit which would be allowed under the employee
housing exemption from the Growth Management Plan. There
will be no necessity to vary any of the density or FAR
requirements or any other requirements of the Land Use Code.
We simply ask that allowable density be permitted on this
lot. To accomplish this we need the exemption from the
Growth Management Plan for the employee unit.
Alan Richman
March 31, 1983
Page Two
The contemplated size of the unit, per Jim Hamilton's
request, is 1,300 square feet. It will be a three- bedroom
unit and Donna would like to be able to rent out the unit
and then sell it or continue to lease it, at her option.
The employee unit will be governed by the ?riddle income
guidelines. This is justifiable because this project is not
a large multi -unit complex; rather it is a duplex and as
such construction costs and high quality of the unit dictate
the middle income classification.
I look forward to having this item placed on your next
available agenda. If you have any questions, please feel
free to contact me.
Very truly yours,
LAW OFFICES OF GIDEON I. KAUFMAN,
a Professional Corporation
II�
( -
By _it/
Gideon Ka fman
GK kw
cc: Donna Lee Curton
Donna Lee Curton Trust
•
Z - G - 3
,,e,( is.. „
k .
Ld try 4 bc. -- ; lie _
(oto,A olio
` ! -4co -..7o 7 a± 't /0 1 co; _ - --- - -- _ -- --
i`re! GL.eCe,o�D (x.2; 4A -. re-ad/pia/
z. ate.'" Mt& 47
A rir( i, << , CA_ 0O -0-4.4Ab - t . _ Q.1 c...1 .
C) (-�
-: ( Q� Lo peil� o
I Y` � - -
3 � I `' 1
Al
tut
cQ. n1 T (p ` e�tL.aQ - f - `1 _
5 .7 uz ._ .
tom;`( -c,c e.�. .vu . C , trA-A L-� X
MEMORANDUM
TO: Richard Grice, Planning Office
FROM: Louis Buettner, Engineering Department
DATE: November 23, 1979
RE: Herndon Subdivision, Final Plat
After reviewing the final plat submitted for the above subdivi-
sion, the Engineering Department finds the following corrections
are needed:
On Page 2
J1 The utility easement crossing parcel "B" for parcel "A's"
utilities is not proposed but is to be an "underground
utility easements ", remove the wording "proposed relocation
of ".
4 The access and underground utility easement across par-
cel "A" must be defined by bearings and distances.
t21 The road and bridge area is to be dedicated as right -of-
way, so it will not be part of parcel "A" or "B ".
4) Quit claim deeds are needed for the westerly property
line. The deeds will be between the owner and the City.
The following five items are correction to sheet one. They may
or may not have been past on to survey engineers.
.4) The book number for the recorded easement upper part of
parcel "A" is 189, not 89.
6) In the legend and notes the contour lines were from 1974
Aspen Aerial Survey, not 1975.
7) The water line easement upper part parcel "A" may be 16
feet, not 18 feet as shown. The deed should be checked.
8) Add a note for why the parenthesis were used on some dis-
tances shown.
9) The work preliminary should be removed. This is a final
plat.
r
MEMORANDUM
TO: Colette Penne, Planning Office
FROM: Jay Hammond, Engineering Department -s*S
DATE: May 10, 1983
RE: Curton Employee Unit Exemption from GMP •
Having reviewed the above application, and made a site
inspection, the City Engineering Department has only one
comment that is not related to the matter of GMP exemption.
We have no particular problems with the proposed exemption P
for an employee unit on the site relative to engineering
concerns or provision of services. There has been some
discussion recently, however, of access to the site. I
would point out that, at this time, it remains our under-
standing that access to the site will be accomplished
through the access easement in parcel "A" and not through
the alley in block 4.
JH /co