HomeMy WebLinkAboutcoa.lu.su.Buckwheat.1979 Reception NO.
2165 Vic,
Recorded at 3;07PM July 20, 1979 Loretta Banner Recorder
nom 13 PAGE 55
SUBDIVISION IMPROVEMENT AGREEMENT
BUCKWHEAT SUBDIVISION
THIS AGREEMENT, made and entered into this /3 day
of / , 1979, by and between FRANK J. WOODS, III,
i
ANTHONY J. MAZZA and MAURICE T. BRODIN (the "Subdividers ") and
THE CITY OF ASPEN, COLORADO, a municipal corporation, (the "City').
WITNESSETH:
WHEREAS, the Subdividers hold record title to a parcel
of land situated in the City of Aspen, County of Pitkin, State
of Colorado, and more fully described on Exhibit "A" attached
hereto and by this reference incorporated herein; and
WHEREAS, the Subdividers have submitted to the City
for approval, execution and recording a subdivision plat of the
above - described property, such subdivision to be known and
designated as "Buckwheat Subdivision "; and
WHEREAS, the City has fully considered such subdivisio'
plat, the proposed development and the improvement of the
subject property shown thereon, and is willing to approve,
execute and accept said plat for recordation upon the agreement
of Subdividers of the matters hereinafter described, which
matters are deemed necessary to protect, promote and enhance
public welfare; and
WHEREAS, the Subdividers and the City wish to reduce
that agreement to writing.
NOW, THEREFORE, in consideration of the premises,
the mutual covenants herein contained, and the approval,
execution and acceptance of said subdivision plat with the
City for recording, parties hereto hereby agree as follows:
1. Subdividers covenant and agree to and with the
City that the Subdividers will affirmatively consent to and
join in the formation of any special improvement district,
eooK373 mu 56
encompassing all or any part of the Buckwheat Subdivision, that
may hereafter be proposed or formed for the construction of
street improvements, drainage improvements and buried electrical
improvements. Subdividers hereby waive and further covenant
and agree to waive any right to protest against the formation
of any such district.
2. In the event the City, at any time or from time
to time, shall construct or install any street improvements,
which improvements service or improve a general area including
the land within the Buckwheat Subdivision, Subdividers agree,
upon demand, to pay or reimburse the City for that portion of
the actual cost of such improvements which is properly allocable
to said subdivision.
3. The Subdividers hereby acknowledge responsibility
for the six inch service line which connects the two buildings
presently on this property to Aspen Metro Sanitation's trunk
line.
4. The Subdividers hereby agree to add a fire hydrant
consistent with the location as shown on the plat. Subdividers
further agree that the placing of the additional fire hydrant
shall be at the expense of the Subdividers. The Subdividers and
the City agree that if the fire hydrant cannot be installed
within 60 days from the approval of this final plat by the City,
the Subdividers shall nevertheless be allowed to record the
final plat provided that they place in escrow an amount to be
determined by the mutual agreement of the Subdividers, the Fire
Marshal and the City Engineer.
5. The covenants and agreements of the Subdividers
herein shall be deemed covenants that run with the land, shall
burden the land included within said subdivision, and shall bind
and be specifically enforceable against all subsequent owners
thereof, including the Subdividers,their heirs, personal
representatives, successors in interest and assigns.
-2-
Mr
sooK 3 /3 MAL 57
6. Upon execution of this Agreement by all parties
hereto, the City agrees to approve and execute the final plat
of the Buckwheat Subdivision and accept the same for recording
in the real property records of Pitkin County, Colorado, upon
payment of recording fees and costs to City by the Subdividers.
IN WITNESS WHEREOF, the parties hereto have executed
this Agreement as of the day and year first above written.
THE CITY OF ASPEN, COLORADO
a municipal corporation
ATTEST: /y
1,-1'401 / i
Wyk J. rds, III
J .. ..a A oriy •
". rice T. Brodin
-3-
MEMORANDUM
TO: Aspen City Council
FROM: Richard Grice, Planning Office
RE: Buckwheat Subdivision - Final Plat
DATE: June 13, 1979
This is a final plat review for the Buckwheat Subdivision. The essence of
the application is as follows: "The applicants' desire is to subdivide the property
into two lots. A single family dwelling is located on one lot and this lot will
contain 6,028 square feet. An apartment building commonly known as the Buckwheat
Apartments is located on the other lot and this will contain 22,656 square feet.
This apartment house presently contains 8 units. The single family dwelling and
the lot on which it is located will be sold to Dean Chiminis who presently occupies
the single family dwelling. The lot is presently under a letter of agreement with
Mr. Chiminis. This subdivision does not contemplate the cominiumization of the
Buckwheat Apartments, but merely the lot split explained above."
I have attached for the Council's review a copy of the Planning Office's
preliminary plat memorandum to the Aspen Planning and Zoning Commission and
the Engineering Department's comments which were made at that time. These items
are attached for informational purposes only.
With regard to the final plat, the applicants have submitted the final plat
and the subdivision improvement agreement. The subdivision improvement agreement
is attached for your review. Both the final plat and the subdivision improvement
agreement were referred to the City Engineer and the City Attorney.
Assistant City Engineer, Dan McArthur, comments as follows: "After having
reviewed the final plat and the subdivision improvement agreement for the Buckwheat
Subdivision, the Engineering Department finds that there are some inadequacies
with regard to the City's subdivision design standards. They are as follows:
1. Subdivision improvement agreement
a. Exhibit 'A' must be attached hereto for the final subdivision
improvement agreement.
b. Page 2, Item #4, Line 8 - 'Post a bond' should be replaced with
'place in escrow.'
2. Record Book and Page number for encroachment easement on final plat.
3. Final plat
a. Under dedication on line #22 - Add 'and access easements' between
the words, 'utility easement' and 'as shown.'"
Ron Stock, City Attorney, has reviewed the final plat and the subdivision
improvement agreement and recommends your approval without condition.
At this time the Planning Office recommends you approve the final plat
for the Buckwheat Subdivision subject to the changes requested by the City
Engineering Department.
MEMORANDUM
TO: Aspen Planning and Zoning Commission
FROM: Richard Grice, Planning Office
RE: Buckwheat Subdivision - Preliminary Plat Review
DATE: April 5, 1979
This is a public hearing to review the preliminary plat submission of the
Buckwheat Subdivision. You will recall that the Buckwheat Subdivision proposal
is to subdivide the property into two parcels. "A single family dwelling is
located on one lot and this lot will contain 6,028 square feet. An apartment
house known as the Buckwheat Apartments is located on the other lot and this
will contain 22,656 square feet. The apartment building presently contains
eight units. The single family dwelling and the lot on which it is located
will be sold to Dean Chiminis who presently occupies the single family dwelling.
The lot is presently under a letter of agreement with Mr. Chiminis."
The application was referred to 8 local agencies. The Planning Office
has received the most relevant of the comments. They are as summarized as follows:
1. Heiko Kuen of Aspen Metro continents that there is no problem with the
development in that it is already being served by sewer. He does on
to point out that the Buckwheat Apartments and the single family
swelling are both connected to one 6" service line going to the Aspen
Metro Sanitation District trunk line. He wishes that it be noted
that the responsibility for maintenance of the 6" service line lies
with the owners. Aspen Metro Sanitation District is only responsible
for the trunk line.
2. Rocky Mountain Natural Gas notes that at the present time both the
buildings are served from one meter and the applicants need to
straighten this out prior to final approval.
3. Bob Jacobs, Fire Marshall, comments that Section 20.17 requires that
fire hydrants be spaced no further apart than 350 feet in high density
residential areas. This proposed subdivision does not meet the intent
of that Section and it should be required to do so.
4. Jim Markalunas, City Water Department, comments that he knows of no
problems with the proposed subdivision and therefore has no comment.
5. The City Engineering Department has reviewed the application and
they recommend approval subject to the correction of five problems
which are enumerated on their attached memorandum of April 2, 1979.
The Planning Office recommends you approve this preliminary plat subject
to the solution to the five problems identified in the Engineering Department's
memorandum of April 2, 1979, the installation of a fire hydrant as requested
by the Fire Marshall, and acknowledgement of responsibility for the 6" service
line which connects the two buildings to Aspen Metro Sanitation's trunk line.
M E M O R A N D U M
TO: RICFIARD GRICE, PLANNING /{,J►
FROM: DANIEL A. McARTHUR, ASST. CITY ENGINE
DATE: April 2, 1979
RE: Buckwheat Subdivision - Preliminary Plat Review
After having reviewed the preliminary plat for the above project
and having made a site inspection, the engineering department
finds that there are several inadequacies with regard to the City's
subdivision design standards. They are as follows:
1) The following information shall be incorporated in the prelim-
inary plat drawing:
a. Show right -of -way and dimensions for Highway 82.
b. Show size of existing sewer on Highway 82.
c. Show telephone numbers of owners, subdividers, and
surveyors.
e. Show boundary lines for adjacent subdivisions and /or
lots.
f. Show address of surveyor.
2) The owner shall provide a utility easement for all overhead
electrical power and communication utilities, should the elec-
trical power and communication utilities in this area be run
underground.
3) The twenty -four foot wide private access easement for Lot 1 must
be extended approximately thirty to forty feet to allow for
proper access to Lot 1.
4) An easement for the southwest corner of the two -story apartment
building must be obtained from the adjoining property owners.
The engineering department's recommendation is for conditional
approval of the above subdivision preliminary plat request subject
to the applicant correcting the following: •
1) Revise and resubmit the preliminary plat drawing.
2) The owner shall provide utility easements for overhead electrical
power and communication lines.
3) The twenty -four foot wide private access easement for Lot 1 shall
be extended.
4) An easement for the southwest corner of the two -story apartment
building must be obtained.
5) The owner shall revise and resubmit the parking design and
easement drawings.
Memo
Re: Buckwheat Subdivision -
Preliminary Plat Review
April 2, 1979
5) The owner shall revise and resubmit the parking design and ease-
ment drawings.
jk
MEMORANDUM
TO: Dave Ellis, City Engineer
Jim Markalunas, City Water Department
Jim Holland, City Parks Department
Bob Jacobs, City Fire Marshall
Rocky Mountain Natural Gas
Mountain Bell
Holy Cross Electric Association
Aspen Metropolitan Sanitation District
FROM: Richard Grice, Planning Office
RE: Buckwheat Preliminary Plat
DATE: March 6, 1979
Attached please find Preliminary Plat for the Buckwheat Subdivision
Exemption. May I please have your comments by Tuesday March 27, 1979 so
that I may submit the Preliminary Plat at a Public Hearing scheduled to be
held before the Aspen Planning and Zoning Commission on Tuesday, April 3,
1979. If you cannot meet this deadline, please contact me immediately at
925 -2020, ext. 223. Thank you.
M= EMORAND = „!.i
TO: Dave Ellis, City Engineer
(dim Markalunas, City Water Department
Jini Holland, City Parks Department
Bob Jacobs, City Fire Marshall
• Rocky Mountain Natural Gas
Mountai n Bell
Holy Cross Electric Association
Aspen Metropolitan Sanitation Di strict
FROM: Richard Grice, Planning Office
•
RE: Buckwheat n Preliminary Plat
DATE: March 6, 1979
• Attached please fi nd Preliminary Plat for the Buckwheat Subdivision
Exemption. May I please have your comments by Tuesday March 27, 1979 so
that I may submit the Preliminary Plat at a Public Hearing scheduled to be
held before the Aspen Planning and Zoning Commission on Tuesday, April 3,
1979. If you cannot meet this deadline, please contact nie irmiediately at
925 -2020, ext. 223. Thank you.
;.?
1011de--1--/te 3 - 7 -
•
•
i
MEMORANDUM
•
TO: Dave Ellis, City Engineer
Jim t1irkalunas, City Water Department
Jim Holland, City Parks Department
'Bob Jacobs, City Eire Marshall
Rocky Mountain Natural Gas
•
Untain Pell
Holy Cross Electric Association
Aspen I etrcpolitan Sanitation District
FROM: Richard Grice, Planning Office
RE: Buckwheat ` ui ' ' Preliminary Plat
DATE: March 6, 1979
Attached please find Preliminary Plat for the Buckwheat Subdivision
Exemption. May I please have your comments by Tuesday March 77. 1979 so
that I may sZm` t the Prelim i - • ' e ' • sf 9 • ' • • >°
held before the Aspen Planning and Zoning Commission on Tuesday, April 3,
1979. If you cannot meet this deadline, please contact me irnrediately at
925 -2020, ext. 223. Thank you.
f ai 44 Se
P O 4)4 " -e(47-
•
MEMORANDUM
T0: Dave Ellis, City Engineer
Jiui Markalunas, City Water Department
Jim Holland, City Parks Department
Bob Jacobs, City Fire Marshall
• Vicky Mountain Natural Gas
Mountain Bell
Holy Cross Electric Association
Aspen Metropolitan Sanitation District
FROM: Richard Grice, Planning Office
RE: Buckwheat Sukdavisicp, Exemption Preliminary Plat
DATE: March 6, 1979
Attached please fir:d Preliminary Plat for the Buckwheat Subdivision
Exemption. May I please have your comments by Tuesday March 2.7, 1979 so
that I may submit the Preliminary Plat at a Public Hearing scheduled to be
held before the Aspen Planning and Zoning Conc:ission on Tuesday, April 3,
1979. If you cannot meet. this deadline, please contact me immediately at
925 -2020, ext. 223. Thank you.
7
- 19 - - ---e F
, 1 : c.- 1 Ett 0 / ,t-- r (2.,7ic
i i y
7 ist . y C , ter
•
E
M E M O R A N D U M
•
TO: RICHARD GRICE, PLANNING OFFICE
FROM: DANIEL A. MCARTHUR
DATE: June 7, 1979
•
RE: Buckwheat Subdivision - Final Plat
After having reviewed the final plat and the subdivision improve-
ment agreement for the above project, the engineering department
finds that there are some inadequacies with regard to the City's
subdivision design standards. They are as follows:
1) Subdivision Improvement Agreement
a. Exhibit "A" must be attached hereto for the final subdivi-
sion improvement agreement.
b. Page 2, Item #4, Line 8 - "Post a bond" should be replaced
with "Place in escrow."
2) Record Book and Page number for encroachment easement on final
plat.
3) Final Plat
a. Under dedication on line #22 - Add "and access easements"
between the words, "utility easement" and "as shown."
jk
GarreLD SC HEOHT
ATTOSiens AT Law
VICTORIAN SQUARE BUILDING
601 EAST HYMAN AVENUE
ASPEN, COLORADO 61611
RONALD GARFIELD 28, T Lsvno B
ANDREW V. HECHT February 28, 1979 1303) 028-1086
ASHLEY ANDERSON
CHRISTOPHER N. SOMMER
CRAIG N. BLOCHWIC%
LYNN O. ALSON
Planning and Zoning Commission
130 South Galena Street
Aspen, Colorado 81611
Re: Buckwheat Subdivision
Dear Members:
This is an application on behalf of Anthony J.
Mazza, Frank J. Woods and Maurice T. Broden for prelimin-
ary plat approval of the Buckwheat Subdivision. The details
of the subdivision are delineated on the plat submitted
with this letter. This letter is intended to give you a
brief summary of the application.
The applicants desire to subdivide the property
delineated on the preliminary plat into two (2) lots. A
single family dwelling is located on one lot and this lot
will contain 6,028 square feet. An apartment house commonly
known as The Buckwheat Apartments is located on the other
lot and this will contain 22,656 square feet. This apartment
house presently contains eight (8) units. The single family
dwelling and the lot on which it is located will be sold to
Dean Chiminis who presently occupies the single family
dwelling. The lot is presently under a letter of agreement
with Mr. Chiminis.
This subdivision does not contemplate the condomin-
iumization of The Buckwheat Apartments, but merely the lot
split explained above.
Thank you very much for your consideration of this
matter.
Sincerely,
Ashley Anderson
Attorney for the Applicants
AA /pa
Enclosure
M E M O R A N D U M
TO: RICHARD GRICE, PLANNING
FROM: BOB JACOBS, FIRE MARSHAL
DATE: March 12, 1979
RE: Buckwheat ertiodttioion Ex,,mption -
Preliminary Plat
Unfortunately, this proposed subdivision is located in an area
where existing fire protection due to fire hydrant spacing could
be greatly improved. Section 20 -16 (Improvements) states that the
subdivider shall provide water lines and fire hydrants, and Section
20 -17 (Design Standards) further states that fire hydrants shall
be spaced no farther apart than 350 feet. This proposed subdivision
does not meet the intent of this section which would make the re-
quired distance between fire hydrants at 175 feet.
I would be happy to meet with the principals or their representatives
in this application to explain some possible corrections for this
deficiency.
jk
. 1. _ ( G�LC✓l. a
a -1 fr y ✓ l F� Pr
k 1 £ k t:_:U S: bb
130 sou', . ° _= street
aspen, c c!ot'adO 81611
February 20, 1979
Mr. David W. McBride
Survey Engineers Inc.
P.O. Box 2506
Aspen, Colorado 81611
Re: Buckwheat Subdivision Preliminary Plat
Dear Dave:
After a cursory examination of the preliminary plat submitted, I
do not see any major deficiencies or inconsistencies with the con-
ceptual approval except for the access and utility easement for
Lot 1 which does not appear to extend as far south as discussed
at the conceptual site inspection. It has been the policy of both
the planning and engineering departments to require a formal sub-
mittal together with payment of the appropriate fees before any
detailed examination is made on an application.
I would suggest that the applicants or their attorney file a formal
preliminary plat submission with the planning department so that
we may proceed with the detailed review at which time we will exam-
ine further the access easement for Lot 1. After formal application .
is made, the engineering department will be more than willing to
work with you or the owners to resolve any deficiencies prior to
setting the date for preliminary plat public hearing.
Very truly yours,
c a.crt. 4-0
Dave Ellis
City Engineer
jk
cc: Richard Grice ✓
Andy Hecht
MEMORANDUM
TO: Dave Ellis, City Engineer
Jim Markolunas, City Water Department
Jim Holland, City Parks Department
Bob Jacobs, City Fire Marshall
Rocky Mountain Natural Gas
•
Mountain Bell
Holy Cross Electric Association
(Aspen Metropolitan Sanitation District
FROM: Richard Grice, Planning Office
RE: Buckwheat • .'•',,'. • ' n Preliminary Pl at
DATE: March 6, 1979
Attached please find Preliminary Plat for the Buckwheat Subdivision
Exemption. May I please have your comments by Tuesday March 27, 1979 so
that I may submit the Preliminary Plat at a Public Hearing scheduled to he
held before the Aspen Planning and Zoning Commission on Tuesday, April 3,
1979. If you cannot meet this deadline, please contact me iimnediately at
925 -2020, ext. 223. Thank you.
tE /5 NO Pie°emery /.. /rN TN /S t e' rLoen, _r, /T /
ALkENAY 73e //-c StLvt? fl- PEI -E R- ,oh -even. /.-e H✓sr pO/rT
OvT 7' i-IA7 /Ss- crr....NEAr A rts A N/> THE $/ «e FAn/cy
Ar /S Po-E rerf lV a cc A .t5
' rE 4 '- /ce ,L/. Co/» -e- 70 /joTN Con -fret Gry To OP- 6 Thep
knsa T [c.r /c „./n -e , /.i/TN to- ° SE/ O6- I--Caf THE A "It/e7
Ciao-P- °T VS E H ELA RE Croat-s/ate__ F t 7/ F. 6 " J_r,e.s ece s,/ •-e
/ct4 /-IAS THE 7!-° AL0 /L0/A.c1 GOI 1 - Ec7E!> T /T. 714. Ann)
grS Poi- sr /s,•/ >Y LI ES ;et •1 /TS TC..r /. 2-/.-e I_/TN ? #C
,/9A /n_7Cn -A.ee O F THE 6 !EtI -FCC t /4- e /3F- /h.< 7 A K eARt
A-Are S
OF PV TI`Fe 7"-o Jin.r.
•
/i tier-
MEMORANDUM
TO: Dave Ellis, City Engineering
FROM: Richard Grice, Planning Office
RE: Buckwheat Subdivision - Final Plat
DATE: May 22, 1979
Attached please find two copies of Final Plat of Buckwheat Subdivision. This
item is scheduled to come before the Aspen City Council on Monday, June 11, 1979.
Therefore may I have your comments by Monday, June 4, 1979. If you cannot meet
this schedule please contact me immediately. Thank you.