HomeMy WebLinkAboutcoa.lu.sp.Little Nell 675 E Durant.A67-92Little Nell Insub. Amend. SPA
2737-182-50-101 (LL) 1467-92
7
ASPENTITKIN PLANNING OFFICE
130 South Galena Street
Aspen, Colorado 81611
(303)920-5090
LAND USE APPLICATION FEES
CITY:
-63250-134
-63270-136
-63280-137
-63300-139
-63310-140
-63320-141
-63330-150
-63432-157
-63432-157
-00100-00000-31070
HISTORIC PRESERVATION:
-63335-151
-63336-152
-63337-153
-63338-154
-63339-155
COUNTY
-63160-126
-63170-127
-63180-128
-63190-129
-63200-130
-63210-131
-63220-132
-63230-133
-63240-149
-63450-146
-63235-148
REFERRAL FEES:
-63360-143
00115-63340-163
00123-63340-190
00125-63340-205
PLANNING OFFICE SALES:
-63080-122
-69000-145
GMP/Conceptual
GMP/Final
SUB/Conceptual
SUB/Final
All-2 Step Applications
All 1 Step Applications
Staff Approval
Zoning Plan Check
Sign Permit
Use Tax for Sign Permits
Exemption
Minor
Major Devel.
Signif. Devel.
Demolition
GMP/General
GMP/Detailed
GMP/Final
SUB/General
SUB/Detailed
SUB/Final
All 2 Step Applications
All 1 Step Applications
Staff Approval
Board of Adjustment
Zoning Plan Check
Engineering - County
Engineering - City
Housing
Environmental Health
County Code
Other (Copy Fees)
TOTAL
Name: �L�- W 56 L , Phone:
Address: i �Lea� l�� Project:
Check #: f /T C;L— Date: -- No of Copies
CASELOAD SUMMARY SHEET
City of Aspen
DATE RECEIVED: 8 5492 PARCEL ID AND CASE NO.
DATE COMPLETE: �9 2737-182-50-101 A67-92
STAFF MEMBER: LL
PROJECT NAME: Little Nell Insub. Amendment to SPA
Project Address: 675 E. Durant Ave., Aspen, CO 81611
Legal Address:
APPLICANT: Aspen Skiinq Co., Eric Calderon, General Manager
Applicant Address: 610 Dean St., Aspen, CO 81611
REPRESENTATIVE: Bob Sharp/ John Cottle,Cottle, Graybeal, Yaw
Representative Address/Phone: 510 E. Hyman,
Aspen, CO 81611 925-2867
FEES: PLANNING $ 200 # APPS RECEIVED 3
ENGINEER $ # PLATS RECEIVED 3
HOUSING $
ENV. HEALTH $
TOTAL $ 200
TYPE OF APPLICATION: STAFF APPROVAL: X. 1 STEP: X 2 STEP:
P&Z Meeting Date
CC Meeting Date
DRC Meeting Date
-----------------------
-----------------------
REFERRALS:
City Attorney _
n City Engineer _
D�v Housing Dir.
(J Aspen Water _
City Electric
Envir.Hlth. _
Zoning _
PUBLIC
HEARING:
YES
NO
VESTED
RIGHTS:
YES
NO
PUBLIC
HEARING:
YES
NO
VESTED
RIGHTS:
YES
NO
Parks Dept.
Bldg Inspector
Fire Marshal
Holy Cross
Mtn. Bell
ACSD
Energy Center
School District
Rocky Mtn NatGas
CDOT
Clean Air Board
Open Space Board
Other
Other
DATE REFERRED:'INITIALS: DUE:_
FINAL ROUTING: + � i'i INITIALD�'L7
DATE ROUTED:
City Atty City Engineer Zoning Env. Health
Housing Open Space Other:
FILE STATUS AND LOCATION:
P4
for
►{
4 It
-So
S l
52
5.5
.s :&7 5- 58
S9
r PON
-f I all
a-
9 ti s� nzi far 721 ►Z/ ar► 51I sit a .
ah �
12-+ i ZY 129 t 3 o li l 132 133 1,,�� �a
c� .
O�
Ihi W bf► 84't �Fl
s�
4� •
4b� '
FIN
Ga_[Ji1�iN5
WA
2Z 1 -0
co
p/i 7aQ - 2q 1 F[r��U7bw, LLs �P,a%sa. N`��� Ira 5
,-, '
of vyl 5 0
&0`.
.s • . .%� .. - /may, U�Z�U `-' �
13
rn
• . _ � .. - -• � _ �O// � _.,- •2� %/ // � � ..•- _ .fG,' 11
�•wS ti y-r rr sl"-•�+`7 .,r ,. +'�_�.'N` •.11` :� �w_�,� • `� _ �O/ . / � -
`
-aci� h...=%w:.ar;s..-ih.7:•�:•�•�..�'ti'-�:._t-.%'i"-� jdFS-ai �� ., 1�
_r}�{)lam • ��: ' ..•c s . ..•�-.t tom*' ...3- t �L' • -\�� _\v `Q // %;
+•••-=� '�r....:a:'=''- rr �.:� t:'?��%_•'` ,�•'`,,� �.;�-••^.,?"� ... - .. .. . .. - _.`. •\� - �O// � _. _.. a - tea/ �`_1� _
�j'ji(yAY/_=. i=•�i i'r•1•,•fi{,tY. � �ti �• w � - S _ - / 1 .. -
.. i..+. .:�.',:..�• z��� ► �- y�-�.._. � .:•a ram; � � � - ... % - � .. - � .
[-ice �--'�i =i'S !�• ..: =fir �.?r-� : � .''-_�.-fllL+':_,-
. .�_•`T^•'' �r ..i�-Cs; ram.. `f._ :j%�: :. ...Y .�1 .'a _ /q/ •�:.
20
_, •�...•,-. _;o ..yam,,_ •-C?{i.+- .. _ - • .. _ �� .. - � - - - -
t� ��� r':a �rM� �� ��.:>. _�X�? Y )`i.e•.`'L:= � � i. _ _ -. - • _ - .� - /��� l ` � - -t . _ .
PAP-7-7A-L {-oT4=L 93 J ��
GRAYBEAL
YAW
ARCHITECTS
LTD
510 EAST HYMAN, SURE 21
ASPEN, COLORADO 81611
PHONE 303/925-2867
l
f� /
I
g11 Co Nc- RET>✓
WADI. '�YPE.A,�--E2NR• SEPAP.AToN�
I Z Fee. ll3
S AfRIL- 19-
C�YF.WAIL,E
co 101' o. L .
"ll
I
l� A L L 'rim V
IZ FEB,193
IP
COTTU
GRAYBEAL
YAW
ARCHrrEC rS
U
W510 EAST HY'IAN, SUITE 21
ASPEN. COLORADO 81611
PHONE 303M52867
J
J
0
v�
2
COTT LE
GRAYBEAL
YAW
ARCHITECT'S
Un .
AO EAST HYMAN, 511(iE 21
ASPEN, CALO b 816ll
PHONE 3OU925.2867
I
IA-2-
MEMORANDUM
TO: Bill Drueding, Zoning Officer
FROM: Leslie Lamont, Senior Planner -
DATE: August 28, 1993
RE: Little Nell Parking Inventory
Based upon our site visit, August 27, 1993, we have concluded that
the Little Nell Hotel has 118 underground parking spaces that would
be classified as legal, conforming spaces. Our site visit
determined that of the 148 mapped spaces, 30 of those spaces are
either obstructed or located in a manner that preclude the use of
those spaces - i.e. next to an exit door, blocked by a column, or
filled with material.
The Little Nell precise SPA plan approved 118 spaces. In the past,
the Hotel has permanently enclosed parking spaces for storage
purposes. Recently the Hotel has requested to enclose six more
spaces and replacing one lost space. In addition, Shlomo's
restaurant seeks to expand the restaurant space by approximately
200 square feet.
Based upon the SPA approval and our site visits, staff has
determined that the Little Nell can enclose six more spaces for
storage purposes and, provided a GMQS Exemption is requested for
the additional restaurant space, an additional 200 square feet of
net leasable space may be added with the following conditions:
1. one new parking space is created with the storage enclosure
(please see attached plans);
2. two existing parking spaces, of the many that are currently
obstructed, shall be cleared and remain open for parking
availability;
3. the total number of useable parking spaces shall be maintained
at 118; and
4. any additional requests for storage space or additional net
leasable square footage for the building must provide parking
spaces or pay a cash -in -lieu for additional parking required.
cc: Peter Olsen, Assistant Engineer Little Nell
•
MEMORANDUM
TO: Bill Drueding, Zoning Officer
FROM: Leslie Lamont, Planner
RE: Little Nell Insubstantial Plat Amendment for Expansion
of Bar Area
DATE: September 30, 1992
SUMMARY: The applicant seeks to amend the Little Nell Final SPA
Plan to enlarge the existing bar area by 507 square feet and
convert parking spaces into storage.
ZONING: Commercial Core (CC) with SPA Overlay
REFERRAL COMMENTS:
Having reviewed the above referenced application, and having made
a site inspection, the engineering department has the following
comments:
1. The application did not contain sufficient detail regarding
the enclosure, i.e. providing permanent heaters, lights and
outlets. In reviewing this application staff has considered
the enclosure as an increase to net leasable space. With an
increase in net leasable space, parking spaces and the trash
area must be reviewed.
From a parking space count in April of 1988, staff determined
there were 144 spaces (note that there were two questionable
spaces with respect to size and design). The SPA precise plan
calls for 118 spaces, therefore parking spaces are not an
issue.
The trash area appears to be sufficient to handle the existing
use and any increase that might be derived from the new space.
Should there become a problem in the future the applicant will
be required to increase its removal times.
2. Upon completion of the work, but prior to a final inspection,
the applicant must submit a revised plat to the engineering
department for review and recordation.
STAFF COMMENTS: The applicant proposes to enclose approximately
507 square feet of outdoor seating area of the Little Nell Hotel.
The enclosure will enlarge the seating area for the bar in the
Hotel.
The applicant also seeks to convert some parking spaces in the
underground parking garage for desperately needed storage.
•
•
Pursuant to Section 24-7-804 E. an insubstantial amendment of an
approved SPA plan may be authorized by the Planning Director
provided that the amendment does not:
a. change the use or character of the development;
RESPONSE: The character of the Little Nell SPA is tourist/guest
and ski orientation. The character and use of the patio will not
change with the enclosure.
b. increase by greater than 3% the overall coverage of
structures on the land;
RESPONSE: The patio enclosure does not increase the site coverage
by greater than 3%.
C. substantially increase trip generation rates of the
proposed development, or the demand for public facilities;
RESPONSE: This area currently functions as a seating area for the
bar in the summer and in the winter during warm weather. Enclosing
the seating will not increase trip generation rate or place a
greater demand on public facilities.
d. reduce by greater than 3% the approved open space;
RESPONSE: This is an interior courtyard of the Hotel and does not
meet the definition of open space.
e. reduce by greater than 1% the off-street parking and
loading space;
RESPONSE: Based upon the underlying zoning, Commercial Core, the
Little Nell was originally required to provide 77 off-street
parking spaces. The SPA agreement approved a total of 118 spaces.
In an April 1988 memo, staff indicated that a parking space count
found 144 parking spaces on -site. The expansion of the bar
requires an additional parking space as long as the conversion of
parking to storage does not reduce the off-street parking to below
118 spaces parking may be converted to storage.
f. reduce in required pavement widths or rights -of -way for
streets and easements;
RESPONSE: The proposal will not affect pavement widths or rights -
of -way for streets and easements.
g. increase greater than 2% the approved gross leasable floor
area of commercial buildings;
RESPONSE: The enclosure of the outdoor seating represents an
increase in net leasable and floor area. The 507 square feet
2
equals 3.1% of the approved gross leasable floor area according to
the information submitted by the applicant. However, the current
use of this space seating for bar patrons, this amendment encloses
that but does not affect or change the original intent of the SPA
Plan approval.
However, because the enclosure is considered an increase in net
leasable, employee housing mitigation is required. Pursuant to
Section 24-8-104.F, the employee generation rate in the CC zone
district is 3.25 - 5.25 employees/1,000 of net leasable and 60% of
the employees generated shall be mitigated. Because of the Little
Nell's high -end service orientation the middle range for employee
generation (4.25) and moderate cash -on -lieu guidelines ($25,000)
have been used to assess employee mitigation.
507 sq. ft. net leasable = 2.15 employees generated
60% = 1.29 employees to be mitigated
$25,000/employee = $32,321 cash -in -lieu
According to the memorandum submitted by the applicant's
representative, Cottle, Graybeal, Yaw, and staff research, the
allowable floor area for the Little Nell Hotel, for development
that is in the Commercial Core zone district, is 86,248 square
feet. The total floor area that was built is 84,522. Thus 1,726
square feet of floor area was left over for future development.
However, the recent approval of the ATM machine for the Hunter
Street courtyard used 44 square feet of floor area. With the 507
enclosure of the outdoor seating area, staff calculates that there
is 1,175 square feet of floor area remaining for future
development.
i. create a change which is inconsistent with a condition or
representation of the project's original approval or which
requires granting of a further variation from the project's
approved use or dimensional requirements;
RESPONSE: The approved use and allowable floor area will not be
varied. Although the Little Nell Hotel was developed through the
GMP process, and impacts of growth were mitigated at the time, the
requirement of employee mitigation for the expansion of the bar is
consistent with the original development approvals.
RECOMMENDATION: Staff recommends approval of the SPA plan
amendment for the 507 square foot enclosure of outdoor seating and
conversion of parking spaces in the below grade parking garage
with the following conditions:
1. The enclosure shall total no more than 507 square feet.
3
E
•
2. Prior to the issuance of any building permits the applicant
shall make a one time cash -in -lieu of $32,321 for employee
mitigation payable to the Aspen/Pitkin County Housing Authority.
3. The Aspen Ski Company has 180 days from final approval by the
Planning Director to file an amended plat. The amended plat shall
indicate the location of the ATM booth, the enclosed seating area
and shall adjust the survey boundary to include the vacated portion
of Hunter Street as part of Aspen Ski Company Ownership.
4. All representations made in this application and during site
visits shall be adhered to.
5. Conversion of parking spaces to storage shall not reduce the
on -site parking below 119 parking spaces.
I hereby approve of the insubstantial amendment
to the final development of the Little Nell
SPA pursuant to Section 24-7-804 of the
Mu icipal Code.
(� ,, -M
GgJ_'- /1 lq2--
Dia oore, City Planning Director
4
•
1�
�4
Aspen/Pitkiy Planning Office
130 South Galena Street
Asp , Colorado 9MI
(303) 92 0 Fax: (303) 920-5197
November 11, 1992
Aspen Ski Company
Attention: Mr. Doug Carlson
P.O. Box 1248
Aspen, Colorado 81612
RE: Little Nell Bar Expansion
Dear Doug,
Leslie Lamont has updated me with regard to the employee mitigation
requirement for the bar expansion at the Little Nell Hotel. She
indicated that the Ski Company intends to first provide a cash -
in -lieu payment of $32,321 in order to receive a building permit.
However, the payment will be refunded if and when the Ski Company
fully deed restricts an employee dwelling unit to the satisfaction
of the Housing Authority and Planning Department
I concur with this procedure. I have discussed, with Tom Baker and
Fred Smith, the possibility of deed restricting a studio unit in
Snowmass to comply with employee mitigation requirements.
Conceptually, this appears to be a reasonable solution. Staff
always supports the provision of actual dwelling units verses cash -
in -lieu. When the deed restriction have been executed and filed,
I will direct the City Finance Department to refund the Ski
Company's payment of $32,321 for employee mitigation for the Little
Nell bar expansion.
Please give Leslie or myself a quick call if you have further
questions.
Si cerely,
Diane Moore, City Planning Director
cc: Dallas Everhart, City Finance Director
Tom Baker, APCHA
recycledpaper
•
•
COTTLE
GRAYBEAL
YAW
ARCHITECTS
LTD
October 12, 1992
Mr. Doug Carlson
Vice President of Finance
Aspen Skiing Company
Re: Little Nell Hotel
Dear Doug,
M
I met with the Planning Office today and this letter documents the agreements
reached in that meeting.
Gorsuch Remodel. Per Bob Wade's letter of October 8, the entire
space that has been the Ute Alpinist's was accounted for in the GMP.
Therefore, no additional mitigation is required, and a building permit will
be issued.
2. The ASC's proposal for mitigating employee generation for the Little Nell
Bar expansion is acceptable in theory:
A. Pay cash in lieu per Leslie Lamont's September 30 memo, or
B. Deed restrict a Willows studio unit in Snowmass, or
C. Find documentation that shows that mitigation is not required.
3. The ASC needs to get together with the Planning Office and resolve the
mitigation method before a building permit can be issued. It was
discussed that perhaps the ASC could write a check to be held by the
City Finance Department for a period of time while the ASC researches
its back files. It was also discussed that both the ASC and our office
would be willing to cooperate to 'update' the files on the Little Nell for
future reference.
4. The Planning Office needs to know if the ASC disagrees with any other
findings in Leslie's September 30 memo.
JOHN COTTLE AIA
DOUG GRAYBEAL, AIA
LARRY YAW. AIA
MARK HENTHORN, AIA
510 EAST HYMAN, SUITE 21
ASPEN, COLORADO 81611
PHONE 303/925-2867
FAX 303/925-3736
E
Mr. Doug Carlson
Page 2
I am copying this memo to Leslie Lamont for her review with the understanding
that if the above is not her understanding she contact me as soon as possible.
Please let me know if there is anything else that we can do for you on this
matter.
Sincerely,
John Cottle, Principal
JC:kj
cc: Leslie Lamont
Eric Calderon
MEMORANDUM
To: Leslie Lamont, Planning Office
From: Rob Thomson, Project Engineer I?S i
Date: September 30, 1992
Re: Little Nell Insubstantial Amendment to SPA
Having reviewed the above application, and having made a site visit, the engineering
Department has the following comments:
1. The application did not contain sufficient detail regarding the enclosure, i.e.
providing permanent heaters, lights and outlets. In reviewing this application
staff has considered the enclosure as an increase to net leasable space. With an
increase in net leasable space, parking spaces and the trash area must be
reviewed.
From a parking space count in April of 1988, staff determined there were 144
spaces (note that there were two questionable spaces with respect to size and
design). The SPA precise plan calls for 118 spaces, therefore parking spaces are
not an issue.
The trash area appears to be sufficient to handle the existing use and any
increase that might be derived from the new space. Should there become a
problem in the future the applicant will be required to increase its removal
times.
2. Upon completion of the work, but prior to a final inspection, the applicant must
submit a revised plat to the engineering department for review and recordation.
cc Chuck Roth, City Engineer
CASELOAM025
•
CITY OF ASPEN
PRE-APPLICATTION CONFE�RENCE SUMMARY
PROJECT: I� > � > (q r( � j /___X _'4 i cs(�,,
APPLICANT'S REPRESENTATIVE::1<:5 Vo ��) �' n C' 0
�i
REPRESENTATIVE'S PHONE: � U — (0 a
OWNER' S NAME: P��
SUMMARY c
1. Type of Application: -_l,n 50 Qs. An y�
2. Describe action/type ofdevelopmentbeing requested:
&cno C S ,"�"_
3. Areas is which Applicant has been requested to respond, types
of reports requested:
Policy Area/
Referral Agent
&, JCl
4. Review P&Z Only)
Comments
(CC Only) (P&Z then to CC)
5. Public Hearing: (YES) (NO)
6. Number of copies of the application to be Ibmitted:
7. What fee was a licant re uested to submi
8. Anticipated date of submission:
9. nACOMMENTS/UNIQUE CONCERNS: %1 l � Il e �x t
frm.pre app
0
ATTAC114ETT 1 .
OLAND USE APPLICATION FORK
1) Project Name LITTLE NELL BAR ADDITION
2) Project Location 675 E. DURANT AVE.
BLOCK 102 --SEE ATTACHED
(iixiicate street address, lot & block number, legal description where
appropri.-. te)
3)
Present zoning CC AND C
4)
Lot Size 88,567 SQ. FT.
5)
Applicant's Name, Address & Phone
ASPEN SKIING
COMPANY
610 DEAN ST ASPEN
6) Repr+esestative,s Name, Address & Phone # COTTLE GRAYBEAL YAW
510 E. HYMAN, ASPEN 925-2867
7) Type of Application (please check all that apply):
Conditional Use
Special Review
8040 Online
Stream Margin
�— Mountain View Plane
Condom i n i i nn i za tion
Lot Split/lDt Line
Adjustment
Cbnoeptual. SPA
v Final SPA
— Cbrceptual PUD
Final PUD
_ Subdivision
Z}Pxt/Map Amerriment
•. •_.. . =
Final Historic Dev.
Minor Historic Dev-
Historic Demolition
Historic Designation
CMD6 Allotment
8) Description of na,st-ing Uses (camber and type of existing ate;
approximate sq_ ft.; zamber of bedro=s: any previous approvals granted to the
property) -
4 story building at the base of Little Nell, Aspen 77,718 sq. ft. hotel and common space
Mountain which will include a hotel and hotel accessory-15,668 sq. ft. hotel subgrade space
spaces along with commercial, food and beverage, and -16, 078 sq. ft. commercial
ski area operations facilities. -9,976 sq. ft. ski area facilities
-77 subgrade parking spaces
9) Description of Development. Applications
ENCLOSE OUTDOOR SEATING FOR HOTEL BAR
77TY 50. FT.
10) Have you attar the folloving'
Response to Attachment 2, Mi.nimmm SZion Caxstents
Respon-se to Attact r 3, Specific Submission scion Oontents
Response to Attacimmcrct 4, Review Starr3ards for Your Application
AUG 05 '92 14:41
• THE LITTLE NELL
P.1/1
August 5, 1992
Hagman & Yaw
210 East Galena Street
Aspen, CO 81622
FAX: 925-3 73 6
Attn: Bob Sharp
Dear Mr. Sharp,
Please use this letter as authorization to act as our
agent for a project to enclose The Little Nell bar
patio.
Th ou.
a&,
Eric Calderon
General Manager
675 EAST DURAN'f STREET . ASPEN. COLORADO 81611 • 303.920-$600 . FAX 303-920-4670
•
Alpine Surveys
414 North Mill Street
Post Office Box 1730
Aspen, Colorado 81612
303 925 2688
April 3, 1986
Job No. 85-121
REVISED DESCRIPTION OF ENTIRE LITTLE NELL S.P.A.
(This description supersedes that of February 24, 1986)
A PARCEL OF LAND SITUATED IN THE CITY OF ASPEN, PITKIN
COUNTY, COLORADO, MORE FULLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF BLOCK 102 IN SAID
CITY OF ASPEN;
THENCE S 75009'11" E 220.00 FEET ALONG THE NORTHERLY
LINE OF SAID BLOCK 102 TO A POINT 10.00 FEET EASTERLY
OF THE NORTHWEST CORNER OF LOT H OF SAID BLOCK 102;
THENCE S 14050'49" W 241.76 FEET TO A POINT HALFWAY,
BETWEEN THE NORTHERLY LINE OF WATERS AVENUE AND THE
SOUTHERLY LINE OF UTE AVENUE;
THENCE N 75009'11" W 29.34 FEET ALONG SAID HALFWAY
LINE TO THE INTERSECTION WITH THE NORTHERLY LINE OF LOT
21, UTE ADDITION;
THENCE N 38035'40" W 16.98 FEET ALONG SAID NORTHERLY
LINE OF LOT 21, TO THE NORTHWEST CORNER OF SAID LOT 21;
THENCE S 45021'00" W 124.28 FEET ALONG THE WESTERLY
LINE OF SAID LOT 21 TO THE SOUTHWEST CORNER OF LOT 21,
UTE ADDITION, SAID CORNER BEING ALSO A POINT ON LINE 1-9
OF THE ORIGINAL ASPEN TOWNSITE;
THENCE N 75009'11" W 50.00 FEET;
THENCE N 14050'49" E 51.30 FEET;
THENCE N 30009'11" W 34.00 FEET;
THENCE N 75009'11" W 235.35 FEET;
THENCE N 15030'00" E 126.67 FEET TO A POINT ON LINE 8-9
OF THE ORIGINAL ASPEN TOWNSITE;
THENCE N 74023'18" E 13.11 FEET ALONG LINE 8-9 TO CORNER
NO. 9 OF THE ORIGINAL ASPEN TOWNSITE;
THENCE S 40001'52" E 52.02 FEET ALONG LINE 1-9;
THENCE S 75009'11" E 4.92 FEET TO A POINT ON THE WESTERLY
LINE OF LOT R, BLOCK 981 CITY OF ASPEN;
THENCE N 14050'49" E 10.00 FEET ALONG SAID WESTERLY LINE
OF LOT R TO A POINT ON THE SOUTHERLY LINE OF DEAN AVENUE;
THENCE S 75009'11" E 60.24 FEET ALONG SAID SOUTHERLY
LINE TO A POINT ON THE WESTERLY LINE OF VACATED HUNTER
STREET;
THENCE N 14050'49" E 50.00 FEET ALONG SAID WESTERLY LINE
TO THE SOUTHEAST CORNER OF LOT I, BLOCK 97, CITY OF ASPEN;
•
Page 2
Job No. 85-121
Revised Description of Entire Little Nell S.P.A.
April 3, 1986
THENCE S 75009'11" E 75.00 FEET TO THE SOUTHWEST CORNER
OF LOT A, BLOCK 102, CITY OF ASPEN;
THENCE N 14050'49" E 100.00 FEET ALONG THE WESTERLY LINE
OF SAID LOT A TO THE POINT OF BEGINNING;
CONTAINING 88,567 SQUARE FEET, MORE OR LESS.
• , I.. • , it I . .� �•.: - � � � • •
a•. tom., •.y I•° ;"'1 +'T .�. i.: .'t: • .:i: •�ri:l ,
;• a• is •'•�` .:I: .� � ,��• ?r _ � .
LU
f'• ax . �� . LLIC : 3.
ct
CL
I �z _� A¢
s /. mzw ,
Ly,-LMu. mat[
.. to c°C1 W
wa & o E--z
CL
a C d>Q
¢ � Z�
t ... • �, ;�f �JE 1
Z
En
Ct F- tY IT CD �-► } Q
W.
.. '•',.tip. •••r• :; :'S:. "•�, . ISUDQ T � � 3 OL2
1Si �•
t ,`. -• •.�• •-Y •-.`i -.ti •,+•. •: ; .r '4j yd T•f to f0 >�� '
ir
mZWO a b Z
:� ,'t• 11 c» z cvYti0 fi ii Cc
;r: .•/' ii .S. 'r,. ;t - q .N En
VZ V 2 ri W t ;+0i_I '
4.1 M ii to °, Z
� in¢ Naa¢ �J ¢ram
' `. •t,• •'� ' � ••, ,:t, c rt • •.� _ r • . -^�.—t T�•�•.-,.�A..�.,..�+tw-•�._.... �r-.w..-.r....,,+•rr+r�
L V 9EL£ 5Z6 EOE 4-ANbdW00 JNIINS N9dSV! lb:£L Z6-5 -9 eaad IMS ssewMouS:Jq AN S
t
w U -'
i
l 7 3 tl I s -----------
El ❑ 1 0 1 !
` 1
i lLi
H �
l`
If
�o
I Y o
I I I ,
gg
u �� ¢ Aux � a��•I:' 1 m ;. If I � �t{ ��I
Z 8 SI81 L rLLrpa�, I
G f
I � 1
v,
f• \1�I r � � I � II ���
fit.
it
,o �
---------------- �-
L--133 M t s.—
`e —
o _
0 og ol8 � I 1 U 1-
��,{� —r■ BSI• �I 'All L V I I M
,
_ -Iy
o
• Fig. 7 •
COTTLE
GRAYBEAL
YAW
ARCHITECTS
LTD
JOHN COTTLE, AIA
DOUG GRAYBEAL, AIA
LARRY YAW, AIA
MARK HENTHORN, AIA
510 EAST HYMAN, SUITE 21
ASPEN, COLORADO 81611
PHONE 303/925-2867
FAX 303/925-3736
LITTLE NELL SPA
INSUBSTANTIAL AMENDMENT
Existing Conditions & Proposal
The Little Nell Hotel Bar Lounge has a total of 980 sq.ft. The Bar Lounge is
adjacent to the Hotel's lower living room, and the outdoor courtyard. There is
outdoor seating that exists in the courtyard during the spring, summer and fall.
There is a great need and desire to add some of this seating capacity to the
winter months for the Bar Lounge.
There is an area of the courtyard that is directly adjacent to the Bar Lounge that
is enclosed by built-in concrete planter boxes that are about 1-1/2 feet high off of
the paving. This enclosed area is about 570 sq.ft. with about 210 sq.ft. already
covered by a soffit from the hotel above.
Our intention is to cover the rest of the 360 sq.ft. with a glass green house type
structure. The structure would sit on top of the existing planter walls and have a
similar look as the nearby hot tub gazebo.
See Plans & Drawings for more.
Bob Sharp
•
•
ZONING STANDARDS
Like the Planned Unit Development regulations, the specially
planned area allows for the specifications of traditional zoning
guidelines to be set in response to the details of a site plan.
The specifications are referred to here as "use and area and bulk
requirements" and based upon the site plan as submitted, the
following area and bulk requirements shall apply to the project
site.
a.
Minimum
lot area
b.
Minimum
lot area per
dwelling
C.
Minimum
lot width
d.
Minimum
front yard
e.
Minimum
side yard
f.
Minimum
rear yard
g.
Minimum
height
h.
Minimum
distance between
primary
and accessory
buildings
i.
Percent
of open space
required
for building
site
j.
External
floor area ratio
k.
Internal
floor area ratio
Off Street Parking Spaces
a. Internal to the project
building
b. External to the project
building
Uses Permitted
3,000 sq. ft.
no requirement
no requirement
26'
no requirement
no requirement
40'
no requirement
25%
2.00:1
no requirement
14
The following uses for the project will be permitted.
a. Hotel
b. Retail Commercial
12
4
COM-T--
GRAYBE•AL
YW
ARCHITECTS
of R: (oi ri,i .IIA
[W)LG GI:.I)'W"AI . A.! 1
I.AF.,I' Y+%V AI'i
'-ARK IifXTIt, )3X :111
`d� C:1<T II1'�I:1C �l;llf 'I
A?Pf\ C ?L14'.AI '.�!Nl
IPfi(AI "oIo!;'µ„i
.IX hot 0`1 '. '��
LITTLE NELL "- PA
INSUBSTANTIAL ANIENDJIENT
ory DULY l Jr /<792 T� P£=V/�5r=D
Z�TTL
7 cc::> 7
177,
AL-) n tall FLn::n�-p,
•
E
m HAGMAN YAW ARCHITECTS LTD
MEMORANDUM
TO: Mr. Bill Kane
Design Workshop
From: John Cottle echitects
4Hagman Yaw x 2
RE: Little Nell's Base Facility - FAR g�plI� �4g AU_OtQ
DATE: 26 November 1985
I would like to point out the Floor Area Ratio of the current project
relative to the size of the existing lot zoned 'Crl(43, 124 SF) .
Previously, we provided you with an area calculation of 111,549
for the project eligible for FAR calculation. This number is erroneously
conservative as it includes ALL overhangs, balconies, and the like.
The area eligible for FAR calculations within the 'C' zone is as
follows:
111,549 SF
- 1,760
32
level
in CC
zone
- 3,410
22
level
in CC
zone
- 3,486
12
level
in CC
zone
- 4,900
0
level
in CC
zone
- 5,488
0
level
retail
in CC zone
92,505 SF
- 2,150
Size
reduction
due to drop off
- 5,833 Trash, sidewalk, auto ramp, per Municipal code
84,522 SF TOTAL FAR IN C ZONE FOR FAR OF 1.96/1.
210 SOMI I GAI LNA SlIITL 24 ASHN COLORADO 81611 303-925-2867
MEMORANDUM
TO: Aspen City Council
THRU: Hal Schilling, City Manage
FROM: Alan Richman, Planning and Development Director t4
RE: Little Nell Precise Plan
DATE: March 19, 1986
APPLICANT: Aspen Skiing Company
ZONING/LOT SIZE: The base area of Little Nell is presently zoned
CC/SPA and C. Ordinance No. 53, Series of 1985, which received
first reading approval from Council at the conceptual stage, will
place an SPA Overlay on that portion of the base area zoned C.
Final action on that ordinance should only be taken when Council
is ready to take final action on the Precise Plan. The area
zoned CC/SPA comprises 43,124 s.f., while the area zoned C
requested for inclusion within the SPA Overlay comprises 45,738
s.f., for a total lot size of 88,862 s.f.
APPLICANT'S REQUEST: At this stage of the review process, the
following land use reviews are before the City Council:
1.
Final
action
on SPA Precise Plan;
2.
Final
action
on Ordinance 53, Series of 1985;
3.
Final
action
on change in use GMP exemption to convert
the Holiday
House from lodging to employee housing;
4.
Final
action
on encroachment (vendor's agreement) into
Dean
Street;
and
5. Allotment of lodge units to the project (multi -year
allotment requested; allotment for additional commer-
cial space not yet submitted, but anticipated on August
1, 1986) .
Final actions taken by the Planning and Zoning Commission
included the following:
1. Grant of Conditional Use Permit for hotel in CC zone
and ski lifts in the C zone district; and
2. Grant of mountain viewplane and 8040 greenline ap-
provals.
PERMITTED AND CONSTRUCTION SCHEDULE: Section 24-7.6 (c)
requires that the application specify the zone district
regulations and variations which are to apply to the
development, while Section 24-7.6(d) requires the provision
of a schedule specifying the timeframe of the development.
The zone district regulations recommended by the Planning
Office and Planning Commission are a combination of those of
the two underlying zones (CC and C). In all cases, however,
the regulations are limited by the Precise Plan as it has
been presented to the P&Z and Council, since Section 24-
7. 5 (b) states that "the plan (including all conditions of
approval and representations of the applicant) shall
constitute the development regulations for the parcel
1. Area
and Bulk Requirements (with variations from
underlying zone noted)
a.
Minimum lot area
3,000 s.f.
b.
Minimum lot area per dwelling unit
No requirement
C.
Minimum lot width
No requirement
d.
Minimum front yard
26 feet
e.
Minimum side yard
No requirement
f.
Minimum rear yard
No requirement
g.
Maximum height
40 feet
h.
Minimum distance between primary
No requirement
and accessory buildings
i.
Percent of open space required
25 percent
for building site (minimum)
j.
External floor area ratio
1.93:1
(maximum)
(83,265 s.f.)
(variation)
k.
Internal floor area ratio
No requirement
1.
Utility/trash service area
3 6 f e e t i n
length
(variation)
2. Off -Street Parking Spaces
a. Internal to the project building 118
b. External to the project building 15 (9 in drop-
off lane, 4 in
p a r a l l e l
parking along
drop-off island
and 2 service
delivery bays)
3. Permitted and Conditional Uses
The following uses for the project will be permitted,
unless identified as conditional uses (variations from
24
LITTLE NELL BASE AREA AND HOTEL DEVELOPMENT
Fact Sheet
Location: Little Nell at the Base of Aspen Mountain, Specially
Planned Area (S. P.A.) Commercial Core zoning.
Description: 4 story building at the base of Little Nell, Aspen
Mountain which will include a hotel and hotel accessory
spaces along with commercial, food and beverage, and
ski area operations facilities.
- 77,718 sq. ft. hotel and common space
- 15,668 sq. ft. hotel subgrade space
- 16,078 sq. ft. commercial (replacing existing 13,396
sq. ft. commercial)
- 9,976 sq. ft. ski area facilities
- 77 subgrade parking spaces
Improvement will require relocation of maintenance shop
to an on -mountain site.
Proposed uses: Hotel lodging in 96 luxury rooms
Commercial retail space
Restaurant and deck space
Skier facilities
ski school
skier services offices
food and beverage
special events accommodations
child care center
lockers and ski storage
rentals and repair
public restrooms
Architect: Larry Yaw, Hagman Yaw Architects Ltd.
Site Planners: Design Workshop Inc.
Legal Council: Gideon Kaufman
Project Manager: Peter Forsch, Aspen Skiing Company
Proposed start date: Optimum - Spring 1987
Proposed construction
period: 20 month construction
i
LITTLE NELL
COMMERCIAL AND OFFICE SPACE
FLOOR AREA SUMMARY
GMP APPLICATION IN "CL AND OTHER ZONES" CATEGORY
I, Gross Floor Area
A. Ski Administrative Offices 3,684 sf
B. Ski Administrative Lockers,
Mechanical, Stairs, Restrooms 6,394 sf
C. Retail 4,868 sf
D. Public Lockers 2,008 sf
Gross Floor Area Total 16,954 sf
II. Space Requested For Exemption From GMP Allocation
A. Ski Administrative Lockers,
Mechanical, Stairs, Restrooms (6,394 sf)
B. Public Lockers (2,008 sf)
Space Requested For Exemption ( 8,402 sf)
III. Gross Floor Area Applied For In GMP 8,552 sf
IV. Floor Area Credit Due To Removal Of Existing Space
A. Mountain Admin./Ski School (1,296 sf)
B. Ticketing ( 264 sf)
Total Credit ( 1,560 sf)
V. Total Net Floor Area Applied For In Commercial
GMP For "CL & Other Zones" Category 6,992 sf
-16-
existing west wing
service corridor,
mach, equip.
0
UP
J-
T-r j--
hot tub
T T J]
. L
pool
1b cc zone
pool terrace terract
7"1 X
. . . . . . . . . .
r
dining terrace
. . . . . . . . . . . . . . . . ... . I
we C Ov
Y/ •. . . . . . . . . .
......... . .... ... fowl
P�F4Q , F_r1WA '-W4
'44
§ #4
'b Wp_4 VA
4 b1W �-
V_F44FA IS/ ----------
1 4f
Its ��� �`
o
M
INVA XNA IOWA
W It
WMA
My------
----------
N-------- -------
.... trash
ramp down
.......... ...... .. Legend
it
terrace ,
lam" ......::::::..':�+.
' ;
: T�q
• ..... .......... L.>� NOTE: area
L / �l �!• I^yo�iror� {Iv��l►4 �raanr .... �T� : w: • ' ..:. : � �;',
:MYln�i: �oorir
... ... a `p`p vv ... .: i�•t;at ram; ::: ' , i - ,, ;
leTi • .......... /. .Ill
--CO$t•8................................ • • `� /` �-r �/ _�: \!- it/�
................................. desk-
�.�..� Qf?icQ• II
, 71
7
......
1•� �!\� I�\�/y; /l.�l_-Imo./l'�!-1.!I �Ir /.\�1�
ramp down
•
I & ac a sory in cc zone T
retai� arealin1cc zone f.
mou
i over
not ;
over
atfril
hgte
(�U
moul
to"I p rations in.cc zone
tang r eck in cc zone
ttrib a le to f.a.r.
sang r eck in cc zone
utab t f.a.r.
dy rQ i i�r•e-zone
tain p tionS in c zone
2
noshading a e not counted 0
total cc zone 20.
3. ,
total c zone 1���'•
rr
w /
of _.
C /
V
f
Spring street
I'
Legend
hotel & accessory in cc zone
vqe)
retail area in cc zone
ou taip 4 rations in cc zone Via
6 l/ T'
lover ang r feck In cc zone
not . trib a ple to f.a.r.
01212 S.f.
over ang r #eck in cc zone 0 S.f.
0 attrib utab f.a.r.
C
hqtel !Aitry re . . I
-xv"
'.T p mour tain tions In c zone
ir
MOTE: are v
with nosbading a e not counted
total cc zone 20.192s.f.
I id
........ total c zone S.f.
....... ,a....ge.. .
... .......
2,
IJ
.6d
\7
J .1
LEVELI 0 8 16
0
0
0
ME�lfiI C�•f� .
d• ,.: I `` /' ' _ ply I � ,
�e N
E AG;..
I- p
IOA
s.
LL—
rI .. II � � .l _��E of •1.lOI�,,Ki -� I . , f�"�t m / _l.— � .
AbOL GOuxr,YIARV ,� I I ice✓ a _ 1\13� 3
No
.
ir TL
r --�-. '
r . F��s
ko
2.
0.
Poll
jk—
if
N c
f J/ r. ' `, t•' 7: / ' •� 1. r ,` SIN ,;.% •/!y+ ..
: P- N rF-e.
r-,X/--S74 e/-,A/CS
-'r- cy1L__y�#w-irLcrs - _
4:E-,/ AIFzs
�157' WlN�v�'
/Tf'L NULL - �L-a--VATrON
=/ --0 (o%- Z
TWiN�S
g8 lt� u
I
LII7-L_EL LL.-Z- DLIv
•
11'1_1K 51-9 ra.:4(i4
SPA AGREEMENT FOR LITTLE NELL BASE DEVELOPMENT
THIS SPA AGREEMENT is made and e..tered into this 2ZL
day oL'l.1L�0 1996, by and between the CITY OF ASPEN,
COLORADO,'aa —municipal corporation and home -rule city
(hereinafter referred to as "City") and the ASPEN SKIING
COMPANY, a Colorado general partnership (hereinafter referred
3
to ar "Owner"). n r fV
- O
n rn
CID
RECITALSt ,may N
V p atCn
= A rw
0o r" N
1. The Owner has submitted to the City focP approval,
execution and recordation, an SPA Precise Plan for
Development (hereinafter referred to as the "Precise Plan")
pertaining to the development of a gondola, lift facilities
and lift buildings known as the "West Wing" and a hotel and
commercial project known as the "Little Nell Hotel"
(hereinafter collectively referred to as the "Project") on a
tract of land situate within the City of Aspen, Colorado,
legally described on Exhibir "1" attached hereto and
incorporated herein by this reference) and,
2. The Owner has received all requisite development
approvals from the City for the -olect except for a Growth
Management Allocation for the n,:w commercial space produced
by the Project which applicant will apply for in August,
1986. The development approvals that the Owner has received
include the following:
•
e.-:x 54 S :x 457
(a) Growth Management Allocation for ninety-two (92)
lodge units for the hotel (approved by City
Council on April 14, 1966),
(b) 8040 Green Line Review approval (approved by P&Z on
March 18, 1966),
(c) Mountain Viewplane Review approval (approved by
P&Z on March 18, 1986)0
(d) Conditional Uss approval for hotel in the CC
Zone, ski lift and other ski facilities in the
Conservation Zone (approved by P&Z on March 10,
1986),
(e) Change of Use approval for employee housing at
Holiday House (approved by P&Z on March 18, 1986,
and by City Council on April 14, 1986),
(f) SPA Conceptual Plan approval and Precise Plan
approval (approved by P&S on March 18, 1986 and by
City Council on April 14, 1986),
(g) Rezoning of Conservation Zone to SPA (approved by
P&Z on March 18, 1986 ano by City Council on April
28, 1996)
3. The City has fully considered the Precise Plan and
the proposed development and improvement of the lands
therein, and the anticipated benefits and burdens to other
adjoining neighboring properties in the downtown area in
gbneral by rcamon of the proposed development and improvement
of the lands included in the Precise Plan, all in accordance
with Article VII and other related provisions of the
- 2 -
a
Y'k,
:r
4
e :K 59 a,:4,%
Municipal Code of the City of Aspen, Colorado (hereinafter
referred to as the 'Municipal Code")
1. The City has fully considered the Precise Plan and
finds that the Precise Plan submitted by the owner has met
the standards set forth in Section 21-7.7(a) of tha Municipal
Code and further finds that the owner has met its burden and
has demonstrated the reasonableness and suitability of the
Precise Plan, its conformity to the requirements of Article
VII of the Municipal Code, that the adverse effects of the
proposed development have been minimised to the extent
practicable, and the project complies with the City Council's
intent in originally designating this site with an SPA
overlay, including the reasonable conformance of the Precise
Plan with the approval granted to the Conceptual Planl and,
S. The City is willing to approve, execute and accept
for.recordation the Precise Plan on the agreement of Owner to
the m ttrms hereinafter described, subject to all of the
requirements, terms and conditions of Article VII of the
Municipal Code as presently constituted and such other laws,
rules and regulations as are or may be applicablei and,
6. The City has imposed conditions and requirements in
connection with its approval, execution and acceptance for
recordation of the Precise Plan and such matters are
- 3 -
LJ
pacossary tb Ftoteotj 4raaote and enhance the public health,
't Ott and 1►l 1 la ril) ` a�,�'�� � 'P • i. ' �s ._ � ,��
�.a x
7.' Under the authority of Arti.clo V22 of t!»' lfnnicipal
Cod+, the City is'entit.1" to assurances that the matters
here inaftar •'agreed to will be faithfully performed by.Owner
rti. - •Y., .i .
and Owner's successor* ,atid assignsi ard�r4{
t. owner is willing to enter into such agreements
with, and to provide such assurances to, the City.
WITNESSETHt
NOW THEREFORE, in consideration of the premises, the
mutual covenants herein. contained, .and the approval,
execution, and acceptance of the Precise Plan for recordation
by the City, it is agreed as followai
1. USE, AM AND SULI( "QUIRLKMS
The Precise Plan attached hereto as Lxhibit 'I• including all
_•� conditions of approval and representations of the applicant
incorporated within the body of this agreement shall
constitute • the developewnt regulations for this parcel of
land. The underlying some on the parcel upon which an SPA
-�, designation exists shall retain as CC and C as they are
0
'riessintly designated on the officially ado ted City of 'Aspen
son Nape 44� of April 14,
ind bulk
rtVirements shall serve as
quid lines ip a ftiat*r' the development of the Project
which is to be.built-La'accordance with the Precise Plan.
_41
1. Minimum lot area 3,000 sq. ft.
2. Minimum lot area per dwelling unit No requirement
3. Minimum lot width No requirement
4. Minimum front yard 26 ft.
S. Minimum side yard No requirement
6. Minimum rear yard No requirement
7. Maximum height 40 ft.
8. Minimum distance between No requirement
p rLmary and accessory buildings
9. Percent of open space requltkd
for building site (minimum) • 251
yet 10. Rxternal floor area ratio 1.931l 83,265 sq. ft.
(maximum) (variation)
11. internal floor area ratio No requirement
12. off street parking spaces
Internal to,the Project building III
external to the Project building 15 (9 in drop-off
lanes 4 in parallel parking along drop-off island,
and 2 service delivery bays)
13. Utility/trash service area no less than 34 ft. In length
(variation)
. S .
1�-
Bcx 51 469
• open space for the parcel shall include all areas
meeting the definition of Section 24-3.7(d) of the
Municipal Code, provided that the requirements of
Subsection 24-3.7(d)(3) shall not apply to this parcel.
a. Uses Permitted. She following uses shall be permitted
in the area governed by the Precise Plan or shall be
conditional uses if so noted&
1. Hotel (conditional)
2. Retail commercial
3. Ski accessory retail to include ski shops, repair,
rental and storage
4. Open use recreation
S. Restaurant and Little Nell apres ski deck
6. Additional retail commercial as specified under
permitted uses in the CC lone, Section 24-3.2 of
the Municipal Code
7. Ski area administrative offices and ski school
B. Shipping and receiving for hotel and mountain food
service and other mountain operations
9. Storage of materials accessory to the above
10. Cabaret and night club
11. Activities associated with emergency medical
service for treatAent of injured skiers
12. Ski lifts and lift buildings (conditional)
13. Mazes and skier milling areas
- 6 -
r
:y r:
• ?t��f
r
� I
C,
f fir}
ti
11• Hotel accessory retail --I 51.9 --:-470
II. VARIATIONS run. THE UNDERLYING ZONE DISTRICT
A. In conjunction with the above set forth use, area and
bulk requirements, the following Variations from the
underlying Zone district regulations governing the property
shall apply to the project,
1. Us_e. Hotel protruding into C Zone.
2. Area and Bulk. The trash access and truck dock area
shall be no less than thirty-six (36) feet wide, containing
approximately sixteen hundred (1,600) sq. ft.
The external floor area ratio shall be 1.93:1.
Open space shell be calculated as specified in Section
I.A.(9) of this Agreement.
III. CONSTRUCTION SCHEDULE
A. Owner and City mutually acknowledge that exact
construction schedules cannot be submitted or agreed to at
this time. Amer shall construct the Project in two phases,
the first phase being the construction of the 'West Wing' and
gondola with associated buildings and accessory structures,
- 7 -
. 4 &5+iL" r.. Akn
-r 5 N
and the second phase being the construction of the Little
Nell Hotel. owner anticipates that the first phase of the
Project shall be commenced on April 15, 1986, and the
estimated completion date of the first phase is December 15,
1986. owner shall apply for a building permit for the second
phase of the Project no later than thirty-three (33) months
after the GMP submission date of December 2, 1985, which date
is September 2, 1988. Owner anticipates that the Project
will proceed in accordance with tie following time frames,
which time frames shall not constitute binding
representations or scheduleai
1986 April 15 Begin utility relocation at Little Nell
June 1 Begin excavation for West Wing and
grading for new lift.
June 15 Begin regrading on Little Nell slope.
August 1 Begin construction of gondola
terminal. Begin construction of lower
lift terminal for IA.
December 15 Structural work and lift terminal
complete.
No later than
September 2, 1988 Begin demolition of Little Nell complex.
January 2, 1989 Hotel framed and roofed.
18 months later Hotel certificate of occupancy.
- 8 -
•. Detailed Construction $chedule.
518 %:471
1. In scheduling and constructing the first phase of
the Project, Owner agrees to provide the City Engineering
Department with plans and schedules as moon as they become
available, ar.d work with the City tngineering Department to
address and alleviate any construction and safety concern■
the City Engineering Department may have.
2. At the time of applicction for a Building Permit
for demolition of the Little Nell complex and construction of
the Hotel portion of the Project, and as a condition
precedent to the issuance thereof, owner agrees to provide
the City Engineering Department with a detailed Construction
Schedule for the construction of the hotel, to the
satisfaction of the City Engineer and Chief Building official
in the exercise of their reasonable discretion, which
Construction Schedule shall address how construction will
best accommodate under the following circumstancesi
(a) barricading and provision of pedestrian
protection,
(b) maintenance of adequate public vehicular access
and circulation in the development area,
(c) excavation access and large truck traffic
circulation and staging areas,
(d) disposal of demolition and excavation
•
518 -At- 47:1
materials,
(a) delivery and storage of major construction
materials,
(f) construction equipment access and storage,
—(g) contractor vehicle parking,
(h) compliance with City noise regulations,
(i) how circulation will occur and what the base
area will look like during construction,
(1) how Owner shall maintain the barricade
and walkway system throughout the course of
construction, including repairs and removal,
(m+) how utility relocetione, replacements and
undergrounding ehall be scheduled and designed,
(n) limits of excavation, construction easements
and shoring needs, and,
(o) proposed landscaping of areas where demolition
Is contemplatod without immediate
reconstruction.
3. The detailed Hotel Construction Schedule shall be
verified by the City Engineer and the Chief Building Official
and (if the City so desires) recorded as a supplementary
exhibit hereto.
1. Major amendments to the Botel Construction Schedule
set forth in Section III.B.2. which, in the view of the City
Engineer, represent a substantial deviation from the original
- 10 -
•
•
ASPEN/PITKIN PLANNING OFFICE
130 South Galena Street
Aspen, Colorado 81611
Phone 920-5090 FAX 920-5197
MEMORANDUM
TO: City Engineer
Zoning Administration
FROM: Leslie Lamont, Planning Office
RE: Little Nell Insubstantial Amendment to SPA
DATE: August 13, 1992
Attached for your review and comments is an application submitted by the Aspen Skiing
Company.
Please return your comments to me no later than August 24, 1992.
Thank you.