Loading...
HomeMy WebLinkAboutcoa.lu.gm.P&Z Scoring.1981 • • RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project V0 1 e/r- //Q C-? Date 2. -F•: A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3. Storm Drainage 3 4. Fire Protection c� 5. Parking Design 6. Roads • 7. Energy : --- Subtotal /o • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 7 2. Police Protection 2 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities / 6. Handicapped Design Features / 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) � 1 Y • 2. Moderate Income (2 points for each 10 percent) 2 4/ 3. Middle Income (2 points for each 15 percent) Subtotal /9. 8 D. Provisions for Unique Financing (maximum of 10 points) ^ G — E. Bonus Points TOTAL 6 Name r7PC ,i J7 //a U-../ RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project y - P,c ?ice Date F41, 2. /9p/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection _ 5. Parking Design 6. Roads 7. Energy Subtotal / 7 • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity / Subtotal 7 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 perdent) / '( // C,4tC/' y� / 607 i �(2 a uo • 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal /45 D. Provisions for Unique Financing (maximum of 10 points) G E. Bonus Points TOTAL. Name ) /7,41/ RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project • - /1/F7ge &RK /,c Pe 0/n Date • • 8.1 A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3. Storm Drainage '? • 4. Fire Protection 2' 5. Parking Design 6. Roads 3 7. Energy 2 — Subtotal �D B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area • 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection / — 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features o 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 3 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) `) E. Bonus Points O TOTAL 2 Name y 7 / /a IiC/ RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project /0/3 • /72/777194, Date 2.7. S A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service '2 2. Sewer Service ,? 3. Storm Drainage 3 4. Fire Protection 5. Parking Design ' 6. Roads 7. Energy 3 Subtotal / 7 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation / • 2. Police Protection 3. Bicycle Paths / 4. Childcare Facilities / 5. Recycling Facilities / 6. Handicapped Design Features // 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) e 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal , 2 2 D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points 61/76 TOTAL K q Name 2 l/a • RECOMMENDED POINT ALLOCATION _ _ RESIDENTIAL PROPOSALS Y4. Project 6( 1 ' j • A 4 om- Date •.3 • S/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service °1 3. Storm Drainage 4. Fire Protection 3 5. Parking Design .� 6. Roads J7 7. Energy 3 Subtotal /c • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 2 ) (./i0 T-271,52, LL y 3. Bicycle Paths J 4. Childcare Facilities /(7( 7(e.o />, icczr 'cEacr 5. Recycling Facilities / 6. Handicapped Design Features ` 7. Commercial Support Proximity / Subtotal 9 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) C 2. Moderate Income (2 points for each 10 percent) • 3. Middle Income (2 points for each 15 percent) • Subtotal G D. Provisions for Unique Financing (maximum of 10 points) / E. Bonus Points TOTAL ✓ 7 Name � ) Z /// RECOMMENDED POINT ALLOCATION die RE PROPOSALS /� p Project Date L ^1 - kit A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3 3. Storm Drainage 3 4. Fire Protection 3 5. Parking Design 2 6. Roads 7. Energy Subtotal [ v B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given • area 1. Public Transportation 2, 2. Police Protection 3. Bicycle Paths • f 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity 2 Subtotal 7 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) /6, t/ • 2. Moderate Income (2 points for each 10 percent) c/ • 3. Middle Income (2 points for each 15 percent) • Subtotal I I D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points Lore. Lore. th-1704.- TOTAL 47 Name 9 11(15-fi C i irs:#°° o • RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project QUMy /1St L Date 02-2-t/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3 3. Storm Drainage 3 • 4. Fire Protection 3 5. Parking Design 2 6. Roads 2 7. Energy 2 Subtotal �� • 0 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new servide at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation , 2. Police Protection 1 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 0 6. Handicapped Design Features 1 7. Commercial Support Proximity Subtotal 7 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) t 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points P / tY4 / TOTAL �O Name @Ache t v 07 RECOMMENDED POINT ALLOCATION / RESIDENNTIAL PROPOSALS Project siiit.�'fi / t„ Date )-- - 9/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2 2. Sewer Service 3 3. Storm Drainage 2 4. Fire Protection 3 — 5. Parking Design '2. 6. Roads 3 7. Energy 2. Subtotal �/ l7 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation it 2. Police Protection 3. Bicycle Paths ' 4. Childcare Facilities 1 5. Recycling Facilities Q 6. Handicapped Design Features 7. Commercial Support Proximity 2 Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points • TOTAL v Name fs-- • Z$ RECOMMENDED POINT ALLOCATION � R E ESIDENTIIAL PROPOSALS • Project 10f r el y 0 444 , Date 2 ' % - 2 G A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. 2. Sewer Service 3 3. Storm Drainage 2 . 4. Fire Protection 2 5. Parking Design 1 6. Roads 2 7. Energy 2 — • Subtotal " / B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2 2. Police Protection 3. Bicycle Paths 1 4. Childcare Facilities 1 5. Recycling Facilities 0 6. Handicapped Design Features 7. Commercial Support Proximity Z Subtotal 9 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2 1 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal 2 L D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points /_- br 60..c4 cot bq - Z • TOTAL Name 7a ' 2 9 4 RECOMMENDED POINT ALLOCATION r RESIDENTIAL PROPOSALS c � Project I94 v Date I • ?- ti A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3 3. Storm Drainage 2.. 4. Fire Protection 3 5. Parking Design 6. Roads 2 7. Energy 3 Subtotal 17. B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 2. 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 0 6. Handicapped Design Features 1 7. Commercial Support Proximity 1 Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 20 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal 2- a D. Provisions for Unique Financing (maximum of 10 points) /0 E. Bonus Points • TOTAL Name i S 70 ei • RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project / /7F e(tir A/46( Date 3 7/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection .3 5. Parking Design 2 6. Roads 7. Energy ° Subtotal / 7 r • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation L 2. Police Protection 1 3. Bicycle Paths 4. Childcare Facilities • 5. Recycling Facilities 1 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) iii 2. Moderate Income (2 points for each 10 percent) 2, �f 3. Middle Income (2 points for each 15 percent) • Subtotal // 7 D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points 4 TOTAL 44r , Name /r t i 7 RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project ,C9/0/0i AM (1 Date ,2 — — P/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection 2 5. Parking Design 2 6. Roads 2 7. Energy 2 Subtotal lir 17 r B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths 1 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) /$ 1 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal l 8 D. Provisions for Unique Financing (maximum of 10 points) !1 E. Bonus Points 0 • TOTAL 44 i Name • e RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project „5M/f)QLr - &f a Date z - a - S'f A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3. Storm Drainage .� • 4. Fire Protection — 5. Parking Design 9 . 6. Roads 3 7. Energy 1 Subtotal 1 r9 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation _ 2. Police_ Protection 7 3. Bicycle Paths • f 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) • • 2. Moderate Income (2 points for each 10 percent) 4c 3. Middle Income (2 points for each 15 percent) Subtotal G D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points fl TOTAL J2, Name 7 r ` � '� f G` heiCree`es' • RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project / &' /, ,� 5. ,J "'f /V Date 2 ° 3 ` S A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service j 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection 1 5. Parking Design .1 6. Roads 0 — 7. Energy 3 — Subtotal / 6 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2 2. Police Protection — 2 • 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features r 7. Commercial Support Proximity Subtotal / C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal 2 L D. Provisions for Unique Financing (maximum of 10 points) 0 E. Bonus Points 9 4/4 Jr& vC 62eN-S GeeM lip a`0 Iht6 °d :S /N/N A TOTAL if Name G / 4044 - RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project � 7/f4C i,L 4110,10 /1/9404 l%WL'' Date „7 A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3. Storm Drainage 2.. 4. Fire Protection 5. Parking Design 2 6. Roads 7. Energy 3 • Subtotal /6 • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new .service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection Z 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 . percent) ) D 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal 2 p D. Provisions for Unique Financing (maximum of 10 points) /0 E. Bonus Points TOTAL Name ,":66t �W " .":1 _, ;.® J /6 RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS P � a D3 8/ Project t - Dat A. Public Facilities and Services (maximum of 21 points) 0 Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service •: 2. Sewer Service 3. Storm Drainage 4. Fire Protection 3 5. Parking Design 6. Roads 7. Energy Subtotal /S B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 1 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 1 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal ,7 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) Uo. 2. Moderate Income (2 points for each 10 percent) 2 . 41— 3. Middle Income (2 points for each 15 percent) Subtotal /,E . K D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points . \ Grip{ c ) n, - ' - T O T A L 41',3 Name C..)44,71/C-CA—C. 7-et RECOMMENDED POINT ALLOCATION RESIDENNTIAL PROPOSALS Project £ U 1.3 1.H PeS A,/ Date Z-/ 4 ' A. Public Facilities and Services (maximum of 21 points) 0 Indicates a total infeasibility of providing services 1 Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2 2. Sewer Service 3 3. Storm Drainage ' 4. Fire Protection 3 5. Parking Design 6. Roads 7. Energy .3 Subtotal 16 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new servide at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities /6 - (fir s fratay attuia cc con(i 7 5. Recycling Facilities 6. Handicapped Design Features 0 7. Commercial Support Proximity Subtotal Co C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) i S 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) 0 E. Bonus Points 67 TOTAL Name v ' k-K • RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project SUAR /4 /tee Date 247 45/ A. Public Facilities and Services (maximum of 21 points) 0 Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3 3. Storm Drainage • • 4. Fire Protection 5. Parking Design 1 6. Roads . 7. Energy S Subtotal ai • • w f .. O B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new servide at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal *� C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 5 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points P '(Q jJ \ QOs pc rip Uk \Dui - Qrrypteu, -C._2 Un i � H&or r (C VP,Pk — CA.3V 4(Saz -. o- pc ( houY.t s co S eQ etto 'c., o itrez4 kor 0 'Oa (f IQ TOTAL JD\ O rf - 0 fl & e- POI »ts Name Jahn") ahn")) 11-e.- ry r RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project 'pis E H<-(A-09— Date Date e2 -O 3 - IS / A. Public Facilities and Services (maximum of 21 points) O Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2+ 2. Sewer Service Z 3. Storm Drainage 4. Fire Protection 2 ' • 5. Parking Design 2 ' 6. Roads a '" 7. Energy ` Subtotal / 5 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new servide at increased public expense 1 - Project may be handled by existing lev -el of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities 2. 5. Recycling Facilities 0 6. Handicapped Design Features 7. Commercial Support Proximity 2' Subtotal 9 C. Employee ousing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 21./ • 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points / no MA) fi onatQ cMxYx7 TOTAL cS Name V c(�vrn7lye, /c( E, 6 RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS „ ` Cs `� 4 ettret S. (-\shQr '-)' Project 0,€ Dt /0 PY1f1� Date 2 " 03-8 A. Public Facilities and Services (maximum of 21 points) • 0 Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 24 2. Sewer Service 9-4 3. Storm Drainage 24 • 4. Fire Protection 3 5. Parking Design Z 6. Roads 7. Energy 3 Subtotal ! 5 • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new servide at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation ( S 2. Police Protection 3. Bicycle Paths 'A. Childcare Facilities 5. Recycling Facilities 7 6. Handicapped Design Features �+ 7. Commercial Support Proximity 1. 5 Subtotal �? 1 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 9-0 • 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points TOTAL 4if7 Name '_"'' Q ylit.CA—e. 214/ • J. 1 RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project ate, 4.4 DatesdA6 / , �T/ p` ! A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 0 4 1 j!'tai 2 - Indicates an acceptable (but standard) service level TT 3 - Indicates no foreseeable deficiencies 1. Water Service J 2. Sewer Service 3 3. Storm Drainage 3 4. Fire Protection 5. Parking Design ?i 6. Roads ?i 7. Energy Subtotal c- B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation v 2. Police Protection 3. Bicycle Paths / 4. Childcare Facilities / 5. Recycling Facilities / • 0 . Handicapped Design Features ! 7. Commercial Support Proximity 1/ Subtotal 9 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) /19,i 2. Moderate Income (2 points for each 10 percent) P. 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points TOTAL "erosi • Name da.c., 91.40a° RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Q/ Project Date �„L6 3 , /9l/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3 3: Storm Drainage 4. Fire Protection 3 5. Parking Design y 6. Roads 7. Energy Subtotal 11 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation ?■' 2. Police Protection 3. Bicycle Paths 1 4. Childcare Facilities ?/ 5. Recycling Facilities 1 6. Handicapped Design Features 1 7. Commercial Support Proximity t Subtotal ID C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) it 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal //p D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points TOTAL Name "SOW, yee • RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS / p Project g�a ^a Date�jc-r/ 6 • 19, A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 7- 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection 5. Parking Design 6. Roads 3 7. Energy Subtotal ite 4.1 • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given . area 1. Public Transportation 7/ 2. Police _Protection 3. Bicycle Paths ( 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity v Subtotal g 1 0 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 5 3. Middle Income (2 points for each 15 percent) • Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points TOTAL t I Name nt°!? /8✓ RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS _. 1a� / Project C Date c 3 � 79), A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3. Storm Drainage 3 4. Fire Protection 5. Parking Design 7/ 6. Roads 7. Energy Subtotal /7 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2 2. Police Protection Z 3. Bicycle Paths 1 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal l0 C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) — 2 2- + � y + 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points Z fre, TOTAL dloresi Name 0 / A t ent , d t • * itedier e e t RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS SAL ' Project �L� ?Sari Datede 5 , /70 A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service #1 3. Storm Drainage 4. Fire Protection 5. Parking Design 1 6. Roads 7. Energy 3 Subtotal 0/3 • s • • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation / 2. Police Protection 1" 3. Bicycle Paths I 4. Childcare Facilities 5. Recycling Facilities , 6. Handicapped Design Features 7. Commercial Support Proximity / Subtotal f C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) �� • r �^a 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points In `2 g 0 TOTAL Name �G�ir' J fel RECOMMENDED POINT ALLOCATION RESI DDENTIAL PROPOSALS Project LAIC e( e U (_ Date A. Public Facilities and Services (maximum of 21 points) • 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 7 2. Sewer Service 3. Storm Drainage 4. Fire Protection 5. Parking Design 6. Roads 7. Energy Subtotal • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 7. 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal C. Employee Housing (maximum of 40 points) / 1. Low Income (2 points for each 5 percent) 76, 2. Moderate Income (2 points for each 10 percent) — 2 / • 3. Middle Income (2 points for each 15 percent) 'Lk�, • • Subtotal / _ D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points Li TOTAL /10 Name RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS • Project (,A,A/k AIZC Date A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service ^� 2. Sewer Service 3. Storm Drainage • 4. Fire Protection 2 5. Parking Design 6. Roads 7. Energy • Subtotal 1 1! • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation • 2. Police Protection 3. Bicycle Paths — I 4. Childcare Facilities 1 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity 4, Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal / eS D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points TOTAL (O Name 46,4„) RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS �_ Project �JA'� �C °- Date A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2 2. Sewer Service 3. Storm Drainage 4. Fire Protection `Z-- 5. Parking Design 7 - 6. Roads 7. Energy 7-- Subtotal /1 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation — 2. Police Protection 3. Bicycle Paths 1 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal 1r C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) • 2. Moderate Income (2 points for each 10 percent) • 3. Middle Income (2 points for each 15 percent) Gl� Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points / 6 e A$ i e-4 7c, (Q 1(-- / A) Aft-' A bpi: R.: s n r? 1) TOTAL / 7 Name <.7 ti RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project /1) r `-; 41- Y kti-0_4., Date A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service • 3. Storm Drainage 4. Fire Protection `7 5. Parking Design 6. Roads • 7. Energy Subtotal • s e A, od B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths f • 4. Childcare Facilities 1 5. Recycling Facilities 1 • 6. Handicapped Design Features I 7. Commercial Support Proximity . Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) Z t 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal Z D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points TOTAL Name `s RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS Project `7k..), -% f ` 5714,12c.24.) / Date A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service .--> 3. Storm Drainage 4. Fire Protection 5. Parking Design 6. Roads 2 - - 7. Energy Subtotal tq _ B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area ,1 1. Public Transportation 2. Police Protection 2. 3. Bicycle Paths I 4. Childcare Facilities 5. Recycling Facilities 6. Handicapped Design Features 7. Commercial Support Proximity / Subtotal C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) —27-0 • 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal - Z-cm D. Provisions for Unique Financing (maximum of 10 points) /0 E. Bonus Points 41664'71/c F 12» C`:- i 1} A.) ST S Pt L-K-= Y1 14-e-c 0 cc54-7 TOTAL Name U/ RECOMMENDED POINT ALLOCATION • / L RESI PROPOSALS Project (X +e 1.»7`7 P/ G' Date_ 2 ri-4 V / A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service ________!7__ 2. Sewer Service 174 • 3. Storm Drainage / 4. Fire Protection '5 — 5. Parking Design 4� 6. Roads 7. Energy Subtotal ( /J • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2 2. Police Protection 3. Bicycle Paths 1 4. Childcare Facilities Jr/ 5. Recycling Facilities 1 6. Handicapped Design Features / 7. Commercial Support Proximity / Subtotal _ C. Employee Housing (maximum of 40 points) // /J 1. Low Income (2 points for each 5 percent) `(� a T 2. Moderate Income (2 points for each 10 percent) v� 3. Middle Income (2 points for each 15 percent) Subtotal�� D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points ,/4 f 7 4fit Mak TOTAL elf Name ( 4 ` RECOMMENDED POINT ALLOCATION RESIDENTIAL PROPOSALS /� Project 4 fr /` Date Z/ / 9 7 A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 3 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection 5. Parking Design 2. /rte 6. Roads 1 7. Energy p Subtotal B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new servide at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths • ! 4. Childcare Facilities ' 5. Recycling Facilities I 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal iU C. Employee Housing (maximum of 40 points) J 1. Low Income (2 points for each 5 percent) / 2. Moderate Income (2 points for each 10 percent) 5 3. Middle Income (2 points for each 15 percent) Subtotal /9 D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points � �C n / ^ n /� / i k TOTAL Name OW A-- RECOMMENDED POINT ALLOCATION w � RESIDENTIAL PROPOSALS Project �� /l.G��n"` % ^'.— " y 11v Date d e/ A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3. Storm Drainage !� 4. Fire Protection • Z 5. Parking Design 3 6. Roads 7. Energy Subtotal / 7 B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths 4. Childcare Facilities / 5. Recycling Facilities 6. Handicapped Design Features 2, 7. Commercial Support Proximity Subtotal _ C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points 2 y4J — -- TOTAL _ Name C2 RECOMMENDED POINT ALLOCATION RESSIIDENTIAL PROPOSALS Project ( t) /5 • &Flea— _ Date 5//4457 A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2 2. Sewer Service 3 3. Storm Drainage 4. Fire Protection 5. Parking Design 17, 6. Roads 5 7. Energy Subtotal ._ • • B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths 1 4. Childcare Facilities / 5. Recycling Facilities 6. Handicapped Design Features / 7. Commercial Support Proximity Subtotal Q C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) 2-2- 2. Moderate Income (2 points for each 10 percent) 3. Middle Income (2 points for each 15 percent) Subtotal D. Provisions for Unique Financing (maximum of 10 points) E. Bonus Points '/ /f 4/ Y j TOTAL 7l Name I RECOMMENDED POINT ALLOCATION RESIDENTIAL 674,9<c40,94-, PROPSALS 17/1.0.0. Project Date A. Public Facilities and Services (maximum of 21 points) 0 - Indicates a total infeasibility of providing services 1 - Indicates a major deficiency in service 2 - Indicates an acceptable (but standard) service level 3 - Indicates no foreseeable deficiencies 1. Water Service 2. Sewer Service 3. Storm Drainage 4. Fire Protection 5. Parking Design 4 6. Roads O 7. Energy 3 Subtotal B. Social Facilities and Services (maximum of 14 points) 0 - Project requires the provisions of new service at increased public expense 1 - Project may be handled by existing level of service in the area 2 - Project in and of itself improves the quality of service in a given area 1. Public Transportation 2. Police Protection 3. Bicycle Paths l 4. Childcare Facilities 5. Recycling Facilities Z 6. Handicapped Design Features 7. Commercial Support Proximity Subtotal 1! C. Employee Housing (maximum of 40 points) 1. Low Income (2 points for each 5 percent) �d • • 2. Moderate Income (2 points for each 10 percent) • 3. Middle Income (2 points for each 15 percent) • Subtotal D. Provisions for Unique Financing (maximum of 10 points) 1 D E. Bonus Poipts • M - Goo r, ,cf,./ , S <, yr.ry c i� arc lh a .' TOTAL 6( Name `�' V - •