Loading...
HomeMy WebLinkAboutcoa.lu.gm.Vincent1,John 1015 E Hyman.1980 Z O • a W o U 0 < Cl)a . a Q Z as 'S cn z Q J Z >' 0 = 3p = Z > . O W W U o r o - _ � !r la J -, z r - a 1-• O 4 4 lq&)- c::vn- Ol Vincenti, John _ 3 Unit Addition 1015 E. Hyman , , 1980 GMP jallll�� I THREE UNIT ADDITION 1015 E . HYMAN AVE. APPLICANT JOHN VINCENTI NOVI . MICHIGAN & ASPEN . CO. ARCHITECT THOMAS WELLS & ASSOC. ASPEN . CO. T FOLD •OLD r i 1 t Page 1 A. Basic Information Page 2 Page 3 1. Project Description (aa) Water System (bb) Sewage (cc) Storm Drainage (cc) Storm Drainaqe (continued) (dd) Fire Protection (ee) Type of Units - Proximity to Schools (ff) Traffic Increase (gg) Location to Various Uses (hh) Police (ii) Location to Retail and Service Outlets (ii) Location to Retail and Service Outlets (continued) (jj) Adjacent Uses (kk) Construction Schedule 2. Site Utilization Maps (aa) Energy Conservation (bb) Landscaping (cc) Vehicular Access (dd) Streets, Paths, Footbridges (ee) Zoning District B. Review Criteria Page 4 1. Availability of Public Facilities and Services (aa) Water (bb) Sewer (bb) Sewer (continued) (cc) Storm Drainage (dd) Fire Protection Page 5 (ee) Parking Design (ff) Roads (gg) Energy (gg) Energy (continued) 2. Availability of Social Facilities and Services (aa) Public Transportation (bb) Police Protection (cc) Child Care (dd) Bicycle Paths (ee) Recycling Facilities (ff) Handicap Features (gg) Proximity to Commercial Support Facilities 3. Provisions for Employee Housing Page 6 3. Provisions for Employee Housing (continued) 4. Section 24-11.4(b)(5): Outstanding Overall Design Meriting Recognition Drawings Al Zoning, Historical District, Parks A2 Bus Routes, Existing Parking and Fire Station A3 Employee Housing Calculations A4 Site Plan A5 Basement Level A6 Ground Level A7 Main Level A8 Upper Level A9 Section "A" A10 Section "B" All North Elevation Al2 West Elevation A13 South Elevation TITLE Of SHEET PROJECT NO. DRAWING NO THOMAS WELLS A ASSOCIATES / ARCHITECTS PROJECT: DATE ASPEN LOS ANGELES DIETERICH400ST Q"RPRINT 10M FOLD FOLD FOLD f FOLD :- N 1 A. BASIC INFORMATION 1. PROJECT DESCRIPTION This application for G.M.P. allotment under Section 24-10.4 pertains to the proposed development of three residential units at 1015 E. Hyman Street, Aspen, Cclorado. This project is located within the RMF zone on a 9,000 sq. ft. lot on which there presently exists two two bedroom units. The proposed development consists of one free market unit of two bedrooms and two low income restricted units, one a two bedroom unit and the other a studio unit. Under the area and Bulk Require:aents set forth in §24-3.4 what is permitted by applicable zoning. Once a GMP allotment is secured Applicant will concurrently apply for (1) special review for exemption of the low income restricted units from GMP; (2) an exemption from subdivision for the construction of a multifamily dwelling; and (3) a subdivision exception for condominium approval, at which time applicant will deed restrict the low income units to the City Housing Authority guideline for low income housing for sale and rental. (aa) Water System The proposed units will be served by a line connected to the existing 12" water line in Hyman Street. The City Water De- partment has indicated the units can be supplied by the exist - of the Aspen City Code and the maximum density provisions ing 12" line with negligible impact on the City water supply. contained in §24-3.7 (k) the following is permitted: Proposed two 2 bedroom units Proposed one studio New units total permitted square footage Existing two 2 bedroom units 4000 sq. ft. 1000 sq. ft. 5000 sq. ft. 4000 sq. ft. (bb) Sewage The site will be served by a 6" line connecting to the existing 3" sewer line in the alley behind the project. The available treatment plant can accommodate the anticipated flow according to the Aspen Sanitation District Manager. Total permitted square footage for project 9000 sq. ft. (cc) Storm Drainage There are no storm drainage lines for residential use in this The applicant, sensitive to impact on the neighborhood, is area of the City. Surface, runoff and underground water will not applying fo_- honus density, but rather is only building be handled by surface absorption. In the event surface TITLE OF SHEET PROJECT NO DRAWING NO THOMAS WELLS & ASSOCIATES / ARCHITECTS PROJECT..f^.Y I � raw DATE 1 AtiPEN A ,Ck . k i! �o H�'r�1a,rJ 57. DIETERICH-POST CLEARPRINT 1020 .OLO FOLD FOLD FOLD absorption is not sufficient, a dry well will be utilized. (dd) Fire Protection This residential application will rely on the fire protection system of the City of Aspen and the current location of the One car per bedroom has been projected by the Aspen City Code pursuant to Section 24-4.1, Off -Street Parking Requirements. Parking on site has been provided for this number of vehicles. East Hyman Street, will serve as the access to this property. It is paved and sized to accommodate the authomotive impact allowed by the zoning. Since the site is within walking distance to the core of the fire station, six and one half blocks away. The average City and served by public transportation, it is expected response time is four minutes. many automobile trips will be eliminated. See attached maps of transit routes. (ee) Type of Units - Proximity to Schools (gg) Location to Various Uses Total Development Area = 3,913 Sq. Ft. a. Parks: the site is within four blocks of Herron Park and playground. S-Ile Rental b. Hospital and Airport: Both facilities are sited to ade- Type of Unit Size Price Price One (1) free market - 2 bedroom 1772 Sq. Ft. Market Market quately serve the City of Aspen One (2) low income - 2 bedroom 1471 Sq. Ft. $60/ft.* $.48/ft.* C. Mass Transit: See attached maps of transit routes. One (1) low income - studio 675 Sq. Ft. $60/ft.* $.48/ft.* The estimated increase on these facilities is minimal. *According to Jim Reents, The City of Aspen Housing Director. Distance to Upper and Lower Elementary Schools = 12 blocks Distance to Middle and High Schools = 11.5 rules Distance to nearest school bus pick-up point (Park Place and E. Hyman St.) = 2 blocks (ff) Traffic Increase (hh) Police There is little impact on the Aspen Police Department by virtue of three additional housing units. According to the Police Department, their average response time would be one minute to this site. (ii) Location to Retail and Service Outlets j This site is within a five minute walk to the downtown core c The added number of vehicles anticipated h•y this project is five. I and the bulk of all retail outlets including City Market. TITLE OF SHEET PROJECT NO DRAWING NO THOMAS WELLS & ASSOCIATES / ARCHITECTS — -- - - - --- -- -- ASPEN LOS ANGELES PROJECTS - ` I� I �r DATE L DIETERICH-POST CLEARPRINT 10M FOLO FOLD FOLD POLO The natural terrain will remain and all utilities will be placed underground. These three units will cause little impact nor increase the demands on existing retail and service outlets. (cc) Vehicular access to the site will be along a secondary street (Hyman Street) with required parking on site. (jj) Adjacent Uses The studio parking is located off the alley thereby reducing the This project does not require bonparking garage width facing Hyman Street. This placement also us density as it conforms to the allowed density of the RMF zone. The project is compatible allows more open space and landscaped area to front with the duplex and multifamily uses in the neighborhood. Hyman Street. (dd) Streets, nearby paths and foot bridges are indicated (kk) Construction Schedule on map. Construction will commnece in the spring or summer of 1981, (ee) The zoning district is identified on the zoning with completion in the Fall of 1981 subject to available map. Surrounding uses are multi -family, duplex and other financing. typical RMF uses. 2. SITE UTILIZATION MAPS B. REVIEW CRITERIA The information contained in this section supplements the maps and plans submitted with this application. 1. AVAILABILITY OF PUBLIC FACILITIES AND SERVICES (aa) The insulation characteristics will exceed the require- (aa) Plater ments of Chapter 53 "Energy Conservation and Thermal Insulation" The existing water system of the City will serve the three units of the Aspen Code. The code requires a R-25 for ceilings over with negligible impacts to the water systems. There is a 12" 12' in height. Tie will provide an R-30 in all of our ceilings, main in Hyman Street with ample capacity. All connections will be normal and will not necessitate any treatment plant or 65% of our window openings face south. The glass area on the other facility upgrading. other two facades having windows totals only 4% of the floor area, while the code allows 12.5%. (bb) Sewer The site will be served by a connection to an 8" sanitary Fireplaces will use external air for com�biistion along i I sewer in the alley. The impact of these three units is with a thermostatically controlled damper. minimal on the capacity of the treatment plant and, according to the Aspen Sanitation District, both the line and the treat- (bb) Landscaping will be placed to achieve privacy while' ment plant can accommodate the anticipated flow. No system complementing the architecture. A privacy fence will be con- extensions beyond those normally installed by the developer will structed along a portion of the west and south property line. TITLE OF SHEETj/E� I w I � , ter, PROJECT NO. DRAWING NO THOPROJECT: - - -- -- DATE 3 MA WELL 8 ASSOCIATES /ARCHITECTS ASPEN LU� AN(:E ..F S DIETERICH-POST CLEARPRINT 1020 roLD FOLD /OLO be necessary. The existing lines and the treatment plant will not need to be upgraded. (cc) Storm Drainage There are no storm drainage lines furnished by the City to this site. All surface water will be absorbed on site by natural ground absorption or if such proves to be necessary, by a dry well. (dd) Fire Protection These units will be constructed with fire protection in excess of the building code requirements. The wood walls will be clad with 5/8" gypsum board which provides a one hour fire rating for all walls. In addition, smoke detectors will be furnished throughout for added protection. All kitchens will be supplied with fire extinguishers. There will be no need to install a new fire station or add major equipment to the existing station. Because of the project's close proximity to the existing station, the response time will be four minutes, well within established response standards. (ee) Parking Design To minimize the parking off of Hyman Street, one parking space has been located off of the alley. This reduces the concrete paving at the front of the building and provides for an increase in open space with additional area for landscaping and planting. The visual impact i; of a residential character enhanced by reducing the number of cars parking off of Hyman. Street and by enclosing two parking spaces in an enclosed garage. The combination of this proposed parking design with the location of the project on a dead end street makes for a safe parking design. (ff) Roads The existing roads have the capacity to serve these units. There will be little or no increase in traffic on adjacent streets. Because the project is close to the downtown core area and the City bus lines, auto use from the project will be minimal and bicycling, walking or the use of public transportation will be maximized. (gg) Energy The cross-section construction of our walls yield the followinq insulating value: R-value Air film coefficient (outer surface; 15 m.p.h. wind) .17 3/4" wood siding .79 1/2" wood fiber insulated board 1.22 Fiberglass insulation (6" thick) 19.00 5/8" sheet rock .58 Air film coefficient (inner surface; still air) .68 Total exterior wall section R-value 22.44 This overall 'Z-value exceeds the Code Standard of R-20. Below grade. Exterior masonry foundation walls will be protected from thermal losses to the earth by a 1 1/2" layer of rigid insulation extending 30" below the surfaces at regular footing depth and full height at basements. This provision will exceed the R-11 code requirement. Roof Construction. All roof sections above 8' will include insulation to bring the overall R-value to R-30, exceeding the code value of R-25. TITLE OF SHEET rDA T NO DRAWING NO THOMAS WELLS & ASSOCIATES / ARCHITECTS PROJECT: --- ASPEN I_05 ANGELE`i � M o ►ljl-r a�i TroN 4 FOLD f FOLD Glass. The bulk of our glass faces south (65%) thereby optimizing solar gain. The glass on the north and west facade total only 4% of the floor area while 12.5% is allowed. All windows will have insulating glass with curtains, blinds or shutters to provide an insulating air space to reduce heat loss at night. The fireplaces shown will use external air for combustion along with thermostatically controlled dampers. If costs will allow it, provisions will be made to use roof top domestic hot water collectors for the low income units. In any case, the free market unit will employ a solar system for domestic water. The collector will be plumbed directly to a storage tank in the basement. Day and night thermostats will be utilized for the three units. 2. AVAILABILITY OF SOCIAL FACILITIES AND SERVICES (aa) Public Transportation The nearest bus route, the Mountain Valley and Silverking run, stops at Cleveland and East Cooper Street, approximately 175' from the project. (bb) Police Protection This proposal does not create any necessity for increased personnel or equipment for the Aspen Police department. The response to this site would be one minute according to the Police department, well within reasonable response standards. In order to improve the quality of security and protection in this area, the applicant will deploy a silent alarm system monitored by a local security company. (cc) Child Care This design allows for an enclosed backyard which is ideal for children and could provide space for a play area for any children in the project. (dd) Bicycle Paths Since this proposal is Located in an existing neighborhood with streets and alleys, the tenants would have access to already existing paths and bridges serving this area. (ee) Recycling Facilities Neither the City or County have retained recycling facilities. However, City Market now recycles aluminium at its store, a three block walk from this site. (ff) Handicap Features Although the three units are on different levels, the lower floor of the free market unit could be available for the elderly or the handicapped person with entry accessible on grade from the alley side. Bathtubs especially designed for use by handi- capped persons will be installed in the project. (gg) Proximity to Commercial Support Facilities This site is closer to the downtown commercial and retail areas than the [,jest end. City Market is three blocks away with the mall at East Cooper and Galena another two block walk. The entire downtown area with all of its shops, drug stores and res- taurants is within walking distance from this site. 3. PROVISIONS FOR EMPLOYEE HOUSING Two units out of three have been set aside for loge income housing. A studio unit of 675 square feet and a two bedroom unit of 1,471 square feet will be deed restricted to TITLE OF SHEET PROJECT NO. DRAWING NO. THOMAS WELLS i ASSOCIATES / ARCHITECTS — --- — ---- -- ASPEN LOS ANGELES PROJECT: �. 1 G DATE FOLD :t POLO rental or sale price terms within housing price quidelines. These units are larger than the maximum square footage set forth by the housing guidelines yet the rents charged will be control -led by this maximum providing excellent value to renters. The project includes a gross area of 3,918 square feet (excluding decks, basement, garage and terrace) with 2,146 gross square feet designated to employee housing. The employee housing represents 55% of the total gross area. There will be 4 3/4 bedrooms (two bedrooms and one studio) 2 3/4 of which are designated employee, therefore employee housing represents 58% of the total number of project bedrooms. The units will be rented or sold under the housing guidelines established by the City of Aspen for low income housing. The employee housing portion of the project shall be constructed of the same exterior building materials and with a compatable exterior architectural style to the free market unit. This project has 55% of the total floor area as low income housing entitling applicant to 22 points. This project has 58% of the total number of bedrooms as low income housinq which also works out to entitle applicant to a minimum of 22 points. 4. Section 24-11.4(b)(5): OUTSTANDING OVERALL DESIGN MRITING RECOGNITION Applicant should be granted additional points for out- standing overall design meriting recognition. The project has incorporated the criteria of Section 24-11.4(b)(1), (2) and (3). The project is tastefully designated to blend in with and enhance the character of the neighborhood. There will be no negative impacts on traffic, roads, public safety, fire protection, police protection, drainage, water or sewer service. The existing services and facilities are adequately situated and set up to efficiently serve the project at no public fiscal increase. Great care has been taken in the design of the project to conserve energy and utilize solar power as much as possible, and the project's energy efciciency ratings significantly exceed all applicable City requirements. Finally, applicant is willing to designate 55% of the total area of the project, 58% of the bedrooms, to low income housing which, in proportion to scope of this three unit project, represents a substantial contribution by applicant to the welfare of the community. 'Phe low income housing units in the project are much larger than the maximum size requirements set forth in the City Code and yet will be sold or rented at prices determined by this smaller maximum square footage. This provides a tremendous value to employee purchasers or renters. TITLE OF SHEET PROJECT NO DRAWING NO. THOMAS WELLS A ASSOCIATES / ARCHITECTS PROJECT; 6 ?r�rc� � U � ►T A'" I i t� � DATE ASPEN LOS ANGELES v POLO FOLD 01 Rio QRANOI- m r — z Z Lo 11t , J j-i 3 10WRK j cl . mA"-4 c1 E i HISTOQit.� I CL R M F f'�Ir.RRON I it f cl 1 1.. _ — f= CORK R V ELM, V R- TITLE OF SHEET PROJECT NO DRAWING NO ZONING , HI STOPICo4— RfCT, THOMAS WELLS & ASSOCIATES / ARCHITECTS PROJECT: DATE ASPEN LOS ANGELF'� DIETERICH-POST CLEARPRINT 1020 10LO - - . -r - .. ' ✓K4-: R+ : 'ri 9 tr _ - .. 's" • S�!r-Y.. " •-{ �s.., _ r''�I....�., - a.� . fOLD .'4 - ►aLD , . �r �- - ,�� �' _ . �. ,� _ _er�'4 • -T .� �t i. s.�+'�_...�-N�.firft.M' r �� iCOUP,— -40ula • ....� VISA .�71 ,... ,__ '`'°�.+` .y �, - - - -------- I ........................... i f . 1 IL - - i - --• --- Lo 7 7� T ul V— ul 0 .................................. vA-�_my 0uS STor-S ul ►1� c) if 1 i =A ^�;< .................................................................................................................................. ....... . . ....................-AI ......................................... .—. — ::t.. 1-------------- iir- - - Ir'a. ............................ TITLE OF SHEET tPROJECT No DRAWING NO TFiOMAS WELLS 8 ASSOCIATES /ARCHITECTSS-70""r1Q,"'4A 2 PROJEC-T:l.,.ij�?1`T[ LO� K� A^E:rti 1 U,LI L1 ILM-Yi7D I I-LLhKNTf IPII IUM T OLD i^,-D , FOLD f FOLD A. 1772 67A L_ 214 6 3918 2146 = 55% ev! 55 �-Y))!5 3918 TITLE OF SHEET PROJECT NO. DRAWING NO THOMAS WELLS & ASSOCIATES / ARCHITECTS PROJECT:IJN1 ! - A 3 ASPEN ,�f, 4^. �3F: F`� 1 �j 11�."t OAT[ FOLD �A R4,,� a 3a:7 ?-JAB : hcl s;��c-K-8" TITLE OR SHEET PROJECT NO. DRAWING No THOMAS WELLS & ASSOCIATES / ARCHITECTS ASPEN LOS ANGE.LES PROJECT: �+�,-,G J U- ;'� Ar,-�I.,,ryr..� A A 1'C {�j w { DATE H L.F FOLD FOLD L TITLE OF SHEET rPRCT NO DRAWING NO THOMAS WELLS A ASSOCIATES / ARCHITECTS �F�1G PROJECT: 'rJfG.���l�"'�L�/��� 1cTI�� ASPEN L,-AN'_,[If ' ! DIETERICH-POST CLEARPRINT 1020 _ `OLD FOLD FOLD 1 i ,I /�'•- lit i I � o �`�' `� '� , � �`^�e/► F'"� b mot/ 7E o, J!1 py - 1 7 • O t 3 G 16 Dp c M Faz TU;o jo�Igr�sra�.r.� C1�'" F.pL.., Jul I' as wl SuN r215 � � r..a�'.�Ml�lt✓M 5 '� TITLE Of SHEET • PROJECT NO DRAWING NO THOMAS WELLS & ASSOCIATES / ARCHITECTS r l PwoJccT:"�-���E (. N j'1 r..•�►ter'; (�!•�/ DATE %, 6 ASPEN LOS ANL.ELES ' O{ � � • �• /��_ +�, �^ • ��, � ^ V DIETERICH-POST CLEJIRPRINT 1020 FOLD FOLD �VLa FOLD f- �Xf , I � i I 5*7 i KITC80N ` L�.F9lT A. P1&0RCKDNt NR- TITLE OF SHEET PROJECT NO DRAWING NO. I ``.v=,._. ems! THOMAS WELLS & ASSOCIATES / ARCHITECTS _ -- ++��--/�------ ____ ASPEN �. �.» A'vGEi E 7 PROJECT. "^,..� „w Lr Ui I i 7+ 141D:�I 3 1 ` N. DATE A ■ v�•.�cn�a. r�-r vas �.�Gnnrnu�l 1VCV :OLD •OLD � 0 P U I T co N guN�.S;s t TITLE 0/ SHEET tPROJECT NO DRAWING NO Irk r� THOMAS WELLS & ASSOCIATES / ARCHITECTS PROJECT:-! iJ� r n I'�'E A'" TE A H 45PFh LOS ANGELF'• DIETERICH-POST CLEARPRINT 1020 FOLD 'OLD FOLD FOLD E,"'iPLOyEE HO',J=iN6 TITLE OF SHEET PROJECT NO. DRAWING NO. �CGTioN I A I �c THOMAS WELLS & ASSOCIATES / ARCHITECTS , �[ - - P11dJECTt " HK" ���tT DATE A ASPEN-JS ANGELES DIETERICH-POST CLLARPRINT 10Y0 FOLD •OLO UNIT" TITLE OF SHEET PROJECT NO DRAWING NO THOMAS WELLS A ASSOCIATES / ARCHITECTS PROJECT: UNIor A=170b-4 DATE %� ASPEN LOS ANGEL ES - A 10 DIETERICH-POST CLEARPRINT I= FOLD FOLD FOLD TOLL •�pN�ip��pNl� 1�UN��lt1/�MN/ �� j I I TITLE OF SHEET PROJECT NO. DRAWING NO- wor- 6-6-= 'r 1 00:1 THOMAS WELLS & ASSOCIATES / ARCHITECTS P00nCT,"f}F REF_, `J;y('j ADD1?�lOiy DATE A 11 ASPS n: LOS ANGElES ; � i� � . r DIETERICH-POST CLEARPRINT I= FOLD FOLD FOLD :i FOLD TITLE �OFF SHEET r0ATE T NO.DRAWING NO i THOMAS WELLS 8 ASSOCIATES / ARCHITECTS PRID ECTr -r �F u-, 4i- ' ^oornoq A 12 ASPEN LOS ANGELES tolS S' HYMAN 57, �'� /r\ TOLD do-- FOLD TITLE OF SHEET PROJECT NO DRAWING NO THOMAS WELLS A ASSOCIATES / ARCHITECTS T ('� ASPEN LOS ANGELES PROJECTI + �.j Q �� j �� �L I �~ I _+(�, DAT[ A —J VICI CrtILn-R/JI L.LLARFPtlnl lYN FOLD