Loading...
HomeMy WebLinkAboutresolution.council.062-12 RESOLUTION # (�/ (Series of 2012) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT FOR MAROON CREEK METERING PROJECT BETWEEN THE CITY OF ASPEN AND HEYL CONSTRUCTION INC. AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO: WHEREAS, there has been submitted to the City Council a contract for the Maroon Creek Metering Project, between the City of Aspen and Heyl Construction Inc., a true and accurate copy of which is attached hereto as Exhibit NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Contract for the Maroon Creek Metering Project, between the City of Aspen and Heyl Construction Inc. a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 11th day of June, 2012. Michael C. Ireland, Mayor I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, June 11, 2012. -oar ∎1. 4/ • ' Kai n S. Koch, City Clerk The City of!been CONTRACT FOR CONSTRUCTION City Meiners Office THIS AGREEMENT, made and entered into on June 11, 2012, by and between the CITY OF ASPEN, Colorado, hereinafter called the "City", and Hevl Construction Inc., hereinafter called the "Contractor". WHEREAS, the City has caused to be prepared, in accordance with the law, specifications and other Contract Documents for the work herein described, and has approved and adopted said documents, and has caused to be published, in the manner and for the time required by law, an advertisement, for the project:Maroon Creek Metering Project, and, WHEREAS, the Contractor, in response to such advertisement, or in response to direct invitation, has submitted to the City, in the manner and at the time specified, a sealed Bid in accordance with the terms of said Invitation for Bids; and, WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined, and canvassed the Bids submitted in response to the published Invitation for Bids therefore, and as a result of such canvass has determined and declared the Contractor to be the lowest responsible and responsive bidder for the said Work and has duly awarded to the Contractor a Contract for Construction therefore, for the sum or sums set forth herein; NOW, THEREFORE, in consideration of the payments and Contract for Construction herein mentioned: 1. The Contractor shall commence and complete the construction of the Work as fully described in the Contract Documents. 2. The Contractor shall furnish all of the materials, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Work described herein. 3. The Contractor shall commence the work required by the Contract Documents within seven (7) consecutive calendar days after the date of "Notice to Proceed" and will complete the same by the date and time indicated in the Special Conditions unless the time is extended in accordance with appropriate provisions in the Contract Documents. 4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for a sum not to exceed One Hundred Eighty Nine Thousand Eight Hundred Ninety Nine ($189,899.00) Dollars or as shown on the BID proposal. 5. The term "Contract Documents" means and includes the documents listed in the City of Aspen General Conditions to Contracts for Construction (version GC97-2) and in the CC1-971.doc Page 1 **CC1 Special Conditions. The Contract Documents are included herein by this reference and made a part hereof as if fully set forth here. 6. The City shall pay to the Contractor in the manner and at such time as set forth in the General Conditions, unless modified by the Special Conditions, such .amounts as required by the Documents. 7. This Contract for Construction shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. Notwithstanding anything to the contrary contained herein or in the Contract Documents, this Contract for Construction shall be subject to the City of Aspen Procurement Code, Title 4 of the Municipal Code, including the approval requirements of Section 4-08-040. This agreement shall not be binding upon the City unless duly executed by the City Manager or the Mayor of the City of Aspen (or a duly authorized official in his/her absence) following a resolution of the Council of the City of Aspen authorizing the Mayor or City Manager (or a duly authorized official in his/her absence) to execute the same. 8. This agreement and all of the covenants hereof shall inure to the benefit of and be binding upon the City and the Contractor respectively and their agents, representatives, employees. Successors, assign , and legal representatives. Neither the City nor the Contractor shall have the right to assign, transfer or sublet his or her interest or obligations hereunder without the written consent of the other party. 9. This agreement does not and shall not be deemed or construed to confer upon or grant to any third party or parties, except to parties to whom the Contractor or the City may assign this Contract for Construction in accordance with the specific written consent, any rights to claim damages or to bring suit, action or other proceeding against either the City or the Contractor because of any breach hereof or because of any of the terms, covenants, agreements or conditions herein contained. 10. No waiver of default by either party of any terms, covenants or conditions hereof to be performed, kept and observed by the other party shall be construed, or 'operate as, a waiver of any subsequent default of any of the terms, covenants or conditions herein contained, to be performed, kept and observed by the other party. 11. The parties agree that this Contract for Construction was made in accordance with the laws of the State of Colorado and shall be so construed. Venue is agreed to be kept exclusively in the courts of Pitkin County, Colorado. 12. In the event that legal action is necessary to enforce any of the provisions of this Contract for Construction, the prevailing party shall be entitled to its costs and reasonable attorney's fees. 13. This Contract for Construction was reviewed and accepted through the mutual efforts of the parties hereto, and the parties agree that no construction shall be made or presumption shall arise for or against either party based on any alleged unequal status of the parties in the negotiation, review or drafting of this Contract for Construction. CC1-971.doc Page 2 "CC1 14. The undersigned representative of the Contractor, as an inducement to the City to execute. this Contract for Construction, represents that he/she is an authorized representative of the Contractor for the purposes of executing this- Contract For Construction and that he/she has full and complete authority to enter into this Contract for Construction for the terms and conditions specified herein. IN WITNESS WHEREOF, the parties agree hereto have executed this Contract for Construction on the date first above written. ATTESTED BY: CITY OF ASPEN, COLORADO By: Title: APPROVED AS TO FORM: By: City Attorney ATTESTED BY: CONTRACTOR: 41_& By: Title: d/'GS/o/. 7 Note: Certification of Incorporation shall be executed if Contractor is a Corporation. If a partnership, the Contract shall be signed by a Principal and indicate title. CC1-971.doc Page 3 "CC1 CERTIFICATE OF INCORPORATION (To be completed if Contractor is a Corporation) STATE OF 6i'a04 ) ) SS. COUNTY OF ;j-/uZer ) On this J/ day of flay , 20/.? , before me appeared /6G-ucr/ , to me personally known, who, being by me first duly sworn, did say that s/he is - /e'-,e) of A4,! l'� A ems, .7,2d and that the seal affixed to said instrument is the corporate seal of said corporation, and that said instrument was signed and sealed in behalf of said corporation by authority of its board of directors, and said deponent acknowledged said instrument to be the free act and deed of said corporation. WITNESS MY HAND AND NOTARIAL SEAL the day and year in this certificate first above written. 6..i', °yV3°l r ,JL -1-u / �/ • -� N ry Public ° G+'``' 'J (;;4,. ,c �;-� HEY[- COI\S r.i� C Ti ON INC, LI\a 6560 CR 3q-.p.{:l .. NEli CAS LF CO (cii 47 Address My commission expires: 9 //- „/O/l CC1-971.doc Page 4 **CC1 Certification and Supplemental Conditions to Contract for Services -. Conformance with §8-17.5.101, et seq. Purpose. During the 2006 Colorado legislative session, the Legislature passed House Bill 06-1343 that added a new article 17.5 to Title 8 of the Colorado Revised Statutes entitled"Illegal Aliens— Public Contracts for Services.''' This new law prohibits all state agencies and political subdivisions, including the City of Aspen, from knowingly employing or contracting with an illegal alien to perform work under a contract, or to knowingly contract with a subcontractor who knowingly employs or contracts with an illegal alien to perform work under the contract. The new law also requires that all contracts for services include certain specific language as set forth in the statutes. This Certification and Supplemental Conditions has been designed to comply with the requirements of this new law. Applicability. The certification and supplemental conditions set forth herein shall be required to be executed by all persons having a public contract for services with the City of Aspen. Definitions. The following terms are defined in the new law and by this reference are incorporated herein and in any contract for services entered into with the City of Aspen. - "Basic Pilot Program"means the basic pilot employment verification program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, that is administered by the United States Department of Homeland Security. "Contractor"means a person having a public contract for services with the City of Aspen. "Public Contract for Services"means any type of agreement, regardless of what the agreement may be called, between the City of Aspen and a Contractor for the procurement of services. It specifically means the contract or agreement referenced below. • "Services"means the furnishing of labor, time, or effort by a Contractor or a subcontractor not involving the delivery of a specific end product other than reports that are merely incidental to the required performance. PURSUANT TO SECTION 8-17.5-101, C.R.S., et. seq.: By signing this document, Contractor certifies and represents that at this time: (i) Contractor does not knowingly employ or contract with an illegal alien; and (ii) Contractor has participated or attempted to participate in the Basic Pilot Program in order to verify that it does not employ illegal aliens. The Public Contract for Services referenced below is hereby amended to include the following terms and conditions: 1. Contractor shall not knowingly employ or contract with an illegal alien to perform work under the Public Contract for Services. 2. Contractor shall not enter into a contract with a subcontractor that fails to certify to the Contractor that the subcontractor shall not knowingly employ or contract with an illegal alien to perform work under the Public Contract for Services. 3. Contractor has verified or has attempted to verify through participation in the Federal Basic Pilot Program that Contractor does not employ any illegal aliens; and if Contractor has not been accepted into the Federal Basic Pilot Program prior to entering into the Public Contract for Services, Contractor shall forthwith apply to participate in the Federal Basic Pilot Program and shall in writing verify such application within five (5) days of the date of the Public Contract. Contractor shall continue to apply to participate in the Federal Basic Pilot Program and shall in writing verify same every three (3) calendar months thereafter, until Contractor is accepted or the public contract for services has been completed, whichever is earlier.The requirements of this section shall not be required or effective if the Federal Basic Pilot Program is discontinued. 4. Contractor shall not use the Basic Pilot Program procedures to undertake pre-employment screening of job applicants while the Public Contract for Services is being performed. 5. If Contractor obtains actual knowledge that a subcontractor performing work under the Public Contract for Services knowingly employs or contracts with an illegal alien, Contractor shall: (i) Notify such subcontractor and the City of Aspen within three days that Contractor has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and (ii) Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Contractor shall not terminate the Public Contract for Services with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. 6. Contractor shall comply with any reasonable request by the Colorado Department of Labor and Employment made in the course of an investigation that the Colorado Department of Labor and Employment undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5- 102 (5), C.R.S. 7. If Contractor violates any provision of the Public Contract for Services pertaining to the duties imposed by Subsection`8-17.5-102, C.R.S. the City of Aspen may terminate the Public Contract for Services. If the Public Contract for Services is so terminated, Contractor shall be liable for actual and consequential damages to the City of Aspen arising out of Contractor's violation of Subsection 8- 17.5-102, C.R.S. Public Contract for Services: Contractor: / / ')//"1 //1/1 By: - / Title: ///l°/� /Oft44 JPW-saved:5131/2012-867-M:\city\cityatty\contract\forms\certification-hb-06-1343.doc • • • • • • • • BID BONA • KNOW ALL PERSONS BY THESE PRESENTS,That we,the'undersigned, Heyl Construction.Inc., • of 6560 GR X35 New Castle CO 816 , 47 as'Principal,hereinafter referred to as"Prinapal",;and Berkley Regional Insurance Company a corporation organized under the laws'Of the State of :'Delaware ,end qualified to transact business in the State of Colorado,as"Surety"are held and firnly`bound unto the;City of lspen,Colorado,as;obligee,hereinafter referred toas"City,"in the;penal sum:of Five Percent of Amount Bid Dailars ),lawful money of the United States of America,far the Payment of which sum,well and truly to be made to?the Clty,we bind ourselves,:and our heirs,executors, • administrators,successors,and assignees,jointly and severally;by these presents WHEREAS,said,Principal has submitted a bid for construction of Maroon Creek Metering project. NOW THEREFOfE, if he City shall accept the bid of the Principal and the'Principal shalt enter Into'a Contract for Construction filth the City to accordance with the terms of such iBid, and,given such bond or bonds as [r ay be specified in the Bid Package or Contract.Documents with good andsuf icient surety fort a faithful performance of such contract and:for the";prompt.payment of labor and material furnished in ;the prosecution thereof, •or in the ;event of the failure of the Prir cipal to enter such Contract for Construction and give such bond or bonds, if the Principal shall pay to the•City the difference not to.exceed`the penalty hereof between the amount specified in said bid:and such larger amount for which the Principal may;in good faith contract with another party to peform the work;covered by said Bid,then this shall be null and void,otherwise to•retrain in hill force and effect in law. ' SIGNED AND SEALED this • 22nd..: day •of :May ,,201:2.. • • PRINCIPAL: (seat)_ git f' BY < ' . Attest c„e 2 , . • • r trt YRETY tc,�1 t e Re a Tonal insurance •m ari {seal). . ��dr,�� �. � � fitness � a .s ) i .�� _ �.� • a �, Jes Talbot.•le; ,Cnsten L McCormick,Attorney-in-Fact • • • Accompany Mit bond with certified copy of General Power of Attorney from the Surety Company to include the date of the 4on4) • ae ° :ao� sae - • • • BID PROPOSAL FORM 04/30/2012 PROJECT NO. : 2012-048 BID DATE: Mary 22,2012 PROJECT: MAROON CREEK METERING PROPOSAL SUBMITTED BY: Heyl Construction, Inc CONTRACTOR CONTRACTOR'S PROPOSAL TO: The Governing Body of the City of Aspen,Colorado The undersigned responsible bidder declares and stipulates that this proposal is made in good faith,without collusion or connection with any other person or persons bidding for the same work, and that it is made in pursuance of and subject to all the terms and conditions of the advertisement for bid, the invitation to bid and request for bid,all the requirements of the bid documents including the plans and specifications for this bid, all of which have been read and examined prior to signature. The bidder agrees to keep this bid open for Sixty(60) consecutive calendar days from the date of bid opening. The Contractor agrees that construction shall start immediately following a mandatory pre-construction conference held by the Water Department, which also constitutes the Notice to Proceed. Submission of this proposal will be taken by the City of Aspen as a binding covenant that the Contractor will fmish construction within the time specified in the Special Conditions of this contract document. The City of Aspen reserves the right to make the award on the basis of the bid deemed most favorable to the City,to waive any informalities or to reject any or all bids. The City shall not pay the Contractor for defective work and/or for repairs or additional work required for successful completion of the project. All work not specifically set forth as a pay item in the bid form shall be considered a subsidiary obligation of the Contractor and all costs in connection therewith shall be included in the prices bid for the various items of work. Prices shall include all costs in connection with furnishing the proper and success completion of the work, including furnishing all materials, equipment and tools,and performing all labor and supervision to fully complete the work to the City's satisfaction. Poor quality and workmanship shall not be paid for by the City. Such work product must be removed immediately and replaced properly at no cost to the City. All quantities stipulated in the bid form at unit prices are approximate and are to be used only as a basis for estimating the probable cost of work and for the purpose of comparing the bids submitted to the City. The basis of payment shall be the actual amount of materials furnished and work done. The Contractor agrees to make no claims for damages,anticipated profit,or otherwise on account of any differences between the BP1-971.doc `BPI P ge 1 ctor's Initials • amount of work actually performed and materials actually furnished and the estimated amount of work. The City reserves the right to increase or decrease the amount of work to be done on the basis of the bid unit price and up to plus or minus Twenty Five(25)Percent of the total bid. By signing this document,Contractor certifies and represents that at this time: (i) Professional shall confirm the employment eligibility of all employees who are newly hired for employment in the United States; and • (ii)Professional has participated or attempted to participate in the Basic Pilot Program in order to verify that it does not employ illegal aliens. I hereby acknowledge receipt of ADDENDUM(s)numbered 1 through ESTIMATED OUANTITY LIST Item Description Totals • 1. • MAROON CREEK METER VAULT: Includes installation(except where specifically noted otherwise)and handling all required City of Aspen and contractor supplied materials and equipment,potholing and verification of existing lines and facilities, all excavation,removal of existing piping and concrete, - protection of existing facilities, installation of new piping, couplings, COA meter,vault supports,concrete vault,lid,and cover,backfill, bedding,compaction, site grading,revegetation,meter operation testing,access road maintenance,and all other items as specified and detailed on the drawings and in the specifications as required to install the new meter. Contractor to supply and install an 8' Dia MH over the existing 30' Concrete Pipe and install a COA supplied Flow Meter inline on the 30"Conc pipe. MH is to be an 8' Dia,-'4' deep(to Bottom of Pipe)MH with a 36"access lid and flat top. The COA supplied meter is to be a 30"McCrometer UltraMag Meter with 125# • flanges. Contractor to supply couplings and pipe to allow transition from 30"Concrete to 30"Flanged DIP and back to 30"DIP, 30"solid sleeves, 30"vertical bends to lower and raise pipe—48", 30"bends if needed for horz.deflections, and 30"tee and plug for access port. Please provide submittals for all vaults and coupling materials Contractor is to install meter in-line on the 30"pipe. Including all . items except supplying the meter. Proposal,at the Lump Sum price of the meter vault. 1. Maroon Creek Meter Vault $ 81,351.94 Eighty one thousand three hundred fifty one and 94/100 BPI-971.doc *BPI Page 2 ntractor's Initials • 2. West Water Treatment Plant Venturi Replacement_ Supplying all labor and materials to remove and replace the existing (4)four BIF Venturi Meters. Work includes completion of the purchase agreement with BIF, all handling of the existing and new meters, removal of the existing meters and actuators, verification of all dimensions for the new meters, installation of the new meters, reinstallation of the existing actuators, (to be used), reconnection of all electrical and controls related to the existing actuators, assistance in all testing and calibration of the new meter as detailed and specified on the BIF and MWE drawings and specifications, for a Lump Sum price of 2. West WTP Venturi Meter Replacement= $ 79,465.65 Seventy nine thousand four hundred sixty five and 65/100 3. Raw Water Line Isolation Valve: • Includes installation(except where specifically noted otherwise)and handling all required City of Aspen and contractor supplied materials and equipment,potholing potholing and verification of existing lines and facilities, all excavation,removal of existing piping,protection of existing facilities,installation of new piping,Installation of new valve, couplings,backfill,bedding,compaction, subgrade installation and compaction,asphalt replacement,revegetation,'and all other items as specified and detailed on the drawings and in the specifications as required to install the new meter. Proposal, at the Lump Sum price of the meter vault. 3. Raw Water Isolation Valve Installation $ 29,080.41 twenty nine thousand eighty and 41/100 TOTAL BID (1, 2, and 3) Total Bid in Numbers: $189,899.00 Total Bid in Words: One hundred eighty nine thousand eight hundred ninety nine and 0/100 I acknowledge that in submitting this bid it is understood that the right to reject any and all bids has been reserved by the owner. Authorized Officer: David He 1 , Title: President Full name signature: — 0000, Company address: 6560 County RD 335 New Castle, CO 81647 • Telephone number: 970.984.3404 Email: dheyl @heylcivil.com BP1-971.doc 'BP1 •:ge 3 ./ fir'.tractor's Initials Attested by: Subcontractor & Material Supplier List Name: GJ Pipe ,Phone#: 963.5700 Address: 740 Hwy 133 Carbondale, CO 81623 Service or Product: All pipe and fittings Name: Western Slope Materials • ,Phone#: 963.2296 Address: Carbondale Service or Product: aggregates Name: Casey Concrete ,Phone#: 963.2296 Address: Carbondale Service or Product: Concrete Name: Grand River Construction ,Phone#: 945.7758 Address: Glenwood Springs Service or Product: asphalt Name: , Phone#: Address: Service or Product: Name: ,Phone#: Address: Service or Product: BP1-971.doc *BPI 'age 4 /�� ractor's Initials • • AFFIDAVIT OF COMPLIANCE PROJECT NUMBER: 2012-048 The undersigned contractor has read a copy of the Contract Documents including the construction plans, for this project and understands and hereby affirms that he/she does not now, nor will he/she in the future,violate the provisions of said Contract Documents,so long as he/she is under the Contract to the City of Aspen for the performance of a Contract. The undersigned further acknowledges he/she understands and agrees to all terms and conditions of the Aspen Municipal Code and its being part of the Contract with the City of Aspen. Attest �a Corpor to Seal Hey]. Construction, Inc Contractor By: //�/ STA TE OF COLORADO ) SS. COUNTY ) Before me . c cl t'-k_ ,a notary public and for County,Colorado personally appeared Dist-u 14-41j I known to me personally to be the person(s)whose signature(s)in my presence this day of ,A.D. My commission expires: 9-// -,a1) (Seal) oti uusiu///��� Notary y Publi S'O.° o,0TARye ° C ar d ° s ACI-971.doe • *AC1 . • City of Aspen Qualification Statement Project NO.: 2012-048 Maroon Creek Metering Project 1. Firm Name, Business Address, Contact Person. & Telephone Number: 2. Year Present Firm 3. Date This Form Established:1999 Prepared: 5/22/12 Heyl Construction, Inc 6560 County RD 335 New Castle, CO 81647 4. Type of Ownership: A. Small Business David Heyl 970.984.3404 B. Minority Owned Y S Corp C. Women Owned 5. Names of not more than two principals to contact: Title/Telephone: a)David Heyl President/970.274.6488 ' b)Kerri Heyl CFO/970..366.0588 6.-Project Examples, Last 5 Years: Project Name, Location & Brief Description: Owner's Name, Address & Telephone: Coat of Work Date (X $1,000) Completed ' 1. Music School Pump House City of Aspen New pump house and infrastructure to Mueller Construction 170,000 on going accommodate the music school. 2. Aspen Valley Hospital utility work Haselden Construction 800,000 12/12/12 Complete infrastructure water mains, sewer mains, storm drainage. 3. Duck Pond Structures C-DOT 361,000 5/2012 Install new dam structures and pipe for a small pond in Grandjuction 4• Sinclair Meadows Related Westpac 4,600,000 5/2009 New subdivision in Snowmass includes all Clearwater Construction infrastructure asphalt and curb and gutter for a 20 lot high end subdivision 5. Shadowrock subdivision Blue Ridge Investments 5,100,000 9/2008 New subdivision in El-Jebel complete infrastructure work and asphalt and curb and gutter for a 80 home site 6. Donegan road reconstruction City of Glenwood Springs 1,200,000 9/2007 Road reconstruction including infrastructure MSE walls, asphalt, curb and gutter 7. 8. • 9. 10. 031-971.doc •01 j . Description:Project Name, Location S Brief Descri p Owner's Name, Address S Telephone: Cost of Work Date (X 81,000) Completed 11. 1 1 I 12. 13. 14. 15. 16. 17. 18. 19. 7. Bank Refernces, Contact Person, Telephone Number: a) Community Banks of Colorado: Rodney Naylor 970.945.7035 b) c). 8. Trade References (material suppliers, subcontractors, etc.), Contact Person and Telephone Number: a)GJ Pipe: Dwayne Hall 970.963.5700 b)Wagner Equipment Bill Miller 970.379.3661 c) Western Slope Materials Sean Mello 970.379.0427. 9. Name of Bonding Company and Insurance Company, Agent's Name. Describe current liability insurance coverage: IMA of Colorado Sara Finn 303.615.7438 I hereby certify that the above Qualification Statement is accurate and true. I hereby authorize the City of Aspen to contact any and all of the persons/fi/. : i-ted above to obtain further information regarding the qualifications of my firm. President Signature , / Title QS1-971.doc *QS' The City of Aspen CONTRACT FOR CONSTRUCTION City limners Office THIS AGREEMENT, made and entered into on June 11, 2012, by and between the CITY OF ASPEN, Colorado, hereinafter called the "City", and Nevi Construction Inc., hereinafter called the "Contractor". WHEREAS, the City has caused to be prepared, in accordance with the law, specifications and other Contract Documents for the work herein described, and has approved and adopted said documents, and has caused to be published, in the manner and for the time required by law, an advertisement, for the project: Maroon Creek Metering Project, and, WHEREAS, the Contractor, in response to such advertisement, or in response to direct invitation, has submitted to the City, in the manner and at the time specified, a sealed Bid in accordance with the terms of said Invitation for Bids; and, WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined, and canvassed the Bids submitted in response to the published Invitation for Bids therefore, and as a result of such canvass has determined and declared the Contractor to be the lowest responsible and responsive bidder for the said Work and has duly awarded to the Contractor a Contract for Construction therefore, for the sum or sums set forth herein; NOW, THEREFORE, in consideration of the payments and Contract for Construction herein mentioned: 1. The Contractor shall commence and complete the construction of the Work as fully described in the Contract Documents. 2. The Contractor shall furnish all of the materials, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Work described herein. 3. The Contractor shall commence the work required by the Contract Documents within seven (7) consecutive calendar days after the date of "Notice to Proceed" and will complete the same by the date and time indicated in the Special Conditions unless the time is extended in accordance with appropriate provisions in the Contract Documents. 4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for a sum not to exceed One Hundred Eighty Nine Thousand Eight Hundred Ninety Nine ($189.899.00) Dollars or as shown on the BID proposal. 5. The term "Contract Documents" means and includes the documents listed in the City of Aspen General Conditions to Contracts for Construction (version GC97-2) and in the CC1-971.doc Page 1 **CC1 Special Conditions. The Contract Documents are included herein by this reference and made a part hereof as if fully set forth here. 6. The City shall pay to the Contractor in the manner and at such time as set forth in the General Conditions, unless modified by the Special Conditions, such amounts as required by the Documents. 7. This Contract for Construction shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. Notwithstanding anything to the contrary contained herein or in the Contract Documents, this Contract for Construction shall be subject to the City of Aspen Procurement Code, Title 4 of the Municipal Code, including the approval requirements of Section 4-08-040. This agreement shall not be binding upon the City unless duly executed by the City Manager or the Mayor of the City of Aspen (or a duly authorized official in his/her absence) following a resolution of the Council of the City of Aspen authorizing the Mayor or City Manager (or a duly authorized official in his/her absence) to execute the same. 8. This agreement and all of the covenants hereof shall inure to the benefit of and be binding upon the City and the Contractor respectively and their agents, representatives, employees. Successors, assigns, and legal representatives. Neither the City nor the Contractor shall have the right to assign, transfer or sublet his or her interest or obligations hereunder without the written consent of the other party. 9. This agreement does not and shall not be deemed or construed to confer upon or grant to any third party or parties, except to parties to whom the Contractor or the City may assign this Contract for Construction in accordance with the specific written consent, any rights to claim damages or to bring suit, action or other proceeding against either the City or the Contractor because of any breach hereof or because of any of the terms, covenants, agreements or conditions herein contained. 10. No waiver of default by either party of any terms, covenants or conditions hereof to be performed, kept and observed by the other party shall be construed, or operate as, a waiver of any subsequent default of any of the terms, covenants or conditions herein contained, to be performed, kept and observed by the other party. 11. The parties agree that this Contract for Construction was made in accordance with the laws of the State of Colorado and shall be so construed. Venue is agreed to be kept exclusively in the courts of Pitkin County, Colorado. 12. In the event that legal action is necessary to enforce any of the provisions of this Contract for Construction, the prevailing party shall be entitled to its costs and reasonable attorney's fees. 13. This Contract for Construction was reviewed and accepted through the mutual efforts of the parties hereto, and the parties agree that no construction shall be made or presumption shall arise for or against either party based on any alleged unequal status of the parties in the negotiation, review or drafting of this Contract for Construction. CC1-971.doc Page 2 **CC1 14. The undersigned representative of the Contractor, as an inducement to the City to execute this Contract for Construction, represents that he/she is an authorized representative of the Contractor for the purposes of executing this Contract For Construction and that he/she has full and complete authority to enter into this Contract for Construction for the terms and conditions specified herein. IN WITNESS WHEREOF, the parties agree hereto have executed this Contract for Construction on the date first above written. ATTESTED BY: CITY OF%;PEN, COLORADO £ 'L piry Title: Pa4Loti-Cr APPROVED AS TO FORM: By: �---� � Ci ttorney ATTESTED BY: CONTRACTOR: CIKe._ ' `�.�✓ By: Title: 4/'(i Note: Certification of Incorporation shall be executed if Contractor is a Corporation. If a partnership, the Contract shall be signed by a Principal and indicate title. CC1-971.doc Page 3 "CC1 CERTIFICATE OF INCORPORATION (To be completed if Contractor is a Corporation) STATE OF L ra ) ) SS. COUNTY OF 61,-,./.644/,64l� ) On this J/ day of /277 , 201? , before me appeared /60. e% /x , to me personally known, who, being by me first duly sworn, did say that s/he is diet ,' /Ce, of ,l rz4 2 ' and that the seal affixed to said i strument is the corporate seal of said corporation, and that said instrument was signed and sealed in behalf of said corporation by authority of its board of directors, and said deponent acknowledged said instrument to be the free act and deed of said corporation. WITNESS MY HAND AND NOTARIAL SEAL the day and year in this certificate first above written. 0. y N ry Public p'I L. C °° HEYL CONSTRUCTION INC. y >° " 6560 CR 335 CASTLE NEW CO 81647 Address My commission expires: 9 //- 07O'% CC1-971.doc Page 4 "CC1 Certification and Supplemental Conditions to Contract for Services - Conformance with 8-17.5.101, et seq. Purpose. During the 2006 Colorado legislative session, the Legislature passed House Bill 06-1343 that added a new article 17.5 to Title 8 of the Colorado Revised Statutes entitled"Illegal Aliens— Public Contracts for Services."This new law prohibits all state agencies and political subdivisions, including the City of Aspen, from knowingly employing or contracting with an illegal alien to perform work under a contract, or to knowingly contract with a subcontractor who knowingly employs or contracts with an illegal alien to perform work under the contract. The new law also requires that all contracts for services include certain specific language as set forth in the statutes. This Certification and Supplemental Conditions has been designed to comply with the requirements of this new law. Applicability. The certification and supplemental conditions set forth herein shall be required to be executed by all persons having a public contract for services with the City of Aspen. Definitions. The following terms are defined in the new law and by this reference are incorporated herein and in any contract for services entered into with the City of Aspen. "Basic Pilot Program"means the basic pilot employment verification program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, that is administered by the United States Department of Homeland Security. "Contractor"means a person having a public contract for services with the City of Aspen. "Public Contract for Services" means any type of agreement, regardless of what the agreement may be called, between the City of Aspen and a Contractor for the procurement of services. It specifically means the contract or agreement referenced below. "Services"means the furnishing of labor, time, or effort by a Contractor or a subcontractor not involving the delivery of a specific end product other than reports that are merely incidental to the required performance. PURSUANT TO SECTION 8-17.5-101, C.R.S., et. seq.: By signing this document, Contractor certifies and represents that at this time: (i) Contractor does not knowingly employ or contract with an illegal alien; and (ii) Contractor has participated or attempted to participate in the Basic Pilot Program in order to verify that it does not employ illegal aliens. The Public Contract for Services referenced below is hereby amended to include the following terms and conditions: 1. Contractor shall not knowingly employ or contract with an illegal alien to perform work under the Public Contract for Services. 2. Contractor shall not enter into a contract with a subcontractor that fails to certify to the Contractor that the subcontractor shall not knowingly employ or contract with an illegal alien to perform work under the Public Contract for Services. 3. Contractor has verified or has attempted to verify through participation in the Federal Basic Pilot Program that Contractor does not employ any illegal aliens; and if Contractor has not been accepted into the Federal Basic Pilot Program prior to entering into the Public Contract for Services, Contractor shall forthwith apply to participate in the Federal Basic Pilot Program and shall in writing verify such application within five (5) days of the date of the Public Contract. Contractor shall continue to apply to participate in the Federal Basic Pilot Program and shall in writing verify same every three (3) calendar months thereafter, until Contractor is accepted or the public contract for services has been completed, whichever is earlier. The requirements of this section shall not be required or effective if the Federal Basic Pilot Program is discontinued. 4. Contractor shall not use the Basic Pilot Program procedures to undertake pre-employment screening of job applicants while the Public Contract for Services is being performed. 5. If Contractor obtains actual knowledge that a subcontractor performing work under the Public Contract for Services knowingly employs or contracts with an illegal alien, Contractor shall: (i) Notify such subcontractor and the City of Aspen within three days that Contractor has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and (ii) Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Contractor shall not terminate the Public Contract for Services with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. 6. Contractor shall comply with any reasonable request by the Colorado Department of Labor and Employment made in the course of an investigation that the Colorado Department of Labor and Employment undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5- 102 (5), C.R.S. 7. If Contractor violates any provision of the Public Contract for Services pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City of Aspen may terminate the Public Contract for Services. If the Public Contract for Services is so terminated, Contractor shall be liable for actual and consequential damages to the City of Aspen arising out of Contractor's violation of Subsection 8- 17.5-102, C.R.S. Public Contract for Services: �/ / Contractor: �-/ / _cy�7��' !/1/1 ''�j By: d Y Title: ,///z°/� /o/t44 JPW-saved:5/31/2012-867-M:\city\cityatty\contract\forms\certification-hb-06-I343.doc a . . BID BOND: ,KNOW ALL PERSONS BY THESE PRESENTS,That we,the undersigned, • .:Heyl Construction.Ine. 8560 CR 335 New Castle,CO 81647 :: as Prir ai,herei of hereinafter referred to es"Prindpat',and 'Berkley Regional Insurance Compaq,;, a corporation organized under;the Jaws tst the'State orf Delaware ,and qualified to transact businessIn the State of Colorado,as°Surety"ere held and firm bound.unto the City of Aspen,Colorado,as 401!60.0;hereinafter referred.4..4.. **. "City,".,.k.„.'4..0...0. penal sum of Five Percent of Amount Bid Dollars • $ 5% ),lawful money of the United States of America,for the Payment of which sum,we11 and truly to be made to the City,we;bind ourselves,end ou(heirs,;executors, administrators,successors,and assignees,Jointly and severally,by these presents: WHEREAS,said Principal has submte a bbtd for construction of Maroon CreekMeterina';pro1ect.•NOW THEREFORE,if the City shall accept the bid of the.Principal and the Principal shall enter Into a Contract':for Construction with,the City in accordance`with the terms of such'Hid, and given such bond or bonds as may be specified in the Bid•�Paekage or Contract Documents with good • and.sufficient sung for the faithful performance of suc 1 contract and for the prompt payment of labor end material furnished in the prosecution thhereof, or in the event;of the:failure of the Principal to enter such Contract for Construction and give such bond or bonds, if the Principal shall pay to the City the difference not:to.exceed the'penalty'he:ie./it between the amount specified in said bid anti such larger amount for which the Principal may in good faith contract with another party.to perform the work covered by said Hid,then this shall be null end**,otherwise to remain •in full force and effect in law. SIGNED AND'SEALED this 22nd day of ,Mao::. 201:2. PRINCI.PAL: .Heyl ,; truction,Inc..... ._..:•• (seat) // , , BY Attest' � C,.ti Title: , .y JRETX � ,a-. z , i„,i RR .tonal Insurance .;.tit;an .,: (seal) t i� .,V .•, e� fitness v . "41: r :as / J )%4151.t: 1�. /.dam . : -' ' m.. �. cu t Jes a 4 #le ,Kristen L:'McCor ick Attorney-in-Fact Talbot 'Aceompany this bond with certified.copy of General;Power of Attorney from the Surety Company to Include the date of the bond.) 5B1-971.doc "8B1 1 • • • I n t-U vans .for nqui a .n .l o is s t 'e o d to hed to•'T its Power' • • 8erkky surety Grope,LLC is the of iliated undearwriting manageir fors the surety bu ess of Acadiai surance OOmpar►.y,Betkiey Insurance Company,Berkley Regional Insurance Company,•Carolina CasusIty ihtsurance t n.Pa y UBlo Standard fns urauce Cempnuy Conttpental . stern Insurance Company(011H:040 insrasce Cutniaat} T�;o:ver'iiy a authenticity of the1b(ind .please=cats 0. 66)76843 44:rr-emai1 BSOlu4ulry berhleysurekty.cor written nttt ees,inquiries,claims or•demands:to the surety on the band to which 1s Ridetr is•attached should be 414 ectptl ttt' • • • Berkley Surety Group,<LL • 412 Mount Ketnble A enue Suite toN .14orristown,N.3 47900 Aitteution Surety Glaimz pegartnieat • Or e riaii BS Gfla fn @ber`kleysurety.com Please 144040`ith all notices the hoed number and the name of the pnocipal on the bond.Where a claim is • b'e g asseried,I lease set fortlh•generally the rbiiis of the elann. In,the ease of.a payment.or.1$14.06 04 bond, 1e se ientirfy the project ti �rt�i01R1'a bond pertains • • • •