Loading...
HomeMy WebLinkAboutcoa.lu.sm.Lefton 1440 N Red Butte.69A-89 1 CASELOAD SUMMARY SHEET City of Aspen DATE RECEIVED: 6/28189 PARCEL ID AND CASE NO. DATE COMPLETE: 10\\16\$5 2735-013-02-001 69A-89 STAFF MEMBER: l�A,4-t PROJECT NAME: Lefton Stream Margin Review Project Address: 1440 N. Red Butte Drive Legal Address: Lot 4, Block 1, Red Butte Subdivision APPLICANT: Donald Lefton Applicant Address: REPRESENTATIVE: Stan Mathis Representative Address/Phone: P. O. Box 1984 Aspen, CO 81612 0-1434 PAID: YES NO AMOUNT: $780.00 NO. OF COPIES RECEIVED: 1 TYPE OF APPLICATION: 1 STEP: / 2 STEP: P&Z Meeting Date O fix,(S PUBLIC HEARING: YES N VESTED RIGHTS: YES CC Meeting Date PUBLIC HEARING: YES NO VESTED RIGHTS: YES NO Planning Director Approval: Paid: Insubstantial Amendment or Exemption: Date: REFERRALS: , City Attorney Mtn. Bell School District v/ City Engineer Parks Dept. Rocky Mtn Nat Gas Housing Dir. Holy Cross State Hwy Dept(GW) Aspen Water Fire Marshall State Hwy Dept(GJ) City Electric Building Inspector Envir. Hlth. Roaring Fork Other Aspen Consol. Energy Center S.D. ,�Q DATE REFERRED: / G Pl INITIALS: f�0( FINAL ROUTING: DATE ROUTED: /o%S/c INITIAL: City Atty City Engineer Zoning Env. Health Housing Other:GY .I FILE STATUS AND LOCATION: Ze, 41-; f7 I At their August 15, 1989 meeting the Planning and Zoning Commission approved the Stream Margin Review for Donald Lefton at 1440 North Red Butte Drive subject to the following conditions: 1. No trees shall be removed within 24 feet of the floodway location and removal of trees 6" caliper or more shall require a tree removal permit from the Parks Department. The applicant has consented to these conditions. lefton2 3 MEMORANDUM TO: Aspen Planning and Zoning Commission FROM: Leslie Lamont, Planner RE: Consent Agenda/Lefton Stream Margin Review DATE: August 15, 1989 SUMMARY: The applicant . proposes to construct a single family residence. The proposed development is located 24 feet from the 100 year floodplain line and 48 feet from the ordinary high waterline. Section 7-5-4, of the Land Use Code requires stream margin review for development that is within 100 feet of the high water line. APPLICANT: Donald Lefton, represented by Stan Mathis. LOCATION: 1440 North Red Butte Drive, City of Aspen. ZONING: R-15. APPLICANT'S REQUEST: Stream Margin Review approval for the construction of a single family home. REFERRAL COMMENTS: Engineering: In a memo dated August 3 , 1989, the Engineering Department recommended approval. STAFF COMMENTS: Section 7-504 outlines stream margin review criteria as follows: Criterion 1: It can be demonstrated that any proposed develop- ment which is in the Special Flood Hazard Area will not increase the base flood elevation on the parcel proposed for development. This shall be demonstrated by an engineering study prepared by a professional engineer registered to practice in the State of Colorado which shows that the base flood elevation will not be raised, including, but not limited to, proposing mitigation techniques on or off-site which compensate for any base flood elevation increase caused by the development. RESPONSE: The parcel is very flat. The proposal will not increase the base flood elevation on the parcel. The flood elevation of this parcel is 7715. 7 and the lowest floor elevation is 7717. 5. Criterion 2: Any trail on the parcel designated on the Aspen Area Comprehensive Plan: Parks/Recreation/Open Space/Trails Plan map is dedicated for public use. RESPONSE: There are no public trails designated for this site. The Rio Grande pedestrian and bike trail is across the river from this site. Criterion 3: The recommendations of the Roaring Fork rk G reenway Plan are implemented in the proposed plan for development, to the greatest extent practicable. RESPONSE: The Greenway Plan does not include this parcel. Criterion 4: No vegetation is removed or slope grade changes made that produce erosion and sedimentation of the stream bank. RESPONSE: According to the application, no trees shall be removed within 24 feet of the floodway location. Similarly, no trees of 6" caliper or more shall be removed without a tree removal permit from the Parks Department. The parcel is very flat thereby diminishing the potential of erosion from development. Criterion 5: To the greatest extent practicable, the proposed development reduces pollution and interference with the natural changes of the river, stream or other tributary. RESPONSE: Development of a new home on the site will cause no pollution or interference with the river. Criterion 6: Written notice is given to the Colorado Water Conservation Board prior to any alteration or relocation of a water course, and a copy of said notice is submitted to the Federal Emergency Management Agency. RESPONSE: Not applicable. Criterion 7. A guarantee is provided in the event a water course is altered or relocated, that applies to the developer and his heirs, successors and assigns that ensures that the flood carrying capacity on the parcel is not diminished. RESPONSE: The applicant has agreed to provide a guarantee in the event a water course is altered or relocated. Criterion 8. Copies are provided of all necessary federal and state permits relating to work within the one hundred (100) year floodplain. RESPONSE: Not applicable as no work is being conducted in the 100 year floodplain. 2 • • RECOMMENDATION: The Planning Office recommends that the Planning and Zoning Commission approve the Stream Margin Review subject to the following conditions: 1. No trees shall be removed within 24 feet of the floodway location and removal of trees 6" caliper or more shall require a tree removal permit from the Parks Department. The applicant has consented to these conditions. lefton2 3 f- • �Jv I ,, lam. '5r3•,,,El , • , + I°7 roar LAnwr•{ F.i-N-t:l•1t1yT ALA>IV;- .'t..:F: t:.:.:;r, • •t. , 10"�Nti .-:, :\ �� i !�' . . t .t S>t�-� \ \ 0' ... Al,.0,...„,,,,itii ' iDWAY LOCATIO\,! ,/------; %" 1 ,' �j vi I ' , 6 ` iI ; 9"Gv(f0f`I WOOD i ... t - I t . PI^1 C.: .,;"�� ' 1. 1 , le''c ra 44rvc, ° - -I- \ tO° ' , Ft345-. • , .--'.---: . • -,•... , \. •• •qq ------'''--- \\ .. ... . • R.FL.00DPLAIVJ 1°: x"1,6 :; .-„'' d \iI4 � w• •1.• • . ,ii .' r i ,j�y`sti +; .. �jz !�', �� .•fir 'I,''+I ' •k• . Iii$ =O r PrA -- •• <, g \ \ \ -t:1 ' . -. • •'(D ] , •'1\\1` .+ �. L��� ' ice �� iik oil,\ .. /0101111. .,,c.s_k_i,toi:......1.61,i....,....._.:...\ \I: .,,.... r pi 1 . 11, CA •,-.1 'o. • :� ''• . ...''.'. ....\ ..:,.r. - y..\ - 430 _ ■.--, . . . . i. I i; . • \,. : •U, . . 1 g % \ , r'' '' r--,,, ., r.:. . 1.. t.\\ tV\ \ \ 1 \ _. 'I . t 411 411 MEMORANDUM TO: Leslie Lamont, Planning Office FROM: Jim Gibbard, Engineering Department DATE: August 3, 1989 RE: Lefton Stream Margin Review Having reviewed the above application and made a site visit, the Engineering Department recommends approval. jg/lefton cc: Chuck Roth • • • MEMORANDUM TO: City Engineer FROM: Leslie Lamont, Planning Office RE: Lefton Stream Margin Review DATE: July 19, 1989 Attached for your review and comments is an application from Stan Mathis on behalf of his client, Donald Lefton, requesting approval of a Stream Margin Review. Please review this material and return your comments no later than August 18, 1989. Thank you. . • ASPEN/PITKIN PLANNING OFFICE 130 S. Galena Street Aspen, Colorado 81611 (303) 920-5090 July 19, 1989 Stan Mathis P. O. Box 1984 Aspen, CO 81611 RE: Lefton Stream Margin Review Dear Stan, This is to inform you that the Planning Office has completed its preliminary review of the captioned application. We have determined that your application is complete. We have scheduled your application for review by the Aspen Planning and Zoning Commission on Tuesday, September 5, 1989 at a meeting to begin at 4 : 30 p.m. The Friday before the meeting date, we will call to inform you that a copy of the memo pertaining to your application is available at the Planning Office. If you have any questions, please call Leslie Lamont, the planner assigned to your case. Sincerely, Debbie Skehan Administrative Assistant • • • STAN MATHIS architecture and planning p.o. box 1984 aspen, colorado 81612 J c4GY 16, 1161 tESaE CA -r c c vreeAst wi.aQQW QE✓!6w I.E.sU . t (AIM Kai& re- Lec4T[OI( of TFIE blot& E- IT tS MOLE CLOSETO SuEvEY THAW once •W6W DATEP Ju m 2-j (AM 04. Al.1 ). f-IU cc v CRE Z PR.ct-lts ccr 41-1 1Juui' !e, Mg/ What slaws' I futtotafG tAiliges 06 1) (.lre'TO eat[.:) c T: pIL64sSE Su.6 sirrcitE 114E d ugc a- PRt 4,s l,n 1 4 'IKES'E. �r YObl F 'bus rito,1E-CT WILL ( E OZ4Y I FafZ: S7R41 & 0,4061t4 t041E‘n c4rce. ID Ger eL4U OCb Qom- PL4e4- c¢ (J - ! DC) you Titti ZN4T rd (i -E'- (Det 044)84tv ci26.143 4 • • STAN MATH IS architecture and planning p.o. box 1984 • j,t1,1 (7, lite/ aspen, colorado 81612 Lttti leiNd 12E% 1104041.11 acc-)z-- tetcrag s rizr,44444 (44it s4r-(ent pArt6(64_ peva() • A) .krv, ii81 p sil4W /414 , 1 —SA k • . p i- lt4'7 ter-- • '.1,1 • . ASPEN/PITKIN PLANNING OFFICE 130 S. Galena Street Aspen, Colorado 81611 (303) 920-5090 July 12 , 1989 Stan Mathis P. O. Box 1984 Aspen, CO 81612 RE: Lefton Stream Margin Review Dear Stan, This is to inform you that the Planning Office has completed its preliminary review of the captioned application. We have determined that your application is not complete. We are unable to schedule it for review at this time. Following is a list of the items we require to complete the application: 1. Two copies of a site plan which shows the following: a. existing natural features on the site , particularly within the proposed building envelope; b. existing and proposed grades. If you have any questions please call me. Thank you. Sincerely, Leslie Lamont, Planner ds • • Aspen/Pitkin Planning Office 201 South Galena Aspen, Colorado 81611 June 28, 1989 This letter requests a stream margin review (sec.7-504) for the construction of a single family residence located at 1440 N. Red Butte Drive. The area is zoned R-15. The owner is Donald Lefton, c/o the applicant Stan Mathis, P.O. Box 1984, Aspen, CO 81612; (303)920-1434. The new residence will be 24'0" from the 100 year flood plane line, 44'0" from the floodway location and 48'0" from the ordinary high waterline at the Northeast corner of the residence. At the Southeast corner of the residence the distance to the 100 year flood plane line is 40'0", to the floodway location, 600 to the ordinary high water line, 70'0". There is no planned construction or earthwork within 20'0" of the 100 year flood plane line other than landscaping. The lowest floor elevation at the garage and family room is 7717.7' . Stream Margin Review Standards: 1 . The new residence will not increase the base flood elevation on the parcel . 2. Trails-there are no public trails dedicated. 3. Greenway plan-no effect. 4. Vegetation-no vegetation will be removed within 24' of the floodway location. 5. The residence will cause no pollution or interference with the river. 6. Not applicable. 7. Agreed. STAN 8. Permits will be applied for if necessary. MATHIS Attached is the site showing the new residence and flood plane location ARCHITECTURE prepared by Schmueser, Gordon Meyer, Inc. AND Thank you for your assistance in this matter. PLANNING Office Sincerely, Office , Box 1984 .441r4 Aspen Colorado 81612 Stan Mathis 303/920-1434 CITY OF ASPEN • PRE-APPLICATION CONFERENCE SUMMARY PROJECT: 1_12:4-4c,11 • APPLICANT'S REPRESENTATIVE: y 1� ►S REPRESENTATIVE'S PHONE: c'e-9,0 - / 4/ 251-- OWNER'S NAME: L,-?4-f SUMMARY 1. Type of Application:54Ge.aw- ►moo-r'S�.f5 2 . Describe action/type of development being �reequested: vvv (`5 i ✓1 Y'C`1 i e L -k-�c� d Prw'c 1 i o✓1 cat- G- 5 7► --raA„ ,;I re car164”ry 4,cast. C c, 5 . - 1 —t'eNV,; I uJ Ct.cce Sap 3 . Areas is which Applicant has been requested to respond, types of reports requested: , k Policy Area/ Referral Agent Comments • - 4 . Review i• (P&Z Only) (CC Only) (P&Z then to CC) 5. Public Hearing: (YES) C (NO) 6. Number of copies of the application to be submitted: 02 7. What fee was applicant requested to submit: -f' &D = � 8. Anticipated date of submission: reloi kD 9. COMMENTS/UNIQUE CONCERNS: • frm.pre_app