Loading...
HomeMy WebLinkAboutcoa.lu.sm.Poliano 1110 Black Birch.1983 ASPEN/PITKIN PLANNING OFFICE ��N� 130 South Galena Street ���p ---' ' Aspen, Colorado 81611 (303) 9 LAND City o 00113 - 63721 47331 52100 GMP/CONCEPTUAL• 63722 47332 �52100 GM�PREUNA0ARY� • " 63723 - 47333 52100 GMP/FINAL 63724 - 47341 52100 SUB/CONCEPTUAL 63725 47342 52100 SUB/PRELIMINARY 83726 - 47343 - 52100 SUB/FINAL ' ' 63727 47350 - 52100 EXCEPT/EXEMPTION 63728 47350 - 52100 -REZONING 63729 47380 52100 SPECIAL REVIEW ^442c1- ' SUB-TOTAL ' County U0113 - 62711 - 47331 - 52200 GMP/GENERAL 63712 ' 47332 - 52200 GMP/DETAILED 63713 47333 52200 G�P/F|NAL � - ^- 63714 - 47341 �' 52200 SUB/GENERAL• ' 83715 ' 47342 52200 SUB/DETAILED. ' 63716 47343 - 52200 SUB/FINAL 83717 47350 52200 SPECIAL REVIEW 83718 ` u735.0 - 52200 REZONING • 63719 _ 47-3S0 52200 SPECIAL APPROVAL � ^ • • SUB-TOTAL ' PLANNING OFFICE SALES 00113 - 63061 08000 62200 COUNTY CODE ' 63063 08000 - 52200 . ALMANAC • 63082 09000 00000 GMP ^ 83066 - 09000 '0UO00 COPY FEES ' 63069 ' 0800n OTHER SUB-TOTAL ~ , TOTAL ~��//�^�~�~~~ ' ^^ ' '' x • '�---' '`\ Nu f� �.t' � ' �o� ^^ ', Address: ���� 1�{7 ' I. �� 0' 'Lt~U.«��> -- . ' __- � -' ~ � Check ��m� ��m . , _� ."". ' Additional Billing: No. of Hours: - . ` Approved subject to submis n of Development Plan Submissi requirement consistent with 24-6.3(b) Inflecting the penciled changes IlIthe submitted site plan dated prepared by Mulary" , to be approved by City Engineering. • z '1 el, MEMORANDUM . .TO: Aspen Planning and Zoning Commission FROM: Colette. Penne, Planning Office t ' RE: Pogliano Stream Margin Review DATE: September 6 , 1983 Location: . 1110 Black Birch Drive (Lot 11, Black Birch Subdi- vision) . Zoning: R-15 PUD. . • Applicant' s Request: Stream margin review approval to build a 150 square foot wine cellar as an addition to a residence Q within 100 feet of the high water line of the Roaring Fork River. Referral (/) Comments: The Engineering Department reviewed the application and made a site inspection and has the following Comments : " 1. The development plan does not mee t the require- ments M\. of Section ' 24-6 . 3, however, due to the nature of the proposed improvement, a more. r thorough plan has not been required. ,-A. 2. A 150 square foot addition to the southwest \ �1,�,� q (eft � side of an existing structure is proposed. This is the side of the existing structure . 4 �\ Y which is away from the stream, therefore, there will be no construction activity on the Ti stream side. of the existing structure. 3. Due to the location of the proposed addition and its relationship to the floodplain, the • . Engineering' Department has no objections to Q IS the approval of the Pogliano stream margin review. " Planning Office • "' Review: Because this construction is within 100 feet of 3 the high water line of the river, it is before you S for stream margin review. It is, however, a relatively Q_ small addition (150 square feet) to the existing . house and the house is in a downstream location from the proposed wine cellar. The lot is not -4 impacted by a trail plan or the' Roaring Fork Greenway Plan. The construction of the wine cellar will `"-r 2 require very minimal excavation for footings and - foundation walls and will not require removal of vegetation or slope grade changes. The stream cat will not be affected and there will be no increase in stream sedimentation. This construction will have no negative effect on the stream as a . natural feature. Planning Office Recommendation: The Planning Office recommends approval of stream margin review for the construction of a 150 squar: 11004k 4 foot wine cellar on the southwest side of the . residence at 1110 Black Birch Drive. �'�` �G� Su�nh�ss�� r" �Nw v.k...i.A....3- 'C \,JI i • ` I ' CIT ' . 130 ` ,.� :v4 � � 4street •., _� •fq-Civ w ,,1611 asp E, s :4X 1. 4c [Ogg 3 ♦ } MEMORANDUM - .G fl DATE: h=u`S't"• '31;/"'1'9'.8. TO Colette Penne" Chuck Roth FROM: Gary Esar it .-- C . - RE: Pogliano Stream Margin Review The requirements of Section 24-6. 3 are mandatory, not permissive. I recommend that we obtain a proper development plan for our files clearly indicating the location of the relevant water lines (flood hazard, high water line, 100 ' from high water line) . The map submitted is a copy of a 1970 survey with a pencilled-in outline of the wine cellar apparently showing the removal of two trees. In addition, I'm informed that the carport has been con- verted to living space. Obviously, 150 sq. feet is not much, but we don't have enough information to determine if there is a F.A.R. impact. Many of these issues are premature and will arise naturally at building permit time. However, to avoid the "why didn't you tell me earlier problem" I raise them now. For this review, we need at least a proper development plan pursu- ant to Section 24-6. 3. The detail of the plan should be up to the engineering and building departments' standards for such things. In my mind, it involves a level of detail somewhere between a stamped improvements survey and a pencil sketch on a 1970 blue- print. You may want to add the Building Department to the referral list. GSE/mc 1 C IVES SEp 0 6 1983 ASPEN / PITKIN CO. , r M ANNJNG OFFICE • • MEMORANDUM TO: Colette Penne, Planning Office FROM: Chuck Roth, Engineering Department C %DATE: August 30, 1983 RE: Pogliano Stream Margin Review This memorandum is an addendum to my memorandum of August 17. The City Attorney' s Office and the City Engineer have taken exception to the contents of my first memorandum, therefore this memorandum is a correction of the memorandum of August 17 and a clarification of Engineering Department policy. The comments of the previous memorandum are hereby rescinded, and the following comments are to be taken as the current comments of the Engineering Department: 1. The development plan does not meet the requirements of Section 24-6. 3 of the Municipal Code. A blueprint of a current document is required. The plan must show the existing structure and the proposed improvements, as specified in 24-6. 3 (b) , as well as the remaining informa- tion required in that section. The plan must show the 100-year floodplain. The plan must be stamped by one of the following professionals registered in the State of Colorado: a. Land Surveyor b. Civil Engineer c. Architect 2. A 150 square foot addition to the southwest side of an existing structure is proposed. This is the side of the existing structure which is away from the stream, there- fore it is understood that there will be no construction activity on the stream side of the existing structure and no impacts of any sort on the stream. 3. The Engineering Department anticipates that it will have no objections to the proposed addition once a proper development plan is submitted. MEMORANDUM TO: Richard Grice, Planning Office FROM: Chuck Roth, Engineering Department DATE: August 17, 1983 RE: Pogliano Stream Margin Review Having reviewed the above application and having made a site inspection, the Engineering Department has the following comments: 1. The development plan does not meet the requirements of Section 24-6 .3, however, due to the nature of the proposed improvement, a more thorough plan has not been required. 2. A 150 square foot addition to the southwest side of an existing structure is proposed. This is the side of the existing structure which is away from the stream, therefore there will be no construction activity on the stream side of the existing structure. 3. Due to the location of the proposed addition, and its relationship to the floodplain, the Engineering Department has no objections to the approval of the Pogliano stream margin review. CR/co • • S • MEMORANDUM TO: City Attorney City Engineer PLANNER: Richard Grice RE: Pogliano Stream Margin Review DATE: August 4, 1983 Attached is a letter of application for a stream margin review for property located at 1110 Black Birch Drive. Please review the letter and plat, and return your comments to the Planning Office by August 22. Thank you. Filed for record the 2 4 t} y of Mar c,ll,, D. 197 7 at 1101 A m. H o'clock Ju 1 .e-. .i�.Zl G RECORDER. Reception No By /....... ,� Syr. L EPUTY. 193040 -• �800K �b PAGE e�,�J KNOW ALL MEN BY THESE PRESENTS, That, Whereas, Fel ix.•,Pogl iano, Jr. and Lenore L. Pog l i a no of the • County of Denver , in the State of Colorado, by DEED OF TRUST dated the 28th day of . November ,A. D. 19 72 ; and duly recorded in the office of the County Clerk and Recorder of the • County of Pit kin , in the State of Colorado, on the 15th day of December , A. D. 19 72 , in book 269 at page 851 (Film No. ' Reception No. ) of the records, in said office, conveyed to the Public Trustee in said County of P it kin , certain real estate in said Deed of Trust described, in trust to • i secure the payment of the indebtedness mentioned therein. AND, WHEREAS, Said indebtedness has been paid and the purposes of said trust have been fully satisfied; NOW, THEREFORE, At the request of the legal holder of the indebtedness secured by said Deed of Trust, and in consideration of the premises,and in further consideration of the sum of Three Dol- lars, to me in hand paid, the receipt whereof is hereby acknowledged, I, as the Public Trustee in said (, County of P i t kin , do hereby remise, ., release and quit-c�aim unto the present owner or owners of said real estate and unto the heirs, successors and assigns of said owner or owners forever, all the right, title and interest which I have under and by virtue of said Deed of Trust in and to the said real estate in said Deed of Trust particularly described, reference to which is hereby made for greater certainty. TO HA VE AND TO HOLD THE SAME, Together with all and singular the privileges and appur- tenances thereunto belonging forever. AND FURTHER, that the said Trust. Deed is, by these presents, to be considered as fully and absolutely released, cancelled and forever discharged. WITNESS my hand and seal, this e?of day of �a .-- :' .N ;A.,D.467/7 , . • ,r . ...iziesot2yoivel."- . ., ' (SE,' :L) As the Public Trustee in •-county of Pi t:k i n t.-- :::- :.!., . By II STATE OF COLORADO, • • }ss. -. 1,t .-...—• County of. P i t k i n `4 The foregoing instrument was acknowledged before me this �i. i a day of a-4-'16 , A. D:.19 77 , by ...I -• as the Public Trustee in said ' County of . Pitkin , Colorado'. -J Witness my hand and Official!Seal. r , � My commission expires 1)0141`?•/-�:/.9:378`•.: Notary:.Public. To the Public Trustee in said County of P it kin Colorado: I 1 Please execute this release, the indebtedness secured by the above mentioned Deed of Trust having !I been fully paid. • h UNITED BANK OF LITTLETON The legal of er of the indebtednc3s ecu d by said Deed•of Trust. 1t lo ;d ne C., Jorg "al Asst. V.P. ii ■ FORM 368 REV. 1971 RELEASE OF DEED OF TRUST BY THE PUBLIC TRUSTEE—THE C. F.HOECKEL CODENVER 27079 ii 40 ALTA-OWNER'S FORM SCHEDULE A Policy Number }I 3482') March 2 4, 19 7p A i Amount of Policy$19,Q00.00 70-2-16 Date of Policy at 3:55 P.M. + • 1. Name of Insured: F'ELIX POGLIANO and LENORE L. POGLLANO, in joint tenancy. 2. The estate or interest in the land described or referred to in this Schedule covered by this Policy is: fee simple estate or interest. ; 3. Title to the estate or interest covered by this Policy at the date hereof is vested in the Insured. 4. The land referred to in this Policy is situated in the County of Pitkin State of Colorado , and is described as follows: It 11, BLACK BIRal ESTATES, according to the plat recorded in Plat Book 3 at Page 244 and according to the Protective Covenants recorded in Book 227 at Pages 452-456 in the Pitkin County Clerk and Recorder's office. SUBJECT TO the terms, conditions, provisions and obligations of said plat and Protective Covenants. ff v This Policy valid only if Schedule B le attached. Authorized Signatory I i III l' I I I II July 17, 1983 TO : Pitkin County Planning and Zoning Commission Aspen, Colorado FROM: Joachim Weimann Weimann Construction 775 Cemetery Lane Aspen, Colorado 81611 RE: River Margin Review Black Birch Subdivision We propose to add a wine cellar consisting of 150 square feet to the existing residence of Mr. Felix Pogliano, 1110 Black Birch Drive. The Review Criteria are all met. There is no involvement with any trail plan; the extent of excavation is for footings and foundation walls only; no vegetation will be removed or slope grade changes made nor any changes to the stream channel. After discussing the project with Colette Penne of your office and being then referred to Jay Hammond of the Engineering Depart- ment, his recommendation was as follows : As the main body of the existing house is already located closer to the river than the proposed addition, and is also downstream therefrom, Mr. Hammond deemed it unnecessary to set a flood plane line on the property plot, the same not shown on hia master plot plans. He thus indicated his approval of the project. In appreciation of your prompt consideration of this proposal. /A) ,/