Loading...
HomeMy WebLinkAboutagenda.council.special.201904241 AGENDA City Council Special Meeting April 24, 2019 4:00 PM, City Council Chambers FOR THE PURPOSE OF: Authorization for City Manager to spend contingency dollars for Project 51112: utility work for 425 Rio Grande 1 Page 1 of 2 MEMORANDUM TO:Mayor and City Council FROM:Robert Schober, Project Manager THROUGH:Jeff Pendarvis, Interim Capital Asset Manager DATE OF MEMO:April 24, 2019 MEETING DATE:April 24,2019 RE:Rio Grande Pl.Utility Project –Change Order for Road Base Improvements and Establishing a New Project Number for Said Improvements REQUEST OF COUNCIL:Staff requests approval of a contract change order for the Rio Grande Utility Work Project and that the change order be assigned to a new project number. This change order will be to the existing Shaw Construction Guaranteed Maximum Price contract for the utilities work approved by Council via Resolution 15-2019 on February 11, 2019. The rationale for the request is due to unforeseen underground conditions in the road base and a desire to repair the base prior to the summer tourist season. Change Orders: 1)Sub excavation & Imported Fill –Rio Grande Pl. Background:During excavation for the deep utilities, site observations by the Geotechnical Engineer of Record on 4/23/19 identified unforeseen unsuitable soils at varying depths that could potentially impact the performance and longevity of the new street surface. The recommended action of the engineer is sub excavation of the poor soils beneath the new road surface to a depth of approximately 2 ft and import of a Class 6 road base to ensure a suitable base for the new road. Cost Impacts:The cost impact of the additional excavation and imported fill is $379,298.53 This change order involves work beyond the scope of the utility replacement project and beyond the purpose of the utility funds. As such, staff is proposing to track these costs separately under a new project number. If City Council approves this resolution, it will be requested that City Council appropriate funds from the Asset Management Plan Fund balance during the second reading of the spring budget supplemental on May 13, 2019. RECOMMENDED ACTION:Staff recommends that council approve Shaw Project Change Order #010 and transfer of the change order to a new project number. The recommendation reduces community impact by addressing the condition while the site is already under construction and closed to public access. 2 Page 2 of 2 ALTERNATIVES: The City could forgo this work and only repair the area disturbed by the current excavation. With this alternative, it is likely the City will experience road base deterioration accelerated as a faster pace through failing pavement and sidewalks. Exhibit A –Shaw PCO #010 3 RESOLUTION #53 (Series of 2019) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, AUTHORIZING A CHANGE ORDER FOR PROJECT 51112 – 425 RIO GRANDE PLACE UTILITY WORK, CREATING A NEW PROJECT NUMBER AND ASSIGNING THE CHANGE ORDER TO THE NEW PROJECT NUMBER AND THE CITY MANAGER TO EXECUTE THE CHANGE ORDER. WHEREAS, there has been submitted to the City Council Contract Change Order between the City of Aspen and Shaw Construction GMP for Project 51112 – 425 Rio Grande Place utility work a true and accurate copy of which is attached hereto as Exhibit “A”; WHEREAS, City Council wishes to establish a new project with project number 51120, for Rio Grande Place Road Base improvements and assign the change order to that new project number. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Contract Change Order between the City of Aspen and Shaw Construction GMP for Project 51112 – 425 Rio Grande Place utility work a copy of which is annexed hereto and incorporated herein. In addition, the City Council establishes a new project with project number 51120, for Rio Grande Place Road Base improvements and assigns the change order to that new project number and does hereby authorize the City Manager to execute said change order on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 24th day of April 2019. Steven Skadron, Mayor 4 I, Linda Manning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held April 24, 2019. Linda Manning, City Clerk 5 Pending Change Order No. 010 Aspen, CO 81611 425 Rio Grande Place City of Aspen Civic Space Relocation - City Offices Project No: 10081-02 PCO No. 010 Contaminated Soils in Rio Grande Place Date Sent: Transmitted To: Aspen, CO 81611 Description of Proposal: From: Brian Thomas, Project ManagerRobert Schober, Tel: 970-248-2619 Fax: Email: brianthomas@shawconstruction.net Aspen, City of 130 Galena Street Shaw Construction LLC GJ Cost Summary for Item : 1 Contaminated Soils in Rio Grande Place QuantityDescriptionPhase Unit Price Amount 324,604.80 324,604.80LS 1Contaminated Soils in Rio Grande Place002300- -010 2 feet over excavation of Rio Grand Place to remove contaminated soils with import backfill per CTO specs $324,604.80Net Total for Item 1: Description Percentage Amount 3,018.82Liability Insurance 0.93% 1,947.63Warranty Reserve 0.60% 2,142.39P&P Bond 0.66% 1,201.04Builders Risk 0.37% 18,143.85Profit 5.45% $26,453.73Subtotal: $351,058.53Total Item #1: Time Extension:NONE Cost Summary for Item : 2 Add Alternate Provide & Install Geogrid under road QuantityDescriptionPhase Unit Price Amount 26,112.00 26,112.00LS 1Contaminated Soils in Rio Grande Place002300- -010 Add Alternate, Provide & Install Geogrid under road $26,112.00Net Total for Item 2: Description Percentage Amount 242.84Liability Insurance 0.93% 156.67Warranty Reserve 0.60% 172.34P&P Bond 0.66% 96.61Builders Risk 0.37% 1,459.54Profit 5.45% $2,128.00Subtotal: $28,240.00Total Item #2: Time Extension:NONE Page 1 of 2 Exhibit A - PCO#010 6 Pending Change Order No. 010 Aspen, CO 81611 425 Rio Grande Place City of Aspen Civic Space Relocation - City Offices Project No: 10081-02 Grand Total PCO #010: Total Time Extension:NONE $379,298.53 Submitted By: Authorized By: Aspen, City of Signature _________________________ Date ________ Name _________________________________________ Signature __________________________ Date ________ Name __________________________________________ I authorize Shaw Construction to proceed with the work noted above and agree to pay for the work. Robert Schober, Brian Thomas, Project Manager Shaw Construction LLC GJ Page 2 of 2 7 Shaw Construction 4/24/2019 2' Over Excavation in Road Aspen City Offices- Utility Relocation 425 & 455 Rio Grande Place Aspen, CO Bid Breakdown Qty Unit Cost Unit Xtd Cost Comment 2' Over excation below 8" base in road & 2' outside curb Excavate 7 Days Fill & Compact 8.5 Days Deliver/Return Smooth Drum 1 ls @ 2,370.00$ each 2,370.00$ Transport 5 hrs @ 150.00$ p/hr 750.00$ Deliver 336 Pilot cars 10 hrs @ 60.00$ p/hr 600.00$ Deliver 336 Transport 4 hrs @ 120.00$ p/hr 480.00$ Deliver D-6 336 56 hrs @ 220.00$ p/hr 12,320.00$ Excavate GPS 56 hrs @ 125.00$ p/hr 7,000.00$ Excavate D6 56 hrs @ 180.00$ p/hr 10,080.00$ Excavate GPS 56 hrs @ 125.00$ p/hr 7,000.00$ Excavate Lrge Smooth Drum 28 hrs @ 180.00$ p/hr 5,040.00$ Labor 192.5 hrs @ 50.00$ p/hr 9,625.00$ End/Side Dumps 387.5 hrs @ $121.00 p/hr 46,887.50$ Haul off fill 336 34 hrs @ 220.00$ p/hr 7,480.00$ Grade GPS 34 hrs @ 125.00$ p/hr 4,250.00$ Grade D6 68 hrs @ 180.00$ p/hr 12,240.00$ Grade GPS 68 hrs @ 125.00$ p/hr 8,500.00$ Grade Lrge Smooth Drum 68 hrs @ 180.00$ p/hr 12,240.00$ Grade End Dump 562.5 hrs @ $121.00 p/hr 68,062.50$ Deliver 3/4" road base Labor 221 hrs @ 50.00$ p/hr 11,050.00$ 2 Labors Water Truck 75 hrs @ 110.00$ p/hr 8,250.00$ Moisture condition road base 938 Wheel Loader 75 hrs @ 160.00$ p/hr 12,000.00$ Moisture condition road base Supervision 31 hrs @ 100.00$ p/hr 3,100.00$ 249,325.00$ Other Traffic control 1 ls @ -$ each -$ Is not included Dump fees 155 loads @ 44.00$ p/load 6,820.00$ Compaction Testing 8 days @ 275.00$ p/day 2,200.00$ HP GeoTech 9,020.00$ Materials 3/4 Base 4716 tn @ 14.05$ p/tn 66,259.80$ Total 66,259.80$ Total 324,604.80$ Add Alternate Provide & Install Geogrid under road 336 8 hrs @ 220.00$ p/hr 1,760.00$ 938 Wheel Loader 8 hrs @ 160.00$ p/hr 1,280.00$ Labor 57 hrs @ 50.00$ p/hr 2,850.00$ 4 Labors 5,890.00$ Other Freight 1 ls @ 1,200.00$ p/ls 1,200.00$ Allowance-waiting for price 1,200.00$ Materials Tensar TriAx TX5 Geogrid 9 roll @ 1,200.00$ each 10,800.00$ Allowance-waiting for price Mirafi 180 N 12 roll @ 643.50$ each 7,722.00$ Stutsman-Gerbaz Inc. 30376 Highway 82 Snowmass, CO 81654 970 923-2734 8 Misc.1 ls @ 500.00$ p/ls 500.00$ Total 19,022.00$ Total 26,112.00$ Notes Traffic control is not included. ROCK CLAUSE, FROST CLAUSE & DEWATERING CLAUSE Add to current Maintainance Bond if required.8,950.00$ 9