Loading...
HomeMy WebLinkAboutresolution.hpc.016-2012 A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING MAJOR DEVELOPMENT (CONCEPTUAL) AND CONCEPTUAL COMMERCIAL DESIGN REVIEW APPROVAL FOR THE PROPERTY LOCATED AT 534 EAST COOPER STREET, LOTS R, S AND EASTERLY 2 1/2 FEET OF LOT Q, BLOCK 95, CITY AND TOWNSITE OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO RESOLUTION #16, SERIES OF 2012 PARCEL ID: 2737-182-24-008. WHEREAS, the applicant, Boogie's Building of Aspen, LLC, represented by Kim Weil of Poss Architecture + Planning, has requested HPC Major Development (Conceptual) and Commercial Design Review (Conceptual) approval for the property located at 534 Cooper Street, Lots R and S, and the Easterly 2 1/2 feet of Lot Q, City and Townsite of Aspen, Colorado; and WHEREAS,the subject property is located within the Commercial Core Historic District; and WHEREAS, Section 26.415.070, Development involving designated historic property, of the Municipal Code states that "no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;" and WHEREAS, for Conceptual Major Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project's conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.D.3.b.2 and 3, Development involving designated historic property- Certificate of appropriateness for major development, of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, for Conceptual Commercial Design Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project's conformance with the City of Aspen Commercial, Lodging and Historic District Design Objectives and Guidelines per Section 26.412.040.A.2, Commercial Design Standards Review Procedure, of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, Sara Adams, in her staff report to Historic Preservation Commission dated July 11, 2011, performed an analysis of the application based on the standards, found that the review standards are met with conditions; and RECEPTION#: 590891, 07/26/2012 at 10:13:55 AM, 1 OF 2, R $16.00 Doc Code RESOLUTION 534 E. Cooper Street (Boogie's) Janice K. Vos Caudill, Pitkin County, CO HPC Resolution #16, Series of 2012 Page 1 of 2 WHEREAS, during the duly noticed public hearing on July 11, 2012, the applicant provided the Historic Preservation Commission with proof of completion of the neighborhood outreach requirement of Section 26.304.035.C.3 and Section 26.304.035.F, Neighborhood Outreach, of the Aspen Municipal Code; and WHEREAS, at their regular meeting on July 11, 2012, the Historic Preservation Commission considered the application during a duly noticed public hearing, the staff memo and public comments, and found the proposal consistent with the review standards and recommended approval with conditions by a vote of four to zero (4-0). NOW, THEREFORE, BE IT RESOLVED: That HPC hereby grants HPC Major Development (Conceptual), Commercial Design Standard Review (Conceptual) approval for the property located at 534 East Cooper Street, City and Townsite of Aspen, Colorado with the following conditions: 1. Chimney is not approved. 2. Restudy materials on elevator shaft to reduce perceived mass and height for review at Final Review. 3. The 42 ft. height increase is not approved. 4. Public amenity approved to be 8% onsite and 2% off-site public improvements to the right of way subject to review and approval by the Parks Department, Engineering Department and Community Development Department. 5. A development application for a Final Development Plan shall be submitted within eighteen (18) months of July 11, 2012, the date of approval of a Conceptual Development Plan. Failure to file such an application within this time period shall render null and void the approval of the Conceptual Development Plan. The Historic Preservation Commission may, at its sole discretion and for good cause shown, grant a one-time extension of the expiration date for a Conceptual Development Plan approval for up to six (6) months provided a written request for extension is received no less than thirty (30) days prior to the expiration date. APPROVED BY THE COMMISSION at its regular meeting on the 11th day of July, 2012. Ann Mullins, Chairman Appr (;) d as to F rm: 0-.Q Deb ie Quinn, Assistant City Attorney ATTES : )-64--"t7114.! X72-J----"Z-4-1-k--Za---,-,;( Kathy Strickland, Chief Deputy Clerk 534 E. Cooper Street (Boogie's) HPC Resolution#16, Series of 2012 Page 2 of 2