Loading...
HomeMy WebLinkAboutresolution.hpc.002-2019 RESOLUTION #2, SERIES OF 2019 A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING CONCEPTUAL MAJOR DEVELOPMENT REVIEW FOR THE PROPERTY LOCATED 931 GIBSON AVENUE, AS LEGALLY DESCRIBED IN ATTACHMENT A PARCEL ID: 2737-074-00-004 WHEREAS, the applicant, BMH Investments, LTD, represented by BendonAdams, LLC., has requested HPC approval for Conceptual Major Development for the property located at 931 Gibson Avenue, as legally described in Attachment A; and WHEREAS, Section 26.415.070 of the Municipal Code states that "no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;" and WHEREAS, for Conceptual Major Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project's conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.D.3.b.2 and 3 of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, HPC reviewed the project on February 27, 2019. HPC considered the application, the staff memo and public comments, and found the proposal consistent with the review standards and granted approval with conditions by a three to zero (3 to 0) vote. NOW, THEREFORE, BE IT RESOLVED: That HPC hereby approves Conceptual Major Development for 931 Gibson Avenue with the following conditions: Section 1: Conceptual Major Development Review HPC hereby approves Conceptual Major Development with the with the following conditions: 1.) At the time of demolition of non-historic additions, investigate the historic framing and materials on the north west elevation of the historic house where the connecting element is proposed with staff and monitor review and approval. 2.) Provide preliminary plans for drainage and stormwater mitigation for review at the time of Final review. Take the status of the Holy Cross Electric Easement into account. 1111111 111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII HPC Resolution #2, Series of 2019 RECEPTION#: 655614, R: $28.00, D: $0.00 Page 1 of 4 DOC CODE: RESOLUTION Pg 1 of 4, 04/3012019 at 03:10:19 PM Janice K.Vos Caudill, Pitkin County, CO 3.) Provide proposed layout for utilities and mechanical equipment for review at the time of Final review 4.) Provide floor area calculations of the existing house on 931 Gibson at the time of building permit application. Section 2: Approvals for Relocation, Demolition, Designation by City Council All approvals granted by City Council through Ordinance #22, Series of 2018 remain valid. Section 3: Project Phasing Project phasing shall be permitted in the following process: A. Applicant may apply for a relocation permit as part of the approval to move the historic structures from 333 Park Avenue to 931 Gibson following the approval for Conceptual Major Development and City Council call-up, but prior to Final Major Development approval. All bonds required as part of the City Council Ordinance #22, Series of 2018 and Administrative Stream Margin approval (Recorded at Reception No. 654054) shall be submitted to the City of Aspen prior to issuance of the relocation permit. B. The applicant must submit for a tree removal permit and the necessary plans required by the Parks Department prior to the issuance of the relocation permit. C. A development application for Final Major Development shall be submitted within one (1) year of the date of approval of a Conceptual Major Development plan. Failure to file such an application within this time period shall render null and void the approval of the Conceptual Development plan. Section 4: Impact Fees and School Land Dedication Any applicable fees shall be assessed at the time of building permit application submittal and paid at building permit issuance. The amount shall be calculated using the methodology and fee schedule in effect at the time of building permit submittal. The allocation of any fee credits for demolition work on 931 Gibson Avenue shall remain with the parcel where the structures are currently located. Credits shall only be given for legally established floor area. The demolition of the existing non-historic residence on 931 Gibson is approved for demolition. Section 5: Material Representations All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Community Development Department, the Historic Preservation Commission, or the Aspen City Council are hereby incorporated in such plan development approvals and the same shall be complied with as if fully set forth herein, unless amended by other specific conditions or an authorized authority. HPC Resolution #2, Series of 2019 Page 2 of 4 Section b: Existing Litigation This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 7: Severability If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED BY THE COMMISSION at its regular meeting on the 27" day of February, 2019• Approved as to Form: Approved as to Content: An rea Bryan, essistant City Attorney Gretc n Gree wood, C air ATTEST: L'ncla Manning, City Clerk HPC Resolution #2, Series of 2019 Page 3 of 4 ATTACHMENT A: Legal Description of Addresses 931 Gibson Avenue Parcel 1: A Parcel of Land situated in the Southeast '/4 of Section 7, Township 10 South. Range 84 West of the 6th Principal Meridian more fully described as follows: Beginning at a point whence corner No. 1 1 of the East Aspen Additional Townsite bears South 54°52'17" East 58.10 feet: Thence South 34°54'00" West 46.63 feet to The True Point of Beginning; Thence North 63°58'00" West 185.12 feet, Thence South 15°30"00" West 86.60 feet; Thence South 63°54'00'" East 155.54 feet; Thence North 34°45'00" East 88.30 feet to The Point of Beginning. Parcel 2: A Tract of Land situated in the Sunset Lode, U.S.M.S. No. 5310. being more fully described as follows: Beginning at a point on the Easterly side line of said Sunset Lode whence Corner No. 10 of East Aspen Additional Townsite bears North 34045' East 46.63 Feet; Thence North 63° 58' West 185.12 feet to a point on the Westerly side line of said Lode, Thence following said Westerly side line North 15°30"' East 17.03; Thence South 62°54'41'" East 150.27 feet: Thence 39.76 feet along the arc of a curve to the right having a radius of 295.57 feet to a point on said Easterly side; Thence following said Easterly side line South 34°45' West 10.70 feet to The Point of Beginning. Together with any property lying Northerly of the above described property and the Southerly line of Gibson Avenue. HPC Resolution #2, Series of 2019 Page 4 of 4