HomeMy WebLinkAboutresolution.council.064-19 RESOLUTION #64 (Series of 2019) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A TRENCH, CONDUIT, AND VAULT AGREEMENT AND TWO SEPARATE EASEMENTS BETWEEN THE CITY OF ASPEN AND HOLY CROSS ENERGY AND AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENTS ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there have been submitted to the City Council a Trench, Conduit, and Vault Agreement, and two separate Easements across properties owned by the City between the City of Aspen and Holy Cross Energy, true and accurate copies of which are attached hereto as Exhibits "A", "B" and "C". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Trench, Conduit, and Vault Agreement, and two separate Easements across properties owned by the City between the City of Aspen and Holy Cross Energy, copies of which are annexed hereto and incorporated herein, and does hereby authorize the Mayor of the City of Aspen to execute said agreements on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 20th day of May 2019. Steri n Skad ron, Mayor I, Linda Manning, duly appointed and acting City aerk do certify that the foregoing is a true and accurate copy of that resolution ad pted by the City Council of the City of Aspen, Colorado, at a meeting held, May 20, 2019. ,/ _ dot Linda Mannar , City Clerk `LOSS k• • A, 2t•� 3799 HIGHWAY 82•P.O.DRAWER 3350 GLENWOOD SPRINGS,COLORADO 81602 14004 (970)945.5491 FAX(970)945-4081 •FST 7939 May 6, 2019 City of Aspen Attn:jack Danneberg 1 30 S Galena Street Aspen, CO 81611 RE: 488 Castle Creek Rd Planned Development Dear jack, Holy Cross Energy has completed a design and cost estimate for providing electric service to the above referenced project, hereinafter the "Project". Our facilities will be installed as shown on the attached sketch. The owner or developer of the subject Project is hereinafter referred to as the "Owner". The estimated cost of construction is as follows: Total estimated cost of underground construction $39,200.00 Construction deposit consisting of equivalent overhead credits (refundable) $26,100.00 Contribution in aid of construction (non-recoverable) $ 13,100.00 Standard Construction Allowance $(1,000) Total payment required before starting work on the project $38,200.00 The above figures are only estimates. After the job has been completed, the actual cost of construction will be determined. The Owner's contribution and deposit will be adjusted to reflect the actual cost by making a refund or further assessment. Execution of this document constitutes the Owner's agreement to pay any further assessment in a timely manner. Adjusted construction deposits are available for refund over a ten year period as specified by Holy Cross Energy's Line Extension Policy. Refunds will be paid to City of Aspen unless otherwise directed in writing. Our power facilities must be installed on an easement. Please execute and return the enclosed document. The following conditions are hereby noted: 1. A Load Form must be submitted for this project. These forms are available on-line and can be by visiting ww.holycross.com 2. Holy Cross Energy has implemented a policy which requires that the Owner provide all excavation, backfill, compaction and cleanup needed for installation of the underground power system extension to serve the Project. The Owner must also set all vaults and install all conduits as specified by Holy Cross Energy's design for the Project and the enclosed construction specifications. Holy Cross Energy will supply all material which can be picked up by the Owner at the appropriate storage yard. The cost of this material is included in the job cost estimate. The attached Trench, Conduit, and Vault Agreement must be properly executed by the Owner and returned prior to the start of excavation. -_A Touchstone Energy®Cooperative Danneberg May 6, 2019 Page Two 3. No excavation will be undertaken within five (5) feet of existing underground power lines except under the on site supervision of a Holy Cross Energy employee. 4. It shall be the Owner's responsibility to ensure that splice vaults, switchgear vaults and transformer vaults installed hereunder for the Project are accessible by Holy Cross boom trucks and other necessary equipment and personnel at all times. The use of such access by Holy Cross shall not require removal or alteration of any improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (1 0) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed in the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four(4) feet from non-opening sides and backs of said transformers and switchgear. Owner hereby agrees to maintain the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Holy Cross Energy. Said corrections will be made at the sole cost and expense of Owner. 5. There is no provision in our estimate for revegetation. Revegetation, if required, must be provided by parties other than Holy Cross Energy. 6. Secondary voltage available will be 208Y/1 20, three-phase. 7. Secondary facilities shall be installed in accordance with National Electrical Code and Holy Cross Energy specifications. All meter locations must be approved. Any service over 200 amps or 240 volts must have prior written approval from Holy Cross Energy. 8. It will be the Owner's responsibility to extend underground secondary entrance conductors from the pad-mounted transformer, or junction box, to points of power usage. 9. All underground services shall be installed in conduit ahead of the meter. All underground services must be in conduit beneath roads, driveways, and other areas of difficult excavation. 10. Low voltage starting will be required on all three-phase motors larger than 25 HP and all single- phase motors larger than 10 HP. 1 1. Motor protection from phase loss and other voltage problems should be provided. This equipment shall be installed and maintained at the expense of the Owner. 12. The above mentioned cost estimate does not include connect fees or meter deposits, if required. Arrangements for payment of these items and for scheduling the actual meter installation should be made through the local Holy Cross Energy office. 1 3. We attempt to complete all projects in a timely manner. However, highest priority is given to maintaining service to our existing consumers. This fact, along with inevitable construction delays, will not allow us to guarantee a project completion date. 14. All Holy Cross Energy rules and regulations will be followed. Danneberg May 6, 2019 Page Three 1 5. When Holy Cross Energy is in receipt of the Owner's check in the amount of $38,200.00, all necessary executed easements, other permits, if required, a completed "Residential Load Form" or "General Services Load Form", the executed trench agreement, and the signed original of this letter agreement (below), the job can be scheduled for construction. Holy Cross Energy does not accept checks with lien waivers. Sincerely, HOLY CROSS ENERGY Keith Hernandez, Engineering Department (970) 947-5439 Email: khernandez@holycross.com KH:MM Enclosure The above terms and conditions are hereby agreed to and accepted By: Title: Pc/6L---/C- At re Date: ' �z 3 /1 1' W/O#1 9-23481:90-75:Castle Creek Rd 488 19-23481 Danneberg W L W M a N ii O U H W Y W I— Z ct a= W 2 �, W Z - I w r JJ 1 \ w II— f '� 1 HH 1 Z W I UW I U U I i I : rW^ \C I\ \ ,\ 1 . VJ C \ U 1= N M \`''' o W ® x I 0 Wo Z '0 _1a D W O OP < Q OZ u- .�� u) Z li W � �G� I- o pZf- -.) zF wzo CP zea ) u. / �o CD z / C U W y / to F co - / O �a / / U -8 0 ,o / ] O m / 8 i TRENCH, CONDUIT, AND VAULT / �/ AGREEMENTRIThis agreement is made and entered into this day of ft 1 20 I between CITY OF ASPEN, COLORADO, whose mailing address is 1 30 S. alena Street, Aspen, CO 8161 1, hereinafter called "Owner", and Holy Cross Energy, a Colorado corporation whose mailing address is P. O. Box 2150, Glenwood Springs, Colorado 81602, hereafter called "Holy Cross". WHEREAS, Holy Cross has been requested by Owner to provide underground electric facilities, hereinafter called "Facilities", to serve a project known as Castle Creek Rd 488, hereinafter called "Project"; and, WHEREAS, Owner is required to provide all excavation, conduit and vault installation, backfill, compaction and cleanup needed to construct said requested Facilities; and, WHEREAS, Owner owns real property described as follows: A parcel of land situate in Sections 12 & 13, Township 10 South, Range 85 West of the 6`h P.M., as more fully described at Plat Book 122, Pages 91-107 in the records of the Pitkin County Clerk and Recorder's Office, Aspen, Colorado, hereinafter called "Property", which Property is the real property where the Project is being developed; and, WHEREAS, installation of Facilities to serve the Project may require trenching or other excavation on certain real property adjacent to the Project described as follows: Lot 3, Marolt Ranch Subdivision situate in Sections 12 & 1 3, Township 10 South, Range 85 West of the 6' P.M., as more fully described at Plat Book 33, Pages 51-55 in the records of the Pitkin County Clerk and Recorder's Office, Aspen, Colorado, hereinafter called "Adjacent Land". NOW, THEREFORE, Owner and Holy Cross agree as follows: 1 . Owner shall provide all excavation, conduit and vault installation, backfill, compaction and cleanup necessary for installation of Facilities to serve the Project. Such excavation shall be located as shown on the construction plans approved by Holy Cross, and performed in accordance with Holy Cross Vault Installation Specifications, Construction Specifications and inspector requirements. Any deviation from the approved construction plans will not be made unless approved by Holy Cross in advance. All Facilities installed hereunder shall be inspected during construction by Holy Cross and shall meet all Holy Cross requirements prior to acceptance of such Facilities by Holy Cross. a. Prior to commencement of any work hereunder, Holy Cross shall furnish to Owner its Vault Installation Specifications and Construction Specifications and such specifications are made a part hereof by reference. b. All Facilities installed within the Property and Adjacent Land shall be within dedicated or conveyed and recorded utility easements. c. The top of all conduits installed hereunder shall be located a minimum of 48" below the final grade of the ground surface. d. A twelve-inch (1 2") minimum separation will be maintained between conduits installed for the Facilities and all other new or existing underground utilities. Wherever possible, this separation will be horizontal. The Facilities conduit separation from plastic gas lines shall be greater than this minimum wherever practicable. e. Holy Cross will supply the necessary conduit and vaults for installation by the Owner upon completion of contractual arrangements. Owner assumes responsibility for all material lost or damaged after such material has been issued to and signed for by Owner or by an agent of Owner. Alternatively, Owner may provide its own conduit and vaults meeting Holy Cross specifications for use on the Project and convey such provided material to Holy Cross with an acceptable Bill of Sale. After installation by the Owner and acceptance by Holy Cross, Holy Cross shall continue as the owner of the conduit, vaults and related structures and facilities. f. If conduit and/or vault installation provided by Owner for the Project are found to be unusable or improperly constructed, irrespective of whether such discovery is made during or after installation, Owner will be responsible for correcting said problems at its expense as specified by Holy Cross and Owner shall reimburse Holy Cross for all additional costs resulting from conduit and/or vault installation being unusable or improperly constructed. 2. Despite the fact that Holy Cross reserves the right to specify acceptable work performed hereunder, Owner shall perform work hereunder as an independent contractor, including, but not limited to, the hiring and firing of its own employees, providing its own tools and equipment, payment of all wages, taxes, insurance, employee withholdings, and fees connected with its work on the Project. 3. Owner shall obtain all necessary digging permits and utility locations prior to excavation for work performed hereunder. Owner shall repair all damage caused during excavation promptly and at its expense. No excavation will be undertaken within five (5) feet of existing underground electric facilities except under the on site supervision of a Holy Cross employee. W/O#1 9-23481 : 90-75: Castle Creek Rd 488 5/6/1 9 19-23481KH Page 1 of 3 Revised 12/18/1 5 4. Owner shall indemnify, save, and hold harmless Holy Cross, its employees and agents, against any and all loss, liability, claims, expense, suits, causes of action, or judgments for damages to property or injury or death to persons that may arise out of work performed hereunder, or because of a breach of any of the promises, covenants and agreements herein made by the Owner. Owner shall promptly defend Holy Cross whenever legal proceedings of any kind are brought against it arising out of work performed hereunder by the Owner and/or work performed at the direction of the Owner. In the event Owner shall fail to promptly defend Holy Cross, it shall be liable to Holy Cross, and shall reimburse it, for all costs, expenses and attorney fees incurred in defending any such legal proceeding. Owner agrees to satisfy, pay, and discharge any and all judgments and fines rendered against Holy Cross arising out of any such proceedings. Owner also agrees to promptly satisfy and pay any monetary settlements of disputes that arise hereunder, provided Owner has been given the opportunity to join in such settlement agreements. The above indemnification clause shall not apply to state and local governments or local service districts. In lieu thereof, whenever Owner is a government or district it shall procure and maintain in effect at least $1,000,000 of public liability insurance covering the acts, damages and expenses described in the above indemnification clause. Upon Holy Cross' request, such an Owner shall furnish a Certificate of Insurance verifying the existence of such insurance coverage. 5. Owner shall repair, at its expense, any excavation settlement and damage to asphalt paving or other surface improvements caused by such settlement resulting from work performed hereunder within the Property and Adjacent Land for a period of two (2) years beginning on the date backfill and cleanup are completed. 6. Owner, at its expense, shall stop the growth of thistles and/or other noxious weeds in all areas disturbed by excavation performed hereunder for a period of two (2) years beginning on the date backfill and cleanup are completed. 7. In the event Owner shall not promptly complete all of the obligations hereinabove agreed to be performed by Owner, Holy Cross may give written notice by registered or certified mail demanding Owner to complete the work and obligations undertaken by Owner herein, and if such is not completed within 30 days after receipt of such notice by Owner, Holy Cross may complete the work and obligations hereof. If Holy Cross shall be required to complete the work, all costs of completion shall be chargeable to and collectible from Owner. 8. As set forth in paragraph 1 above, Owner covenants that the trench, and all Facilities within the trench installed hereunder shall be located within dedicated or conveyed and recorded utility easements and at the proper depth below finished grade. It shall be the obligation of Owner to properly locate and construct the Facilities within the easement. Should it ever be discovered that such Facilities have not been properly located within dedicated or conveyed and recorded utility easements, or at the proper depth, it shall be the obligation of Owner to provide new easements for the actual location of the Facilities, or to relocate the Facilities within the easement, all of which shall be at the sole cost and expense of Owner. 9. It shall be Owner's responsibility to ensure that splice vaults, switchgear vaults and transformer vaults installed hereunder on the Property are accessible by Holy Cross boom trucks and other necessary equipment and personnel at all times. The use of such access by Holy Cross shall not require removal or alteration of any improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (1 0) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed in the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four(4) feet from non- opening sides and backs of said transformers and switchgear. Owner hereby agrees to maintain the requirements of this paragraph and further agrees to correct any violations that may occur as soon as notified by Holy Cross. Said corrections will be made at the sole cost and expense of Owner. 10. All Holy Cross meter locations must be approved in advance. Notwithstanding such advance approval, it shall be the Owner's responsibility to maintain acceptable access, as determined solely by Holy Cross, to all Holy Cross meters at all times. At any time in the future, should access to any Holy Cross meters be determined by Holy Cross to be unacceptable, then it shall be the Owner's responsibility, at the Owner's sole cost, to correct the access and make it acceptable, as determined solely by Holy Cross. 11 . Owner covenants that it is the owner of the above described Property and that said Property is free and clear of encumbrances and liens of any character, except those held by the following: All those of Record. The promises, agreements and representations made by Owner herein shall be covenants that run with the Property and shall be binding upon the successors in interest, and assigns, of the Property. W/0#19-23481: 90-75: Castle Creek Rd 488 5/6/19 19-23481KH Page 2 of 3 Revised 12/18/15 The individual signing this Trench, Conduit and Vault Agreement hereby represents that he/she has full power and authority to sign, execute, and deliver this instrument. Holy Cross Energy, a Colorado corporation CITY OFASPEN, LOA O By: By: David Bleakley - Vice President, Engineering Steven Skadron as Mayor STATE OF U1, 0 ,#-I�i h ) ss. U COUNTY OF V -III The foregoing instrument was acknowledged before me this -IS day of WWI . 20 11, by Steven Skadron as Mayor of CITY OF ASPEN, COLORADO. WITNESS my hand and official seal. 41/•-ivi/' My commission expires: 1 kfr'w Notary Public TARA L. NELSON 1 12)v S - a Itn G Ae .CO NOTARY PUBLIC Address: STATE OF COLORADO NOTARY ID#2OC140'0017 My Commission Expires Se!,iember 2.5,202 i STATE OF ) ss. COUNTY OF The foregoing instrument was acknowledged before me this day of , 20 , by David Bleakley- Vice President, Engineering, Holy Cross Energy, a Colorado corporation. WITNESS my hand and official seal. My commission expires: Notary Public Address: W/O#19-23481: 90-75: Castle Creek Rd 488 5/6/1 9 19-23481KH Page 3 of 3 Revised 12/18/15 Trench, Conduit and Vault Agreement Holy Cross Energy HOLY CROSS ENERGY UNDERGROUND RIGHT-OF-WAY EASEMENT KNOW ALL MEN BY THESE PRESENTS, that the undersigned, CITY OF ASPEN, COLORADO (hereinafter called "Grantor"), for a good and valuable consideration, the receipt whereof is hereby acknowledged, does hereby grant unto Holy Cross Energy, a Colorado corporation whose post office address is P. O. Box 2150, Glenwood Springs, Colorado (hereinafter called "Grantee") and to its successors and assigns, the right of ingress and egress across lands of Grantor, situate in the County of Pitkin, State of Colorado, described as follows: A parcel of land situate in Sections 12 & 1 3, Township 10 South, Range 85 West of the 6th P.M., as more fully described at Plat Book 122, Pages 91-107 in the records of the Pitkin County Clerk and Recorder's Office, Aspen, Colorado. And, to construct, reconstruct, repair, change, enlarge, re-phase, operate, and maintain an underground electric transmission or distribution line, or both, with the underground vaults, conduit, fixtures and equipment used or useable in connection therewith, together with associated equipment required above ground, within the above mentioned lands, upon an easement described as follows: An easement ten (10) feet in width, the centerline for said easement being an underground power line as constructed, the approximate location of which upon the above described property is shown on Exhibit A attached hereto and made a part hereof by reference. The rights herein granted specifically allow Grantee to install additional underground and/or pad-mounted facilities within the easement described herein. It shall be the Grantor's responsibility to ensure that splice vaults, switchgear vaults and transformer vaults installed hereunder on said real property are accessible by Grantee's boom trucks and other necessary equipment and personnel at all times. The use of such access by Grantee shall not require removal or alteration of any improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (10) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed in the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear. Grantor hereby agrees to maintain the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Grantee. Said corrections will be made at the sole cost and expense of Grantor. Together with the right to remove any and all trees, brush, vegetation and obstructions within said easement and the right to pile spoils outside said easement during construction and maintenance, when such is reasonably necessary for the implementation and use of the rights hereinabove granted. In areas where vegetation is disturbed by the above described use of the easement, the ground surface shall be seeded using a standard native mix by Grantee. Grantor agrees that landscaping or other surface improvements added on said easement after the date of execution hereof will be minimized and that Grantee will not be responsible for damage to said additional landscaping or surface improvements caused by exercise of its rights granted by this easement. Grantor agrees that all facilities installed by Grantee on the above described lands, shall remain the property of Grantee, and shall be removable at the option of Grantee. Grantor covenants that they are the owner of the above described lands and that the said lands are free and clear of encumbrances and liens of whatsoever character, except those held by the following: All those of Record. W/O#19-23481: 90-75: Castle Creek Rd 488 5/6/1 9 19-23481KH Page 1 of 2 Revised 12/18/15 TO HAVE AND TO HOLD, said right-of-way and easement, together with all and singular, the rights and privileges appertaining thereto, unto Grantee, its successors and assigns, forever. IN WITNESS WHEREOF, Grantor has caused these presen to be duly executed on this day of 1A- 4 , 2011 . The individual signing this Holy Cross Energy Underground Right-of-Way Easement hereby represents that he has full power and authority to sign, execute, and deliver this instrument. ,cITY A PEN, LORADO By: _ L____-, i� Steven Sk dron as Mayor STATE OF Ate-AV( 1 j7 ) ss. COUNTY OF 1N ) The fop oing instrument was acknowledged before me this 23 day of 111 Y 20 1 , by Steven Skadron as Mayor of CITY OF ASPEN, COLORADO . WITNESS my hand and official seal. I My commission expires: £I/. I t ,G® v ' Notary Public 1 TARA L. NELSON Address: l' D S 60rIfIiq (1 1((/ NOTARY PUBLIC I _��" STATE OF COLORADO t NOTARY ID;12001.4030317 R My Commission Expl is Sei.iemt.r 25,2021j W/O#1 9-23481: 90-75: Castle Creek Rd 488 5/6/1 9 19-23481KH Page 2 of 2 Revised 12/18/15 Q r_ m ill t1 /" ' tli T /, nr P‘t 6" N .. 0Z 01 i. Rail, 0 014 —" pPR.4 U ../ W OC / " U tJ J ¢ � '" W O N /' Cr-� i adaw Q•O CL 4 c� /' O \ V 04 /' F 7i Fin ' /to �v co CD 0 / C) ,\� co co ��� CL. ,y <4.:7 \v�4_ 70 <1_ N O ,o" ort ` / 0- , LIJ W / U o J Y r / ,\ , as 0 Q / N /� N Z U 9 / p7 O N \ ' / 6) \, // o /\ /' r4 ZNyjo 7 4o-o --‘1U .0.- , �a /' Z 0 Tb \ j' o No co U N V (.1)m N U1 T 3 O C' O HOLY CROSS ENERGY UNDERGROUND RIGHT-OF-WAY EASEMENT KNOW ALL MEN BY THESE PRESENTS, that the undersigned, CITY OF ASPEN, COLORADO (hereinafter called "Grantor"), for a good and valuable consideration, the receipt whereof is hereby acknowledged, does hereby grant unto Holy Cross Energy, a Colorado corporation whose post office address is P. O. Box 21 50, Glenwood Springs, Colorado (hereinafter called "Grantee") and to its successors and assigns, the right of ingress and egress across lands of Grantor, situate in the County of Pitkin, State of Colorado, described as follows: Lot 3, Marolt Ranch Subdivision situate in Sections 12 & 1 3, Township 10 South, Range 85 West of the 6`h P.M.,as more fully described at Plat Book 33, Pages 51-55 in the records of the Pitkin County Clerk and Recorder's Office, Aspen, Colorado. And, to construct, reconstruct, repair, change, enlarge, re-phase, operate, and maintain an underground electric transmission or distribution line, or both, with the underground vaults, conduit, fixtures and equipment used or useable in connection therewith, together with associated equipment required above ground, within the above mentioned lands, upon an easement described as follows: An easement ten (10) feet in width, the centerline for said easement being an underground power line as constructed, the approximate location of which upon the above described property is shown on Exhibit A attached hereto and made a part hereof by reference. The rights herein granted specifically allow Grantee to install additional underground and/or pad-mounted facilities within the easement described herein. It shall be the Grantor's responsibility to ensure that splice vaults, switchgear vaults and transformer vaults installed hereunder on said real property are accessible by Grantee's boom trucks and other necessary equipment and personnel at all times. The use of such access by Grantee shall not require removal or alteration of any improvements, landscaping, or other obstructions. The ground surface grade shall not be altered within ten (10) feet of said splice, switchgear and transformer vaults, nor along the power line route between the vaults. The ground surface grade at said transformer and switchgear vaults shall be six (6) inches below the top of the pad. The ground surface grade at said splice vaults shall be even with the top of the pad. The manhole opening of said splice vaults shall be uncovered (excluding snow) and accessible at all times. Improvements, landscaping or any other objects placed in the vicinity of said transformers and switchgear shall be located so as not to hinder complete opening of the equipment doors. The ground surface within ten (10) feet of said transformer and switchgear doors shall be flat, level and free of improvements, landscaping, and other obstructions. Improvements, landscaping and other objects will be kept a minimum of four (4) feet from non-opening sides and backs of said transformers and switchgear. Grantor hereby agrees to maintain the requirements of this paragraph and further agrees to correct any violations which may occur as soon as notified by Grantee. Said corrections will be made at the sole cost and expense of Grantor. Together with the right to remove any and all trees, brush, vegetation and obstructions within said easement and the right to pile spoils outside said easement during construction and maintenance, when such is reasonably necessary for the implementation and use of the rights hereinabove granted. In areas where vegetation is disturbed by the above described use of the easement, the ground surface shall be seeded using a standard native mix by Grantee. Grantor agrees that landscaping or other surface improvements added on said easement after the date of execution hereof will be minimized and that Grantee will not be responsible for damage to said additional landscaping or surface improvements caused by exercise of its rights granted by this easement. Grantor agrees that all facilities installed by Grantee on the above described lands, shall remain the property of Grantee, and shall be removable at the option of Grantee. Grantor covenants that they are the owner of the above described lands and that the said lands are free and clear of encumbrances and liens of whatsoever character, except those held by the following: All those of Record. W/O#1 9-23481: 90-75: Castle Creek Rd 488 5/6/1 9 19-23481KH Page 1 of 2 Revised 12/18/15 TO HAVE AND TO HOLD, said right-of-way and easement, together with all and singular, the rights and privileges appertaining thereto, unto Grantee, its successors and assigns, forever. IN WITNESS WHEREOF, Grant F a� caused these presen to be duly executed on this day of``( , 20 1" The individual signing this Holy Cross Energy Underground Right-of-Way Easement hereby represents that he has full power and authority to sign, execute, and deliver this instrument. TY OF SEN COLO ADO (... -------) By: nn,,,,'' nnnn�� S even Sk droras Mayor STATE OF WIA APV 1 � ,�/I N ) ss. COUNTY OF fl 1 The for going instrument was acknowledged before me this 73 day of , 20 , by Steven Skadron as Mayor of CITY OF ASPEN, COLORADO . WITNESS my hand and official seal. 17%/41/1/ �'pI('�i/1/1 My commission expires: 'W if ' l� Notary Public�m /� Address: (�L? c• g�1I1'IQ AV11 ' "v W/O#1 9-23481: 90-75: Castle Creek Rd 488 5/6/1 9 19-23481KH Page 2 of 2 Revised 12/18/1 5 Q ^ I-- C13 r w W #ir z ��.�\ N 3N11 10 c evil wco Z N Z CCI- 1 i---- o n- O lel- U CG NN, oa. co (1) o 3 1 CC N U op \ Q U Q \\ ZO co ❑J C:\ mz�m acsoQ� Z Z N ao LU N cc U \ 0 L11 r Q U N ice* ::I 15 100cu 0 X01w❑ O¢ CC rVa O,- U Z ' � o QCP CO cs Q i� w 0 Q" to F N a ON d �\• -?c).2 $ C