HomeMy WebLinkAboutcoa.lu.rz.McCullough/Smuggler.1973 Aspen Planning & Zoning July 17, 1973
TOP OF ASPEN REZONING -
COMMENTS ON COUNTY RECOMMENDATIONS
1. The Planning & Zoning Commission would like to request
assurance that public facilities i.e. , schools , roads ,
(anything that has an impact on public facilities) can,
in fact, be provided.
2. Further request that with the revision of the Master
Plan, the type of housing not necessarily be restricted
to resident housing, but rather to the results of the
findings of the revising committee, i.e. which is
more appropriate, short or long-term housing.
May, 1973
PITKIN COUNTY PLANNING AND ZONING RESOLUTION'
CONCERNING THE McCULLOUGH OIL-TOP OF ASPEN REZONING
•
Location: Smuggler Mountain, northeast of the City of
Aspen, Colorado.
From: R-15 Residential District, R-30 Residential District
and AF-1 Agriculture and Forestry District.
To: AR-2 Accomodations/Recreation District P.U.D.
WHEREAS , McCullough Oil - Top of Aspen has filed
an application to rezone 226 . 68 acres situated on Smuggler
Mountain northeast of the City of Aspen shown on the
attached map from R-15 Residential District, R-30 Residential
District and AF-1 Agriculture and Forestry District to
AR-2 Accomodations/Recreation District P.U.D. , and
WHEREAS , based on the evidence, testimony, letters,
. exhibits , a study of future land use plans for the area and
comments from the City/County Planning office, the Pitkin
County Planning and Zoning Commission finds as follows :
1. The present application is not the same
as that originally submitted in February of
1972 which was for 476 units and a different
housing type.
2. That the road system must be improved and
provision made for pedestrian access to the
business area as a condition for any major
new development occurring in the area.
3. The timing for construction for any major
project in the area must be approved by the
County to coordinate the county' s ability to
provide services to the area and assure that
any major construction is not premature.
/
-1-
4 . That any development in the area should he
oriented toward permanent housing and not
second homes , the tourist market or short
term rentals .
5. The Silver King apartment project (438 total
units of which 304 will be constructed at end
of this construction season) in which the
applicant has an interest is a different housing
type than that presently proposed .and a need
exists for the housing type being requested
by the applicant.
6. Slopes exceeding 40% on Smuggler Mountain
should not be used for and development
whatsoever.
7. That the lands of less than 40% slope on
Smuggler Mountain should not be developed
for single-family purposes but should be
part of a 'planned unit development, to avoid
a land use type that can only be served by
the individual auto.
8. A change in zoning to AF-Agriculture Forestry
District density is consistent with the
Planning and Zoning recommendations to change
the zoning on Smuggler Mountain from R-30
Residential District to AF-Agricultural Forestry
District. This action together with the purchase
of Hunter Valley would vertally set the land
use policies needed to complete the planning
in Smuggler - Hunter Valley area.
9. Aspen Metropolitan Sanitation District will
more than double its sewage treatment capability
with the expansion planned and funded for 1973.
-2-
10 . The proposal calls for development of approxi-
mately 14% of the applicant' s property and
dedication to the public of the remaining 86%.
This constitutes - a very valid application of
the density transfer concept serving to cluster
all development toward the bottom of the mountain
leaving the more visible upper areas undisturbed.
NOW THEREFORE. BE IT RESOLVED, that the- Pitkin County
Planning and Zoning Commission does hereby recommend to the
Pitkin County Commissioners that McCullough Oil - Top of Aspen' s
application to rezone from R-15 Residential District, R-30
Residential District, and AF-1 Agriculture and Forestry District
to AR-2 Accommodations/Recreation District P.U.D. be granted
subject to the following conditions:
1. All development shall occur according to an
approved PUD plan;
2. Density shall be limited to 188 dwelling units ;
3. The units shall provide housing for permanent
residents wishing to own a home as well as
rent;
4. The initiation and phasing of construction of
the project shall be approved by the County so
as to correspond to the ability of the public
sector to solve the problems of impact including
a solution to the school site location serving
the area;
5. The applicant shall be required to participate
in a realistic solution to the road and circula-
tion system in the general area of the project
which shall include a pedestrian path connect-
ing subject property with the Trueman property
being purchased by the City;
-3-
•
6. Sal gtion Ditch shall be proti `ed and any
ditch seepage or ditch failure within the
project area shall be the responsibility of the
applicant. Public access to and along the
ditch shall be preserved;
7 . The land not planned for development (195 acres)
shall be dedicated to the Pitkin County
Board of Commissioners or the Forest Service
for use as open space and parkland: In
the event that the land is conveyed to the
Forest Service and the County shall enter
into an agreement with the Forest Service
requiring County approval for any road
construction or land use changes to occur
in said area;
8. Landscaping within the development area
shall be by an approved plan;
9. The developer shall provide for vehicular,
pedestrian and bicycle circulation within the
project to include a pedestrian and bicycle
easement along the southern boundary for
future access to schools;
10. All utilities shall be placed underground;
11. All building locations, setbacks, heights and
similar matters shall be established according
to an approved PUD plan;
12. The applicant shall be required to participate
with other land owners in providing a proportion-
ate contribution in a shuttle transportation
system linking the area hereby recommended for
rezoning with Ruby Park.
()Ct
Chairman
Pitkin County P1 nning and Zoning - - -
i
Dated this (') day,' n : `'��`'�� _._. , 1973.
TOP-OF-ASPEN
Density Transfer Calculations
AF-2 = 196 . 13 acres (above 8200 elevation)
R-30 = 13.42 acres •
R-15 = 17 . 13 acres
TOTAL 226 . 68 acres
Density Calculations
AF-2 = 196.13 acres
minus 77 .13 acres (slope > 40 7)
119.00 acres (for density calculation)
119.00 acres (AF-2) @ 1 d.u. per acre = 119.00 du
13.42 acres (R-30) @ 1.45 d.u. per acre = 19.46 du
17.13 acres (R-30) @ 2.9 d.u. per acre = 49.68 du
TOTAL 188. 14 du
Existing zoning of the subject application area allows
approximately 350 units which does not include any
density bonus .
...•
. • •
. . . ,:.
.--
v ,JAN
. ..
•t,-
• .
. :
7.---
, ..
....//
..---- •
,..,.v•-..-----• . .
e...y_Ltr,e. ,;:.,,:._s-...,--- - . - - •
,... •....
( . .
. ,
,
i .
!
t i
i icto.4 Ac.Rr=5 .
.14. ..--..--...,...... .
r '/
■
/ '...
-•...
-P
•••.. ,,
tiz
••—sZki
17:- •:..•
; ..8.12 1 " \■,..4 \ _
I 1
R • (r
.$.. k%
kx
.....,..
.z. \\
u
I
i \ • -
,. IN
If
( ,_
i : 71 `) •• =,
.....„-....,
1- 6tviu cis 11—n K. II 1 .
i - • Lk-=.!/' /
woulT - IN _ 4 //
n li
4
......,........_ •
..... ,) 5-
1. H
e).40rq LettIZL *‘■••••
\te.
0.' TRAU-MR. ''..1 ) it ./ PARCEL I —
---
CCURr
7 4 , II 199.4
, •
il
i, rjr,k 4,1,CEL 5 46.
-'I/
I I./%4 e ‘
. ...k _4::)_
\'■...
e
- A• C 7::. NI
.....--r....7..... _
•
. 1 . TOP OF/6\--.-P -N 1 INC.
...14.610......... & ip IN mairafaik .
. ....,
. . ,
- . .
. _
, .
, -
...
,
._
•....