Loading...
HomeMy WebLinkAboutcoa.lu.sm.Hunter Creek Trail.0055.2012 THE CITY OF ASPEN City of Aspen Community Development Department CASE NUMBER 0055.2012.ASLU PARCEL ID NUMBERS 2737 073 66 800 PROJECTS ADDRESS HUNTER CREEK TRAIL EXTENTION PLANNER CHRIS�ENDON CASE DESCRIPTION STREAM MARGIN REVIEW - EXCEMPTION APPROVED 7.23.12 REPRESENTATIVE CITY OF ASPEN DATE OF FINAL ACTION 8/29/12 CLOSED BY ANGELA SCOREY ON: 8.29.12 2v ? Al;L Ll May 23, 2012 Chris Bendon Community Development Director THE CITY OF ASPEN City of Aspen 130 S. Galena St. Aspen, CO 81611 RE: Hunter Creek Trail Extension - Stream Margin Review Exemption Dear Chris: Parks Department staff is currently in the planning phase of a project to construct a 4' wide soft surface trail that will connect the existing Hunter Creek Trail to the Rio Grande Trail, along the northern banks of Hunter Creek. This project includes a 6' wide pedestrian bridge to cross Hunter Creek at a point just upstream of the Hunter Long House. We will be utilizing both Pitkin County owned property (located within the City of Aspen limits and Pitkin County owned trail easements throughout the entire trail corridor. Since much of the proposed trail alignment sits within the 100' high water line of Hunter Creek, we are formally requesting a Stream Margin Review Exemption as outlined in the City of Aspen Land Use Code, section 26.435.040, paragraph B, line 1. Under the Exemptions paragraph it states "Construction' of pedestrian and automobile bridges, public trails........" as items that qualify for the exemption to the Stream Margin Review. Our project certainly seems to fit these parameters. It is our request that you authorize this exemption as Community Development Director for the City of Aspen. Sincerely: Austin Weiss, City of Aspen Parks Department Approved by Chris Bendon, Community Development Director, City of Aspen 130 SOUTH GALENA STREET ASPEN,COLORADO 81611-1975 ' PHONE 970.920.5000 ' FAx 970.920.5197 www.aspenpitkin.com Printed on Recycled Paper Chris Bendon From: Austin Weiss Sent: Tuesday, May 22, 2012 4:21 PM To: Chris Bendon Subject: Hunter Creek Trail Project Attachments: HunterCrk_Bridge Location Layout_3-8-12.pdf; Hunter Creek-TE_Complete 1of2_5-8-12.pdf; Hunter Creek-TE_Complete 2of2_5-8-12,pdf Hi Chris, I'm sorry to bother you but just wondering if you've had a chance to look at the Hunter Creek project described below. Approved Thanks, Austin r ?2 Austin Weiss date: Ll ! Trails Coordinator, City of Aspen Chris Bendon,AICP 970-429-2023 Community Development Director City of Aspen From: Austin Weiss r—eooeo Sent: Wednesday, May 09, 2012 10:32 AM /� l To: Chris Bendon Subject: Hunter Creek Trail Project Hi Chris, As I'm sure you've heard, we are working on an extension of the Hunter Creek trail behind the Hunter Longhouse. It requires the construction of a new pedestrian bridge over Hunter Creek. I want to check in with you regarding getting a Stream Margin Review Exemption for this project. I have attached a site plan and an overview of the entire trail project. The only portion of the project that is in the City(although located on Pitkin County owned property) is the southern landing of this bridge. We are designing the bridge to be as high as reasonably possible above the creek and it will be designed to "breakaway" in the event of flood damage and will be anchored to the northern abutment so that it will not become a hazard. Please let me know what further information you will require. Thanks,Austin Austin Weiss Trails Coordinator, City of Aspen 970-429-2023 1 _ EXAMPLE OF AN EXISTING PEDESTRIAN BOARDWALK ON A SECTION HUNTER CREEK TRAIL. THIS EXISTING SECTION OF TRAIL TRAVELS OVER WETLAND AREAS. THE SAME RO.ARDWACK TYPE, T'O BE INSTALLED AT ($) PROPOS'EO LOCATIONS THAT CROSS WETLAND AREAS 1 Y � w R O L N4R nl/ ( �,TrEr, L IN TIER . -�I+ar`� ►�IOE A�.wr • 1 EONS HIUN TER CREEK TRATL. CENTER LINE E TRAIL SIMILAR BRIDGE TYPE TO BE HUNTER CREEK RIVER BED EASEMENT LOCATED IN THE INSTALLED AT PROPOSED BRIDGE LOCATION @ L�CRENQ- =CLOMEMT PLAITED IOCAI!- OT HWTI:R CREEK 20'-D' RIOI TRAIL EAYMEN( O=ERI6TMG HINIER CREEK TRAR •I—AT1oR Of RLi TVU1T PROTo H w ER CRE K LONG HOU v. EXISTING EASEMENT ABOYE= WAGES OF THE EXISTING ARTIFACT. Y-1 Y--9•9.4 THROUGH WETLANDS EXISTING TRAIL EASEMENT TRAVELS DIRECTLY _ THROUGH THE CENTER OF THIS ARTIFACT " (APX. 45' DAY-LIGHTED STEEL POPE WITH WEATHERED WOOD COVERING) r- `+`� ension AR o O Eggs TANG TRA1t Ew 1D SEy T 1 EEK J'� U f p � _1 R a - EXISTING HUNTER CREEK TRAIL HUNTER Nr EXISTING FENCE �� w ✓ `-l EXIST STORM WA L r JL <J Hunter Creek Trial Extension ASPEN Pedestrian Bridge Location NlliIREC I SMAJI UG140Y PONOS ESTATES z °c s r1P < 1 I' D �:pEtq: a _ I f n d!!"MIER CWFK?0^0 n WlOE TYwp.Ew9H(NI r ! C._._.._.__J EItl5l aiG A!o GwwntM. rwwu. ,�///� r '� • -(-aurpp Q qE EYnNi RgIG VIEW PROM t' '' a - AO EXISTING Rio GRAMME TRAIL �j TM lrtuu.EwOL—TMrl avr e ;t � �\ pKO�T r Nw GRnMOE rMll f m Z - ncnnrwm rtowo Fpf pETwtt S) Hul Creek Trail Ex ension l' I