HomeMy WebLinkAboutresolution.apz.018-12 RECEPTION#: 593257, 10/22/2012 at
12:35:15 PM,
1 of 9, R $51.00 Doc Code RESOLUTION
Janice K.Vos Caudill, Pitkin County, CO
RESOLUTION N0. 18
(SERIES OF 2012)
A RESOLUTION OF THE CITY OF ASPEN PLANNING AND ZONING COMMISSION
REGARDING A CONCEPTUAL PLANNED UNIT DEVELOPMENT APPLICATION
FOR THE SOUTH ASPEN LODGE PROJECT LOCATED ON A PARCEL OF LAND
DESCRIBED AS PARCELS 1,2,AND 3,OF THE SOUTH ASPEN STREET
SUBDIVISION/PUD, CITY AND TOWNSITE OF ASPEN, PITKIN COUNTY,
COLORADO.
Parcel No. 2735-131-39-001 (Parcel 1)
Parcel No. 2735-131-39-002 (Parcel 2)
Parcel No. 2735-131-39-003 (Parcel 3)
WHEREAS, the Community Development Department received an application from
ASV Aspen Street Owners, LLC, represented by David Parker, of Bald Mountain Development,
requesting Conceptual Planned Unit Development approval of a mixed-use development
consisting of 35 free-market residences, 31 "lock-off' units to be associated with the residences,
employee housing in both dormitory and apartment style, and a 73 unit (76 keys) lodge
containing a restaurant/bar, accessory retail, various meeting facilities, a spa and fitness facility
with indoor and outdoor amenities, underground parking, and various administrative and support
function spaces; and,
WHEREAS, the subject property is described as Lots 1, 2, and 3, of the South Aspen
Street Subdivision/Planned Unit Development as described on the subdivision plat thereof
recorded as reception number 537080 in Book 83, Page 50, with the Pitkin County Clerk and
Recorder; and,
WHEREAS, pursuant to Section 26.445.030, Conceptual Planned Unit Development
approval may be granted by the City Council after considering a recommendation from the
Community Development Director and a recommendation from Planning and Zoning
Commission made during a public hearing; and,
WHEREAS, the Community Development Director recommended, after consultation
with the applicant, the Conceptual approval be limited to a review of the proposed program (the
types and amounts of various land uses within the project), the site plan (how those uses lay on
the land), and massing (how the buildings would appear in 3 dimensions) aspects of the project;
and,
WHEREAS, the Planning and Zoning Commission, during a duly noticed public hearing
and after soliciting public input, has reviewed the program, site plan, and massing aspects of this
application and has provided statements concerning conformance with the Planned Unit
Development review criteria and suggestions to achieve greater conformance.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF ASPEN PLANNING AND
ZONING COMMISSION THAT:
PZ Reso No. 18,
Series of 2012.
Page 1 of 4
Section 1: Commission Concerns
The Commission finds that the application does not conform to the Planned Unit Development
criteria for approval as outlined in Section 26.445.050 of the City of Aspen Land Use Code. The
Commission's primary concerns are:
• The project is predominantly a free-market residential project with a lodging component.
There are more units and more square footage devoted to free-market residential use in
this plan than in the entirety of the vested townhomes plan.
• The upper two parcels have a "private enclave" feel to them, although this condition may
not be worse than with the vested townhomes plan.
• The proposal accommodates only half of the standard affordable housing mitigation as
otherwise required. The project generates more employees than the townhomes plan and
the Commission believes this under-mitigation shifts too much housing burden to the
public. The Commission questions the validity of such a significant trade-off.
Section 2: Supported Revision
The Commission supports the applicant's revision to the vehicular circulation plan. The original
plan contained a Juan-to-Garmisch traffic pattern for hotel parking and presented too much
traffic impact upon the neighborhood to the west. By moving the hotel parking entrance to
South Aspen Street, overall traffic impacts are minimized. The Commission believes this
amendment is a significant improvement.
Section 3: Commission Recommendations
The Commission finds that the application could be substantially improved and achieve
compliance with the criteria for Planned Unit Development approval. Following are suggested
ways to achieve compliance:
• The free-market portion of the project could function more `lodge-like' — assisting the
hotel use and increasing short-term stays. This could be achieved through fractional
interests, the operation of the lock-off units, or other mechanisms. In any regard, this
needs to be assured through appropriate land use and legal mechanisms that sustain.
• The design of rights-of-way along the western extent of the site could be oriented to
maximize on-street parking. The City Engineer is encouraged to explore this option.
• Massing concerns along the north edge of the hotel could be alleviated by vacating all or
part of Juan Street and shifting the lodge building southward. The applicant has agreed to
explore this option. The Commission also encourages the applicant to explore a tunnel
rather than a bridge to connect the buildings.
• The applicant is to increase affordable housing on-site or off-site to decrease the
unmitigated employee housing burden of this project. The applicant has agreed to explore
partnership options utilizing city-owned properties to achieve a greater amount of
affordable housing.
PZ Reso No. 18,
Series of 2012.
Page 2 of 4
Section 4: Requested Clarifications
The Commission finds that certain aspects of the application are difficult to understand. A 3-
D rendering(s) of the project would help reviewers fully understand the scale and massing of
the project and its visual impacts, especially in comparison with the COWOP II project.
Section 5: Limitations
Approval of this conceptual development plan does not constitute final approval or permission to
proceed with any aspect of the development. Approval of this conceptual development plan
authorizes the Applicant to proceed to City Council review for Conceptual PUD.
This application is subject to Final Planned Unit Development review, Conditional Use, Special
Review, Growth Management Review, Mountain View Plane Review, Subdivision,
Condominiumization, Commercial Design Review and 8040 Greenline Review, and a Street
Vacation and Right-of-Way Dedication Plat pursuant to the Municipal Code. Additional reviews
may be necessary depending on amendments made to the program, site plan, and massing of the
project. Application for final review must be in accordance with the City Council Resolution
granting conceptual PUD approval. A pre-application conference with a member of the
Community Development Department is required prior to submitting an application.
This Conceptual Review by the Planning and Zoning Commission provides guidance to the
applicant and to City Council regarding this project's program, site plan, and massing. This
Resolution shall not create specific reliance or prohibit the Commission from conducting a full and
throrough review of the application upon final PUD review. The limitations of Section
26.445.030.D apply.
Reviews by the referral departments have not been conducted for this Conceptual review and certain
aspects of this project may need to be redesigned or reconsidered to achieve compliance with
applicable building and development codes.
Section 6:
This Resolution shall not affect any existing litigation and shall not operate as an abatement of.
any action or proceeding now pending under or by virtue of the ordinances repealed or amended
as herein provided, and the same shall be conducted and concluded under such prior ordinances.
Section 7•
If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason
held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be
deemed a separate, distinct and independent provision and shall not affect the validity of the
remaining portions thereof.
Section 8:
If a lodge is developed on Parcel 1, the Commission recommends removing the right for free-
market residential uses on the parcel unless otherwise waived by the City Council for good
cause.
PZ Reso No. 18,
Series of 2012.
Page 3 of 4
APPROVED BY the Planning and Zoning Commission of the City of Aspen on this ;)- day of
2012.
APPROVED AS TO FORM: PLANNING AND ZONING COMMISSION:
Debbie Quinn, LJ r gamer, Chair
Assistant City Attorney
ATTEST:
a '
J kie Lothian, beputy City Clerk
ExhibitA — Summary of Program, Site Plan, and Massing
PZ Reso No. 18,
Series of 2012.
Page 4 of 4
I
+erg
•
TT77 �i__� A �I t� •� ��6 # ■ � p�(�a� _ � 1j7
11111 WUJOLK�V PARK 4'ee.,w;So
bA
3=.. �a4S VW'�
' °f �E Q.,
Its� .} .'' dry,�• -- °d'yi r t �'���:..� �i+Ke'{I ���Q'+ff1\'
— ,� 4� sly . � ,� �► '' _
• '� 141 �'�g� � �_ � � �
� • � ��1 m'r a s_ ` aJ�y �'' I • fir � }y
�'' ®®®EIS
® ,
NMI
/, e ee 'e e•i
S.ASPEN STREET
f I 12'-0'
PARCELI POOL
LODGE
I V MIDDLE
, ,••�, I BURRING
i<� I ENCLOSED J
' BRIDGE PARCEL] lYr
(Wee) ` °S Y ENTRY UPPER
, - ..S� BUILgNO
Yf '�'
•:.":� LOBBY
r ROOF
1, .�. ,•.5 --- D DECK
J• .. -6/ , —
RESIDENTIAL -CLOSED
!� /T•• -M BRIDGE
�
1 -A 30'<•
,OJT ---
ACGESS I I ��
_ 1 _
PARCEL 3 BUILDING TOTALS
PARCEL 2 BUILDING TOTALS
TOTAL GROSS AREA: 63,939 SQ.FT.
TOTAL GROSS AREA: 67,746 SQ.FT. TOTAL GROSS FREE MARKET AREA: 41,596 SQ.FT.
TOTAL GROSS FREE MARKET AREA: 43,984 SQ.FT. TOTAL AREA ABOVE GRADE FAR: 43,903 SQ.FT.
TOTAL AREA ABOVE GRADE FAR: 42,389 SQ.FT. TOTAL AREA BELOW GRADE: 20,036 SQ.FT.
TOTAL AREA BELOW GRADE: 25,357 SQ.FT.
PARCEL#3
PARCEL#2 LEVEL FREE MARKET UNITS LOCK-OFF UNITS
LEVEL FREE MARKET UNITS LOCK-OFF UNITS I B1 1 1
LEVEL 1 1 1 LEVEL 1 3 3
LEti:L 2 4 4 LEVEL 2 5 5
LEVEL 3 5 5 w LEVEL 3 5 5
LEVEL 4 4 4 LEVEL 4 3 3
LEVEL 4 4 I TOTALS 17 17
TOTALSI 18 18
®oESisM PouArtlltecdu.lPlaRRlnE — _d --�a.
I
.l
1 '
o I
PROPOSED HOTEL
01-0.,
Pp I LIFT ONE LODGE -GRADE
NA%Nw 4-W T-
SOUTH ASPEN STREET REDEVELOPMENT
pOSS ARCHITECTURE+PWINING CONCEPTUAL DESIGN:PROPOSED HOTEL 10'SETBACK ■
pp. mm,M xm. September 28.2012 I
., u
r ..
,
r
i
I
i
1
�f�ftnD4-1�rwA -42 is,
SOUTH ASPEN STREET REDEVELOPMENT
p0$$ARCHITECTURE PLANNING CONCEPTUAL DESIGN:PERSPECTIVE 3-
rrrrrrzrrr.rsrirrrr�rrrrrrrr rrrrr Ja7�ze September hih,2012
"4♦
y
fy.
o-
SOUTH ASPEN STREET REDEVELOPMENT
PO$$ARCHITECTURE+PLANNING C O N C E PT UAL D E S I G N:PERSPECTIVE 29
...............o.,......... ...., onur..�t:tMr,�.. S.m.mtoraw,z0iz