Loading...
HomeMy WebLinkAboutagenda.hpc.201908281 AGENDA ASPEN HISTORIC PRESERVATION COMMISSION August 28, 2019 4:30 PM, City Council Meeting Room 130 S Galena Street, Aspen I.SITE VISIT I.A.12:00 pm: Please meet out front at 202 E. Main Street II.ROLL CALL III.MINUTES III.A.Draft Minutes for August 14th, 2019 coa.hpc.081419.docx IV.PUBLIC COMMENTS V.COMMISSIONER MEMBER COMMENTS VI.DISCLOSURE OF CONFLICT OF INTEREST VII.PROJECT MONITORING VIII.STAFF COMMENTS IX.CERTIFICATE OF NO NEGATIVE EFFECT ISSUED X.CALL UP REPORTS XI.SUBMIT PUBLIC NOTICE FOR AGENDA ITEMS XII.OLD BUSINESS XII.A.4:45 pm: 1020 E. Cooper, Conceptual Major Development, Relocation, and Variations - Continued, PUBLIC HEARING XIII.NEW BUSINESS 1 2 XIII.A.4:50 pm: 202 E. Main, Conceptual Major Development, Relocation, Setback Variations, Parking, Fee Waivers, and Floor Area Bonus, PUBLIC HEARING 202EMain_Memo_08.28.19.pdf 202EMain_Draft_Resolution_08.28.19.pdf ExhibitA.1_HPGuidelinesCriteria.pdf ExhibitA.2_SetbackVariationCriteria.pdf ExhibitA.3_RelocationCriteria.pdf ExhibitA.4_FloorAreaBonus.pdf ExhibitB_ReferralComments.pdf ExhibitC_Application.pdf XIV.ADJOURN XV.NEXT RESOLUTION NUMBER Typical Proceeding Format for All Public Hearings 1)Conflicts of Interest (handled at beginning of agenda) 2) Provide proof of legal notice (affidavit of notice for PH) 3) Staff presentation 4) Board questions and clarifications of staff 5) Applicant presentation 6) Board questions and clarifications of applicant 7) Public comments 8)Board questions and clarifications relating to public comments 9) Close public comment portion of bearing 10) Staff rebuttal/clarification of evidence presented by applicant and public comment 11) Applicant rebuttal/clarification End of fact finding. Deliberation by the commission commences. No further interaction between commission and staff, applicant or public 12) Chairperson identified the issues to be discussed among commissioners. 13) Discussion between commissioners* 14) Motion* *Make sure the discussion and motion includes what criteria are met or not met. Revised April 2, 2014 2 1 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 Chairperson Greenwood opened the meeting at 4:29 p.m. Commissioners in attendance: Gretchen Greenwood, Bob Blaich, Roger Moyer, Kara Thompson, Richard Lai, Jeffrey Halferty, Scott Kendrick. Absent were Nora Berko and Sheri Sanzone. Staff present: Nicole Henning, Deputy City Clerk Jim True, City Attorney Amy Simon, Historic Planning Director Sarah Yoon, Historic Preservation Planner MINUTES: Mr. Moyer moved to approve the minutes of July 24th, Mr. Blaich motioned to approve, Ms. Thompson seconded. All in favor, motion carried. PUBLIC COMMENT: None. COMMISSIONER COMMENTS: Mr. Blaich said hespent this last weekend at the Bauhaus event at the Institute. He said it was very organized and well presented and he really liked the Aspen Modern pamphlet that Ms. Simon handed out and said it’s really nice to have. Ms. Simon said she wants to do a summary of what was learned and mentioned that Ms. Yoon also did some traveling, so they would like to discuss these items on an agenda where there is some extra time. Mr. Moyer entered the meeting. DISCLOSURES OF CONFLICT: Ms. Thompson said she works for Forum Phi who is contracted withMark Hunt on some other projects. She spoke with Mr. True and he thinks this is ok as long everyone else is ok with it. Mr. True asked her to note her objectivity. Ms. Thompson stated that she can be objective on this project. PROJECT MONITORING: None. STAFF COMMENTS: None. CERTIFICATE OF NO NEGATIVE EFFECT: None. CALL UPS: None. PUBLIC NOTICE: Mr. True said they have been received and are appropriate. NEW BUSINESS: 201 E Main Mike Kramer Mr. Kramer is asking for continuance on this project because the applicant needed to make some changes to the site plan and once that is done, they will resubmit it back to staff and allow for some extra time. They are requesting continuance for September 11 th and this does require a motion from the board. MOTION:Mr. Moyer moved, Mr. Kendrick seconded. All in favor, motion carried. 3 2 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 NEW BUSINESS:414- 422 E Cooper Avenue Amy Simon Ms. Simon said this is a single property made up of three townsite lots with three distinct buildings. One is where Natural Pets is, another with the Red Onion bar and a vacant store front. HPC reviewed the redevelopment of the Bidwell building a few years ago and included the demolition of the poster shop. You may have questions about how this all works together, but that project was previously approved. Jas Aspen will create a venue that will be on the second floor of the historic Red Onion building and on the second floor of the Natural Pets shop. There are relatively few exterior changes. There will be a small addition on the alley of the Natural Pet shop and some rooftop changes for mechanical and a skylight. Other things to be discussed are growth management and a small amount of affordable housing mitigation that is due, which is roughly 1700 sq. ft. net leasable expansion. The expansion also generates a requirement for parking mitigation of 1.76 new spaces and those cannot be provided, so those can also be mitigated through cash in lieu. Staff is recommending approval. There are no design issues. We have a condition for the applicant to do nothing to change the existing amount of second tier space. There is a common lobby to serve multiple tenants. This property is within two designated view planes; one from the Wheeler and one from Main Street. The Wheeler is the more restrictive one and is the ruling view plane. Most of this development is already above the protected view plane level. The expansion on the alley and the addition of the skylights is permissible by the community development director as long as the points of origin cannot be seen. There are diagrams being shown tonight which reflect that nothing will further pierce the view planes. APPLICANT PRESENTATION: Sara Adams of Bendon Adams, Mark Hunt and Jim Horowitz from Jas Aspen Ms. Adams said this is a very exciting project. Mr. Horowitz said this is not an overnight happening. He said they started talking about this over 10 years ago. There isn’t a single room size of this type of venue in the city, until now and will hold 125-250 people. This space will provide AV capability, catering, daytime natural light or full black out darkness. It will add back a vitality to the core, appealing to diverse age groups. We are short on gathering places here in Aspen. we are short of them. This new space offers the promise of stability and growth for an organization celebrating our 30 th year. So far, we have been nomads for a very long time in every nook and cranny. This would be a game changer for us. Café pricing for the performances, is very affordable and well within reach. We are privately financed. There are four purposes and uses and the first is the education programs. We are always hurting to find a place for young musicians to have a rehearsal or a lesson. The JAS Academy is a one of a kind program and we will be expanding it to 4 weeks starting in 2021. The JAS Café runs 36 nights a year, between winter and summer and have used various spots all around town. We never know where we will be, so it will be nice to have a home for this. Lastly, there will be a gallery on the second floor. We house 45,000 pictures of iconic artists currently, so we would like a place to exhibit these and rotate them out. Mr. Horowitz showed a picture of Billie Holliday standing in front of the Red Onion, which was recently found in someone’s shoebox in Montana. She played in Aspen in 1952. Ms. Adams showed the previous approval and explained how this new one will be tied into the Red Onion. All mechanical is set back to keep the visual impact as minimal as possible. She showed the materials and all very simple. They are happy to work with staff and monitor on the brick, but would like to have it close to the Red Onion, but not exactly the same. 4 3 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 Ms. Greenwood asked when this project will be built, and Mr. Hunt said they are in position to apply for a permit within 4-6 weeks after approval. Public comment: Lorenzo Semple: First of all, what an exciting project. It’s clear that JAS Aspen has couch surfed too long. Instead of being the Kato Kaelin of jazz gigs, they need a permanent home. Everyone in this room has incredible memories of JAS Aspen concerts. He has seen incredible performances, such as, Chuck Berry. These are life altering experiences. He also mentioned the education component and said his son Patrick, went through the program and from that, has become a touring musician. This just makes so much sense. Bill Stirling: He has been connected very loosely with JAS Aspen right from the beginning. Jazz music in Aspen goes back to the 50’s and 60’s when the Red Onion was really the venue. America was ripe for an exciting for a new form of musical expression and had really spilled over into Aspen. In the late 60’s, early 70’s, less and less jazz was played in town and that continued until 1990. Jim’s vision occurred because of that and he first brought the Labor Day spectacle, which has evolved and moved, and that place is set. The jazz series downtown could also be set in that same way. Now young people are turning to jazz and it’s spawning all sorts of new musicians. Downtown is what people call a community center, where you have “accidental encounters”. That is what a cornerstone of a community is. He is urging everyone to support this. Susan Rubel: She is the executive and artistic director at Aspen Film. She said they live down the hall from Mr. Horowitz and JAS Aspen. She has been looking for ways to collaborate together for the past couple of years and is still relatively new to the community. She understands the need for their own home because it’s not good to bounce from venue to venue. This venue can also be used for other organizations and nonprofits, such as hers, as well. We would love to be able to collaborate and recently did a successful join up with the Temporary in Basalt. They have ceased their program since the Temporary closed down, so we hope you will support this project. Christian McBride: Mr. McBride said that the first ever Jazz festival took place in Nice, France in 1948. Most jazz musicians during that time, were African American, so they fled to Europe to be able to keep creating their music, which was more readily embraced. A lot of the more contemporary artists have been taught in European schools and European institutions. Only in the last 50 years has jazz been accepted as something legitimate. In terms of how it’s taught in schools, we are still in the dark ages. There are only four institutions currently in the U.S.where jazz is being taught, and this Aspen program would add to that. 1994 was his first trip here to play at the Wheeler. He quickly found out about the Aspen Music Festival. He mentioned that he went to Julliard and it was his original goal to play classical and jazz. He found that jazz happened sometimes here in Aspen, in the 90’s. Mr. Horowitz was creating something so special in a town not necessarily known for jazz. The city now has the opportunity to claim itself as an important city in American history with regard to its indigenous music. People can now say New York, New Orleans, Detroit, Chicago and Aspen. Paul Menter: He remembered when Mr. Horowitz regaled him with the plan to bring vitality back to the core. He is here 17 years later, still doing it as this is a lifetime mission for him. He put his Billie Holiday playlist on last night, which is ironic because of the historic picture that was just found, and it gave him chills. He thinks there are three elements relating to the tapestry of Aspen and the history of the 5 4 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 organization and how this all came together. His kids graduated from Aspen High School in 2012 and at the time, he felt the music program was pretty inadequate, even though it’s one of the top-rated schools in the country. He grew up in a small town outside of Cincinnati and the music program was huge and a center of the community. This will provide that sense and center for Aspen and the community. Music has gravity and brings people together. Most importantly, music has soul. Jazz is, without question, the most diverse and inclusive music genre ever created. There is real historic and long-term value to that. Chuck Bergeron: He is the program director of the JAS Academy and faculty member of the Frost School of Music at the University of Miami. The combination of the Frost School and the JAS Academy creates a unique educational idea and brings together two dozen of the most talented young people in college across the country. Now we elevate their careers and prepare them in an entrepreneurial way. Technology has a huge hand and we’ve created a curriculum which is very hands on. Mr. Horowitz has allowed us to create a sort of recruitment from all around the country. There are a lot of life lessons to be learned and is a model for schools across the country. Rick Crandall: He said he is a 20-year resident of Aspen and has been connected with JAS Aspen for the past eight years. You can read about our strategic plan on the internet and we talk about the Aspen experience and how JAS is key to the overall experience. This is an authentic town focused on health. In our plan, we have set a goal that jazz aspen be a key contributor. We want this to be a part of the physical Aspen experience, meaning, people can walk around and be a part of the performance. This kind of thing is what we would love to have and return the Red Onion to its roots. Personally, I am very passionate about this project. Hope that you all see the vision and go along with moving forward. Evan Wiley: He lives across the alley from this building and has a beautiful view of the mountain for the past 20 years. He likes the project, but it has a serious negative impact on the neighbors. The gallery for photos destroys the view plane of the mountain from where he lives and his light. We currently have a beautiful view and our view is right where the gallery is. He hates the idea of looking at the alley side of a building. The property taxes just went up, but this will hurt the valuation of his property. His natural light will be negatively impacted as well. He loves JASAspen and hopes the project goes forward and he is not trying to prevent that from happening but would like more consideration regarding the addition. All the new people will impede on the alley and the parking. He said the alley traffic is already horrible and trucks have a difficult time getting in and out. There are a number of things that haven’t been considered, in his opinion. Ms. said the Bidwell portion has already been approved where Kemosabe used to be. Ms. Simon entered another public comment from Rose Sullivan who supports the project. Ms. Greenwood clarified that the gallery space has already been approved from a different project. Their purview is the view from the Wheeler and the addition on the back. Ms. Simon said the Community Development Director will make the decision regarding the view plane. Ms. Greenwood said it’s a wonderful spot, but we can’t comment on the emotional move, just the building. She inquired how the long the relationship will go between Mr. Hunt and JAS Aspen. Mr. Hunt said they will be buying it from him and they will control their destiny on this and he almost never does that. 6 5 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 Mr. Horowitz said the blessing from HPC is hugely important. We have to raise the money to do this. At first, there was a lot of skepticism and people saying, you can’t do that, it will never happen. We aren’t hearing these things so much anymore. We just need your blessing now to move forward. We have a very good relationship with Mr. Hunt, and this took a year to develop this plan that works for everyone. Ms. Greenwood closed the public comment. Mr. Moyer asked if they could address the accoutrements on the alley side. Ms. Adams said the plan is to have the penetrations to the roof with clean and clear walls. They want to improve the alley. Mr. Moyer said they have discussed the importance of alleys and how to use them otherwise and mentioned “messy vitality”. Mr. Cunniffe agreed that they want to work on this idea and mentioned that CCLC is currently working on this. Ms. Greenwood said they are slowly getting nicer with the developments. Mr. Moyer said he is inconcurrence with staff. He would like to add condition #9 to look at materials. Our purview is the building and that is what we are looking at. Our community is amazing, and we have accomplished so many firsts in the country. If we made a list, it would be over a page long. Now we have another thing to add to the list. He doesn’t see an issue with the view plane pure and simple and he is in favor of the project. Mr. Lai said he is very enthusiastic about this project and agrees with Mr. Moyer. He cannot help, as a citizen, to be very enthusiastic about this. His background is in buildings, planning and architecture, but his brings back his personal background in Aspen circa 1959. He stayed from 1960-65 and the Red Onion was always been a centered gathering. He agrees with Bill Stirling, that it’s the accidental meeting places that make Aspen what it is. He really misses having to go to the post office because they didn’t do mail delivery. You would see everyone there in line. The other thing is that when the music school moved out to the suburbs, he missed hearing all of the music through the windows downtown. Bringing everything back to the core of Aspen will be so important. Maybe this is historic preservation in terms of urban planning, but this will give life to this whole town. It’s wonderful to hear jazz emanating from downtown 24/7. So, he is glad, as a planner, that this will bring life back to Aspen with music. He is very much in favor of this proposal, professionally and personally. Ms. Thompson said she echoes what the rest of the board said regarding bringing jazz into town. She feels the project meets all of the guidelines and she is in favor. Mr. Kendrick said his two concerns were alley facades and view planes and those have been answered. He’s in favor of the project. Mr. Halferty said he is in favor of the project. He mentioned that Harry Teague used to say that “architecture is just frozen jazz”. Mr. Blaich said hewould love this project. At this age, it’s harder for him to go out to Snowmass for concerts. Putting this right into town where he can walk and have a couple drinks, it’s a real asset. He was introduced to jazz very early. His mother sang for the metropolitan opera and she took him to see Benny Goodman at Carnegie Hall. It was a real eye opener or ear opener and he’s been a fan ever since. 7 6 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 There is an opportunity to do something here in town and he supports this as a project and as a fan. He wishes them well on it. Ms. Greenwood said this is surreal and it’s truly the right home. She congratulated the applicants. MOTION: Mr. Lai motioned to approve resolution#14 with the addition of condition #9, Mr. Moyer seconded. Roll call vote: Mr. Kendrick, yes; Mr. Halferty, yes; Mr. Blaich, yes; Ms. Greenwood, yes; Mr. Moyer, yes; Mr. Lai, yes; Ms. Thompson, yes. Mr. Lai is project monitor. NEW BUSINESS: 616 ½ W. Main Street B Sara Yoon Ms. Yoon said this is for the establishment of TDR’s. There are two units on this lot. The owner of unit B is here. According to this documentation, the rights have been awarded to unit B, which is the legally established single home on the property. There is an active current undertaking on unit A, which is the Victorian in front. We have been given direction that this enforcement doesn’t have any impact on this application. TDR’s are a way of taking development rights and removing them from the property. This does not increase mass and scale on the site. Under the new guidelines, this property is located in the mixed-use zone district and will be a 20 % deduction relating to calculating floor area. The applicant can request three TDR’s for this property. In terms of the criteria for the TDR’s, all criteria have been met. Staff is in favor of awarding the TDR’s and ultimately, city council is in control of awarding the TDR’s. APPLICANT PRESENTATION: Alex Halperin, owner and Patrick Rawley of Stan Clauson Associates Mr. Rawley showed the two units as a visual aid. He showed how the two units were established along with the floor areas calculations on screen. We can’t have a fraction of a TDR, so we are asking for 3. The program enables standard market forces. Ms. Greenwood said there are no questions and she doesn’t have any issue with this. Mr. Moyer agreed and said he has no questions. Ms. Thompson noted that the existing floor area calculations aren’t done correctly for the lower level. She questioned how they are measured. Ms. Simon said they will have to be proofed and have a little leeway for now . MOTION: Mr. Blaich motioned to approve, Ms. Thompson seconded. All in favor, motion carried. MOTION: Mr. Halferty motioned to adjourn, Mr. Moyer seconded. All in favor, motion carried at 6:08 p.m. ________________________ Nicole Henning, Deputy City Clerk 8 7 REGULAR MEETING HISTORIC PRESERVATION COMMISSION AUGUST 14, 2019 9 Page 1 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com Memorandum TO: Aspen Historic Preservation Commission FROM: Sarah Yoon, Historic Preservation Planner THROUGH: Amy Simon, Historic Preservation Officer MEETING DATE: August 28, 2019 RE: 202 East Main Street – Conceptual Major Development Review, Relocation and Dimensional Variations, and Floor Area Bonus, PUBLIC HEARING. APPLICANT /OWNER: Rocking Lazy J Properties, LLC Jake Vickery and Della Pegolotti REPRESENTATIVE: Jake Vickery, Architect LOCATION: Street Address: 202 E. Main Street Legal Description: Lot 1, Main Street Victorians Historic Landmark Lot Split Subdivision Exemption, According to the Plat thereof recorded November 9, 2012 in Plat book 100 at Page 92, City and Townsite of Aspen, Colorado. Parcel Identification Number: PID# 2737-073-99-001. CURRENT ZONING & USE MU – Mixed Use (Main Street Historic District) Commercial Use PROPOSED USE: Single-Family Residential SUMMARY: The applicant has requested a Conceptual Major Development review for the demolition of non-historic additions, relocation of the historic building onto a new basement, and the construction of a new rear addition. A change in use from commercial to residential, dimensional variations related to setbacks and parking, and a 500 sf floor area bonus are requested. STAFF RECOMMENDATION: Staff recommends continuation of this project to restudy the issues identified on page 9 of this memo. Site Locator Map – 202 East Main Street 202 10 Page 2 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com BACKGROUND: 202 East Main Street is a designated landmark on a 3,000 square foot lot in the MU zone district. This property contains a one-story miner’s cottage with a non-historic addition to the rear of the property. The house appears to be in its original location according to the historic Sanborn maps. Historic photographs show that much of the original architectural details are intact. There is a small spruce tree in front of the historic resource and two large cottonwood trees towards the front of the property in the public right-of-way. The site slopes down towards the alley by approximately 3’-6”. s Figure 1 – Sanborn Map, 1904 Figure 2 – Historic Photograph, 1890 Image Credit: Aspen Historical Society In 2012, Aspen City Council granted approval for a Historic Lot Split between 202 E. Main and 208 E. Main creating two (2) 3,000 sf parcels (Ordinance #14, Series of 2012). The Historic Preservation Commission (HPC) granted approvals for demolition of a storage room that linked the two historic structures together and setback variations for both parcels (Resolution #5, Series of 2012). NOTE: This project will be reviewed under the Land Use Code prior to the code amendments approved by City Council on May 13, 2019 because it was submitted and declared complete before the new code language went into effect on June 12, 2019. REQUEST OF HISTORIC PRESERVATION COMMISSION (HPC) The Applicant is requesting the following land use approvals: • Major Development (Section 26.415.070.D) for demolition of non-historic additions and construction of a new addition towards the rear of the historic building. • Relocation (Section 26.415.090) for the relocation of the historic residence onto a new basement. • Setback Variation (Section 26.415.110.C) for the new addition, lightwells, and trash enclosure. 11 Page 3 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com • Parking Reduction and Waiver of fees (Section 26.415.110.D) request for a reduction of one (1) parking space and fee waivers. • Floor Area Bonus (Section 26.415.110.F) request for a 500 sf bonus for the rooftop deck and lightwells. The HPC is the final review authority, however, this project is subject to Call-up Notice to City Council. The project, once approved, will be granted an Administrative Growth Management Exemption for Change in Use from commercial to residential with no affordable housing mitigation required. PROJECT SUMMARY: The applicant proposes to demolish the existing non-historic addition and construct a new above grade addition to the rear of the historic resource. A full basement is proposed and will require the temporary relocation of the historic structure during excavation. The proposed design changes the use from commercial to a single-family residence, which results in a 20% floor area reduction as required by underlying zoning. The applicant requests setback variations, parking reduction, fee waivers, and a floor area bonus of 500 sf as part of this proposal. STAFF COMMENTS: The applicant highlights the importance of site context and proposes to maintain the historic alignment of the historic structure with the adjacent properties, which is in compliance with Guideline 1.1. The applicant plans to pursue preservation/restoration work on the historic resource according to the Historic Preservation Design Guidelines, but staff finds that the proposed new above grade addition does not meet the Design Guidelines and recommends continuation. The new addition must achieve compatibility with the historic landmark according to Design Guideline 10.6. As part of the restudy, staff requests a preliminary stormwater mitigation plan that takes the proposed design and existing site conditions into account. The following points go into more detail regarding the proposal for HPC discussion: 1. Site Planning & Relocation: The Sanborn maps indicate the existing footprint of the historic house is original to the location. To construct the basement design, the applicant plans to temporarily move the house on site, then onto the new foundation. Ultimately, the historic structure will be placed back in its original location. The applicant will need to provide structural assessment and financial assurances in order to comply with Design Guideline 9.1. Considering the lot size, the proposed subgrade addition, and the large Cottonwood trees near the property, staff finds preliminary plans addressing stormwater mitigation is critical. As part of the site design, Historic Preservation Guideline 1.8 recommends stormwater management be addressed early in the design process. Other City Departments have provided comments 12 Page 4 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com requesting more information and discussion about plans for stormwater mitigation and identifying locations for a new waterline. See referral comments for details (Exhibit B). As part of the site planning process, the applicant will need to work closely with relevant City Departments to address allowed work in the dripline of trees and requirements related to public improvement. Staff supports the removal of the small spruce tree in the front yard of the historic property due to its proximity to the resource. Additionally, the final grading of the site will need to maintain the historic relationship of how the structure meets the ground while providing positive drainage (Design Guideline 1.8). In order to provide natural light into the subgrade spaces, the applicant proposes two large lightwells. One is located between the historic resource and the new addition on the west side of the property and the other one is abutting the historic porch along the street facing façade of the historic building. Staff finds that the street facing lightwell adjacent to the historic porch does not meet Design Guideline 9.6 and recommends restudy. Figure 3 – Proposed Site Plan Staff finds the criteria for relocation are met, but more information needs to be provided in order to address the comments and concerns expressed by other City Departments related to excavation staying within the property boundaries. Staff requests preliminary stormwater mitigation plans for the proposed design due to the design of the subgrade space and the existing site conditions. Staff recommends restudy of the proposed front lightwell. 2. New Addition – Connecting Element & Form/Materials/Fenestration: The proposed above grade addition is taller than the historic building and has a floor area that is approximately 87 sf larger than the historic resource. The transitional space between the old and the new is a two- 13 Page 5 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com story space that contains vertical circulation. A majority of the roof form on the new addition is a flat roof with a roof deck and an 8:12 pitched roof above the master bedroom along the alley. Connecting Element: When a new addition is taller than the historic resource, the guidelines call for a one-story connector with a minimum length of 10 feet that tucks under the eave of the historic building in order to provide a meaningful separation (Guideline 10.9). The proposed connection does not meet this guideline. The size of the lot and the surrounding context does create a limited area for new development, but the current design of the new addition does not create a sensitive transition between the old and new. According to Design Guideline 10.6, the new addition needs to be recognized as a product of its own time, but visual compatibility with the historic resource must be achieved. In order to promote compatibility, the Design Guidelines requires two of the following characteristics to relate back to the historic resource: form, material and fenestration. Figure 4 – Proposed East Elevation Figure 5 – Proposed West Elevation 14 Page 6 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com Form: The overall form of the above grade addition is a composition of articulated rectilinear shapes expressed through material changes and minor changes in plane. Much of the addition has a flat roof. A small portion of the upper level towards the alley with a 8:12 pitched roof. When compared to the cross gabled historic resource, the form and massing of the addition does not strongly relate to the forms found on the historic resource. Materials: The historic miner’s cottage is mostly clad with horizontal clapboard siding and decorative architectural detailing on the front façade and porch. The historic structure sits on a simple brick foundation. The new above grade addition is a combination of stone or tile and metal siding. The variety of materials and different application method result in accentuating individual massing elements of the new addition, which is a stark contrast from the uniformity created by the historic wood siding on the historic resource. It is clear there is a deliberate departure from materials in this design. Fenestration: The fenestration choices on the new addition are elongated window openings in both vertical and horizontal configurations. The fenestration on the historic resource consists of mostly double hung windows. The design does allude to the historic window proportions; however, due to the various window orientations found on the new addition, it is difficult to identify a direct correlation between the old and new fenestration. The Design Guidelines call for visual compatibility between the new addition and the historic landmark. Staff finds that the proposed design of the above grade new addition deviates from all three categories of form, materials, and fenestration. Staff recommends restudy of the design by picking two of the three characteristics in order to create visual compatibility. Staff recommends restudy of the connecting element to comply with Guideline 10.9 since the new addition is taller than the historic resource. 3. Dimensional Variations: As a historically designated landmark, certain preservation benefits may be granted by HPC. As mentioned above, this application was submitted and deemed complete before the code amendments to the Historic Preservation Benefits went into effect, therefore, is subject to the old code. Setback Variations: Following the Historic Lot Split between 202 E. Main and 208 E. Main, HPC granted the following setback variations for the historic resource (Resolution #5, Series of 2012): • up to a 5’ west sideyard setback reduction for the existing main building • 2’ setback east sideyard setback reduction for the existing main building • 5’ rear yard setback reduction for an existing roof over the rear entry path With this project, the applicant requests additional setback variations for the project: • 2’ setback west sideyard setback reduction for new addition • 2’ setback east sideyard setback reduction for new addition 15 Page 7 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com In granting a variance, the HPC must make a finding that such a variance: a) Is similar to the pattern, features and character of the historic property or district; and/or b) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. Parking Reductions & Fee Waivers: Underlying zoning requires two (2) parking spaces for single-family residence. Due to the site configuration and the location of the historic resource, the applicant proposes one (1) on-site parking spot accessed from the alley and requests a parking reduction of one (1) space. Access for the proposed one car garage is off the alley. According to Section 26.415.110.D, HPC may approve the reduction of parking upon a finding that it will enhance or mitigate an adverse impact on the historic significance or architectural character of a designed historic property. As a designated property under the old code, exemptions for growth management and impact fees are available. Staff recognizes the potential challenges for providing two on-site parking spaces on this site due to the lot size and the need to maintain the historic alignment of the front façade, but recommends restudy of the proposed rear addition to provide a more sensitive connection between the old and new. Following this restudy, staff would like to reevaluate the possibility of providing two (2) on-site parking spaces. Staff supports the request for setback variations since it is a result of maintaining the historic location of the historic house which enhances the historic significance of the property. Staff recommends restudy of the current design for the new addition in order to reevaluate the impact of providing two (2) on-site parking spaces to the historic resource. 4. Floor Area Bonus: The applicant is requesting a floor area bonus to the amount of 500 sf. The proposal mentions undertaking any necessary restoration/preservation work and indicates that the extra floor area is for the proposed rooftop deck and lightwells. The proposed use of additional floor area would not increase mass and scale. Following is the criteria for awarding a floor area bonus for this application (Section 415.110.F) 1. In selected circumstances, the HPC may grant up to five hundred (500) additional square feet of allowable floor area for projects involving designated historic properties. To be considered for the bonus, it must be demonstrated that: 16 Page 8 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com a) The design of the project meets all applicable design guidelines; b) The historic building is the key element of the property and the addition is incorporated in a manner that maintains the visual integrity of the historic building; c) The work restores the existing portion of the building to its historic appearance; d) The new construction is reflective of the proportional patterns found in the historic building's form, materials or openings; e) The construction materials are of the highest quality; f) An appropriate transition defines the old and new portions of the building; g) The project retains a historic outbuilding; and/or h) Notable historic site and landscape features are retained. 2. Granting of additional allowable floor area is not a matter of right but is contingent upon the sole discretion of the HPC and the Commission's assessments of the merits of the proposed project and its ability to demonstrate exemplary historic preservation practices. Projects that demonstrate multiple elements described above will have a greater likelihood of being awarded additional floor area. Staff recognizes that with the change in use from commercial to residential, the property is subject to a considerable floor area reduction. A single family home is limited to 1,920 sf, whereas a commercial property could be 3,000 sf. There is, however, a challenge in accommodating significant expansion on this site in a sympathetic manner. Staff finds that a number of criteria for a floor area bonus are being met; however, the proposed design of the new addition does not meet all applicable Design Guidelines. Staff recommends restudy of the new addition before awarding any amount of a floor area. REFERRAL COMMENTS: The application was referred out to other City departments who have requirements that will significantly affect the permit review. The following is a summary of comments received. See Exhibit C for more details. Engineering Department: 1. The applicant will need to provide a conceptual level information regarding stormwater treatment and how onsite runoff will be captured and treated prior to HPC approval. 2. Excavation stabilization may require agreements with neighboring properties which must be submitted at the time of building permit. Micropile walls cannot impact neighboring properties. 3. Work with Parks and Engineering Departments to determine the best alignment for a new water service line that minimizes impact to the street trees. 4. Public improvements to the sidewalk and a new curb and gutter will be required. 17 Page 9 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com Parks Department: 1. Clarifications for the tree removal request is needed. 2. Details regarding the proposed excavation need to be reviewed and approved by the City Forester. 3. Survey information about the size of the cottonwood trees need to be verified. 4. Public improvements such as sidewalks must be floating and no excavation is permitted in the dripline of the existing Cottonwood trees. All excavation work will require discussion with the City Forester. 5. Location for new waterline requires discussion with Parks and Engineering. Building Department: 1. The historic building and parts of the proposed new addition along the East and West property lines must comply with fire separation and fire rating requirements. Please see Building comments for specific details (Exhibit B). 2. Emergency escape and rescue windows adjacent to walkways require guards. RECOMMENDATION: Staff recommends the Historic Preservation Commission continue this application for further restudy of the following: 1.) Restudy the new addition of achieve compatibility with the historic landmark as outlined in Design Guideline 10.6 by strongly relating the two of the following characteristics: Form, Materials, and Fenestration. 2.) Restudy the connecting element to meet Design Guideline 10.9. 3.) Restudy the proposed lightwell at the front of the property to meet Design Guideline 9.6. 4.) Provide preliminary plans for drainage and stormwater mitigation for review at the time of Final review. 5.) Related to the floor area bonus request, provide a detailed preservation plan with supporting historic documents for review and approval by staff and monitor. 6.) Reevaluate the parking reduction and floor area bonus request after the restudy of the new addition that complies with the Design Guidelines. 7.) Clarify scope of work related to tree removal and development in the dripline of trees with the all relevant City Departments. 8.) Provide necessary agreements from neighboring properties for site excavation stabilization prior to submission of Building permit. 18 Page 10 of 10 130 South Galena Street Aspen, CO 81611-1975 | P: 970.920.5197 | cityofaspen.com ATTACHMENTS: Resolution #____, Series of 2019 Exhibit A.1 – Historic Preservation Design Guidelines Criteria /Staff Findings Exhibit A.2 – Dimensional Variations Review Criteria /Staff Findings Exhibit A.3 – Relocation/Staff Findings Exhibit A.4 – Floor Area Bonus/Staff Findings Exhibit B – Referral Comments Exhibit C – Application 19 HPC Resolution #___, Series of 2019 Page 1 of 3 RESOLUTION #__, SERIES OF 2019 A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING CONCEPTUAL MAJOR DEVELOPMENT REVIEW, RELOCATION, SETBACK VARIATIONS, PARKING REDUCTION, FEE WAIVERS, AND FLOOR AREA BONUS FOR THE PROPERTY LOCATED AT 202 EAST MAIN STREET, LOT 1, MAIN STREET VICTORIANS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION, ACCORDING TO THE PLAT THEREOF RECORDED NOVEMBER 9, 2012 IN PLAT BOOK 100 AT PAGE 92, CITY AND TOWNSITE OF ASPEN, COLORADO PARCEL ID: 2737-073-99-001 WHEREAS, the applicant, Rocking Lazy J Properties, LLC, represented by Jake Vickery, has requested HPC approval for Major Development, Relocation, Setback Variations, Parking Reduction, Fee Waivers, and Floor Area Bonus for the property located at 202 East Main Street, Lot 1, Main Street Victorians Historic Landmark Lot Split Subdivision Exemption According to the Plat thereof recorded November 9, 2012 in Plat Book 100 at Page 92, City and Townsite of Aspen, Colorado; and WHEREAS, Section 26.415.070 of the Municipal Code states that “no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;” and WHEREAS, for Conceptual Major Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project’s conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.D.3.b.2 and 3 of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, for approval of Relocation, the application shall meet the requirements of Aspen Municipal Code Section 26.415.090.C, Relocation of a Designated Property; and WHEREAS, for approval of Setback Variation, the application shall meet the requirements of Aspen Municipal Code Section 26.415.110.C, Setback Variations; and WHEREAS, for approval of Parking reduction and waivers of payment of payment-in-lieu, the application shall meet the requirements of Aspen Municipal Code Section 26.415.110.D, Parking; and WHEREAS, for approval of Floor Area Bonus, the application shall meet the requirements of Aspen Municipal Code Section 26.415.110.F, Floor Area Bonus; and 20 HPC Resolution #___, Series of 2019 Page 2 of 3 WHEREAS, Community Development Department staff reviewed the application for compliance with the applicable review standards and recommended continuation for restudy; and WHEREAS, HPC reviewed the project on August 28, 2019. HPC considered the application, the staff memo and public comments, and found the proposal consistent with the review standards and granted approval with conditions by a vote of __ to __. NOW, THEREFORE, BE IT RESOLVED: That HPC hereby approves Conceptual Major Development, Relocation, Setback Variations, Parking Reduction, Fee Waivers, and Floor Area Bonus for 202 E. Main Street, Lot 1, Main Street Victorians Historic Landmark Lot Split Subdivision Exemption, according to the Plat thereof recorded November 9, 2012 in Plat Book 100 at Page 92, City and Townsite of Aspen, CO as follows: Section 1: Conceptual Major Development Review, Relocation, Setback Variations, Parking Reduction, Fee Waivers, and Floor Area Bonus. HPC hereby approves Conceptual Major Development, Relocation, and Setback Variations as proposed with the with the following conditions: 1.) Provide preliminary plans for drainage and stormwater mitigation for review at the time of Final review. 2.) Provide a detailed preservation plan with supporting historic documents for review at Final review. 3.) Clarify scope of work related to tree removal and development in the dripline of trees with all relevant City Departments prior to Building Permit submission. 4.) Provide necessary agreements from neighboring properties for site excavation stabilization prior to submission of Building permit. 5.) Provide details of the relocation plan, outlined by a structural engineer and housemover, at Final. The applicant will be required to provide a financial security of $30,000 until the house is set on the new foundation. 6.) The following variations are accepted: • 2’ setback west sideyard setback reduction for new addition. • 2’ setback east sideyard setback reduction for new addition. Section 2: Material Representations All material representations and commitments made by the Applicant pursuant to the development proposal approvals as herein awarded, whether in public hearing or documentation presented before the Community Development Department, the Historic Preservation Commission, or the Aspen City Council are hereby incorporated in such plan 21 HPC Resolution #___, Series of 2019 Page 3 of 3 development approvals and the same shall be complied with as if fully set forth herein, unless amended by other specific conditions or an authorized authority. Section 3: Existing Litigation This Resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior ordinances. Section 4: Severability If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and shall not affect the validity of the remaining portions thereof. APPROVED BY THE COMMISSION at its regular meeting on the ____ day of ____________, 2019. Approved as to Form: Approved as to Content: _________________________________________________________________ _________________________________________________________ Andrea Bryan, Assistant City Attorney Bob Blaich, Vice Chair ATTEST: _________________________________________________________________ Nicole Henning, Deputy City Clerk 22 Page 1 of 12 Exhibit A.1 Historic Preservation Design Guidelines Criteria Staff Findings NOTE: Staff responses begin on page 11 of this exhibit, following the list of applicable guidelines. 26.415.070.D Major Development. No building, structure or landscape shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or a property located within a Historic District until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review. An application for a building permit cannot be submitted without a development order. 3. Conceptual Development Plan Review b) The procedures for the review of conceptual development plans for major development projects are as follows: 1) The Community Development Director shall review the application materials submitted for conceptual or final development plan approval. If they are determined to be complete, the applicant will be notified in writing of this and a public hearing before the HPC shall be scheduled. Notice of the hearing shall be provided pursuant to Section 26.304.060.E.3 Paragraphs a, b and c. 2) Staff shall review the submittal material and prepare a report that analyzes the project's conformance with the design guidelines and other applicable Land Use Code sections. This report will be transmitted to the HPC with relevant information on the proposed project and a recommendation to continue, approve, disapprove or approve with conditions and the reasons for the recommendation. The HPC will review the application, the staff analysis report and the evidence presented at the hearing to determine the project's conformance with the City Historic Preservation Design Guidelines. 3) The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny. 4) A resolution of the HPC action shall be forwarded to the City Council in accordance with Section 26.415.120 - Appeals, notice to City Council, and call-up. No applications for Final Development Plan shall be accepted by the City and no associated permits shall be issued until the City Council takes action as described in said section. 23 Page 2 of 12 Chapter 1: Site Planning & Landscape Design MET NOT MET 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. 1.2 Preserve the system and character of historic streets, alleys, and ditches. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. 1.5 Maintain the historic hierarchy of spaces. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. 1.7 Provide positive open space within a project site. 1.8 Consider stormwater quality needs early in the design process.NOT MET 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. 1.12 Provide an appropriate context for historic structures. See diagram. 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. 1.26 Preserve the historic circulation system. 1.27 Preserve and maintain significant landscaping on site. Chapter 2: Rehabilitation - Building Materials MET NOT MET 2.1 Preserve original building materials. 2.2 The finish of materials should be as it would have existed historically. 2.3 Match the original material in composition, scale and finish when replacing materials on primary surfaces. Chapter 3: Rehabilitation - Windows MET NOT MET 3.1 Preserve the functional and decorative features of a historic window. Chapter 4: Rehabilitation - Doors MET NOT MET 4.1 Preserve historically significant doors. Chapter 5: Rehabilitation - Porches & Balconies MET NOT MET 5.1 Preserve an original porch or balcony. Chapter 6: Rehabilitation - Architectural Details MET NOT MET 6.1 Preserve significant architectural features. 6.3 Remove only the portion of the detail that is deteriorated and must be replaced. 6.4 Repair or replacement of missing or deteriorated features are required to be based on original designs. CONDITION MET MET MET MET MET CONDITION CONDITION Historic Preservation Design Guidelines Review Criteria for 202 E. Main Street The applicant is requesting a Conceptual Major Development review approval for relocating the historic resource onto a new basement, and the construction of a new above grade addition. The proposed design must meet all applicable Historic Preservation Design Guidelines. MET MET MET MET CONDITION MET MET MET MET CONDITION MET MET 24 Page 3 of 12 Relevant Historic Preservation Design Guidelines: 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. • Building footprint and location should reinforce the traditional patterns of the neighborhood. Chapter 7: Rehabilitation - Roofs MET NOT MET 7.1 Preserve the original form of a roof. 7.4 New vents should be minimized, carefully, placed and painted a dark color. 7.5 Preserve original chimneys, even if they are made non-functional. Chapter 9: New Construction - Excavation, Building Relocation & Foundations MET NOT MET 9.1 Developing a basement by underpinning and excavating while the historic structure remains in place may help to preserve the historic fabric. 9.4 Position a relocated structure at its historic elevation above grade. 9.6 Minimize the visual impact of lightwells.NOT MET 9.7 All relocations of designated structures shall be performed by contractors who specialize in moving historic buildings, or can document adequate experience in successfully relocating such buildings. Chapter 10: New Construction - Building Additions MET NOT MET 10.2 A more recent addition that is not historically significant may be removed. 10.3 Design a new addition such that one's ability to interpret the historic character of the primary building is maintained. 10.4 The historic resource is to be the focus of the property, the entry point, and the predominant structure as viewed from the street.NOT MET 10.6 Design a new addition to be recognized as a product of its own time.NOT MET 10.7 When planning an addition to a building in a historic district, preserve historic alignments on the street. 10.8 Design an addition to be compatible in size and scale with the main building. 10.9 If the addition is taller than a historic building, set it back from significant façades and use a “connector” to link it to the historic building.NOT MET 10.10 Place an addition at the rear of a primary building or set it back substantially from the front to minimize the visual impact on the historic structure and to allow the original proportions and character to remain prominent. 10.11 Roof forms shall be compatible with the historic building.NOT MET 10.12 Design an addition to a historic structure that does not destroy or obscure historically important architectural features. Chapter 12: Accessibility, Lighting, Mech. Equipment, Services Areas & Signs MET NOT MET 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. MET MET MET CONDITION CONDITION MET MET MET CONDITION MET CONDITION MET MET 25 Page 4 of 12 • Allow for some porosity on a site. In a residential project, setback to setback development is typically uncharacteristic of the historic context. Do not design a project which leaves no useful open space visible from the street. 1.2 Preserve the system and character of historic streets, alleys, and ditches. When HPC input is requested, the following bullet points may be applicable. • Retain and preserve the variety and character found in historic alleys, including retaining historic ancillary buildings or constructing new ones. • Retain and preserve the simple character of historic ditches. Do not plant flowers or add landscape. • Abandoning or re-routing a street in a historic area is generally discouraged. • Consider the value of unpaved alleys in residential areas. • Opening a platted right of way which was abandoned or never graded may be encouraged on a case by case basis. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. • If an alley exists at the site, the new driveway must be located off it. • Tracks, gravel, light grey concrete with minimal seams, or similar materials are appropriate for driveways on Aspen Victorian properties. 1.5 Maintain the historic hierarchy of spaces. • Reflect the established progression of public to private spaces from the public sidewalk to a semi-public walkway, to a semi private entry feature, to private spaces. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. • Meandering walkways are not allowed, except where it is needed to avoid a tree or is typical of the period of significance. • Use paving materials that are similar to those used historically for the building style and install them in the manner that they would have been used historically. For example on an Aspen Victorian landmark set flagstone pavers in sand, rather than in concrete. Light grey concrete, brick or red sandstone are appropriate private walkway materials for most landmarks. • The width of a new entry sidewalk should generally be three feet or less for residential properties. A wider sidewalk may be appropriate for an AspenModern property. 1.7 Provide positive open space within a project site. • Ensure that open space on site is meaningful and consolidated into a few large spaces rather than many small unusable areas. • Open space should be designed to support and complement the historic building. 1.8 Consider stormwater quality needs early in the design process. • When included in the initial planning for a project, stormwater quality facilities can be better integrated into the proposal. All landscape plans presented for HPC review must include at least a preliminary 26 Page 5 of 12 representation of the stormwater design. A more detailed design must be reviewed and approved by Planning and Engineering prior to building permit submittal. • Site designs and stormwater management should provide positive drainage away from the historic landmark, preserve the use of natural drainage and treatment systems of the site, reduce the generation of additional stormwater runoff, and increase infiltration into the ground. Stormwater facilities and conveyances located in front of a landmark should have minimal visual impact when viewed from the public right of way. • Refer to City Engineering for additional guidance and requirements. 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. • Retaining historic planting beds and landscape features is encouraged. • Protect historically significant vegetation during construction to avoid damage. Removal of damaged, aged, or diseased trees must be approved by the Parks Department. • If a significant tree must be removed, replace it with the same or similar species in coordination with the Parks Department. • The removal of non-historic planting schemes is encouraged. • Consider restoring the original landscape if information is available, including original plant materials. 1.12 Provide an appropriate context for historic structures. See diagram. • Simplicity and restraint are required. Do not overplant a site, or install a landscape which is overtextured or overly complex in relationship to the historic resource, particularly in Zone A. In Zone A, new planting shall be species that were used historically or species of similar attributes. • In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in height, sod, and low shrubs are often appropriate. • Contemporary planting, walls and other features are not appropriate in Zone A. A more contemporary landscape may surround new development or be located in the rear of the property, in Zone C. • Do not cover areas which were historically unpaved with hard surfaces, except for a limited patio where appropriate. • Where residential structures are being adapted to commercial use, proposals to alter the landscape will be considered on a case-by-case basis. The residential nature of the building must be honored. • In the case of a historic landmark lot split, careful consideration should be given so as not to over plant either property, or remove all evidence of the landscape characteristics from before the property was divided. • Contemporary landscapes that highlight an AspenModern architectural style are encouraged. 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. 1.27 Preserve and maintain significant landscaping on site. • Protect established vegetation during any construction. • If any tree or shrub needs to be removed, replace it with the same or similar species. • New planting should be of a species used historically or a similar species. • Maintain and preserve any gardens and/or ornamental planting on the site. 27 Page 6 of 12 Maintain and preserve any historic landscape elements. 2.1 Preserve original building materials. • Do not remove siding that is in good condition or that can be repaired in place. • Masonry features that define the overall historic character, such as walls, cornices, pediments, steps and foundations, should be preserved. • Avoid rebuilding a major portion of an exterior wall that could be repaired in place. Reconstruction may result in a building which no longer retains its historic integrity. • Original AspenModern materials may be replaced in kind if it has been determined that the weathering detracts from the original design intent or philosophy. 2.2 The finish of materials should be as it would have existed historically. • Masonry naturally has a water-protective layer to protect it from the elements. Brick or stone that was not historically painted shall not be painted. • If masonry that was not painted historically was given a coat of paint at some more recent time, consider removing it, using appropriate methods. • Wood should be painted, stained or natural, as appropriate to the style and history of the building. 2.3 Match the original material in composition, scale and finish when replacing materials on primary surfaces. • If the original material is wood clapboard for example, then the replacement material must be wood as well. It should match the original in size, and the amount of exposed lap and finish. • Replace only the amount required. If a few boards are damaged beyond repair, then only those should be replaced, not the entire wall. For AspenModern buildings, sometimes the replacement of a larger area is required to preserve the integrity of the design intent. 3.1 Preserve the functional and decorative features of a historic window. • Features important to the character of a window include its frame, sash, muntins/mullions, sills, heads, jambs, moldings, operations, and groupings of windows. • Repair frames and sashes rather than replacing them. • Preserve the original glass. If original Victorian era glass is broken, consider using restoration glass for the repair. 4.1 Preserve historically significant doors. • Maintain features important to the character of a historic doorway. These include the door, door frame, screen door, threshold, glass panes, paneling, hardware, detailing, transoms and flanking sidelights. • Do not change the position and function of original front doors and primary entrances. • If a secondary entrance must be sealed shut, any work that is done must be reversible so that the door can be used at a later time, if necessary. Also, keep the door in place, in its historic position. • Previously enclosed original doors should be reopened when possible. 28 Page 7 of 12 5.1 Preserve an original porch or balcony. • Replace missing posts and railings when necessary. Match the original proportions, material and spacing of balusters. • Expanding the size of a historic porch or balcony is inappropriate. 6.1 Preserve significant architectural features. • Repair only those features that are deteriorated. • Patch, piece-in, splice, or consolidate to repair the existing materials, using recognized preservation methods whenever possible. • On AspenModern properties, repair is preferred, however, it may be more important to preserve the integrity of the original design intent, such as crisp edges, rather than to retain heavily deteriorated material. 6.3 Remove only the portion of the detail that is deteriorated and must be replaced. • Match the original in composition, scale, and finish when replacing materials or features. • If the original detail was made of wood, for example, then the replacement material should be wood, when feasible. It should match the original in size and finish. 6.4 Repair or replacement of missing or deteriorated features are required to be based on original designs. • The design should be substantiated by physical or pictorial evidence to avoid creating a misrepresentation of the building’s heritage. • When reconstruction of an element is impossible because there is no historical evidence, develop a compatible new design that is a simplified interpretation of the original, and maintains similar scale, proportion and material. 7.1 Preserve the original form of a roof. • Do not alter the angle of a historic roof. Preserve the orientation and slope of the roof as seen from the street. • Retain and repair original and decorative roof detailing. • Where the original roof form has been altered, consider restoration. 7.4 New vents should be minimized, carefully, placed and painted a dark color. • Direct vents for fireplaces are generally not permitted to be added on historic structures. • Locate vents on non-street facing facades. • Use historic chimneys as chases for new flues when possible. 7.5 Preserve original chimneys, even if they are made non-functional. • Reconstruct a missing chimney when documentation exists. 29 Page 8 of 12 9.1 Developing a basement by underpinning and excavating while the historic structure remains in place may help to preserve the historic fabric. • This activity will require the same level of documentation, structural assessment, and posting of financial assurances as a building relocation. 9.4 Position a relocated structure at its historic elevation above grade. • Raising the finished floor of the building slightly above its original elevation is acceptable if needed to address drainage issues. A substantial change in position relative to grade is inappropriate. • Avoid making design decisions that require code related alterations which could have been avoided. In particular, consider how the relationship to grade could result in non-historic guardrails, etc. 9.6 Minimize the visual impact of lightwells. • The size of any lightwell that faces a street should be minimized. • Lightwells must be placed so that they are not immediately adjacent to character defining features, such as front porches. • Lightwells must be protected with a flat grate, rather than a railing or may not be visible from a street. • Lightwells that face a street must abut the building foundation and generally may not “float” in the landscape except where they are screened, or on an AspenModern site. 9.7 All relocations of designated structures shall be performed by contractors who specialize in moving historic buildings, or can document adequate experience in successfully relocating such buildings. • The specific methodology to be used in relocating the structure must be approved by the HPC. • During the relocation process, panels must be mounted on the exterior of the building to protect existing openings and historic glass. Special care shall be taken to keep from damaging door and window frames and sashes in the process of covering the openings. Significant architectural details may need to be removed and securely stored until restoration. • The structure is expected to be stored on its original site during the construction process. Proposals for temporary storage on a different parcel will be considered on a case by case basis and may require special conditions of approval. • A historic resource may not be relocated outside of the City of Aspen. 10.2 A more recent addition that is not historically significant may be removed. • For Aspen Victorian properties, HPC generally relies on the 1904 Sanborn Fire Insurance maps to determine which portions of a building are historically significant and must be preserved. • HPC may insist on the removal of non-historic construction that is considered to be detrimental to the historic resource in any case when preservation benefits or variations are being approved. 10.3 Design a new addition such that one’s ability to interpret the historic character of the primary building is maintained. • A new addition must be compatible with the historic character of the primary building. 30 Page 9 of 12 • An addition must be subordinate, deferential, modest, and secondary in comparison to the architectural character of the primary building. • An addition that imitates the primary building’s historic style is not allowed. For example, a new faux Victorian detailed addition is inappropriate on an Aspen Victorian home. • An addition that covers historically significant features is inappropriate. • Proposals on corner lots require particular attention to creating compatibility. 10.4 The historic resource is to be the focus of the property, the entry point, and the predominant structure as viewed from the street. • The historic resource must be visually dominant on the site and must be distinguishable against the addition. • The total above grade floor area of an addition may be no more than 100% of the above grade floor area of the original historic resource. All other above grade development must be completely detached. HPC may consider exceptions to this policy if two or more of the following are met: o The proposed addition is all one story o The footprint of the new addition is closely related to the footprint of the historic resource and the proposed design is particularly sensitive to the scale and proportions of the historic resource o The project involves the demolition and replacement of an older addition that is considered to have been particularly detrimental to the historic resource o The interior of the resource is fully utilized, containing the same number of usable floors as existed historically o The project is on a large lot, allowing the addition to have a significant setback from the street o There are no variance requests in the application other than those related to historic conditions that aren’t being changed o The project is proposed as part of a voluntary AspenModern designation, or o The property is affected by non-preservation related site specific constraints such as trees that must be preserved, Environmentally Sensitive Areas review, etc. 10.6 Design a new addition to be recognized as a product of its own time. • An addition shall be distinguishable from the historic building and still be visually compatible with historic features. • A change in setbacks of the addition from the historic building, a subtle change in material, or a modern interpretation of a historic style are all techniques that may be considered to help define a change from historic construction to new construction. • Do not reference historic styles that have no basis in Aspen. • Consider these three aspects of an addition; form, materials, and fenestration. An addition must relate strongly to the historic resource in at least two of these elements. Departing from the historic resource in one of these categories allows for creativity and a contemporary design response. • Note that on a corner lot, departing from the form of the historic resource may not be allowed. • There is a spectrum of appropriate solutions to distinguishing new from old portions of a development. Some resources of particularly high significance or integrity may not be the right instance for a contrasting addition. 10.7 When planning an addition to a building in a historic district, preserve historic alignments on the street. 31 Page 10 of 12 • Some roof lines and porch eaves on historic buildings may align at approximately the same height. An addition can not be placed in a location where these relationships would be altered or obscured. 10.8 Design an addition to be compatible in size and scale with the main building. • An addition that is lower than, or similar to the height of the primary building, is preferred. 10.9 If the addition is taller than a historic building, set it back from significant façades and use a “connector” to link it to the historic building. • Only a one-story connector is allowed. • Usable space, including decks, is not allowed on top of connectors unless the connector has limited visibility and the deck is shielded with a solid parapet wall. • In all cases, the connector must attach to the historic resource underneath the eave. • The connector shall be a minimum of 10 feet long between the addition and the primary building. • Minimize the width of the connector. Ideally, it is no more than a passage between the historic resource and addition. The connector must reveal the original building corners. The connector may not be as wide as the historic resource. • Any street-facing doors installed in the connector must be minimized in height and width and accessed by a secondary pathway. See guideline 4.1 for further information. 10.10 Place an addition at the rear of a primary building or set it back substantially from the front to minimize the visual impact on the historic structure and to allow the original proportions and character to remain prominent. • Locating an addition at the front of a primary building is inappropriate. • Additions to the side of a primary building are handled on a case-by-case basis and are approved based on site specific constraints that restrict rear additions. • Additional floor area may also be located under the building in a basement which will not alter the exterior mass of a building. 10.11 Roof forms shall be compatible with the historic building. • A simple roof form that does not compete with the historic building is appropriate. • On Aspen Victorian properties, a flat roof may only be used on an addition to a gable roofed structure if the addition is entirely one story in height, or if the flat roofed areas are limited, but the addition is primarily a pitched roof. 10.12 Design an addition to a historic structure that does not destroy or obscure historically important architectural features. • Loss or alteration of architectural details, cornices, and eavelines must be avoided. 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. • Place mechanical equipment on the ground where it can be screened. 32 Page 11 of 12 • Mechanical equipment may only be mounted on a building on an alley façade. • Rooftop mechanical equipment or vents must be grouped together to minimize their visual impact. Where rooftop units are visible, it may be appropriate to provide screening with materials that are compatible with those of the building itself. Use the smallest, low profile units available for the purpose. • Window air conditioning units are not allowed. • Minimize the visual impacts of utility connections and service boxes. Group them in a discrete location. Use pedestals when possible, rather than mounting on a historic building. • Paint mechanical equipment in a neutral color to minimize their appearance by blending with their backgrounds • In general, mechanical equipment should be vented through the roof, rather than a wall, in a manner that has the least visual impact possible. • Avoid surface mounted conduit on historic structures. Staff Finding: The applicable sections of the design guidelines are as follows: site planning, relocation, building materials, windows, doors, roofs, porches, building additions, and service areas. Staff finds Design Guideline 1.8 regarding stormwater mitigation requires further discussion with all relevant City Departments. Engineering and Parks have specific requirements that need to be met. This guideline requires the design of the stormwater mitigation system to provide positive drainage away from the historic buildings and minimize the visual impact of any associated features, such as drywells. Staff recommends further discussion with all relevant City Departments and the provision of a preliminary plan that considers the existing site conditions, as well as the proposed subgrade addition. Design Guideline 9.6 relates to the visual impact of lightwells and their overall location. The applicant proposes two lightwells to provide daylight into the subgrade areas of the house. Both lightwells are significant in size, but the one visible from the street facing façade and connected to the historic porch is problematic because it competes with other architectural features that are character defining to the historic building. Staff recommends restudy of the size and/or location of the front lightwell so that it has minimal visual impact. The Building Department provided comments related to railings for the proposed lightwells. We plan to continue working with the Building Department to find a solution that does not result in elements that would obstruct the view of the historic resource. Design Guideline 10.4 calls for the historic resource to be the focus and main entry for the property. The main entrance is proposed on Main Street with an alternative entrance being proposed on the alleyway in the form of a loggia. The historic resource is perceived as the visually dominant structure on the site; however, the total above grade floor area of the new addition is more than 100% of the historic resource. HPC may consider an exception to this requirement if two or more of the listed concepts are met. Staff finds that only one of the concepts related to the utilization of interior space has been met. Staff recommends a restudy of the scale and proportions of the new addition to be more sensitive to the historic resource. 33 Page 12 of 12 Design Guideline 10.6 concerns the design of the new addition to be compatible with the historic resource by considering form, materials, and fenestration. Staff finds that the proposed design does not establish a strong relationship for any of the three aspects listed. Staff recommends a restudy of the new above grade addition by selecting two of the three characteristics listed and relating them back to the historic resource. Design Guideline 10.9 provides requirements for situations where the new above grade addition is taller than the historic resource. As a one-story historic resource on a 3,000 sf lot, it is important that the new addition does not overshadow the historic resource through mass and scale. The above grade addition is two stories and does not have a connecting element as stipulated in the requirements. The addition does not tuck under the eave of the historic resource, but attaches to the back side of the historic building. Staff recommends restudy for a more sensitive connection between the old and the new. Design Guideline 10.11 addresses the roof form of the new addition. These forms must be simple and compatible with the historic resource. In this case, a majority of the new addition is a flat roof that also has a roof deck located on top of the roof, which may be visible from Main Street. Unless form is the selected aspect for deviation from the historic resource, new additions to Victorian structures primarily have a pitched roof. Staff recommends restudy. In summary, staff recommends restudy above grade addition and a more sensitive connecting element between the old and new buildings. 34 Page 1 of 2 Exhibit A.2 Dimensional Variations Criteria Staff Findings 26.415.110.C: Variances: Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be required by the underlying zoning's dimensional standards. 1. The HPC may grant variances of the Land Use Code for designated properties to allow: a) Development in the side, rear and front setbacks; b) Development that does not meet the minimum distance requirements between buildings; c) Up to five percent (5%) additional site coverage; d) Less public amenity than required for the on-site relocation of commercial historic properties. 2. In granting a variance, the HPC must make a finding that such a variance: a) Is similar to the pattern, features and character of the historic property or district; and/or b) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. Staff Finding: The applicant is requesting for setback variations on the west and east sideyards of the property for the construction of a new addition. The historic resource is currently in the setback and received dimensional variations when the lot was approved for a historic lot split in 2012. As a 3,000sf lot located between two properties and a historic alignment to maintain, there is a limited area of buildable space. Staff finds the granting of setback variations helps mitigate any adverse impacts towards the historic resource and supports the granting of the setback variation. 2. In granting a variance, the HPC must make a finding that such a variance:MET NOT MET DOES NOT APPLY a.) Is similar to the pattern, features and character of the historic property or district; and/or b.) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. MET Review Criteria for 202 East Main Street As a historically designated property, HPC may grant dimensional variations of the Land Use Code to allow for development in the side, rear and front setbbacks. The applicant is requesting Setback Variations for the proposed design. MET Summary of Review Criteria for Setback Variation Request 26.415.110.C - Variances. Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be requried by the underlying zoning's dimensional standards. 35 Page 2 of 2 26.415.110.D: Parking: Parking reductions are permitted for designated historic properties on sites unable to contain the number of on-site parking spaces required by the underlying zoning. Commercial designated properties may receive waivers of payment-in-lieu fees for parking reductions. In addition to the review criteria listed in Chapter 26.515, the parking reduction and waiver of payment- in-lieu fees may be approved upon a finding by the HPC that it will enhance or mitigate an adverse impact on the historic significance or architectural character of a designated historic property, an adjoining designated property or a historic district. Staff Finding: The proposal requires two (2) parking spaces for a single-family residence. The proposed design provides for one (1) parking space, and the applicant wishes to reduce the parking requirement by one (1) space. Staff recognizes the potential challenge of providing for two on-site parking spaces due to the size of the lot and the need to maintain historic alignment towards the front of the property; however, staff recommends restudy of the proposed above grade addition, then reevaluating the site conditions for a parking space reduction. In addition to the review criteria in Section 26.515, the parking reduction and waiver of payment-in-lieu fees may be approved upon a finding by HPC that:MET NOT MET DOES NOT APPLY it will enhance or mitigate an adverse impact on the historic significance or architectural character of a designeated historic proerty, an adjoining designated property or a historic district.NOT MET Review Criteria for 202 East Main Street As a historically designated property, HPC may grant parking reduction and waiver of payment-in-lieu fees if designated properties are unable to contain the number of required parking spaces. Summary of Review Criteria for Parking Variation Request 26.415.110.D - Parking. Parking reductions are permitted for designated historic properties on sites unable to contain the nubmer of on-site spaces requird by the underlying zoning. 36 Page 1 of 2 Exhibit A.3 Relocation Criteria Staff Findings 26.415.090.C: Relocation: Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be required by the underlying zoning's dimensional standards. 1. The HPC may grant variances of the Land Use Code for designated properties to allow: a) Development in the side, rear and front setbacks; b) Development that does not meet the minimum distance requirements between buildings; c) Up to five percent (5%) additional site coverage; d) Less public amenity than required for the on-site relocation of commercial historic properties. 2. In granting a variance, the HPC must make a finding that such a variance: a) Is similar to the pattern, features and character of the historic property or district; and/or b) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. 26.415.090.C - Relocation. Relocation for a building, structure or object will be approved if it is determined that it meets any one of the following standards:MET NOT MET DOES NOT APPLY 1. It is considered a noncontributing element of a historic district and its relocation will not affect the character of the historic district; or N/A 2. It does not contribute to the overall character of the historic district or parcel on which it is located and its relocation will not have an adverse impact on the Historic District or property; or .N/A 3. The owner has obtained a certificate of economic hardship; or N/A 4. The relocation activity is demonstrated to be an acceptable preservation method given the character and integrity of the building, structure or object and its move will not adversely affect the integrity of the Historic District in which it was originally located or diminish the historic, architectural or aesthetic relationships of adjacent designated properties; and Additionally, for approval to relocate all of the following criteria must be met:MET NOT MET DOES NOT APPLY 1. It has been determined that the building, structure or object is capable of withstanding the physical impacts of relocation;CONDITION 2. An appropriate receiving site has been identified; and 3. An acceptable plan has been submitted providing for the safe relocation, repair and preservation of the building, structure or object including the provision of the necessary financial security.CONDITION MET MET Review Criteria for 202 East Main Street The applicant is requesting for Conceptual Major Development review approval and relocation of the historic building onto a new basement. Summary of Review Criteria for Relocation Request 37 Page 2 of 2 Staff Finding: According to the historic Sanborn Map from 1904, it appears that the historic miner’s cottage is in its original location. The applicant’s plan for temporary relocation is for the purpose of building a new basement. The proposed work for relocation and excavation must comply with Design Guideline 9.1 by providing structural assessment and financial assurances. Additional comments have been provided by other relevant City Departments regarding the excavation process that the applicant will need to address prior to Building permit submittal. Staff finds all the relevant review criteria for relocation are met with conditions. 38 Page 1 of 2 Exhibit A.4 Floor Area Bonus Criteria Staff Findings 26.415.110.F: Floor Area Bonus: 1. In selected circumstances, the HPC may grant up to five hundred (500) additional square feet of allowable floor area for projects involving designated historic properties. To be considered for the bonus, it must be demonstrated that: a) The design of the project meets all applicable design guidelines; b) The historic building is the key element of the property and the addition is incorporated in a manner that maintains the visual integrity of the historic building; c) The work restores the existing portion of the building to its historic appearance; d) The new construction is reflective of the proportional patterns found in the historic building's form, materials or openings; e) The construction materials are of the highest quality; f) An appropriate transition defines the old and new portions of the building; g) The project retains a historic outbuilding; and/or h) Notable historic site and landscape features are retained. 2. Granting of additional allowable floor area is not a matter of right but is contingent upon the sole discretion of the HPC and the Commission's assessments of the merits of the proposed project and its 26.415.110.F - Floor Area Bonus. In selected circumstances, the HPC may grand up to five hundred (500) additional square feet of allowable floor area for projects involving designated historic properties. To be considered for the bonus, it must be demonstrated that: MET NOT MET DOES NOT APPLY a) The design of the project meets all applicable design guidelines;NOT MET b) The historic building is the key element of the property and the addition is incorporated in a manner that maintains the visual integrity of the historic building; c) The work restores the existing portion of the building to its historic appearance; d) The new construction is reflective of the proportional patterns found in the historic building's form, materials or openings; e) The construction materials are of the highest quality; f) An appropriate transition defines the old and new portions of the building;NOT MET g) The project retains a historic outbuilding; and/or N/A h) Notable historic site and landscape features are retained.N/A MET MET MET MET Review Criteria for 202 East Main Street The applicant is requesting for Conceptual Major Development review approval and a 500 sf floor area bonus. Summary of Review Criteria for Floor Area Bonus Request 39 Page 2 of 2 ability to demonstrate exemplary historic preservation practices. Projects that demonstrate multiple elements described above will have a greater likelihood of being awarded additional floor area. 3. The decision to grant a floor area bonus for major development projects will occur as part of the approval of a Conceptual Development Plan, pursuant to Subsection 26.415.070.D. The floor area bonus may also be approved as part of a Historic Landmark Lot Split Review. 4. Floor area bonuses are cumulative. A property shall receive no more than 500 square feet total. Staff Finding: This project is subject to the code language before the Historic Preservation Benefits updates. HPC may grant up to 500 sf floor area bonus. Of the eight criteria listed, two are not applicable, and staff finds that the applicant meets four of the six remaining criteria for awarding a floor area bonus. The applicant is taking a 480 sf reduction for building a residential building in the MU zone district due to underlying zoning requirements, and the request for the 500 sf bonus is for the proposed rooftop deck and lightwells that do not add mass and scale. Staff could support the request for a floor area bonus; however, recommends a restudy of the above grade addition and connection element to ensure the expansion is sympathetic to the site before discussing this request. 40 From:Nick Thompson To:Sarah Yoon; Amy Simon; Ben Carlsen; Bob Narracci; Bonnie Muhigirwa; David Coon; David Radeck; Denis Murray; Hailey Guglielmo; Jack Danneberg; Jim Pomeroy; Mike Horvath; PJ Murray; Trish Aragon Subject:RE: HPC Referral Project: 202 E. Main Street Date:Friday, June 21, 2019 4:58:44 PM Attachments:image009.png image010.png image011.png image012.png image003.png Hi Sara, Here are comments from building: 1. Historic portion East property line fire separation distance of 3’-5” complies with IRC (change in use to single family) if fire sprinklers are installed. (2015 IRC R302.1) 2. Historic portion West property line fire separation distance of 1’-0” requires 1 hour rated wall and no windows or eave overhangs allowed. The existing condition is similar but with a few more inches of clearance on the West (but then less on the East) (2015 IRC R302.1). However, 2015 IEBC 1205.3 allows the existing historic exterior wall and opening situation to remain due to a change of occupancy to an equal hazard category. The applicant must submit a report per 2015 IEBC 1201.2. 3. The new addition is 3’ from the East and West property lines. This requires either a fire sprinkler or 1 hour fire rated wall with windows no more than 25% of wall area and 1 hour fire rated eave overhangs no closer than 2’ to the property lines (2015 IRC R302.1). Applicant should verify with the Parks department that a fire sprinkler line can feasibly be installed. 4. Emergency escape and rescue opening window wells have grates and appear to be adjacent to walkways- requiring guards per City policy. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen, CO 81611 p: 970.429.2757 c: 970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: EXHIBIT B - REFERRAL COMMENTS 41 From:Hailey Guglielmo To:Sarah Yoon Subject:RE: HPC Referral Project: 202 E. Main Street Date:Thursday, June 27, 2019 4:22:55 PM Attachments:image001.png image002.png image003.png image004.png image005.png Sarah, Engineering comments are as follows: 1.Stormwater - The application makes no reference to how onsite runoff will be captured and treated for water quality. The proposed plan does not leave much room for stormwater treatment. Prior to HPC approval the applicant shall provide information on a conceptual level of how rainwater will be treated. 2.Excavation Stabilization - The proposed excavation stabilization plan is very constrained. If any work or layback is proposed to be done on neighboring properties, an agreement between the property owners must be submitted to the City along with the building permit. Micropile walls cannot have any impact on neighboring properties. 3.Water service line – at building permit, the applicant shall work with the Parks and Engineering Departments to determine the best alignment of the new water service line. Any plan shall minimize impacts to the street trees. The application mentioned removing the tree in the front yard so it is my understanding there will be no onsite utility tree conflicts. 4.Public improvements – at the time of building permit a 6’ sidewalk will be required. The sidewalk shall follow the COA “floating sidewalk” detail to avoid tree roots. New curb and gutter will be required. A one sided pour on the back will be required to protect the existing tree roots. A 2’ asphalt t-top patch will be required. Thanks, Hailey Guglielmo, PE Development Engineer Engineering Department 201 N Mill St. Ste 203 Aspen, CO 81611 p: 970.429.2751 www.cityofaspen.com 42 From:David Radeck To:Sarah Yoon; Amy Simon; Ben Carlsen; Bob Narracci; Bonnie Muhigirwa; David Coon; Denis Murray; Hailey Guglielmo; Jack Danneberg; Jim Pomeroy; Mike Horvath; Nick Thompson; PJ Murray; Trish Aragon Subject:RE: HPC Referral Project: 202 E. Main Street Date:Thursday, June 20, 2019 5:00:08 PM Attachments:image001.png image012.png image013.png image014.png image015.png Hi Sarah, Parks comments: On page 19, applicant is asking for a removal of the front tree. As there are two trees in the front yard, 1 deciduous and 1 coniferous, we need to know which they are inquiring about. What are the limits of excavation in front yard? This will require discussion with the City Forester to see how close to the cottonwood trunks they can disturb. On pages 5 & 30, Waiver request for Parks Dedication fees will need approval of Manager of Parks. DBH on cottonwood trees are the same on both surveys, one dated 9/24/2012 and the other dated 3/21/2019. Will need to verify sizes. If ENG is requiring sidewalk to be replaced it must be of a floating design and no excavation can occur within the driplines of the existing cottonwoods. Any activity in the front yard will require discussion with the City Forester as it is entirely within the driplines of the cottonwoods. This includes staging of house while the basement is being dug. The waterline for both 202 and 208 W Main is in between the 2 cottonwoods and a discussion will need to be had between ENG and Parks to determine the best location for the new waterline. Dave David Radeck Project Technician Parks Department 585 Cemetery Lane Aspen, CO 81611 p: 970.429.2025 c: 970.274.2175 f: 970.920.5128 www.cityofaspen.com 43 202 EAST MAIN STREET APPLICATION FOR MAJOR DEVELOPMENT VICKERY – PEGOLOTTI JUNE 10, 2019 44 202 East Main Application for Major Development June 10, 2019 Contents Sections Application Form Written Description Vicinity Map Context Analysis Site Improvement Survey Architectural Drawings Total FAR Summary Overall Construction Method Partial Demolition Temporary Relocation multiple Summary of Proposed Variations and Benefits Code Section Compliance Documents Site Improvement Survey Site Improvement Survey Enlargement Recorded Subdivision Exemption Plat Vicinity Aerial FEMA Flood Plain Proof of Ownership Mailing List Structural Integrity Report* Landscape Plan on site plan* Lighting Plan* Exhibits Site Improvement Survey Enlargement Envelope Reduction Graphic 202-208 Adjacent Site Plan Diagram Livability Benefits Workup Photographs of Existing Worksheets FAR Calculation Worksheet – Existing FAR Drawing Worksheets – Existing FAR Calculation Worksheet – Proposed FAR Drawing Worksheets – Proposed FAR Calculation Worksheet – Resource Only Demolition Calculation Demolition Plan Worksheet Demolition Elevation Worksheet 45 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT November 2017 City of Aspen|130 S. Galena St.|(970) 920 5090 Agreement to Pay Application Fees An agreement between the City of Aspen (“City”) and I understand that the City has adopted, via Ordinance No. 30, Series of 2017, review fees for Land Use applications and payment of these fees is a condition precedent to determining application completeness. I understand that as the property owner that I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $.___________flat fee for __________________. $.____________ flat fee for _____________________________ $.___________ flat fee for __________________. $._____________ flat fee for _____________________________ For Deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that addit ional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review and presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are paid in full. The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy including consequences for no-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render and application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated. $________________ deposit for_____________ hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. $________________ deposit for _____________ hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. City of Aspen: ________________________________ Jessica Garrow, AICP Community Development Director Signature: _________________________________________ PRINT Name: _______________________________________ Title: ______________________________________________City Use: Fees Due: $_______Received $_______ Case #___________________________ Please type or print in all caps Address of Property: ______________________________________________ Property Owner Name: __________________________ Representative Name (if different from Property Owner)_______________________ Billing Name and Address - Send Bills to: ___________________________________________________________________________________________________ Contact info for billing: e-mail: _______________________________________ Phone: __________________________ 202 East Main Street, Aspen, CO 81611 Jake Vickery, RLJP* Della Pegolotti Jake Vickery Jake Vickery, PO Box 12360, Aspen, CO 81612 jakevickery@comcast.net 970 309-7722 Jake Vickery co-owner & manager *Rocking Lazy J Properties 6$1950 46 November 2017 City of Aspen|130 S. Galena St.|(970) 920 5090 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT LAND USE APPLICATION Project Name and Address:_________________________________________________________________________ Parcel ID # (REQUIRED) _____________________________ APPLICANT: Name: ______________________________________________________________________________________________ Address: _______________________________________________________________________________________________ Phone #: ___________________________ email: __________________________________ REPRESENTIVATIVE: Name: _________________________________________________________________________________________________ Address:________________________________________________________________________________________________ Phone#: _____________________________ email:___________________________________ Description: Existing and Proposed Conditions Review: Administrative or Board Review Have you included the following?FEES DUE: $ ______________ Pre-Application Conference Summary Signed Fee Agreement HOA Compliance form All items listed in checklist on PreApplication Conference Summary Required Land Use Review(s): Growth Management Quota System (GMQS) required fields: Net Leasable square footage _________ Lodge Pillows______ Free Market dwelling units ______ Affordable Housing dwelling units_____ Essential Public Facility square footage ________ 202 EAST MAIN; 202 East Main Street, Aspen, CO Parcel #273707399001; Account #R021796 Jake Vickery and Della Pegolotti, Rocking Lazy J Properties 202 East Main Street, Aspen, CO 970 309-7722 jakevickery@comcast.net Contact: Jake Vickery 1. Single story "miner's cottage", a local historic landmark, on an interior 3000 sf lot in the 200 block of East Main Street. The existing house encroaches into side yard setbacks. There is a non-historic addition on the rear. There is a similar house structure on the lot to the east, developed as mixed use building. The two parcels are an historic landmark lot split. 2. The proposal is to demolish the existing non-historic rear addition, restoring of the exterior of the existing structure, add a full basement, convert existing commercial use to residential single family, and expand with an new addition to the rear. The existing house will be temporarily relocated on site. An FAR bonus of 500 FAR sf is being sought. HPC Major Development Plan; partial demolition, temporary relocation na 1 0 0 x na x 970 309-7722 jakevickery@comcast.net 202 East Main Street, Aspen, CO na Legal: Lot 1 Main Street Victorians Historic Lot Split Subdivision Exemption, Pitkin County x x x 47 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT November 2017 City of Aspen|130 S. Galena St.|(970) 920 5090 DIMENSIONAL REQUIREMENTS FORM Project and Location ____________________________________________________________________ Applicant: ____________________________________________________________________________ Gross Lot Area: __________Zone District: _______ Net Lot Area: __________ Please fill out all relevant dimensions Single Family and Duplex Residential Existing Allowed Proposed 1) Floor Area (square feet) 2) Maximum Height 3) Front Setback 4) Rear Setback 5) Side Setbacks 6) Combined Side Setbacks 7) % Site Coverage 8) Minimum distance between buildings Proposed % of demolition ______ Commercial Proposed Use(s)____________________ Existing Allowed Proposed 1) FAR (Floor Area Ratio) 2) Floor Area (square feet) 3) Maximum Height 4) Off-Street Parking Spaces 5) Second Tier (square feet) 6) Pedestrian Amenity (square feet) Proposed % of demolition ______ Existing non-conformities or encroachments: Variations requested: **Please refer to section 26.575.020 for information on how to calculate Net Lot Area Multi-family Residential Existing Allowed Proposed 1) Number of Units 2) Parcel Density (see 26.710.090.C.10) 3) FAR (Floor Area Ratio) 4) Floor Area (square feet) 4) Maximum Height 5) Front Setback 6) Rear Setback 7) Side Setbacks Proposed % of demolition ______ Lodge Additional Use(s)____________________ Existing Allowed Proposed 1) FAR (Floor Area Ratio) 2)Floor Area (square feet) 3)Maximum Height 4) Free Market Residential(square feet) 4) Front setback 5) Rear setback 6) Side setbacks 7) Off-Street Parking Spaces 8) Pedestrian Amenity (square feet) Proposed % of demolition ______ Complete only if required by the PreApplication checklist 1550 MU 3000 sf 3000 sf Main Street Historic District 202 EAST MAIN; 202 East Main Street, Aspen, CO Jake Vickery and Della Pegolotti, Rocking Lazy J Properties na nana (1) HP Bonus requested - 500 sf max.500 sf FAR 1920 2420(1) 25'25'(2)19'-1" 13'-4"13'-4"10'-0"(min. required) (min. required) (min. req'd new) 5'-0"5'-0"5'-0" 5'-0"3'-0"(2)see below na na na (1339 sf /4149 sf)32.27% 1.8' East Side Yard encroachment to 3.2' (not including roof overhang) 3.9' West Side Yard encroachment to 1.1' (not including roof overhang) 2' East sideyard reduction to 3' for new addition 2' West sideyard reduction to 3' for new addition 1 parking space; sideyard variances for new basement under existing house (see above) WAIVERS REQUESTED: Park dedication fees, transportation demand management fees, employee housing mitigation (exempt); 5' light well encroachments both side yards, trash enclosure HP Bonus - 500 sf. in lieu parking fees (2) (3) the site drops approximately 3' front to back 48 COMMUNITY DEVELOPMENT DEPARTMENT November 2017 City of Aspen | 130 S. Galena St. | (970) 920-5090 Homeowner Association Compliance Policy All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this form) certifying the scope of work included in the land use application complies with all applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. Property Owner (“I”): Name: Email: Phone No.: Address of Property: (subject of application) I certify as follows: (pick one) □This property is not subject to a homeowners association or other form of private covenant. □This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary. □This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners association or covenant beneficiary. I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: _________________________ date:___________ Owner printed name: _________________________ or, Attorney signature: _________________________ date:___________ Attorney printed name: _________________________ 202 East Main Street, Aspen, CO Jake Vickery and Della Pegolotti, Rocking Lazy J Properties jakevickery@comcast.net 970 309-7722 x Jake Vickery 6.10.19 x 49 202 EAST MAIN STREET Application for Major Development, Partial Demolition, Temporary Relocation, and Benefits Written Description June 7, 2019 OVERVIEW This application is for Major Development, Partial Demolition, Temporary Relocation, and Benefits for 202 East Main Street, Aspen. This application conforms to the purpose, intent, and provisions of the relevant sections of the Land Use Code and the AACP as well as complying with the more detailed requirements and standards of the Historic Preservation Guidelines. INTRODUCTION 202 East Main is a one-story “Miner’s Cottage” located on the north side of the 200 block of East Main Street in Aspen. This application is for the preservation and rehabilitation of this historic house and redevelopment of the property including the removal of an existing non-historic rear addition and replacement with a new addition. The current use of the property is commercial. This application changes the use to single family residential. A FAR bonus and several variations are requested as well as waivers of several development fees. CONTRIBUTION & CONTEXT 202 East Main is a small, simple one-story vernacular structure located on a small interior 3,000 sf lot. As such this modest building has inherent limits on its ability to individually distinguish itself. That said, this particular resource derives increased community value and historical importance from its grouping with adjacent historical buildings, its location at the entry to Aspen’s commercial core, and from its strategic position in multiple levels of historical context. For this reason, this application has an important secondary focus on understanding, supporting, and responding to the specific attributes of this particular contextual situation. In this way, this application seeks to set an example for properties of this type, both in terms of process and design. HISTORY The general history of the property is provided in the City’s HP Evaluation Sheet on record and is not reiterated here. Included below is a historical photograph of the West End around 1887 and an enlargement of the area around 202 East Main. Of interest is that 202 East Main and the buildings immediately adjacent to it do not resemble the current buildings. This would indicate that the existing structures were either constructed or moved to this site at a later date. 50 Aspen’s West End circa 1987 Enlargement of 200-216 East Main Street EXISTING SITE CONDITIONS This 3000 sq. ft. lot is 100’ x 30’ and has about a 3’ drop towards rear. The existing historical structure is 44’ long and 25’ 7” wide. The side yard on the east is 3’5” and on the west is 1’0” totaling 4’5”. The historic structure occupies roughly the front 58’ of the lot including a 13’4” deep front yard. The historic structure has a footprint including the porch of 1041 sf. There is a partial basement of about 358 sf under the rear portion of the resource with the rest being crawl space. The overall FAR for the existing structure is 1,550 FAR sf. Detailed information is provided in the attached documentation. Adjacent conditions are addressed under “Context” in that section of this application. PRESERVATION & REHABILITATION In this application the exterior of the historic house will be fully preserved and rehabilitated using best established standards and practice. Structure and utilities will be upgraded to current standards. After temporary relocation for the construction of a new basement the historic house will be returned to its existing location aligning with adjacent buildings. The front façade, trim, bay window, openings, chimney, and front porch will be fully repaired and restored to original condition. The house has been resided. If workable, the new siding on the front will be removed to expose original siding if it remains and can be used. Non-historic windows in the existing house will be removed or replaced with windows of compatible design, proportion, and trim. It is believed that one of the original windows on the east side was removed and reused in a new location on the house. The proposal is to return this window to its original location. The northeast corner of the PARTIAL DEMOLITION The non-historic detractive addition on the rear will be demolished as shown in the drawings. The percent of this partial demolition is 32.6%, less than the 40% threshold for full demolition. TEMPORARY RELOCATION Prior to this relocation work the structural systems will be exposed and examined by a structural engineer and house moving expert. Recommendations will be followed to brace and support the 1887 51 structure and fully protect all historical features including all openings. The house will then be placed on steel beams and raised an estimate of 5’. The house will be moved to the front of the lot to permit construction of the rear basement. Similarly, the house will be moved to the rear of the lot to allow construction of the basement in the front of the lot. The house will then be returned to its existing location for the completion of the work. These moves enable the installation of micro piles and a new basement while allowing the historic house to remain on site during construction. Drawings showing this process are included in the application. CHANGE IN USE This proposal creates a change in use from commercial to residential single-family. To note, the owner’s preferred use is a mixed-use building containing existing commercial in front and residential use in rear. This was the owner’s plan for the last 20 years. This option was removed by recent code changes. PROPOSED DEVELOLPMENT - DESIGN A new rear addition and full basement are proposed to be added to the historic structure to improve and assure its continued utility and to meet current usability standards. The above grade FAR of the addition is just slightly larger than that of the original resource. The height of the roof of the addition is roughly the same as the original historic resource. The design of the addition utilizes the historic 14’ module throughout. Window and door proportions of the resource are utilized in the design of the addition. Most basic functional spaces are located in the basement and not above grade. The design gives priority to the west side of the property over the east side. A larger combined lightwell has been created on the west side leaving the undisturbed portion of the north wall of the historic house intact and exposed. It also provides the effect of a 10’ separation. A “loggia” orients to the alley and to Aspen Street and provides a back entry / rear porch type interface. The loggia also creates a void in the building form of the addition which accentuates the look and scale of a one car garage. The flat roof area in the center of the site is utilized for a roof deck to make up for the lack of usable private outdoor space. Derivative elements refer to the Sardy House and the relocated 208 shed. The second story master bedroom has a gable roof for historical reference. PRESERVATION IMPACT TO PROPERTY RIGHTS AND UTILITY The principle impact of historic designation and preservation of this property is that the existing building must remain and a second floor cannot be built above it. This eliminates the ability to build approximately 960 sf of prime second story space on the front of the lot. BENEFITS – VARIATIONS The existing house extends into the side yard setbacks and variations will be necessary to legitimize this condition. Partial side yard variations for the addition are requested as enable the preferred preservation strategy compared to other options. They allow more useable interior width, utility, and livability. The increased space provides some offset the loss of the 2nd floor space mentioned above. This strategy preserves the historic house intact. An itemization of the requested variances is on the “Summary of Variations and Benefits” included in this application. 52 BENEFITS – BONUS A bonus of 500 FAR sf. is requested for this design. The vast majority (443 FAR sf – about 90%) of this bonus is for decks and lightwells that have no effect on the above grade mass and scale of the project. They greatly improve the utility and livability of the project without any negative impact on historical value or the public interest. Only 57 FAR sf (3% of allowable) of this “bonus” are for above grade interior space. This modest request is supported, if for no other reason, by the remedial actions being offered to return the character defining elements of this house to their original condition. FAR SUMMARY The following provides a summary of the FAR for this project: Allowable FAR sf 1920 (36% downzone (1080) ABOVE GRADE FAR Existing FAR 1550 Proposed FAR 1977 Net FAR increase 427 Resource FAR 945 New Addition (net) 1032 Net difference 87 TOTAL FAR Above grade 1977 Below grade (Basement) 218 Roof Deck & Stair 176 Loggia 49 TOTAL FAR 2420 BONUS (Requested) Lightwells & Decks 443 Addition Above Grade Space 57 (3% of allowable 1920) Total Bonus 500 Introduction 6.7.19i 53 202 East Main St. 202 EAST MAIN STREET VICINITY MAP 202 East Main Street 202 EAST MAIN STREET VICINITY MAP EXHIBIT 54 CONTEXT As stated earlier the contextual situation of this property is a focus of this application and project design. There are four levels of context used to inform the re-development of this property. They are (1) Main Street and the Historic District, (2) Neighborhood, (3) Immediate, and (4) Site Specific. Aerials, diagrams, and photographs representing these levels have been included in this application. The following aerials show the 4 different levels of context: 202 EAST MAIN - CONTEXT LEVELS Level 1 – Town of Aspen & Main Street Historic District Level 2 – Neighborhood Context Aerial Level 3 - Immediate Context Level 4 - Site Specific Context 55 SARDY HOUSE NORTH ASPEN STREET 4 AMIGOS PAN ABODE EMPLOYEE HOUSING GAS STATION WEST MAIN STREET 200 BLOCK - NORTH SIDE WEST MAIN STREET #200 to #216 - NORTH SIDE 202 WEST MAIN STREET CONTEXT PANORAMA 202-21656 202 EAST MAIN - CONTEXT DIAGRAM Context Analysis Diagram 57 CONTEXT ANALYSIS – KEY ASPECTS (1) Town of Aspen and Main Street Historic District • Proximity and gateway to the Commercial Core • High vehicle traffic route, and Main Street Divide • Important Pedestrian Route • Streetscape- trees, sidewalk, setbacks, building, width and spacing, front yards, parking, guidelines • Main Street Historic District Guidelines (2) Neighborhood – (Block) • Historical structures on both sides of Main Street in this block • Aspen and Main street intersection and gateway to the West End • Relationship to Sardy House, Iconic Nation Register historic landmark • Mixture of uses: Office, retail, personal service, residential, employee housing, auto service • Residential R6 use across adjacent alley • Alley Guidelines (3) Immediate • 200 – 216 East Main St. – Four synergistic structures • 3 Historic Landmarks plus and a very supportive new structure on the west of 202 . • 5 sheds – type synergistic structures • Alley termination to west at Aspen Street with focal point of arch and vacated alley of Sardy House • 200 new building, sympathetic, parking in rear provides setback opening to northeast, loggia • 216 not redeveloped • Alley, trash, parking, secondary uses • Negative space, loggia (4) Site Specific • Interior lot • Site slopes site (about 3’6”) down towards rear • One story structure, typical, front 58’ of site • Existing encroachments and narrow side yards • Limits on second story space a very supportive new structure on the west of 202 . (about 3’6”) down towards rear 58 EXHIBIT 59 202 East Main Survey Enlargement 60 3D Isometric Drawings are for illustration ONLY! Color May Differ Slightly Due to Different Monitor Settings and Printers. Verify All Colors with Homeowner Prior to Any Painting. Hebrews 3:4 (NIV) - For every house is built by someone, but God is the builder of everything.202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:09 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StProject Cover Sheet A0.0 Sheet Index Label Title A0.0 Project Cover Sheet A0.1 Survey A1.0 Existing Site Plan A1.1 Exist Lower Level Plan A1.2 Existing Ground Floor A1.3 A1.4 Existing Roof Plan A1.5 Existing Elevations A1.6 Existing Cross Sections A2.0 Demo Site Plan A2.1 Demo BSMT Floor A2.2 Demo Ground Floor A2.3 A2.4 Demo Roof Plan A2.5 Demo Elevations A3.0 Proposed Site Plan A3.1 Proposed BSMT Plan A3.2 Proposed Ground Plan A3.3 Proposed Upper Plan A3.4 Proposed Roof Plan A3.5.1 Proposed Elevations A3.5.2 Proposed Elevations A3.5.3 Proposed Elevations A3.6.1 Proposed Sections A3.6.2 Proposed Sections A3.6.3 Proposed Sections A3.6.4 Proposed Sections A3.6.5 Proposed Sections A3.7 Typical Details X0.1 Exibit Site Plan X1.1 Exibit Exist BSMT X1.2 Exibit Exist GRND X1.3 Exibit Exist Roof X1.4 Exibit Exist Elev X2.1 Exibit Demo BSMT X2.2 Exibit Demo GRND X2.3 Exibit Demo Roof X2.4 Exibit Demo Elev 202200 208 216 vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netReserved Reserved Reserved Date: 5.28.19 Reserved Reserved Reserved Reserved Existing Lower Floor Plan Existing Ground Floor Plan Proposed Lower Floor Plan Proposed Ground Floor Plan Proposed Upper Floor Plan Proposed Cross Sections Proposed Cross Sections NOTE: REFER TO ARCHITECTURAL DRAWINGS PROVIDED UNDER SEPARATE COVER 61 N 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 5'10'5'5'Site Plan - 202 E Main Scale: 1/8 in = 1 ft Property Line Setback Line 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:26 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StExisting Site Plan A1.0 7897'7898'7899'7900' 7901'vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netAreas of existing structure in setbacks Areas to be demolished Proposed Demolition Existing Site Plan Date: 5.28.19 62 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:26 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StDN D01 - 2868 W17 - 2810 PIC D02 - 2868 W18 - 2810 PIC W01 - 5040 XO W03 - 2020 PIC W04 - 2666 SH W05 - 2666 SH W10 - 2056 SH W12 - 2812 X 2668W16 - 5026 XO W15 - 2620 X W13 - 2620 X W09 - 2630 XO W08 - 2630 XO 2668266810068266826682668 W11 - 2620 X W07 - 2666 SH W06 - 2666 SH W02 - 41066 DH 12 : 12 12 : 12 12 : 12 3 : 12 3 : 12 12 : 12 12 : 12 0 : 12 6 : 12 10 : 12 10 : 12 10 : 12 4 : 12 4 : 12 6 : 12 6 : 12 3'2'-6"3'-5"2'-6"3' 1'5'5'-1"2'-8"2'-3"8'-11"2'-6"2'-6 1/2"2'-5 1/2"2'-6"5'-7"2'-6"1'10'2'-6"12'-2" 1'16'13'-11 1/2"14'-0 1/2"24'-8" 69'-8"8"2'-6"11"2'-6"10"5'2'-1"2'-8"2'2'-8"3'-9"14'-6"7'-4"25'-7"11'-4"2'-8"10'-8" 24'-8"8'-9 1/2"4'-9 1/2"14'-5"16'1' 69'-8"4'-5 1/4"5'-6 1/2"4'-5 1/4"25'-7"2'2'-8"3'-6"8'-2"4'-5 1/2"8'-6"12'-7 1/2"1310 SQ FT Office / Display 15'-6" x 13'-5" 1st Floor Plan Scale: 1/8 in = 1 ft LIVING AREA%HEIGHTS, GET GLOBALS% DECK%HEIGHTS, GET GLOBALS% Display 13'-5" x 12'-0" Display 13'-5" x 12'-1" Display 13'-1" x 24'-7" Display 24'-2" x 13'-6" OFFICE / DISPLAY%HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS%DISPLAY%HEIGHTS, GET GLOBALS% BATH%HEIGHTS, GET GLOBALS% OPEN BELOW%HEIGHTS, GET GLOBALS%DISPLAY%HEIGHTS, GET GLOBALS% 1'0 6'2'8'4'10' GRAPHIC SCALE: Property Line Setback Line A X1.4 B X1.4 C A1.5 D X1.4 E2 A1.6 E2 A1.6 E3 A1.6 E3 A1.6 E4 A1.6 E4 A1.6 E5 A1.6 E5 A1.6 E6 A1.6 E6 A1.6 Existing Ground Floor A1.2 955 sf 358 sf DEMO Note: All interior walls to be removed vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netAreas to be demolished Proposed Demolition Lower Level Floor PlanExisting Ground Floor Plan Date: 5.28.19 63 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:26 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StW H FurnW20 - 2812 X 26602028W14 - 2812 X W19 - 2812 X 2668W21 - 1430 X 26682668 UP 16'14'-6"13'-6"24'-8" 68'-8" 24'-8"13'-6"14'-6"16' 68'-8"14'-6"25'-7"3'-9"7'-4"3'14'-5"25'-7"8'-2"Foundation Plan Scale: 1/8 in = 1 ft DISPLAY%HEIGHTS, GET GLOBALS% 1'0 6'2'8'4'10' GRAPHIC SCALE: Crawl Space Utility Storage Display Property Line Setback Line Brick/Rubble Foundation Concrete Block Foundation A X1.4 B X1.4 C A1.5 D X1.4 E2 A1.6 E2 A1.6 E3 A1.6 E3 A1.6 E4 A1.6 E4 A1.6 E5 A1.6 E5 A1.6 E6 A1.6 E6 A1.6 Exist Lower Level Plan A1.1 358 sf DEMO Note: All interior walls to be removed vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netBasement Plan Areas to be demolished Existing foundation to be demolished and replaced with full basement 21 sf 362 sf 585 sf Refer to Ground Floor Plan for this area Proposed Demolition Existing Lower Floor Plan Date: 5.28.19 Partial Basement 64 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:27 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St12 : 12 12 : 12 12 : 12 3 : 12 3 : 12 12 : 12 12 : 12 0 : 12 6 : 12 10 : 12 10 : 12 10 : 12 4 : 12 4 : 12 6 : 12 6 : 12 Floor Roof Plan Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: Property Line Setback Line Existing Roof Plan A1.4 DEMO vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net Roof Plan Areas to be demolished Proposed Demolition Existing Roof Plan Date: 5.28.19 65 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:27 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StSouth Elevation B - 202 E Main Scale: 1/8 in = 1 ft Cut Wood Shingles Fixed Wood Window w/ Wood Trim West Elevation C - 202 E Main Scale: 1/8 in = 1 ft Asphalt Shingles East Elevation A - 202 E Main Scale: 1/8 in = 1 ft Horizontal Wood Siding Brick Siding Concrete Blocks Double Hung Wood Windows w/ Wood Trim Aluminum Windows w/ Wood Trim Sliding Wood Window w/ Wood Trim Flat Panel Siding Aluminum Awning Window Aluminum Awning Window Wood Panel Door w/ Transom Window Wood Rim Board Wood Fascia Wood Cornerboard Turned Wood Post Brick Chimney North Elevation D - 202 E Main Scale: 1/8 in = 1 ft Fixed Wood Window Sliding Wood Window Sliding Aluminum Window Wood Access PanelGlass Panel Double Hung Wood Window Existing Elevations A1.5vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netAreas to be demolished Areas to be demolished 69 sf 63 sf Proposed Demolition crawl space crawl space crawl space Date: 5.28.19 Existing partial basement and crawl space to be removed and replaced with full basement - existing exterior brick to be salvaged and reused or replaced with similar 66 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:31 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StSection 2 - 202 E Main Scale: 1/8 in = 1 ft Section 3 - 202 E Main Scale: 1/8 in = 1 ft Section 6 - 202 E Main Scale: 1/8 in = 1 ft Section 4 - 202 E Main Scale: 1/8 in = 1 ft Section 5 - 202 E Main Scale: 1/8 in = 1 ft Existing Cross Sections A1.6 Section 5 - 202 E Main Scale: 1/8 in = 1 ft DEMO vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netAreas to be demolished 152 sf Proposed Demolition Date: 5.28.19 Existing Cross Sections Existing partial basement and crawl space to be removed and replaced with full basement - existing exterior brick to be salvaged and reused or replaced with similar 67 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:38 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StN 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E1'4'3'2'3'2'3'-5"1'-7"10'1'4'5' Site Plan - Proposed Walkway on Adjacent Property 1'0 6'2'8'4'10' GRAPHIC SCALE: Setback Line Property Line 7900.0 Setback Line 7899.0 7898.0 7897.0 New Light Well w/ Operable Grate Light Well 10" Spruce Trash Enclosure Covered Porch Proposed 2' Side Yard Variance Proposed 2' Side Yard Variance Variance for Existing House Variance for Existing House Existing Historic House Proposed New Addition Existing Grade Interpolated Grade Key Perimeter Micro Piles Shown on Foundation Plan. Notes Hard Surface Adjacent Building Adjacent Building Adjacent Light Well Scale: 1/8 in = 1 ft 7901.0 7901.0 2.5' Dia Cottonwood 2.5' Dia Cottonwood 7899.0 7900.0 Proposed Site Plan A3.0 Porous Paving vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netDate: 5.28.19 68 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:38 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StShower Shower ShowerDryer Washer W HFurnFurnW19 - 5050 PIC W09 - 4050 XO W23 - 4050 DC 30682680 26802880 26803080 508050803080368050805080 36802680 5080W22 - 3050 SC UP UP 9'-2"7'-8"27'-2"2'-7"12'-3 3/16"15'-9 13/16"5'-9"1'-4" 81'-9"3'20'-5"4'-10"28'-3"2'-6"24'26'2'-1"2'2'-8"22'-7 3/4"15'-1 1/4"28'16' 81'-9"10"5'3'-8"4'-11"4'-0 1/2"6'-3 1/2"6'-8"2'-7"18'-9"2'-7"10'-5"6'-8"2'-8"6'-8 1/2"4'-9"7'-6"2'-3"5'2'-10"11'-9"2'-8 1/2"7'-10 1/2"2'-9"BEDROOM 3 / FAMILY ROOM%HEIGHTS, GET GLOBALS% BEDROOM 2%HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% BEDROOM 1%HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% Foundation Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: DISPLAY%HEIGHTS, GET GLOBALS% MECH ROOM%HEIGHTS, GET GLOBALS% Mech Room 12'-0" x 7'-3" Bedroom 1 15'-7" x 15'-3" 239 sq ft %HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% Bedroom 2 19'-7" x 12'-8" 210 sq ft Bedroom 3 / Family Room 15'-9" x 21'-2" 333 sq ft BEDROOM 3 / FAMILY ROOM%HEIGHTS, GET GLOBALS% Property Line %HEIGHTS, GET GLOBALS% BEDROOM 3 / FAMILY ROOM%HEIGHTS, GET GLOBALS% Light Well Egress Light Well 4 A3.6.4 4 A3.6.4 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 5 A3.6.4 5 A3.6.4 2 A3.6.2 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 3 A3.6.3 Proposed BSMT Plan A3.1vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netProposed Lower Floor Plan Date: 5.28.19 Proposed Lower Floor Plan 69 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:38 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St D01 - 2868 W17 - 2810 PIC D02 - 2868 W18 - 2810 PIC W01 - 5040 XO W03 - 2020 PIC W04 - 2666 SH W05 - 2666 SH W10 - 2056 SH D04 - 3068 D03 - 8076 W28 - 2630 DH W07 - 2630 DH W06 - 2666 SH W20 - 2666 SH W02 - 41066 DH 10080 OHD Metal (Non-Insulated)266824682668W24 - 5050 PIC 4068UP UP 12 : 12 12 : 12 2 : 12 3 : 12 12 : 12 12 : 12 6 : 12 10 : 12 10 : 12 10 : 12 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 8 : 12 8 : 12 0 : 12 0 : 12 0 : 12 12 : 12 19'-2"2'-6"3'-5"2'-6"3' 1'5'5'-1"2'-8"2'-3"3'2'-6"3'-5"2'-6"3'-9"5'7'-10"2'-7" 1'16'30'-7"5'-2 3/4"6'-5 1/2"23'-5 3/4" 82'-9"4"4'-10 1/2"4"4'-5 1/4"5'-6 1/2"4'-5 1/4"6'2'-2"25'-7"3'14'-5"8'-2"5'-4"2'10'2'1'8'1'14'10'26'2'-8"2'2'-8"7'-4"7'-3 1/4"5'2' 8'15'-5 3/4"11'-8 1/4"2'-7"28'16'1' 82'-9" 8' 8'8'5'-4"1'12'-6"5'-2"7'-9 1/2"9'-0 1/2"8'-9"6'-8 1/2"2'-6"5'-5 1/2"7'-3 1/2"3'-5 1/2"2'-7"7'-2" 1st Floor Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft DECK%HEIGHTS, GET GLOBALS% 1'0 6'2'8'4'10' GRAPHIC SCALE: Property Line LOGGIA%HEIGHTS, GET GLOBALS% Garage 22'-6" x 23'-0" 437 sq ft Loggia 4'-11" x 9'-11" 49 sq ft Dining Area 27'-5" x 14'-4" 406 sq ft Living Area 15'-10" x 13'-5" 212 sq ft Kitchen 17'-2" x 10'-3" 177 sq ft Trash Enclosure Property Line Wall AboveWall AboveEntry 7'-1" x 8'-2" 66 sq ft Restore Historical Window Remove Non Historical Windows & Restore Building Corner 4 A3.6.4 4 A3.6.4 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 5 A3.6.4 5 A3.6.4 2 A3.6.2 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 3 A3.6.3 Proposed Ground Plan A3.2vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netProposed Ground Floor Plan Date: 5.28.19 Proposed Ground Floor Plan 70 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:39 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StDN Shower tub W12 - 6016 PIC W08 - 4050 PIC W26 - 6016 PIC W15 - 6016 PIC W16 - 6016 PIC 2668 2668 W13 - 4050 PIC W29 - 6016 PIC W27 - 6016 PIC W25 - 4050 PIC W11 - 6016 PIC W14 - 4050 PIC W21 - 7616 PIC 3068 3068 UP9'-10 3/4"4'-11 1/4"4'-9"4'-5"24'24'27'-10"7'-4" 35'-2" 14'-9 3/4"9'-7 1/2"5'-3 1/2"8'-6 1/2"11'-1 3/4"2'-10 1/4"5'-7"4'-5"10'4'4'-2 3/4"1'6'2'-9 1/4"3'-9 1/4"6'-2 3/4"4'-2 3/4"1'6'5'-4 1/2"6'1'4'-2 3/4" 7'-4" 2nd Floor Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: BONUS ROOM%HEIGHTS, GET GLOBALS%BONUS ROOM%HEIGHTS, GET GLOBALS% OPEN BELOW%HEIGHTS, GET GLOBALS% MASTER BATH%HEIGHTS, GET GLOBALS% Property Line Master Bedroom 12'-10" x 13'-2" 169 sq ft Master Bath 13'-0" x 9'-5" 122 sq ft Master Closet 9'-1" x 9'-5" 86 sq ft OFFICE AREA%HEIGHTS, GET GLOBALS% Office Area 14'-0" x 13'-2" 173 sq ft Existing Roof See Roof Plan New Roof UP MASTER BEDROOM%HEIGHTS, GET GLOBALS% Roof Deck Above 4 A3.6.4 4 A3.6.4 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 5 A3.6.4 5 A3.6.4 2 A3.6.2 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 3 A3.6.3 Proposed Upper Plan A3.3vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net71 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:39 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St12 : 12 12 : 12 2 : 12 3 : 12 12 : 12 12 : 12 6 : 12 10 : 12 10 : 12 10 : 12 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 8 : 12 8 : 12 0 : 12 0 : 12 0 : 12 12 : 12 Overframing Area 1st Floor Roof Framing Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: DN 76 SQ FT DECK%HEIGHTS, GET GLOBALS% 3rd Floor Plan - 202 E Main Proposed LIVING AREA%HEIGHTS, GET GLOBALS% OPEN BELOW%HEIGHTS, GET GLOBALS% Deck 22'-4" x 19'-10" 395 sq ft Property Line 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 Proposed Roof Plan A3.4 402 sf Proposed Roof Plan Date: 5.28.19vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net72 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:40 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StEast Elevation A - 202 E Main Proposed Scale: 1/8 in = 1 ft Proposed Elevations A3.5.1 13'-11"vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net11'-0"450 sf Proposed East Elevation Proposed East Elevation Proposed West Elevation Date: 5.28.19 302 sf 13'-11" East 73 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:46 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StWest Elevation C - 202 E Main Proposed Scale: 1/8 in = 1 ft Proposed Elevations A3.5.2 FAR Calculation Worksheetvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net81 sf Proposed West Elevation Date: 5.28.19 81 sf Proposed West Elevation 74 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:47 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StSouth Elevation B - 202 E Main Proposed Scale: 1/8 in = 1 ft Proposed Elevations A3.5.3 291 sf 258 sf Proposed South Elevation (Main Street)Proposed North Elevation (Alley) Proposed North & South Elevationsvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netDate: 5.28.19 75 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:48 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St6"3'10'1'-6"9'1'-6"6'4'25'10'-6"37'-7"Cross Section 1 - 202 E Main Proposed Scale: 1/8 in = 1 ft 7919 7901.75 Dining Room Garage Master Bedroom Bedroom #3 Hallway Proposed Sections A3.6.1vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net76 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:53 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StCross Section 4 - 202 E Main Proposed Scale: 1/8 in = 1 ft Dining Room Cross Section 5 - 202 E Main Proposed Scale: 1/8 in = 1 ft Dining Room Proposed Sections A3.6.46"3'10'1'-6"9'1'-6"6'4'25'10'-6"37'-7"Cross Section 6 - 202 E Main Proposed Scale: 1/8 in = 1 ft 7919 7901.75 154 sf vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net154 sf Cross Section 7 - 202 E Main Proposed Scale: 1/8 in = 1 ft Mech Room 30 sf Proposed Cross Section 4 Proposed Cross Section 7 Proposed Cross Section 6 Date: 5.28.19 16 sf 77 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:56 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StTypical Details A3.7vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netPreliminary Materials Metal siding of Hardy Board Brick light guard railing (deck) or solid Stone or tile Sheet metal siding Porus paving Asphalt shingles Metal framed window ML WF Wood framed window light guard railing (deck) horizontal wire in light weight pipe frame Preliminary Materials Proposed 78 202 East Main St. TOTAL FAR CALCULATION - SUMMARY 6.7.19 Existing Ground 1303 Basement 247 Total 1550 Resource Ground 945 Basement 50 Total 995 Demolition (net) Ground 358 Basement 197 Sub Total 555 Proposed Upper 633 Ground 1344 Subtotal above grade 1977 Mass & Scale Basement 218 Total Space 2195 Roof Deck & Stair 176 Loggia 49 Total Decks 225 TOTAL FAR 2420 Allowable 1920 Bonus 500 Total 2420 EXHIBIT 79 202 EAST MAIN STREET Summary of Proposed Variations and Benefits (requested) 6.9.19 EXISTING NON-CONFORMITIES AND ENCROACHMENTS 1. 1.8' East Side Yard encroachment to 3.2' (not including roof overhang) & new basement 2. 3.9' West Side Yard encroachment to 1.1' (not including roof overhang) & new basement PROPOSED VARIATIONS 1. Partial 2' East side yard reduction to 3' for new addition 2. Partial 2' West side yard reduction to 3' for new addition 3. 1 parking space or small vehicle 4. 5' light well encroachments both side yards FAR BONUS REQUEST: 500 sf (All numbers in FAR square feet) Allowable Calculation Reduction in allowable Base 1:1 3000 Reduction per Code 1080 (36%) FAR Allowable 1920 Above Grade Calculation Interior above grade space 1858 Garage after 250 sf exemption @ .5 119 Subtotal 1977 Over allowable (1920) 57 Below Grade Calculation* Basement 218* Deck Calculation* Decks (after 15% exemption) 176* Roof Deck & Stairs (462-288) (24%) Loggia 49* Total 234 TOTAL FAR WITH BASEMENT & DECKS 2420 Bonus 500 (Request) (*) Does not add space and doesn’t effect building mass WAIVERS REQUEST: 1. Park dedication fees 2. transportation demand management fees 3. In lieu parking fee or small vehicle space EXHIBIT 80 202 EAST MAIN APPLICATION FOR MAJOR DEVELOPMENT 6.9.19 OVERALL CONSTRUCTIONN TECHNIQUE TEMPORARY RELOCATION – INCLUDING VARIATIONS Demo existing rear addition Remove front tree Strip interior, brace and support existing roof, chimney, and exterior walls, remove existing interior walls Remove existing floor for construction access Excavate crawl space area under house for basement Lift house approximately 6 feet and move house fully forward (keeping house on site) Install micro piles on rear half of lot Excavate and pour rear foundation walls on rear half of lot Move house to rear of lot Demo existing foundation and preserve historic brick Install micro piles on from half of lot Excavate and pour foundation Move house back forward and lower to original location/position Restructure floor and roof of house Restore house RELOCATION 81 N 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 5'10'5'5'Site Plan - 202 E Main Scale: 1/8 in = 1 ft Property Line Setback Line 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:26 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StExisting Site Plan A1.0 7897'7898'7899'7900' 7901'vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netAreas of existing structure in setbacks Areas to be demolished Proposed Demolition Existing Site Plan Date: 5.28.19 Temporary Position 2 Existing Location Temporary Position 1 Temporary Relocation TR1.0 RELOCATION 82 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:48 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St6"3'10'1'-6"9'1'-6"6'4'25'10'-6"37'-7"Cross Section 1 - 202 E Main Proposed Scale: 1/8 in = 1 ft 7919 7901.75 Dining Room Garage Master Bedroom Bedroom #3 Hallway Proposed Sections A3.6.1vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netDate: 5.28.19 Temporary Position 1 Temporary Position 2 Existing Location Proposed Grade6'-0"Steel BeamsRise height Centerline of site Cross Section 1 - 202 E Main Proposed Scale: 1/8 in = 1 ft Dining Room Garage Master Bedroom Bedroom #3 Hallway Temporary Position 1 Temporary Position 2 Existing Location Proposed Grade6'-0"Steel BeamsRise height Centerline of site Temporary Relocation Property line Property lineMidline of site TR1.1 RELOCATION 83 202 EAST MAIN APPLICATION FOR MAJOR DEVELOPMENT 6.10.19 Code Compliance Worksheet _____________________________________________________________________________________ 26.304 Common Development Review Procedures 26.415.010 Purpose and Intent 26.415.070 Major Development of Designated Properties Guidelines Compliance Introduction Overview Chapter 1 Context Chapters 2 – 8 Rehabilitation Chapter 9 Excavation, Building Relocation, Foundations Chapter 10 Building Additions Chapter 11 New Buildings on Landmarked Properties Chapter 12 Accessibility, Architectural Lighting, Mechanical Equipment, Service Areas, & Signage CONTEXT 1.1 Context: Block, Neighborhood, District – SEE WORKUP CODE COMPLIANCE 84 REHABILITATION 1.2 Alley, Shed 1.3 Alley 1.6 Side walkway 1.8 Storm water, positive drainage 1.11 Trees, driplines, roots 1.23 Site regrading for positive drainage 2.6 Siding has been replaced 3.5 Replacing non-historic windows 3.7 Adding windows 5.0 Porches Alley (Rear) Porches - Loggia 6.0 Details 7.0 Roofs chimneys & vents 8.0 Secondary Structures ____________________________________________________________________________________ NEW CONSTRUCTION 9.0 Foundations 9.1 underpinning 9.5 brick foundation on rubble 9.6 minimize visual impacts of light wells ____________________________________________________________________________________ BUILDING ADDITIONS 10.1 RESPONSE: The existing rear addition has no historic value of its own. 10.2 RESPONSE: The existing addition is to be demolished. 10.3 RESPONSE: • The addition is compatible in height, scale, size, and massing. Utilizes the 14’ module and historic window proportions throughout. • The addition is secondary to resource; it is behind resource on interior lot, not visible from street • The addition differentiates from the resource with massing, fenestration, and materials. “There is a 3’ seam” between old and new. • Historic features are preserved and repaired to highest standards 85 • Not a corner lot 10.4 RESPONSE: • The resource is visually dominant when viewed from the street and the existing entry point is maintained. The addition is behind the resource and not visible from the street. The footprint of the addition (849) is smaller than the footprint of the resource (1054). The design of the addition and the design is particularly sensitive to resource. The above grade FAR of the addition is 1032; the above grade FAR of the existing resource is 945; a difference of 87 FAR sf or 9%; The addition is compatible in height, scale, size, and massing. Utilizes the 14’ module throughout. • An existing detractive addition is being removed. • The interior of the resource is fully utilized • The addition differentiates from the resource with form, fenestration, and materials. • There is a 3 foot wide “architectural seam” between old and new. • Historic features are preserved and unaffected 10.5 RESPONSE: n/a - Not a corner lot 10.6 RESPONSE: • product of its own time • modern interpretation • form, materials, fenestration • “derivative response” 10.7 RESPONSE: existing alignment is preserved. 86 10.8 RESPONSE: n/a - the addition is similar in height and scale to resource 10.9 RESPONSE: n/a - the addition is similar in height to the resource The design has a 1 story 3’ “seam” / connector articulating the addition from the resource. Due to construction concerns the seam can not come in below the existing roof of rear shed. minimum headroom issues it does not connect below eave. minimum of stair, goes where the rear wall has been removed). Light well 10.10 RESPONSE: addition to rear, entrance to addition is off alley, there is no impact on the resource from the addition, new basement is fully utilized housing the majority of new space. 10.11 RESPONSE: A flat roof area is located in the center, interior to the property and not visible from street. Mechanical equipment, vents, etc., primarily sloped roof 10.12 RESPONSE: The addition does not obscure any historically important architectural features of the resource. 10.13 RESPONSE: n/a the addition is not a roof top addition 10.14 RESPONSE: n/a the addition is not a roof top addition 10.15 RESPONSE: n/a the addition is not a roof top addition 26.415.080 Demolition (Partial) 26.415.090 Relocation (Temporary) 26.415.110 Benefits The following is a summary of benefits requested in this application to further the preservation of this resource: VARIATIONS Existing encroachments: (not including overhangs 1.8’ into East side yard to 3.2’; new basement below 3.9’ into East side yard to 1.1’; new basement below Proposed variations Partial 2’ East side yard reduction to 3’ Partial 2’ West side yard reduction to 3’ Limited 5’ reductions for East & West side yards for light wells (and areaway) 1 parking space reduction from 2 to 1; space of smaller vehicle 87 WAIVERS Park dedication fee Transportation Demand Management Fee Employee housing (exempt) In lieu parking fee BONUS Requested 500 26.470 GMQS The use will be changed from Commercial to Residential 26.575.020 Calculations and Measurements FAR Calculations – worksheets are provided Demolition Calculations– worksheets are provided 26.535 TDR’s the project is using all available FAR. 26.610 Impact Fees The property is exempted from Impact Fees Impact Fees are requested to be waived 88 26.710.180 Mixed-Use (MU). A. Purpose. The Mixed Use (MU) zone serves as a transition from the more intense commercial areas of the CC and C - 1 zones, and the residential and lodging zones surrounding Main Street. By allowing for a mix of commercial and residential uses and smaller-scale development, the Mixed Use zone reflects Aspen’s historic character and provides different economic and residential opportunities from more traditional commercial zones. Particularly along Main Street, the Mixed Use zone serves as a buffer from the traffic of Highway 82 while allowing for smaller scale commercial and residential opportunities. Buildings in the Mixed Use zone consist primarily of commercial, service and office uses on the ground floor, and residential and office uses on upper floors and off of the primary street frontage. Uses in the MU zone should not erode the character of the neighborhood or create excessive impacts to the surrounding residential and lodging zone. Standalone residential uses are permitted on properties as a reflection of the historic residential nature of the zone district. 26.710.180 Mixed-Use (MU). B. Permitted uses. The following uses are permitted as of right in the Mixed-Use (MU) Zone District: 1. Single-family residence, Duplex residence, or Two (2) detached single-family residences. Accessory dwelling unit in a separate building accessed off the rear of a lot as an accessory use. C. D. Dimensional requirements. 1. Minimum front yard setback (feet): 10, which may be reduced to 5, pursuant to Special Review, Chapter 26.430. exceeds; 13’4 Minimum side yard setback (feet): 5. 2’ variance 2. Minimum rear yard setback (feet): 5. 2’ variance Minimum utility/trash/recycle area: Pursuant to Chapter 12.06. 3. Maximum height: a. Detached residential and duplex dwellings: 25 feet. 4. Floor Area Ratio (FAR): c. The following FAR schedule applies to single-family and duplex uses when developed as the only use of the parcel: i. Detached residential and duplex dwellings established after the adoption of Ordinance No. 7, Series of 2005: 80% of the allowable floor area of an equivalent-sized lot located in the R-6 Zone District. (See R-6 Zone District.). 89 202 EAST MAIN STREET APPLICATION FOR MAJOR DEVELOPMENT VICKERY – PEGOLOTTI JUNE 10, 2019 SUPPLEMENTAL DOCUMENTS AND WORKSHEETS EXHIBITS AND WORKSHEETS 90 202 East Main Survey Enlargement WORKSHEET 91 EXHIBIT 92 202 East Main EXHIBIT 93 FEMA WEST ASPEN FLOOD PLAIN MAP 202 East Main St. not in flood plane is in Zone X -(determined to be out of 500 yrs. flood plain) 202 East Main St. Base Elevation 7897' EXHIBIT 94 ` Land Title Guarantee Company Property Report Order Number: QPR62010250 This Report is based on a limited search of the county real property records and provides the name(s) of the vested owner(s), the legal description, tax information (taken from information provided by the county treasurer on its website) and encumbrances, which, for the purposes of this report, means deed of trust and mortgages, and liens recorded against the property and the owner(s) in the records of the clerk and recorder for the county in which the subject is located. This Report does not constitute any form of warranty or guarantee of title or title insurance. The liability of Land Title Guarantee Company is strictly limited to (1) the recipient of the Report, and no other person, and (2) the amount paid for the report. Prepared For: ROCKING LAZY J PROPERTIES, LLC This Report is dated: 03/15/2019 at 5:00 P.M. Address: 202 E MAIN ST, ASPEN, CO 81611 Legal Description: LOT 1, MAIN STREET VICTORIANS HISTORIC LANDMARK LOT SPLIT SUBDIVISION EXEMPTION, ACCORDING TO THE PLAT THEREOF RECORDED NOVEMBER 9, 2012 IN PLAT BOOK 100 AT PAGE 92. COUNTY OF PITKIN, STATE OF COLORADO Record Owner: EXHIBIT 95 ROCKING LAZY J PROPERTIES, LLC, A COLORADO LIMITED LIABILITY COMPANY (AS TO AN UNDIVIDED 78% INTEREST) AND DELLA PEGOLOTTI (AS TO AN UNDIVIDED 22% INTEREST) We find the following documents of record affecting subject property: 1. DEED OF TRUST RECORDED SEPTEMBER 27, 2013 UNDER RECEPTION NO. 604267. 2. SCRIVENERS AFFIDAVIT RECORDED SEPTEMBER 06, 2017 UNDER RECEPTION NO. 641203. ***************** PROPERTY TAX INFORMATION ********************** Parcel No.: 273707399001 2019 Land Assessed Value $609,000.00 2019 Improvements Assessed Value $37,270.00 2019 real property taxes FIRST HALF PAID in the amount of $11,648.04. **************************************************************** Valley Response Land Title Guarantee Company valleyresponse@ltgc.com www.ltgc.com These images are provided for informational purposes only. They are not guaranteed as to availability or quality. Content in this email is Copyright LT Systems, L.L.C. All rights reserved. template: commitment.html 08/2016 . 96 PARCEL ACCOUNTNUMBEROWNER_NAME OWNER_ADDRESS1 OWNER_ADDRESS2OWNER_CITY OWNER_STATEOWNER_ZIPOBJECTID SITUS_ADDRESS 273707321002 R000123 CARLS REAL ESTATE LLC PO BOX 1365 ASPEN CO 81612 100 306 E MAIN ST 273707328005 R000195 CARVER RUTH A REV TRUST 116 S ASPEN ST ASPEN CO 81611 165 116 S ASPEN ST 273707320008 R000271 232 EAST MAIN STREET LLC 2001 N HALSTED #304 CHICAGO IL 60614 223 232 E MAIN ST 273707328001 R000319 201 EAST MAIN STREET LLC 2001 N HALSTED ST #304 CHICAGO IL 60614 270 201 E MAIN ST 273707320009 R000365 ASPEN CORNER OFFICE LLC 200 E MAIN ST ASPEN CO 81611 301 200 E MAIN ST 273707328002 R000505 1543 LLC 1543 WAZEE ST #400 DENVER CO 80202 419 221 E MAIN ST 273707315002 R000595 PENN PAUL E & SUSAN W 2566 LUCILLE DR FT LAUDERDALE FL 333162324 510 134 E BLEEKER ST 273707320002 R000612 WEST END HOUSE LLC 623 E HOPKINS AVE ASPEN CO 81611 526 209 E BLEEKER ST 273707328006 R000706 NUNN RONALD FAMILY LP 10500 BRENTWOOD BLVD BRENTWOOD CA 94513 614 208 E HOPKINS AVE 273707328007 R000719 JAFFE JONATHAN & KAREN 88 EMERALD BAY LAGUNA BEACH CA 92651 627 220 E HOPKINS AVE 273707328003 R000931 MONARCH BUILDING LLC PO BOX 126 WOODY CREEK CO 81656 800 227 E MAIN ST 273707328004 R000932 MONARCH BUILDING LLC PO BOX 126 WOODY CREEK CO 81656 801 231 E MAIN ST 273707320006 R000953 PEARCE FAMILY TRUST 216 E MAIN ST ASPEN CO 81611 817 216 E MAIN ST 273707320006 R000953 PEARCE MARGARET A 216 E MAIN ST ASPEN CO 81611 818 216 E MAIN ST 273707315003 R001142 RODNEY JOHN W PO BOX 2989 ASPEN CO 81612 978 126 E BLEEKER ST 273512438005 R001149 BTRSARDY LLC PO BOX 10195 DEPT 1173 PALO ALTO CA 94303 982 128 E MAIN ST 273707328008 R001432 360 HEXAGON LLC 9401 INDIAN CREEK PKWY STE 800 OVERLAND PARK KS 66210 1239 230 E HOPKINS AVE 273707320707 R001443 ICONIC PROPERTIES JEROME LLC 1375 ENCLAVE PKWY HOUSTON TX 77077 1249 220 E MAIN ST 273512437011 R009106 HOGUET CONSTANCE M 333 E 68TH ST NEW YORK NY 10065 7618 118 E BLEEKER ST #1 273512437012 R009107 HOGUET CONSTANCE M 333 E 68TH ST NEW YORK NY 10065 7619 118 E BLEEKER ST #2 273707376001 R012149 JBC PREFERRED PROPERTIES LLC 1005 BROOKS LN DELRAY BEACH FL 33483 9569 117 N MONARCH ST #1 273707376002 R012150 JBC PREFERRED PROPERTIES LLC 1005 BROOKS LN DELRAY BEACH FL 33483 9570 117 N MONARCH ST ##2 273512438002 R013896 120 EAST MAIN PARTNERS LLC 120 E MAIN ST ASPEN CO 81611 10985 120 E MAIN ST 273707316801 R013932 ASPEN COMM UNITED METHODIST CHURCH200 E BLEEKER ST ASPEN CO 81611 11013 200 E BLEEKER ST 273512456851 R014733 CITY OF ASPEN 130 S GALENA ST ASPEN CO 81611 11650 MAIN ST 273707320010 R015265 HODES ALAN & DEBORAH 19951 NE 39TH PLACE AVENTURA FLA 33180 12166 114 N ASPEN ST 273512470002 R015722 120 EAST MAIN PARTNERS LLC 120 E MAIN ST ASPEN CO 81611 12601 120 E MAIN ST 273707348001 R016992 WHITMAN RANDALL A 4845 HAMMOCK LAKE DR CORAL GABLES FL 33156 13727 214 E BLEEKER ST 273707348002 R016993 WHITMAN RANDALL A 4845 HAMMOCK LAKE DR CORAL GABLES FL 33156 13728 214 E BLEEKER ST 273707328009 R018344 HOFFMAN JOHN L & SHARON R TRUST411 E 63RD ST KANSAS CITY MO 64108 14292 214 E HOPKINS AVE 273707320013 R020012 KRIBS KAREN REV LIV TRUST PO BOX 9994 ASPEN CO 81612 15999 217 E BLEEKER ST 273707320014 R020013 GETTMAN ROSA H TRUST 88824 BLUE HERON RD SEASIDE OR 971384811 16000 227 E BLEEKER ST 273512437801 R020965 HOGUET CONDO ASSOC COMMON AREA 118 E BLEEKER ST ASPEN CO 81611 16939 118 E BLEEKER ST 273707376800 R021102 LE VOTAUX II CONDO ASSOC COMMON AREA 117 N MONARCH ST ASPEN CO 81611 17077 117 N MONARCH ST 273707399002 R021797 208 MAIN LLC 623 E HOPKINS AVE ASPEN CO 81611 17744 208 E MAIN ST 273707321004 R022311 ICONIC PROPERTIES JEROME LLC 1375 ENCLAVE PKWY HOUSTON TX 77077 18327 310 E MAIN ST 273707316011 R022448 232 E BLEEKER LLC 210 LAVACA ST #2405 AUSTIN TX 78701 18465 232 E BLEEKER ST 273707316012 R022449 MC2 PARTNERS LLC 225 W HUBBARD ST #501 CHICAGO IL 60654 18466 203 N MONARCH ST 273707316803 R022450 EAST BLEEKER DUPLEX CONDO ASSOC232 E BLEEKER ST ASPEN CO 81611 18467 232 E BLEEKER ST 202 East Main St. - Mailing List within 300' EXHIBIT 97 202 East Main St. TOTAL FAR CALCULATION - EXISTING WITH OLD ADDITION 6.7.19 Existing Ground 1303 945 358 Upper 0 Basement Calculation 247 from below 1550 Resource Ground Upper Basement Calculation TOTAL FAR Basement FAR Calculation Total Basement Wall Surface North South East West Total 181 181 98 100 174 175 181 181 272 275 909 Total Basement Wall Surface Exposed North South East West 94 0 27 81 90 22 94 0 117 103 314 Calculation 909 314 0.3454 34.54% 715 34.54%246.96 247 WORKSHEET 98 202 East Main St. TOTAL FAR CALCULATION - PROPOSED 6.7.19 Above Grade Ground 1344 includes 118 garage Upper 633 deducts 92 stair Total Above Grade 1977 57 over 1920 Below Grade Basement Calculation 218 Subtotal FAR w/o decks 2195 space Decks Roof deck with stair 176 288 exempt Loggia 49 used to be 80 Total Decks add 225 TOTAL FAR 2420 Allowable 1920 500 2420 w/ full bonus Basement FAR Calculation Total Basement Wall Surface North South East West Total 291 258 481 482 414 413 291 258 895 895 2339 58 49 0 0 0 0 0 58 49 0 0 107 2446 Total Basement Wall Surface Exposed North South East West Total 41 34 43 81 sidewalls lightwells 0 18 36 29 triangles 41 52 79 110 282 Calculation 2446 282 0.1153 11.53% 1884 11.53%217.23 218 WORKSHEET 99 202 East Main St. TOTAL FAR CALCULATION - RESOURCE 6.7.19 Existing Ground 1303 945 358 Upper 0 Basement Calculation 247 from below 1550 Resource Ground 945 945 358 Upper Basement Calculation 50 from below TOTAL FAR 995 Net Rear Addition 555 Basement FAR Calculation Resource Total Basement Wall Surface North South East West Total 181 181 98 100 181 181 98 100 560 Total Basement Wall Surface Exposed North South East West 70 0 27 22 70 0 27 22 119 Existing Calculation 560 119 0.2125 34.54% 715 34.54%246.96 247 Resource Calculation 560 119 0.2125 21.25% 234 21.25%49.73 50 WORKSHEET 100 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:38 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StN 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E1'4'3'2'3'2'3'-5"1'-7"10'1'4'5' Site Plan - Proposed Walkway on Adjacent Property 1'0 6'2'8'4'10' GRAPHIC SCALE: Setback Line Property Line 7900.0 Setback Line 7899.0 7898.0 7897.0 New Light Well w/ Operable Grate Light Well 10" Spruce Trash Enclosure Covered Porch Proposed 2' Side Yard Variance Proposed 2' Side Yard Variance Variance for Existing House Variance for Existing House Existing Historic House Proposed New Addition Existing Grade Interpolated Grade Key Perimeter Micro Piles Shown on Foundation Plan. Notes Hard Surface Adjacent Building Adjacent Building Adjacent Light Well Scale: 1/8 in = 1 ft 7901.0 7901.0 2.5' Dia Cottonwood 2.5' Dia Cottonwood 7899.0 7900.0 Proposed Site Plan A3.0 FAR Calculation Worksheet Porous Paving vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net75 sf 37'-9" 48 sf 48 sf WS WORKSHEET 101 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:38 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StShower Shower ShowerDryer Washer W HFurnFurnW19 - 5050 PIC W09 - 4050 XO W23 - 4050 DC 30682680 26802880 26803080 508050803080368050805080 36802680 5080W22 - 3050 SC UP UP 9'-2"7'-8"27'-2"2'-7"12'-3 3/16"15'-9 13/16"5'-9"1'-4" 81'-9"3'20'-5"4'-10"28'-3"2'-6"24'26'2'-1"2'2'-8"22'-7 3/4"15'-1 1/4"28'16' 81'-9"10"5'3'-8"4'-11"4'-0 1/2"6'-3 1/2"6'-8"2'-7"18'-9"2'-7"10'-5"6'-8"2'-8"6'-8 1/2"4'-9"7'-6"2'-3"5'2'-10"11'-9"2'-8 1/2"7'-10 1/2"2'-9"BEDROOM 3 / FAMILY ROOM%HEIGHTS, GET GLOBALS% BEDROOM 2%HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% BEDROOM 1%HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% %HEIGHTS, GET GLOBALS% Foundation Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: DISPLAY%HEIGHTS, GET GLOBALS% MECH ROOM%HEIGHTS, GET GLOBALS% Mech Room 12'-0" x 7'-3" Bedroom 1 15'-7" x 15'-3" 239 sq ft %HEIGHTS, GET GLOBALS% DISPLAY%HEIGHTS, GET GLOBALS% Bedroom 2 19'-7" x 12'-8" 210 sq ft Bedroom 3 / Family Room 15'-9" x 21'-2" 333 sq ft BEDROOM 3 / FAMILY ROOM%HEIGHTS, GET GLOBALS% Property Line %HEIGHTS, GET GLOBALS% BEDROOM 3 / FAMILY ROOM%HEIGHTS, GET GLOBALS% Light Well Egress Light Well 4 A3.6.4 4 A3.6.4 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 5 A3.6.4 5 A3.6.4 2 A3.6.2 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 3 A3.6.3 Proposed BSMT Plan A3.1 FAR Calculation Worksheetvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net1,056 sf 828 sf 1056 828 1884 (1879) 1884 x 11.28% 212.51 92 sf WS WORKSHEET 102 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:38 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St D01 - 2868 W17 - 2810 PIC D02 - 2868 W18 - 2810 PIC W01 - 5040 XO W03 - 2020 PIC W04 - 2666 SH W05 - 2666 SH W10 - 2056 SH D04 - 3068 D03 - 8076 W28 - 2630 DH W07 - 2630 DH W06 - 2666 SH W20 - 2666 SH W02 - 41066 DH 10080 OHD Metal (Non-Insulated)266824682668W24 - 5050 PIC 4068UP UP 12 : 12 12 : 12 2 : 12 3 : 12 12 : 12 12 : 12 6 : 12 10 : 12 10 : 12 10 : 12 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 8 : 12 8 : 12 0 : 12 0 : 12 0 : 12 12 : 12 19'-2"2'-6"3'-5"2'-6"3' 1'5'5'-1"2'-8"2'-3"3'2'-6"3'-5"2'-6"3'-9"5'7'-10"2'-7" 1'16'30'-7"5'-2 3/4"6'-5 1/2"23'-5 3/4" 82'-9"4"4'-10 1/2"4"4'-5 1/4"5'-6 1/2"4'-5 1/4"6'2'-2"25'-7"3'14'-5"8'-2"5'-4"2'10'2'1'8'1'14'10'26'2'-8"2'2'-8"7'-4"7'-3 1/4"5'2' 8'15'-5 3/4"11'-8 1/4"2'-7"28'16'1' 82'-9" 8' 8'8'5'-4"1'12'-6"5'-2"7'-9 1/2"9'-0 1/2"8'-9"6'-8 1/2"2'-6"5'-5 1/2"7'-3 1/2"3'-5 1/2"2'-7"7'-2" 1st Floor Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft DECK%HEIGHTS, GET GLOBALS% 1'0 6'2'8'4'10' GRAPHIC SCALE: Property Line LOGGIA%HEIGHTS, GET GLOBALS% Garage 22'-6" x 23'-0" 437 sq ft Loggia 4'-11" x 9'-11" 49 sq ft Dining Area 27'-5" x 14'-4" 406 sq ft Living Area 15'-10" x 13'-5" 212 sq ft Kitchen 17'-2" x 10'-3" 177 sq ft Trash Enclosure Property Line Wall AboveWall AboveEntry 7'-1" x 8'-2" 66 sq ft Restore Historical Window Remove Non Historical Windows & Restore Building Corner 4 A3.6.4 4 A3.6.4 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 5 A3.6.4 5 A3.6.4 2 A3.6.2 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 3 A3.6.3 Proposed Ground Plan A3.2 15 sf FAR Calculation Worksheet 80 sf 94 sf vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net958 sf 268 sf 485 sf 958 268 1226 485 235 118 1344 92 sf WS WORKSHEET 103 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:39 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StDN Shower tub W12 - 6016 PIC W08 - 4050 PIC W26 - 6016 PIC W15 - 6016 PIC W16 - 6016 PIC 2668 2668 W13 - 4050 PIC W29 - 6016 PIC W27 - 6016 PIC W25 - 4050 PIC W11 - 6016 PIC W14 - 4050 PIC W21 - 7616 PIC 3068 3068 UP9'-10 3/4"4'-11 1/4"4'-9"4'-5"24'24'27'-10"7'-4" 35'-2" 14'-9 3/4"9'-7 1/2"5'-3 1/2"8'-6 1/2"11'-1 3/4"2'-10 1/4"5'-7"4'-5"10'4'4'-2 3/4"1'6'2'-9 1/4"3'-9 1/4"6'-2 3/4"4'-2 3/4"1'6'5'-4 1/2"6'1'4'-2 3/4" 7'-4" 2nd Floor Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: BONUS ROOM%HEIGHTS, GET GLOBALS%BONUS ROOM%HEIGHTS, GET GLOBALS% OPEN BELOW%HEIGHTS, GET GLOBALS% MASTER BATH%HEIGHTS, GET GLOBALS% Property Line Master Bedroom 12'-10" x 13'-2" 169 sq ft Master Bath 13'-0" x 9'-5" 122 sq ft Master Closet 9'-1" x 9'-5" 86 sq ft OFFICE AREA%HEIGHTS, GET GLOBALS% Office Area 14'-0" x 13'-2" 173 sq ft Existing Roof See Roof Plan New Roof UP MASTER BEDROOM%HEIGHTS, GET GLOBALS% Roof Deck Above 4 A3.6.4 4 A3.6.4 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 5 A3.6.4 5 A3.6.4 2 A3.6.2 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 3 A3.6.3 Proposed Upper Plan A3.3 FAR Calculation Worksheet 92 sf 725 sf 725 -92 633 vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net38 sf WS WORKSHEET 104 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:39 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St12 : 12 12 : 12 2 : 12 3 : 12 12 : 12 12 : 12 6 : 12 10 : 12 10 : 12 10 : 12 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 30'-0 1/4"S75° 9' 11"E100' S14° 50' 49"W30'-0 1/4"N75° 9' 11"W100' N14° 50' 49"E 8 : 12 8 : 12 0 : 12 0 : 12 0 : 12 12 : 12 Overframing Area 1st Floor Roof Framing Plan - 202 E Main Proposed Scale: 1/8 in = 1 ft 1'0 6'2'8'4'10' GRAPHIC SCALE: DN 76 SQ FT DECK%HEIGHTS, GET GLOBALS% 3rd Floor Plan - 202 E Main Proposed LIVING AREA%HEIGHTS, GET GLOBALS% OPEN BELOW%HEIGHTS, GET GLOBALS% Deck 22'-4" x 19'-10" 395 sq ft Property Line 7 A3.6.5 7 A3.6.5 8 A3.6.5 8 A3.6.5 2 A3.6.2 9 A3.6.5 9 A3.6.5 1 A3.6.1 6 A3.6.4 6 A3.6.4 3 A3.6.3 Proposed Roof Plan A3.4 FAR Calculation Worksheetvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net402 sf 62 sf 402 62 464 40 sf WS WORKSHEET 105 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:40 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StEast Elevation A - 202 E Main Proposed Scale: 1/8 in = 1 ft Proposed Elevations A3.5.1 FAR Calculation Worksheetvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net11'-0"36 sf 414 sf 481 sf 43 sf 43 36 79 481 414 895 11'-0"WS WORKSHEET 106 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:46 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StWest Elevation C - 202 E Main Proposed Scale: 1/8 in = 1 ft Proposed Elevations A3.5.2 FAR Calculation Worksheetvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net29 sf 413 sf 483 sf 81 sf 414 483 897 29 81 110 WS WORKSHEET 107 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:47 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StSouth Elevation B - 202 E Main Proposed Scale: 1/8 in = 1 ft Proposed Elevations A3.5.3 FAR Calculation Worksheetvickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net291 sf 258 sf 258 291 258 291 897 895 2341 158 2499 110 79 189 93 282 361/2499 14.46% WS WORKSHEET 108 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:53 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main StCross Section 4 - 202 E Main Proposed Scale: 1/8 in = 1 ft Dining Room Cross Section 5 - 202 E Main Proposed Scale: 1/8 in = 1 ft Dining Room Proposed Sections A3.6.46"3'10'1'-6"9'1'-6"6'4'25'10'-6"37'-7"Cross Section 6 - 202 E Main Proposed Scale: 1/8 in = 1 ft 7919 7901.75 60 sf 18 34 41 93 49 58 107 FAR Calculation Worksheet 154 sf vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.net154 sf 6'-4" Cross Section 7 - 202 E Main Proposed Scale: 1/8 in = 1 ft Mech Room 18 sf30 sf 34 sf 41 sf 3'-0"3'-1"49 sf 58 sf WS WORKSHEET 109 202 EAST MAIN PERCENT DEMOLITION CALCULATION 3.14.19 Demolition is 32.27% of existing Does not include interior walls white areas are overall existing grey areas are the demolished rear addititon WALLS S.F.WINDOWS S.F. east west north south TOTAL DEM east west north south TOTAL DEM 7 7 53 33 100 53 16 16 6 4 42 173 179 141 220 713 141 16 16 16 30 78 373 376 34 63 846 7 3 20 30 39 32 68 25 164 4 4 4 18 4 22 4 233 234 11 478 467 20 12 32 12 88 79 19 186 167 2 2 2 7 7 7 31 31 62 62 3 3 6 6 2 2 7 11 4 944 938 326 341 2549 82 37 61 54 234 352 344 194 890 5 5 29 39 WINDOWS CALCULATION TOTAL DEM NOTES 2549 890 0.3492 34.92 Windows counted in total 234 All windows 2315 890 0.3844 38.44 Windows not counted in total 39 Windows in demolished addition 2315 851 0.3676 36.76 Total & demo windows not included GRAND TOTALS Square Footage Percentage Existing Total Demo WALLS 2315 890 0.3844 see elevations exhibit ROOF 1834 449 0.2448 see roof exhibit Percent demolition TOTAL 4149 1339 0.3227 32.27% WS WORKSHEET 110 202 E Main StAspen, CO 81611970.309.7722Parcel # - R021796Vickery / PegolottiPrinted On: 2/14/2019 10:53:57 Sheet: CHD Job #: 18-0081 13404 221st ST EGraham, WA 98338Jared Baehmer, OwnerPh: 253.777.2362202 E Main St234 Sq Ft 90 Sq Ft 156 Sq Ft 31 Sq Ft34 Sq Ft 376 Sq Ft 179 Sq Ft 7 Sq Ft 16 Sq Ft 16 Sq Ft 5 Sq Ft 3 Sq Ft 7 Sq Ft18 Sq Ft 21 Sq Ft 38'-10"7'12'-5"7 '- 8 " 17'-6" 25'-7" 5'-8" East Elevation A - 202 E Main Scale: 1/8 in = 1 ft 220 Sq Ft 4 Sq Ft 63 Sq Ft 33 Sq Ft 25 Sq Ft 31 Sq Ft 21 Sq Ft12'-5"10'-7"7'-5" South Elevation B - 202 E Main Scale: 1/8 in = 1 ft 141 Sq Ft 5 Sq Ft 53 Sq Ft 19 Sq Ft11 Sq Ft16 Sq Ft 50 Sq Ft 34 Sq Ft 11 Sq Ft 71 Sq Ft36 Sq Ft 5 Sq Ft 13 Sq Ft 7 Sq Ft 3 Sq Ft 7 Sq Ft 3 Sq Ft 5 Sq Ft 27'-7" 16'-6" North Elevation D - 202 E Main Scale: 1/8 in = 1 ft 234 Sq Ft 81 Sq Ft 170 Sq Ft 31 Sq Ft 29 Sq Ft 376 Sq Ft 179 Sq Ft 7 Sq Ft 16 Sq Ft 16 Sq Ft 3 Sq Ft 3 Sq Ft 24'-3" 16'-10" 38'-10"7'West Elevation C - 202 E Main Scale: 1/8 in = 1 ft Exibit Exist Elev X1.4 174 sf 100 sf 175 100 275 total 120 exposed 155 subgrade 81 sf 175 81 exposed 94 subgrade 181 sf 94 sf 181 sf 181 sf 9 sf3 sf vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netDemolition & FAR Exterior Walls Diagram 180 sf(181 sf NIC) 98 sf 174 sf 84 sf71 sf 27 sf 95 sf 176 sf 9 sf 76 sf 22 sf 31 sf 9 sf WS WORKSHEET 111 vickeryarchitecture & planning202 east main street aspen colorado 81611970 309-7722 jakevoickery@comcast.netDemolition & FAR Diagram202 E Main StWS WORKSHEET 112 Unbuildable portion of zoning envelope 202 East Main - Zoning Envelope WS WORKSHEET 113 Scale: ISSUE A 1.1 3/31/17Plotted On:SITE PLANALL DESIGNS, IDEAS ARRANGEMENTS AND PLANS I N D I C AT E D B Y T H E S E D R A W I N G S A N D SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF KIM RAYMOND ARCHITECTS, INC. AND SHALL NEITHER BE USED ON ANY OTHER WORK NOR BE USED BY ANY OTHER PERSON FOR ANY USE WHATSOEVER WITHOUT WRITTEN PERMISSION. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS AND SHALL BE VERIFIED AT THE SITE. ANY DIMENSIONAL DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK. IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE BEEN ENLARGED OR REDUCED, AFFECTING ALL LABELED SCALES. 1" ACTUAL AS NOTED DATE SCHEMATIC DESIGN03/11/17 "SALON TULLIO"208 E. MAN STREETASPEN CO, 8161104/03/17 PERMIT SUBMITTAL A A 1 1 B B C C B B A A 01 A4.2 3 3 2 2 FRONT SETBACK LINEPROPERTY BOUNDARY0,0,0 CONTROL POINT ROOF TERRACE 301 MAIN STREETALLEY BLOCK 73208 E. MAIN STREET ASPEN, CO 81611 PARCEL ID 273707399002 3,000 SF LOT LOT 1 EXISTING SIDEWALK TO REMAINPLANTING BED SIDE SETBACK SIDE SETBACK SKYLIGHT BELOW DN EXISTING GRASS TO REMAIN GENERAL NOTES - SITE PLAN 1. ARCHITECTURAL ELEVATION 100'-0" = SURVEY 7899.39' 2. PROPERTY LINE, BUILDING ENVELOPE, TOPOGRAPHY, ETC. INDICATED HERON ARE TAKEN FROM SURVEY DATED SEPTEMBER 24, 2012 BY HIRED GUN SURVEYING LTD. 3. NO EXISTING TREES OR SHRUBS ON SITE MAY BE REMOVED OR TRIMMED FOR CONSTRUCTION PURPOSES WITHOUT PRIOR WRITTEN PERMISSION FROM THE ARCHITECT. 4. LAYOUT SITE UTILITY RUNS SO AS TO MINIMIZE DISTURBANCE OF EXISTING TREES AND SHRUBS. VERIFY UTILITY LAYOUT WITH ARCHITECT PRIOR TO CLEARING AND EXCAVATION. 5. PROTECT ALL ON-SITE VEGETATION NOT APPROVED BY THE ARCHITECT FOR REMOVAL OR TRIMMING FROM DAMAGE DURING ALL CONSTRUCTION ACTIVITY. 6. CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL SOILS ENGINEER WHO SHALL MAKE AN ON SITE INVESTIGATIONT OF THE EXISTING SOILS CONDITIONS AFTER STRUCTURAL EXCAVATION IS COMPLETE AND SHALL PREPARE A LETTER WITH COPIES TO THE ARCHITECT AND STRUCTURAL ENGINEER DESCRIBING SOIL CONDITIONS IN SUFFICIENT DETAIL SUCH THAT THE FOUNDATION DESIGN INDICATED ON THE DOCUMENTS MAY BE VERIFIED AS BEING ADEQUATE OR MAY BE REVISED AS NECESSARY BY THE STRUCTURAL ENGINEER. 7. LOCATE AND INSTALL FOUNDATION DRAINS, DRYWELLS, AND CATCH BASINS ETC. PER RECOMMENDATIONS AND DETAILS OF SOILS & MECHANICAL ENGINEER. EXISTING ENTRY PATH EXISTING GRASS TO REMAIN EXISTING HISTORIC RESOURCE ROOF CONCRETE PAVER LANDING & WALKWAY 06 EAST 04 WEST 02 SOUTH 26'-1 3/4"5' 9" 11 1/2"3'1'-7"3'-6 3/4"TRASH ENCLOSURE RELOCATED GAS,ELECTRIC AND WATER METERS 1 1/2 O WATER LINE TO CITY WATER LINE STEP FROM DOOR RESIDENCE LIGHT WELL EXISTING SALON AIRLOCK RELOCATED SHED ADJACENT BUILDING EXISTING SALON A/C UNITSPLANTING BEDS WINDOW WELL ALLOWED SETBACK AC UNIT NEW PAVERS ON SLOPED PATH FOR ALLEY ACCESS. APPROVED SET BACK 7901790 0789978987897 789778977897789978987897RUBIX OUTDOOR LED UP AND DOWN WALL SCONCE LANDSCAPE PLAN KEY PLANTING BEDS PAVERS PEBBLES SOD EXISTING CONCRETE WALK CATVTEL.ELEC.METERGASMETERWATERA/C UNIT ND D SCALE: 3/16" = 1'-0" 1 PROPOSED SITE PLAN A 1.1 202 - 208 Site Plan Diagram WORKSHEET 114