Loading...
HomeMy WebLinkAboutresolution.hpc.034-2012 A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING FINAL MAJOR DEVELOPMENT AND COMMERCIAL DESIGN APPROVAL FOR THE PROPERTY LOCATED AT 204 SOUTH GALENA STREET, LOTS A, B AND C, BLOCK 94, CITY AND TOWNSITE OF ASPEN, COLORADO RESOLUTION #34, SERIES OF 2012 PARCEL ID: 2737-073-40-001 WHEREAS, the applicant, 204 South Galena LLC, contract purchaser of the property, represented by Charles Cunniffe Architects, has requested Final Major Development and Commercial Design review for the property located at 204 S. Galena Street, Lots A, B, And C, Block 94, City and Townsite of Aspen, Colorado; and WHEREAS, 204 S. Galena Street is located within the Commercial Core Historic District but is not considered a contributing building to the integrity of the Historic District; and WHEREAS, Section 26.415.070 of the Municipal Code states that "no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;" and WHEREAS, Final Major Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project's conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.D.3.b.2 and 3 of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, for Final Commercial Design Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project's conformance with the City of Aspen Commercial, Lodging and Historic District Design Objectives and Guidelines per Section 26.412.040.A.2, Commercial Design Standards Review Procedure, of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, Amy Guthrie, in her staff report to HPC dated December 12, 2012 performed an analysis of the application based on the standards, found that the review standards had been met, and recommended approval with conditions; and WHEREAS, at their regular meeting on December 12, 2012 the Historic Preservation Commission considered the application during a duly noticed public hearing, the staff memo and public comments, and found the proposal consistent with the review standards and recommended approval with conditions by a vote of 4 to 1. 204 S. Galena Street RECEPTION#: 595906, 01/08/2013 at HPC Resolution#34, Series of 2012 09:18:54 AM, Page 1 of 2 1 OF 2, R $16.00 Doc Code RESOLUTION Janice K. Vos Caudill, Pitkin County, CO NOW, THEREFORE, BE IT RESOLVED: That HPC hereby grants Final Major Development and Commercial Design approval for the property located at 204 S. Galena Street, Lots A, B, And C, Block 94, City and Townsite of Aspen, Colorado with the following conditions: 1. A lighting plan, Exhibit II of the December 12, 2012 meeting record, was reviewed and approved by HPC. 2. Prior to building permit application, amend the floor plans to include an airlock entry for each tenant space. 3. Prior to building permit application, provide a plan indicating all rooftop mechanical and screening for review and approval by staff and monitor. No mechanical equipment or vents may be placed on top of the second floor mass. 4. The applicant has represented that the requirement to provide 10% of the lot area dedicated to public amenity space will be satisfied by an upper floor restaurant deck, an option that is permissible within the Commercial design guidelines. If the restaurant use is removed, compliance with the Public Amenity requirements in effect at that time will be required. 5. Replacement of the existing 7 on-site parking spaces shall be by cash-in-lieu payment. 6. The applicant has demonstrated in the Conceptual review that the project is below the Courthouse View Plane as it crosses the property. 7. Verify net leasable commercial and non-unit calculations with the City Zoning Officer prior to building permit application. APPROVED BY THE COMMISSION at its regular meeting on the 12th day of December 2012. fi' ullins, Chair Approved as to Form: Debbie Quinn,Assistant City Attorney ATTEST: -v Kathy Striddand, Chief Deputy Clerk 204 S. Galena Street HPC Resolution#34, Series of 2012 Page 2 of 2