Loading...
HomeMy WebLinkAboutresolution.council.020-13 RESOLUTION # (Series of 2013) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT AMENDMENT BETWEEN THE CITY OF ASPEN AND OZ ARCHITECTURE AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a contract amendment for Burlingame Phase II OZ Architecture Contract Amendment #20, between the City of Aspen and OZ Architecture, a true and accurate copy of which is attached hereto as Exhibit "A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Contract amendment for Burlingame Phase II OZ Architecture Contract Amendment #20, between the City of Aspen and OZ Architecture, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 25th day of February, 2013. / tZ Michael C. Irel nd, Mayor I, Kathryn S. Koch, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held February 25, 2013. F,dhryn S. Koch, City Clerk Amendment 20 - Exhibit A pip FEE SUMMARY- Ph 2B PreCon CA-Base CA-Add/Alt Total CA Fee Total CA Fee Last Updated: 1/8/2013 By:TR Ph 2B (1-4)* Ph 2B(5-7) Ph 2B 2013 2014 2015 Ph 2B By Phase By Year Architecture $13,000 $225,000 $92,000 $330,000 $148,000 $149,200 $32,800 $330,000 7 s' Civil $13,000 $75,000 $15,500 $103,500 $69,250 $31,250 $3,000 $103,500 Structural $3,000 $12,000 $3,500 $18,500 $15,000 $3,500 $0 $18,500 Mechanical $3,440 $10,040 $2,600 $16,080 $10,133 $5,147 . $800 $16,080 Electrical 0 $9,000 $2,600 $14,600 $9,000 $4,800 $800 $14,600 Plumbing $9,000 g $2,600 $14,600 $9,000 $4,800 $800 $14,600 Landscape $720 $14,000 $8,800 $23,520 $5,720 $14,600'. $3,200 $23,520 Irrigation $4,000 $10,000 $10,500 $24,500 $7,000 $13,000 $4,500 $24,500 Subtotal-1 $43,160 $364,040 $138,100 $545,300 $273,103 $226,297 $45,900 $545,300 Waterproofing $2,000 $6,000 $2,000 $10,000 $6,000 $4,000 $0 $10,000 i Acoustical $2,000 $6,000„ $2,000 i $10,000 $6,000 $4,000 $0 $10,000 Fire Protection $600 $2,400: $1,000 „ $4,000 $1,800 $2,200 $0 $4,000 Other $0 $0 $0 $0 $0 $ $0 $0 Subtotal-2 $4,600 $14,400 $5,000 $24,000 $13,800 $10,200 $0 $24,000 Subtotals $47,760 $378,440 $143,100 $569,300 $286,903 911 $569,300 Reimbursables(Estimated at 10%) $4,776 $37,844 $14,310 $56,930 $28,690 $23,650 $4,590 $56,930 Grand Total $52,536 $416,284 $157,410 $626,230 $315,594 $260,146 $50,490 $626,230 * Base Fee for 2013 includes completion of CA Services for A&I Burlingame Ranch Phase 2A CA Base Fee Summary EX.B-BASE FEE Burn Rate By Month PreCon-Ph2B Construction Administration Phase 2B+Complete A&I Last Updated: 1/8/2013 By:TR Jan Feb Mar April May June July August 5ept Oct Nov Dec 2013 Jan Feb Mar April May June 2014 PreCon $13,000 4,333 4,333 4,333 13,000 CA-Base $225,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 135,000 15,000 15,000 15,000 15,000 15,000 15,000 90,000 Architecture $238,000 148,000 90,000 PreCon $13,000 6,500 6,500 13,000 CA-8ase $75,000 6,250 6,250 6,250 6,250 6,250 6,250 6,250 6,250 6,250 56,250 6,250 6,250 6,250 18,750 Civil $88,000 69,250 18,750 PreCon $3,000 1,500 1,500 3,000 CA-Base $12,000 2,000 2,000 2,000 2,000 2,000 2,000 12,000 0 Structural $15,000 15,000 0 PreCon $3,440 1,720 1,720 3,440 CA-Base $10,040 1,673 1,673 1,673 1,673 6,693 1,673 1,673 3,347 Mechanical $13,480 10,133 3,347 PreCon $3,000 1,500 1,500 3,000 CA-Base $9,000 1,500 1,500 1,500 1,500 6,000 1,500 1,500 3,000 Electrical $12,000 9,000 3,000 PreCon 53,000 1,500 1,500 3,000 CA-Base $9,000 1,500 1,500 1,500 1,500 6,000 1,500 1,500 3,000 Plumbing $12,000 9,000 3,000 PreCon 720 360 360 720 CA-Base 14,000 750 750 1,750 1,750 5,000 1,750 1,750 2,750 2,750 9,000 Landscape 14,720 5,720 9,000 PreCon 4,000 2,000 2,000 4,000 CA-Base 10,000 500 1,500 500 500 3,000 3,000 1,000 1,000 2,000 7,000 Irrigation 14,000 7,000 7,000 Subtotal-1 $407,200 4,333 19,413 19,413 23,750 30,173 23,250 29,173 23,250 30,173 21,250 27,673 21,250 273,103 25,923 21,250 30,673 17,750 18,750 19,750 134,097 Waterproofing $8,000 2,000 2,000 2,000 6,000 2,000 2,000 Acoustical $8,000 2,000 2,000 2,000 6,000 2,000 2,000 Fire Protection $3,000 600 600 600 1,800 600 600 1,200 Other $0 0 0 Subtotal-2 $19,0001 0 0 4,600 0 0 0 4,600 0 4,600 0 0 0 13,800 0 4,000 600 0 600 0 5,200 A/E Totals $426,200 4,333 19,413 24,013 t 33,773 23,250 34,773 21,250 r 19,350 19,750 Reimb.(Est @ 10%) 42,620 433 1,941 2,401 2,375 3,017 2,325 3,377 2,325 3,477 2,125 2,767 2,125 1 28,690 2,592 2,525 3,127 1,775 1,935 1,975 1 13,930 Jan Feb Mar April May June July August Sept Oct Nov Dec 2013 Jan Feb Mar April May June 1 2014 ;Grand Totals t 0,4 315,5940 153,226 (G:\2009\809003.00 Burlingame Ranch Phase II\Project Management\Contracts\Contract Addendum\In Process\Amendment 20-NEXT\Burlingame Ph2B CA Fee APPROVED_2012-11-30.xlsx) Burlingame Ranch Phase 2A CA Add-Alternate Fee Summary EX.C-ADD-ALT Burn Rate By Month Pre-Construction Construction Administration-Phase 2C(Buildings 5,6&7) Last Updated: 1/8/2013 By:TR Jan Feb Mar April May June July August Sept Oct Nov Dec 2014 January February March April May June 2015 PreCon $10,000 5,000 5,000 10,000 CA-Add-Alt $82,000 5,467 5,467 5,467 5,467 5,467 5,467 5,467 5,467 5,467 49,200 5,467 5,467 933 933 10,000 10,000 32,800 Architecture $92,000 59,200 32,800 PreCon 53,500 1,750 1,750 3,500 CA-Add-Alt $12,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 9,000 1,000 1,000 1,000 3,000 Civil $15,500 12,500 3,000 PreCon $500 250 250 500 CA-Add-Alt $3,000 500 500 500 500 500 500 3,000 0 Structural $3,500 3,500 0 PreCon $600 300 300 600 CA-Add-Alt $2,000 400 400 400 1,200 400 400 800 Mechanical $2,600 1,800 Boo PreCon $600 300 300 600 CA-Add-Alt $2,000 400 400 400 1,200 400 400 800 Electrical $2,600 1,800 800 PreCon 5600 300 300 600 CA-Add-Alt $2,000 400 400 400 1,200 400 400 800 Plumbing $2,600 1,800 800 PreCon 800 400 400 800 CA-Add-Alt 8,000 1,600 1,600 1,600 4,800 1,600 1,600 3,200 Landscape 8,800 5,600 3,200 PreCon 500 250 250 500 CA-Add-Alt 10,000 500 2,500 500 500 1,500 5,500 1,000 1,000 2,500 4,500 Irrigation 10,500 6,000 4,500 Subtotal-1 $138,100 0 8,550 8,550 7,467 9,467 6,967 10,267 6,967 10,267 6,467 10,767 6,467 $92,200 6,467 7,667 4,533 3,133 14,100 10,000 45,900 Waterproofing $2,000 500 500 500 500 2,000 0 Acoustical $2,000 500 500 500 500 2,000 0 Fire Protection $1,000 250 250 250 250 1,000 0 Other $0 0 0 Subtotal-2 $5,0001 o 0 1,250 1 0 0 0 1,250 0 1,250 0 1,250 0 5,000 0 0 0 0 0 0 1 0 A/E Totals $143,100 0 8,550 9,800 7,467 9,467 6,967 11,517 6,967 11,517 6,467 12,017 6,467 97,200 6,467 7,667 4,533 3,133 14,100 10,000 45,900 Reirn h.(Est @ 10%) 14,310 0 855 980 747 947 697 1,152 697 1,152 647 1,202 647 �]9,720//EE 647 767 453 313 1,410 1,000 4,590C Jan Feb Mar April May June July August Sept Oct Nov Dec 2014 Jan Feh Mar April May June 2015 Grand Tota • r r 9,405 r- 106,920 t 11,000 50,490 x- 1-4 RLB I Rider Levett Bucknall 1675 Larimer Street Suite 470 Denver,Colorado 80202 T:+720 904 1480 memorandum To Scott Miller, Chris Everson City of Aspen cc From Rob Taylor Date 28 January 2013 Subject OZ Architecture— Burlingame Ranch Phase II - Proposed Reference No. Contract Amendment#20 - Recommendation Scott/Chris The purpose of this memo is to summarize the proposed OZ Architecture Contract Amendment#20 and offer Rider Levett Bucknall's opinion as Owners Agent on the way forward. The memo should be read in conjunction with the OZ Architecture Proposed Contract Amendment#20 (dated Jan 08, 2013). This was discussed with OZ and CoA staff on Dec 3, 2012. Background The original 2009 OZ proposal for Burlingame totaled $1,675,686, broken down as follows: Initial Design Phase $814,759 Implementation Design Phase $386,357 Construction Phase $474,670 Total $1,675,786 To date, the first two"base services" phases have been approved by the City Council. The$474,670 for Construction Phase Services was for a single construction phase of all 167 units and this has been partially awarded, reflecting the phased construction approach. Amendment VIII was accepted by City Council in April for Access and Infrastructure construction administration (CA)for $207,211. The construction phase is now anticipated to be significantly longer than the initially proposed single phase and this has meant that fees are"drawn out" somewhat over a longer duration and less intensive phases. The OZ contract amendments to date are summarized below: www.rLb.com RLB I Rider Levett Bucknall 28 January 2013 Memorandum Page 2 Approved Value Original Contract, approved 3/8/10 $014,759 Amendment No. I, Impl. Docs, approved 9/27/10 $386,357 Amendment No. II, Life Safety Design, approved 3/22/11 $22,048 Amendment No. III, Model, approved 7/12/11 $14;265 Amendment No. IV, ALTA Survey & Plat, approved 9/26/11 V1,365' Amendment No. V, Logo/Finish/PUD, approved 9/26/11 $17,677' Amendment No. VI, Suppl. Drainage, approved 9/26/11 .m Amendment No. VII, Reuse Line Utilities Inclusion, approved 2/27/12 $14 IN Amendment No. Vlll, 2012 All Construction Admin (construction account) -419112 ' 12 $1 3,723` Amendment No. X-Addition Duration of IPD Design, Reso77, Aug 13, 12 $11$,574' Amendment No. XII - Pump House Detailed Design, Reso77, Aug 13, 12 �; � Amendment No. XIII -Revised Irrigation Water Source Analysis and Design, Reso77, Aug 13, 12 $9,261 i Amendment No. )QV-Additional Drainage Report, Reso77, Aug 13, 12 $ 6;884 Amendment No. 15-Change to Single Phase Electrical $91670 Amendment No. 16- Earthwork Mining Plan to reduce potential import co $5,a6p Amendment No. 17- Recirculation Pipe Design $5,280' Amendment No. 18- Breakout 61-65 Permit Set $12,5971 Amendment No. 19- Early Start CA and VE Services $24,760 Contract Value to Date $11,7403 Proposed Amendments Amendment No. 20-2013 Construction Administration $315,594, Subtotal Proposed Amendments Percentage of total current contract value 1$1,704,0331 18.5% Contract Value including Proposed Amendments 32,.019,827 Proposed Amendment No. 20-2013 CA $315.594 Given annual CoA budgets and the anticipation of further vertical phases in 2014, this OZ proposal is for the 2013 calendar year only. In Q4 2013 we will present the CA for 2014 and beyond for further council review and approval. This CA fee represents scope from all key design consultants and is at a level commensurate with the level of service anticipated as the housing takes shape. RLB takes no exception to CoA accepting this fee proposal from OZ. Budget Status The approved 2013 budget anticipated this fee and no further funding request is required to enable this contract amendment#20.' R L B I Rider Levett Bucknall 28 January 2013 Memorandum Page 3 Recommendation RLB recommend amendment#20 for$315,594 is accepted. This fee was anticipated and is within budget. Please contact me for any queries relating the attached or above. Sincerely, Rob Taylor Associate Principal Rider Levett Bucknall Ltd Encl: OZ Architecture-BGRPII Proposed Amendment#20. ARCHITECTURE MEMORANDUM URBAN DESIGN INTERIOR DESIGN Schedule Approval of this Amendment extends the Architect's Schedule through Calendar Year 2013(only)as a result of this Change in Service.A separate amendment will be required to authorize continuation of Phase 2B Base CA Services into 2014 and/or to include Add-Alternate Services of any kind for Phase 2B of the project. i r. Fee Breakdown • The fees presented below are for 2023 Base Services only.See attached Exhibits for additional information. Proposed Total Amendment 20(ind.Reimbursables estimated at zo%) $315,594 Authorization Pursuant Article 4.4 of the Owner-Architect agreement referenced above,please indicate acceptance of the terms of Amendment 20 as described herein by providing your signature below, Owner/Architect City of Aspen OZ Architecture ! Scott Miller E ardo Illanes BOULDER PHONE:303 449.8900 1805 29TH STREET,SUITE 2054 FAX:303.449.3886 DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TAME BOULDER,COLORADO 80301 W W W.OZARCH,COM a ARCHITECTURE MEMORANDUM URBAN DESIGN ® INTERIOR DESIGN TO: Scott Miller DATE: January 8, 201.3 FROM: Will Hentschel PROJECT: Burlingame Ranch Phase II SUBJECT: Burlingame Phase II PROJECT#: 809003 Contract Amendment No.1.9 OZArchitecture 81.95-2oo8 CC: Chris Everson, Barry Crook,Rob FILE#: Taylor Amendment 20 Proposed Amendment to AIA Document B195-2oo8 Agreement between Owner and Architect for Integrated Project Delivery for the Burlingame Ranch Phase II Project Dated January 25,2010. Description of Service At the request and direction of the Owner's Representative,OZ Architecture and its Consultants shall provide the following services for the Burlingame Ranch Phase II Project: Add CA Services for 2011 only for Base Bid of Phase 21B Buildings 1.to 4)including completion of CA Services on Access&Infrastructure portion of the Work deferred to Spring Of 201.-4. On 1.1./13/2012,approval in principal was granted by City Council to proceed with permitting and construction for Buildings 1.through 4 as Phase 2b,and expenditures in that regard were authorized for the Calendar Year 2013. Approval of this proposed amendment would add the CA Services for Base Bid and completion of A&I to be provided during Calendar Year 2013 fees to the Owner-Architect agreement. Per the attached exhibits,we have organized the CA fees for Phase 2B into a Base Fee(for Buildings 1.thru 4)and an Add- Alternate Fee(for Buildings 5,6&7)as directed. As requested,we have broken down the fees'By Consultant','By Phase', and`By Year'so that the attached exhibit maybe used to monitor cash flow by the Owner. Approval for Base Fees to be incurred in 2014 and all fees associated with the Add-Alternate will be sought under separate cover at a later date if requested. NOTE-Due to a number of unforeseen circumstances beyond the control of the Architect,the Contractor's Schedule for completion of construction for the Access and Infrastructure(A&I)improvements initially scheduled to conclude in Calendar Year 2012 have been deferred to Spring of 2013,however a final invoice for Amendment 8 (CA Services for A&I in 2012)has been submitted. Accordingly,fees for the completion of CA Services for A&I for the A/E Consultant Team have been included in these proposed CA fees for Phase 2B in 2013 and therefore no additional fees shall be requested in relation to Amendment 8. Supporting Documents(See attached) • Exhibit A- Phase 2B Fee Summary Tables(By Phase&By Year)dated 11812o1.3 • Exhibit B- Phase zB Base Fee(Burn Rate By Month)dated 1.181201.3 • Exhibit C-Phase zB Add.Alt.(Burn Rate By Month)dated 11812o13 Deliverables Construction Phase Services as described in AIA Documents 8195 dated January 25th,2oio and A295 dated 1/15/2010. IryARCHITECTURE MEMORANDUM 4w URBAN DESIGN ® INTERIOR DESIGN TO: Scott Miller DATE: January 8,2013 FROM: Will Hentschel PROJECT: Burlingame Ranch Phase II SUBJECT: Burlingame Phase II PROJECT#: 8o9003 Contract Amendment No.19 OZ Architecture B195-20o8 CC: Chris Everson,Barry Crook,Rob FILE#: Taylor Amendment 20 Proposed Amendment to AIA Document 8195-2oo8 Agreement between Owner and Architect for Integrated Project Delivery for the Burlingame Ranch Phase II Project Dated January 25, 2010. Description of Service At the request and direction of the Owner's Representative,OZ Architecture and its Consultants shall provide the following services for the Burlingame Ranch Phase II Project: Add CA Services for 201:t only for Base Bid of Phase 2B Buildings Ito 4)including completion of CA Services on Access&Infrastructure portion of the Work deferred to Spring of 2013. On 11/13/2012,approval in principal was granted by City Council to proceed with permitting and construction for Buildings 1through 4 as Phase 2b,and expenditures in that regard were authorized for the Calendar Year 2013. Approval of this proposed amendment would add the CA Services for Base Bid and completion of A&I to be provided during Calendar Year 2013 fees to the Owner-Architect agreement. Per the attached exhibits,we have organized the CA fees for Phase 2B into a Base Fee(for Buildings 1 thru 4)and an Add- Alternate Fee(for Buildings 5,6&7)as directed. As requested,we have broken down the fees`By Consultant',`By Phase', and'By Year'so that the attached exhibit may be used to monitor cash flow by the Owner. Approval for Base Fees to be incurred in 2014 and all fees associated with the Add-Alternate will be sought under separate cover at a later date if requested. NOTE-Due to a number of unforeseen circumstances beyond the control of the Architect,the Contractor's Schedule for completion of construction for the Access and Infrastructure(A&I)improvements initially scheduled to conclude in Calendar Year 2012 have been deferred to Spring Of 2013,however a final invoice for Amendment 8 (CA Services for A&in 2012)has been submitted. Accordingly,fees for the completion of CA Services for A&I for the A/E Consultant Team have been included in these proposed CA fees for Phase 2B in 2013 and therefore no additional fees shall be requested in relation to Amendment 8. Supporting Documents(See attached) • Exhibit A- Phase 2B Fee Summary Tables(By Phase&By Year)dated 11812o13 • Exhibit B- Phase 2B Base Fee(Burn Rate By Month)dated 11812o13 • Exhibit C-Phase 2B Add.Alt.(Burn Rate By Month)dated 11812o13 Deliverables Construction Phase Services as described in AIA Documents 8195 dated January 25th,2o10 and A295 dated 1/15/2010. r ARCHITECTURE MEMORANDUM URBAN DESIGN •� INTERIOR DESIGN Schedule Approval of this Amendment extends the Architect's Schedule through Calendar Year 2o3.3(only)as a result of this Change in Service.A separate amendment will be required to authorize continuation of Phase 2B Base CA Services into 2014 and/or to include Add-Alternate Services of any kind for Phase 2B of the project. Fee Breakdown • The fees presented below are for 2013 Base Services only.See attached Exhibits for additional information. Proposed Total Amendment 20(ind.Reimbursables estimated at to%) S 315.594 Authorization Pursuant Article 4.4 of the Owner-Architect agreement referenced above,please indicate acceptance of the terms of Amendment 20 as described herein by providing your signature below. Owner/Architect City of Aspen OZ Architecture Scott Miller E ardo Illanes 9OULDER PIONE:303 449.8900 1805 29TH STREET,SUITE 2054 FAX:303.449.3996 DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TANOE BOULDER,COLORADO 90301 W W W.OIARCN.COM