HomeMy WebLinkAboutcoa.cclc.ag.040313 COMMERCIAL CORE & LODGING COMMISSION
REGULAR MEETING
SISTER CITIES MEETING ROOM
April 3, 2013
8:30 A.M.
8:30 I. Roll call and approval of minutes — March 20, 2013
minutes.
II. Public Comments not on the agenda (please limit your
comments to 3 minutes)
III. GAP construction mitigation —Mak Keeling,Tricia
Aragon,Tony Kornasiewicz, Steve Barwick, Torre
IV. Adjourn
Construction Mitigation
204 S. Galena —GAP building
E. Hopkins is 47 feet wide.
Centaur Construction is taking 90 feet in length by 19 feet of width for their jersey
construction encroachment pedestrian bypass for the summer of 2013 on the
south sides of E. Hopkins to the end of the parking lot. Centaur Construction has
agreed to let the agriculture vendor, DeVries park their truck which is 45 to 50
feet long inside the barricades on Saturday for the duration of the Saturday
Market which ends October 12, 2013. Centaur Construction said they would have
someone onsite Saturdays to let the truck in.
The fire lane is 18 feet wide which will be maintained.
DeVries will put their tents up on the north side of Hopkins and not protrude
more than ten feet out.
i
All parties are aware of the c d"tions r e with he arr ngement.
Centaur Construction
�/�.5�13
Commercial Core & Lodging Commission
Saturday Market Agriculture chair /
Fire Department
Engineering Department
r,,
SITE LOGISTICS PLAN CtJ
GJ
-HOPKINS AVE.-
(TWO WAY)
• ,+wM OVts I L7 0[MR
somrsmom"
PE+Tltft-WhLWmfty
fir
Fl
C
IV GAW- bmv
HIM I Ill-.I-r.0
_WAt
PIM022ZYOLL fmmR &W"W7nmlWkj
90.3'
1
.� 3a vl ! 4T'��I'! �i:
"'T"os-rium
t 1 411-
SMU PULY STrJCr6 E
j ADIOACENIF SL%DNG
2 04 S.GALENA S
SCALE= 1:20
IOWA
Ic
0 T
svW
_ w
Ao W.,r7a .ftc L
F_
03-26-13;03: 13PM; ; 3126444472 # 1/ 3
DATE: 3/26/13
TO: Don Sheeley FROM: John Pawlicki
COMPANY: Commercial Core Lodging Commission FAX #: 312.644.4472
FAX a: 970.925.6037 PHONE a: 312.644.4470
PHONE k: 970.925.6025
TOTAL PAGES INCLUDING COVER PAGE: 3
CC:
SUBJECT: 204 S Galena St.Aspen, CO 81611
COMMENTS:
Please see the attached documents regarding the above referenced project.
Any questions feel free to contact me.
Thank you,
John Pawlicki
833 N ORLEANS STREET SUITE 300 CHICAGO ILLINOIS 60610 P 312 644 4470 F 312 644 4472 CENTAURCO.COIM
Aspen
We e
kend Far
n1ers Market Ma
p
2013 Gap \
COnstru
Encr �On
°ach�ent `
�t
vP
w
i/
20
0
I
OpERATI0N8 pLA
FOR SEpTE1yBER 1
2023 TO MAY 31
2014
� s I
U l(��ES � 'K•��
I :rwyroz w
�/ nv y M.'w�taiv
" 9 ' rr.rx ��4!°B ty°'a�u9+t nk'C u�y Miir�irga
l
j� ONSUCIto ACC
ce
f f o
� � o
' f
v/
w 9F5iWe:�Sn
1
L /
0 , k Q'
�W
EDP
' \ Co
HYMgIVAVEIVUE 7-S'
d S O AciurtaL
IX][`I III ti
i OPERATIONB PLAN FOR�y)�,�� TO NOVEMBER 15, OON_ STRU(TION
2013 AND
APRIL 1, 2014 TO NOVEMBER 15, 2014 IEE KUOw,rAR
ui
81,6pLnQ.es —�
- '.KwG:K.�rwEru r¢o iO MV�e,STryKie.,�
��M.Mw06a KweESUt.a rEry
L'113•
Ow.Oy�q I
Ai I
w v ► t V
U
w d a� uw, z C
0
W a
a �
ay
cl)
J
r E_.
„w
E�
— � I � RO. REN8ICN GTE
FIol
A I 1
I CoNST �c.Ttc
+ R FEr --
°s �
r gA2. I I
ComL1no2
v ARCNOEOTURAL
911E PLAN
HYMAN AVENUE
• 1B":1.,-0..
port iml
CW CTURNL SITEPWJ ® @MOm
A2.00