Loading...
HomeMy WebLinkAboutInformation Update.201910221 AGENDA INFORMATION UPDATE October 22, 2019 4:00 PM, I.INFORMATION UPDATE I.A.Main Street pothole update 1 INFORMATION ONLY-MEMORANDUM TO:Mayor and City Council FROM:Trish Aragon, PE, City Engineer THROUGH:Scott Miller, Director Public Works MEETING DATE:October 22, 2019 RE:Information Only: Main Street Pothole Update SUMMARY:In order to assist CDOT this year with its annual pavement repairs on Main Street /Highway 82, the City will be performing repair work and will be reimbursed by CDOT for the materials used. BACKGROUND The CDOT contracts with the City of Aspen for maintenance services on Main Street / Highway 82. These services include minor repairs on the pavement (ie pothole repairs). Because potholing repairs are only temporary in nature these areas need permanent repairs in order to provide a pavement surface that can make it through the winter. As a result, each year depending on the pavement condition, CDOT places permanent patches on these failing areas. DISCUSSION: Unfortunately, this year CDOT has faced mechanical issues with its equipment, material availability issues, and lack of staff availability. On October 11, 2019, CDOT notified the City, that due to these challenges, they will not be scheduling their annual repairs on Main Street / Highway 82. As a result there are areas of our pavement surface along Main Street / Highway 82 that will not make it through the winter. Because Main Street / Highway 82 is a vital corridor through the City, and its condition is critical to our citizens and visitors, the City Streets Department crews will be installing permanent patches in these areas. CDOT has agreed to reimburse the City for the materials used in these permanent patches. In house labor and equipment typically employed for our City maintained streets will be used to complete this project. 2