HomeMy WebLinkAboutlanduse case.boa.615E-Hopkins.008-79
"--'
APPEAL TO BOARD OF ZON I NG ADJUST/HIT
CITY OF ASPErl
?tft/{)p~ 5/-oh'1.43331
.
DATE
5/21/79
CASE NO.
/q~?:
APPELLANT Copland Hagman Yaw Ltd ADDRESS P.O. Box 2736, Aspen, Colorado
210 S. Galena St.
PHONE
925-2867
OHNER
Albert Vontz
(KSNO Radio Station)
ADDRESS 1390 S. Ocean Blvd. - Apt. 7-F
The Wittington
Pompano, Florida 33062
LOCATION OF PROPERTY
East ~ of Lot 0, all of Lot P, Block 98
City of Aspen, Colorado
(Street & Number of Subdivision Blk. & Lot No.)
Building Permit Application and prints or any other pertinent
data must accompany this application, and will be made part of
CASE NO. :]9~ ~
THE BOARD WILL RETURN THIS APPLICATION IF IT DOES NOT CONTAIN
ALL THE FACTS IN QUESTION.
DESCRIPTION OF PROPOSED EXCEPTION SHOHI NG JUSTIFI CATImIS:
(see attached copy)
SIGNED:
Appell
Will you be represented by counsel? Yes No
PROVISIONS OF THE ZONING ORDINANCE REQUIRING THE BUILDING INSPE TOR
TO FORWARD THIS APPLICATION TO THE BOARD OF ADJUSTMENT AND REASON
FOR NOT GRANTING:
APPLICATION IS MADE FOR A BUILDING PERMIT TO BUILD A RADIO BROADCASTING
FACILITY AND FIVE DWELLING UNITS.
1) The proposed bUilding provides three off-street parking spaces
whereas six spaces are required. Section 24-4.5(c) C-l Zoning District.
2) The proposed building does not provide an open area adjacent to the
alley with minimum vertical clearance of ten feet, a minimum depth
of ten feet and a horizontal dimension of thirty feet for each lot
developed. Section 24-3.7(h)(4). '
3) The proposed building has an external floor area ratio of 1.87:1.
The maximum F.A.R. is 1:1 with an additional 0.5:1 allowed for residential
use constructed in conformance with a duly adopted housing plan for the
City of Aspen. Section 24-3.4 Area G Bulk Requirements, C-l Zoning District.
I'
Chief Building Inspector on H. Me rin
Status Signed
PERMIT REJECTED, DATE DECISION {)JI'fl.1JflLJo/v1-i-- DATE c,,/.:t:>/7!f
APPLICATION FILED S;.~.2.f'1 DATE IF HEARING b/7hr
MAILED SECRETARY" -1tp1(~~~
-t l}~eP fVwJw-tMUi.f.d./:;t&tLL.o( o-J fluuteJ' ~ Us:t.o.~
1'"
\..-
,
'"";,,Ii'
NOTICE OF PUBLIC HEARING
Case No. 79-8
BEFORE THE CITY OF ASPEN BOARD OF ADJUSTMENT
TO ALL PROPERTY OWNERS AFFECTED BY THE REQUESTED ZONING OR USE VARIANCE
DESCRIBED BELOW:
Pursuant to the Official Code of Aspen of June 25, 1962, as amended, a
public hearing will be held in the Council Room, City Hall, Aspen, Colo-
rado, (or at such other place as the meeting may be then adjourned) to
consider an application filed with the said Board of Adjustment requesting
authority for variance from the provisions of the Zoning Ordinance, Chapter
24, Official Code of Aspen. All persons affected by the proposed variance
are invited to appear and state their views, protests or objections. If
you cannot appear personally at such meeting, then you are urged to state..
yo~views by letter, particularly if you have objection to such variance,
as the Board of Adjustment will give serious consideration to the opinions
of surrounding property owners and others affected in deciding whether to
grant or deny the request for variance.
The particulars of the hearing and of the requested variance are as follows:
Date and Time of Meeting:
Date:
Time:
June 7, 1979
4:00 PM, City Council Chambers
Name and address of Applicant for Variance:
Name:
Address:
Albert Vontz (KSNO Radio Station)
620 E. Hopkins Avenue
Location or description of property:
Location:
Description:
620 E. Hopkins, Aspen, CO 81611
East ~ of Lot 0, all of Lot P, Block 98
Variance Requested:.
Appli~ation iS,made ~or a building permit to build a radio broadcasting facility
and f1ve dwel11n~ un1ts. The prop~sed building provides three off-street parkin
spaces whereas ~1X spaces are requ1red. The proposed building does not provide
an open area adJacent to the alley with minimum vertical clearance of ten feet,
Duration of Variance: (Please cross out one) (continued below)
'EI.IIlfIllI'all'~'
Permanent
THE CITY OF ASPEN BOARD OF ADJUSTMENl'
BY \. ~;A~ ~~fJ~~
Sheryl S en, Deputy City Clerk
a minimum depth of ten feet and a horizontal dimension of thirty feet for each
lot developed. ~he proposed building has an external floor area ratio of
1.87:1. The max7mum FAR is 1:1 with an additional 0.5:1 allowed for residential
use constructed 1n conformance with a duly adopted housing plan for the C't
of Aspen. 1 y
,\
.'
.~
Copland Hagman VOd Architects
:)
Date: 21 May 1979
KSNO Radio Station
Case No. ?:1- 8'
Appeal to Board of Zoning Adjustment
Description of Proposed Exception Showing Justifications
The building project for which variance is requested is a
4 story structure to include approximately 1500 s.f. for a
new KSNO radio station facility and approximately 5200 s.f.
of low and moderate employee housing (5 units). The It
city lot parcel, although non-conforming, has been previously
approved for construction.
On the basis that the narrow lot imposes hardship relative
to egress requirements, parking requirements and refuse area
requirements and, further, places the ordinances regulating
such requirements into conflict with each other we request
approval of this request for variance.
The 25% open space requirement which is provided in accor-
dance to the zoning ordinance basically relegates the
accomoda tion of parking, egress and trash access to the 45. ft.
dimension contiguous to the alley frontage. This dimension,
irrespective of depth cannot physically accomodate the
necessary requirements. With the approval of the Planning
Department it has been determined that the following
provisions can accomodate the intent of the zoning ordinance
and the functional requirements of the building,
Egress
A second stairway is required by building code as a second
means of egress from the third floor employee unit. In
order to meet the code requirements (horizontal distance
between stairs) it is necessary to locate the stair at the
northwest corner of the building site, thus encroaching on
the refuse area envelope which, as defined, requires the
full alley frontage. This problem is inherent with a building
meeting building code requirements on a small site in that
it has the identical requirements of a structure on a larger
site without the flexibility. In order to delete the second
stairway (by code) it would be necessary to delete both the
3rd and 4th levels of employee units.
.
Copland Hagman VOd Architects
:)
Appeal to Board of Zoning Adjustment
Page 2
Parking
The employee housing units comprising this project include
(4) studio units and (1) two bedroom unit. The zoning
ordinance would require one parking space per bedroom thus
6 spaces. The available dimensions will not permit including
these spaces. In addition to the advantageous location of
the building relative to services and transportation the
employee units are designated for KSNO employees who would
have limited need for parking spaces, Variance is requested
to permit (3) parking spaces at nine feet width, Practical
hardship is incurred in that 3 employee housing units would
have to be deleted in order to comply with the one parking
space per unit provision.
Refuse Area
The zoning ordinance requires a refuse and utility area
10 feet deep by 10 feet high by the entire width of the
building (45 ft) which is in conflict with both the egress
and parking requirement. As shown on the plans variance
is requested to provide a refuse area 10 ft. x 18 ft. with
direct alley access, This would allow (2) two yard dumpsters,
a box bin and adequate space for transformer and other
utility requirements, In order to cover and protect this
area we request excluding the the covered refuse area from
the F.A.R, calculation,
F.A.R.
In order to accommodate off street parking, refuse and utility
areas, protected entry and decks at employee housing units
the building was necessarily designed with protective over-
hangs elements. The building, including these elements
conforms to the height, bulk and open space requirements,
The allowed F.A.R. is 6,750 sq. ft. When calculated in accor-
dance with Ordinance 34 (ordinance specifying new F.A.R.
calculation method) the F.A.R. is 1697 s,f. over the allowed
F.A.R. which is exactly equal to the area of overhang (hori-
zontal projection) on the building. On a larger site both
the employee housing and the code required spaces could be
accommodated however on a l~ lot site it is not practically
possible. The penalty this project would suffer in order
to comply with the specific F.A.R. calculation method is the
loss of 2 low income and 2 moderate income employee studio
units (i.e,) removal of the second level. Variance is there-
fore requested to delete horizontal projection areas from
the F.A.R. calculation method,
-
Copland Hagman YOtd Architects
o
Appeal to Board of Zoning Adjustment
Page 3
Summary
This project was initiated in December of 1978. Its concept
was simple: To construct a new facility for KSNO, which
is allowed by right without approval; and to construct a
maximum number of low and moderate income rental employee
units, a notion both needed and encouraged by the city,
Through what may be described as "unfortunate timing" this
project has been bounced around new approvals, changed laws
and pending legislation ever since. The delay incurred -
for something the city wants will be six months when it
comes before the Board of Adjustment. In an overall sense
it is the delay and frustrated efforts to reconcile this
project with the changing intentions of the city who constitutes
the hardships.
Thank you for your consideration.
Very truly yours
Copland Hagman Yaw Ltd
Larry Yaw, principal
- -
4
#
Copland Hagman vaOd Architects
o
Adjacent property owners to East 1/2 of Lot
and all of Lot P, Block 98 (KSNO Building)
Albert Vontz (Aspen Broadcasting Co.)
1390 S. Ocean Blvd.
Apt 7-F
The Wittington
Pompano, Florida 33062
Lot K thru West 1/2 of 0, Blk 98
The Victorian Company
Stephen Marcus
Box 1790
Aspen, Colorado 81611
Lot H & I, Blk 98
The Spring Street Associates, a Colorado Joint Venture
P.O. Box 1107
Aspen, Colorado 81611
Lots H & I, Blk 99
W.R. Walton
Box 665
Aspen, Colorado 81611