HomeMy WebLinkAboutlanduse case.boa.S20'Lot14&All15-BldgCondos.006-74
APPEAL '1'0 BOARD OF ZONING ADJUSTHENT
CITY OF ASPEN
Lt'" ill
2 881# ****10.00
DATE March 13, 1~74
CASE NO. 71-?
APPELLANT Aspen Cooperative Housin~ ADDRESS P. O.Box 4509
Partnership
Aspen, Colo. 81611
OWNER
Roland F. Merner
ADDRESS P. O. Box 67
c/o Hans of Aspen
Ac:;pRTl. rnln ~lh."
LOCATION OF PROPERTY
of Lot 14,
Numbe 0
Page 925
Building Permit Application and prints or any other pertinent data
must accompany this application, and will be made a part of
CASE NO.
11-1,
The Board will return this application if it does not contain all the
facts in question.
Description of proposed exception showing justifications:
The Appellant requests that the Board of Adjustment reverse the
conc~pt disapproval decision made by the Planning and Zoning
Commission under Ordinance 19 on the Appellant'S proposed four-
plex on the grounds that disapproval of the proposed project
denies a substantial property right enjoyed by all other prop-
erties in the same vicinity and zone.
provisions of the Zoning Ordinance requiring the Building Inspector
to forward this application to the Board of Adjustment and reason
for not granting permit:
APPLICATION IS MADE TO BUILD FOUR CONDOMIUM APARTMENT UNITS. THE PLANN-
ING and Zoning Commission denied the Aspen Cooperative Housing Project under
Ord.#19 conceptual review Feb. 21, 1974 for the following reasons:
1) Inadequate access, i.e., road width and grade, visibility
and lot entrance C.2. (a)
2) Insuf~icient off street parking spaces on street which is
presently congested. C.3.
3) Adverse impact on already existing problems of circulation
and snow removal. C.4.
4) Excessive density and lot use for physical conditions of
development site and immediate surroundings. C4. (a)
Chief Buildina In~p~crnr
Status
~~p)~r~
J.gned
PERMIT REJECTED, DATE
DECISION
DATE
APPLICATION FILED
DATE OF HEARING
MAILED
Secretary
-
,""".,
,"........
',..,....
NOTICE OF PUBLIC HEARING
Case No. 74-6
BEFORE THE CITY OF ASPEN BOARD OF ADJUSTMENT
TO ALL PROPERTY OWNERS AFFECTED BY THE REQUESTED ZONING OR USE VARIANCE
DESCRIBED BELOW:
Pursuant to the Official Code of Aspen of June 25, 1962, as amended, a
public hearing will be held in the Council. Room, City Hall, Aspen, Colo-
rado, (or at such other place as the meeting may be then adjourned) to
consider an application filed with the said Board of Adjustment requesting
authority for variance f~om the provisions of the Zoning Ordinance, Chapter
24, Official Code of Aspen. All persons affected by the proposed variance
are invited to appear and state their views, protests or objections. If
you cannot appear personally at such meeting, then you are urged to state.
yorrviews by letter, particularly if you have objection to such variance,
as the Board of Adjustment will give serious consideration to the opinions
of surrounding property owners and others affected in deciding whether to
grant or deny the request for variance.
The particulars of the hearing and of the requested variance are as follows:
Date and Time of Meeting:
Date:
Time:
April 4, 1974
3:00 p.m.
Name and address of Applicant for Variance:
Name: Aspen Cooperative Housing Partnership
Address: P.O. Box 4509
Aspen, Colorado 81611
Location or description of property:
Location:
Description:
South 20' of Lot 14, all of lot 15, North 10' of Lot 16,
Block 1, Conners Addition, City of Aspen
Variance Requested:
Application is made to build four condominium apartment units. The Aspen
Planning and Zoning Commission denied the Aspen Cooperative Housing Pro-
ject under Ordinance #19 conceptual review February 21, 1974.
Duration of Variance: (Please cross out one)
%HmpNr~ Permanent
THE CITY OF ASPEN BOARD OF ADJUSTMENT
BY
--
IIJIlOA ~ ~~. p"~A.Al."'-'"
~-lo~~~
~O~ ~ :;00'
i~ M~ ~1L:hL,
~ c.c-
~ I Co. ilb'l
'~i~
~v
~, Co. ~/"I
r~~~
~ Z-1~
~ I Co. ~f('11
U~~~~
~ Z,~f
~ I to , ~1C.1l
~AI~~~P~
&t Igz...
~ I CtJ, <I/~'
~~.~.
~Ivtv
~ I Co 10""
~1~
~ I Co. <is/'ll
T~~
~ ~1..
~ I to. ~/""
.,..................-.'"""'-..... - '-' - - " ..,. ""'"~. "." - - .
~.~.fl~
~ (,7
~\ CD, cgl~11
~~~W~
2-~U> ~4 ~ .
~ ' rJ1... G,DC.~7
. W~B. D~
I'" Ott;.L PMll ~ 1.2.(,
. ur--~ 0
la~.
E~~ W~ (C. F~
Lv. Pit r~ NJ'l ~ Wa-'
~l W) M~. '~/Pf
I H~ w. ~, ~.
lISt> M~ ~~.
~ I T~ 75'2.6'
~b.~
Zt,; ~~.
~ ~ I xU. {,oS-2.t
~OMV B, ~
~ ~<iri .
~ \. Co , <iI'"
G-~ W~
~ 3L/ql
~ I U>I f/iPl \
. !
--
Iltt. ~~ ~
~ I-~~It~.
~ 3707
~ I u,. ?lftJ{f
/M.,t. II~ M~
2/ (ff) ~~ tl.AI-e..
fb1t" l-eL , tJ. J. ()7D~1
'JA. W~ 4J~
C[1f)'~, ()~ ~.
~, F~ 3~)DS
~.~~
/2, 0 p~ 1Ji\.wt
Ir~
#rz. ~ p~
~ ITr
J.-~ I Ak. 6)'Isl.
~. e~ ()~
"3~ ~ ~
Ii K~ q, ;1" 6rO/
D~V;H,z.(J. (~Jf~.
~ ~3YO
~, Co, rl"l
{U.,). . -l ~
vlz~
~ { CD. i/,//
....__ _ _ . _ _ _ _. ...... ....-. ~. . r r . .. ..' ~ .
.)IA.. II~ /(~
/21 ~. 8'Z~ ~
I IJAA.AJ~ (AJ,Y /h 28
ft!n,~ II
: '!1' 71z;:; ~ .
I I j1)~ r I A)'I_ 1tJ7),"2.-
,4{A. ~ I- ~
II J.-~~ f~JI~
I brr 9$"1,
I VM1 rA..
i I
I~
'l~'13
,! ~ ' ~. Y'/6//
Mil. t-~ II~
3s'f~ E. ~~
~ / (J~ ~3z-~
I{/I,. w~ ~
~7/)? ~ &..
, G~ RF/ #4 'f1~1nJ
ft{4,. w~ w~
I tf7tJb 5~w-nd.-!)A. arlll)
'; ~A1~,J;I(. 611001'
I T,I.M~ E ztz"
;j;f 371/7 (j
. ~ l CD. 1/(//
.JJ.J. ~ E~
c.-r~. ~
92. J.l~ I tfV~. 5'1~/'
NA.~~
~ 3572
~, OJ. 9'/~11
(t?A. 6~ It~
~ ">>.>71,4-
~(a. ?rUt I
.. R. G~tU.lI~
. 4~t7 ~
! I ~ Vr I 1JJ.Ar. ~11J1
!
MI't.~~
1/1/ ~ ~:tt: 7A-
~, Co , 'irD 2A)~
,
!~~ .
. &'lSD ~~f~
T ~, O~.
i I
I
,
I
: i
c
'1.
.I
MEMORANDUM
TO: The City of Aspen Board of Adjustment
FROM: Aspen Cooperative Housing Partnership
SUBJ: Case 74-6, A Proposed Fourplex on South
Monarch Street
DATE: April 1, 1974
1. The Aspen Cooperative Housing Partnership (Partner-
ship) is a partnership that has been formed by four
local residents (William Wesson, Thomas Hughes,
Bayard Hovdesven and Richard Ferrell) for the pur-
pose of constructing four townhouse-type units near
Lift 1.'1. on South Monarch Street. Each of the four
resulting units will be conveyed to each of the
partners after construction for use as their per-
manent residences.
.
2. The site is located on the west side of South
Monarch Street. Adjacent to the property are the
Caribou Condominiums (uphill), the Hearst Apart-
ments (downhill), a lodge (to the rear), and the
Dolomite Villas Condominiums (across the street).
The subject property is 60' by 100', and therefore,
consists of 6000 sq. ft. The legal description of
the property is South 20' of Lot 14, all of Lot 15,
North 10' of Lot 16, Block 1, Conners Addition,
City of Aspen. A location map is attached as
Exhibit A.
,
3. On February 21, 1974, the Partnership presented the
proposed fourplex to the Aspen Planning and Zoning
Commission (P&Z) for review under City Ordinance 19,
Series of 1973. Under this Ordinance all plans for
development (with certain exceptions not here rele-
vant) must be submitted to P&Z for its review and
approval before a building permit may be issued by
the City Building Inspector. A copy of the written
portion of the presentation is attached as Exhibit B.
4. On February 21, 1974, P&Z voted to disapprove the
Aspen Cooperative Housing Partnership under Ordin-
ance 19.
c
'-,
'-.._,,./
Memo to The City of Aspen Board of Adjustment
April 1, 1974
-2-
5. On March 7, 1974, written reasons for disapproval were
stated in a memorandum signed by Bruce Gillis, as
Chairman of P&Z. A copy of such memorandum is
attached hereto as Exhibit C.
6. On March 13, 1974, the Partnership requested an appeal
to the Board of Zoning Adjustment. The Board of
Zoning Adjustment is the appropriate appeal body for
projects that have been denied under Ordinance 19.
Section 2-21 Powers and Duties of the Board of Adjust-
ment from the Aspen Municipal Code states: "To hear
and decide appeals from and review any order, require-
ment, decision, or determination made by any adminis-
trative official charged with the enforcement of the
regulations established by the zoning laws. "In this
case the administrative official is P&Z and the zoning
law is Ordinance 19.
7. The Partnership is appealing P&Z's decision because we
feel that THERE IS NO LEGITIMATE BASIS IN FACT OR IN
LAW FOR THE DISAPPROVAL OF THE PROJECT and the action
of P&Z, in so doing, constitutes an abuse of discre-
tion, is in excess of its jurisdiction and is arbitrary
and capricious.
8. The Project, as proposed, fully complies with all re-
quirements of the City's Zoning Ordinances, and the
use complies with the Aspen General Land Use Plan
which is part of Ordinance 19.
The P&Z memo, Exhibit C, states four reasons for dis-
approval:
The first reason is inadequate access, i.e., road width
and grade, visibility and lot entrance. The property
has excellent access consisting of 60 feet of frontage
on a dedicated city street. The street is not near its
capacity and the additional traffic generated by four
units is minimal. The lot is relatively flat (less
than 10%) which poses no problem in terms of lot en-
trance. South Monarch is fairly steep in certain sec-
tions, but automobiles seem to easily make it to exist-
ing condominium dwellings. Visibility in and out of
the subject property is adequate given the traffic
pattern and speed on South Monarch.
o
~
,)
Memo to The City of Aspen Board of Adjustment
April 1, 1974
-3-
The second reason is insufficient off-street parking. Our
proposed plan shows four off-street parking spaces or
one space per unit as required by City Zoning Ordin-
anace. It seems strange that paZ this week is consider-
ing prohibiting off-street parking in the core area,
but finds four spaces for four units inadequate.
The third reason is adverse impact on already existing
problems of circulation and snow removal. Such a small
project has a very minimal incremental impact on the
area's problems.
The fourth reason is excessive density and lot use for
physical conditions of the development site and
immediate surroundings. The site is eminently develop-
able. It is relatively flat (less than 10%) and is
served by all municipal utilities. All surrounding
property has all been developed. We committed to pre-
serve the site's only tree.
We are only asking to be allowed to develop the prop-
erty at a density and in a manner similar to that per-
mitted on all surrounding properties.
9. The Partnership believes that paz voted to disapprove
the Project, not on the basis of the reasons given in
Exhibit C and above, but on the basis that at some
future date the Partners would sell their units to
individuals who may be tourists or who may rent their
property to tourists. Thus, the general City Council
policy of no additional tourist growth would be
violated. We feel that this consideration is beyond
the scope of the police power of the City to protect
the health, safety and welfare of its residents.
10. And, since ALL SURROUNDING PROPERTIES HAVE BEEN
DEVELOPED AT HIGHAR-l TYPE DENSITIES AND ARE TOURIST
RELATED USES (See Exhibit A - Location map), the denial
of AR-l density of 1500 sq. ft, per unit and a possible
future tourist use DENIES ENJOYMENT OF A SUBSTANTIAL
PROPERTY RIGHT ENJOYED BY OTHER PROPERTIES IN THE SAME
VICINITY AND ZONE. Section 22-2 of the Aspen Municipal
Code states that the above is a reason "to reverse any
order, requirement, decision or determination of any
administrative official, or to decide in favor of the
applicant any matter upon which the board is required
to pass, or to effect any variation in the provisions
of the zoning laws of the City."
o
"'"",
....~
Memo to The City of As~en Board of Adjustment
April 1, 1974
-4-
11. The Partnership seeks a reversal of P&Z's negative
decision under the concept review section of
Ordinance 19. A reversal would establish that the
proposed four townhouse-type condominium units is
an appropriate use and density on the subject prop-
erty. The Partnership still will be required to
proceed under Ordinance 19 for preliminary and
final architectural review and to proceed under the
Subdivision Ordinance.
I 7"';-;'r
. > ,'.'.,
......~~-~:::.....
" !..." 'I , ~ . ~
. ", ,. i c: >-
.:........:
;-:=~J.'~/J
',.'i/I I
i .
"_.
:]" ') S
/
r,
,,,
"
,J
\!
~\.
"
,
v
'.
.'. ....
"
"
,
\j
tJ
,
\-" \
'-.' \ -,>
"
,.
':-','
1..}
,
."
~'
....~'
'I":~:-" I
"),,~' >.,~ c ,,:!
-' ,-' I
iL)~-':'_1
.,
---....". C',
:/"
..
..'
,\\
i\
1,1,
.1
;
iL______l
,
,
,.-',
;.
.....
'1
c
ll,':.".....;-
...... --'--._-,.~ -"-".-
'.-... '-
~f
r---~'\-"-'--'~
(!'-"'!j ,!
" ~ \ - . . ;
, .j'; \1'/;
L, .~_._\)~. .{ \,
I,'.
i
L
I
i
,
,
I
I ~~I:
I
I
,
;
..
l__
r
."
l' -'
Ii",
L.__.
(,1;
--. '-
Lj:
r~~,
"
r~
It~!
(\
C~I ecu
:)1
i_;:__,
\;
\.
,
,
"
j i
~
\ ~, .'
,
''. ,
[ ."
,
r
E:KHI ~II
;.:0:
,
:1
._ ... _.1
-'
A
:)
,:)(,0'
L
,,(: J -----1
r~
--,- .....1)..... --j ,
-. .... .... ....--..../ '
~----__._H_ \ t,
---\-
'--',.--
,.
,co
'.'
,
..0
"
. "';: /' j '\,
~ i r"l ;
-r
~
<;::
;Z
..0
;t
/
/....'V-
.I. 'I '.
. . Dolo"l17E I
I .---.e:...J
-. VILllt~
~
,
,
,-;r,X. I
L '7fJ'P . '$,. i1~
t.QtJl>>S i
,.."
"
f'
~O"'frn'l~
qOEEN
. ~_f
",-..'
or;
2A
. ~.-
~--.'
"
,
.
.,
.-.1
;
i
i
j
,
I
()
-, f
(__~----l
L
r-.J'
! ?i:
..J
"
\. 'J,
L.
,.~.
c
'""\
..J
/
(
(
_Ul-D~f_L _.f?_~_
MEMORANDUM
TO: Aspen Planning and Zoning Commission
FROM: Aspen Cooperative Housing Partnership
SUBJ: Conceptual Review Under Ordinance 19
Jh,~'^'~
~"~
~ 1l.....Ju...
~F~
DATE: February 12, 1974
The Aspen Cooperative Housing Partnership is a partner-
ship that has been formed by four local residents to
construct a four-plex near Lift lA on South Monarch.
Each of the four resulting units will be conveyed to
the respective partners after construction. By using
this method of joint effort, we feel that we can pro-
duce reasonable housing that can be afforded by each
of the partners. '
The site is located on South Monarch Street downhill
from the recently constructed Caribou Condominiums.
To the North the property is bounded by the Hirst
Apartments, and to the rear is the Skier's Chalet
Lodge. It is 60' by 100' and, therefore, consists
of 6,000 sq. ft. Under existing zoning and under the
Aspen Proposed Land Use Map, the property can accommo-
date four units (1500 sq. ft. of land each).
The project that we propose would incorporate the
following features:
1.
Four condominium apartment units
approximately 1200 sq. ft. each.
two bedroom, two bath units.
consisting of
They shall be
2. The apartments will be in a four-plex structure
with an approximate total square footage of 4800.
3. Two of the apartments will be in a two story
section of the four-plex. To minimize site
coverage and maximize the limited views, the
other two apartments will be three stories. The
three story units may require a height variance.
It is envisioned that these taller units will re-
late to the Caribou which is a very high building
to the South. The height issue will be addressed
at the Preliminary Architectural Review after we
have performed detailed architectural studies.
o
:)
(
f
"
Memor$ndum to Aspen P and Z Commission
4. Four on-site parking spaces will be provided.
s. We will attempt to preserve the large existing
cottonwood tree.
RWF: j d
Page 2
c
:)
,
lbWFr
IA
S/(JE"R'S C.HI'H..e:,
(( ((
- .. _ __ _ _ _'";> 101'0 51.-OfG"
2 S1l1R.Y
1: IlCO SQ. Pr.
Z $TO~V
1 I1.DO SQ.J:T.
5 mfGY
t I zgo sq.Pr.
.J
3 ~Ib~'(
1: IV>O Sil.!=T.
~E:~CES
,
~
THE
c.14-/2 J SO/J
A / E'](lsrl"'G. "TRaO
tV 11> & ~ER"S)
H/~5'"
IIf1JKTM9JI
sovl}{ MONAR..c.~ STREl::T
/lSYEN ccoP€RAn\IE HODS/tV&- "~HI P I Box L/SD'l/ ASPEN
SCf'I1.:E:" 'P/~'l."" II
~N
. ,
c
J
,
"8\I1lBrr L
.
Il '.~
CITY
ff' "l'
,\; " ,-i
...........,. ...:.\.
ltSPEN
box v
aspen ,coR f;C:'il doL}, 61:611
. .'
'4"1
-...'1J
TO: Building Inspector
FROM: Aspen Planning & Zoning Commission
SUBJECT: Aspen Cooperative Housing Project
DATE: March 7, 1974
At its continued meeting of February 21, 1974, the P & Z
Commission denied an application by Aspen Cooperative
Housing Project under Ordinance 19 Conceptual Review
for a four unit condominium development ot 655 S. Monarch.
Denial was based on the following reasons:
Four permanent resident to_vnhouses, which assure
continual, year around use and maximize the use
of private automobiles, are inappropriate at the
location because of:
1. Inadequate access, i.e., road width and
grade, visibility and lot entrance. C.2.(a)
2. Insufficient off street parking spaces on
street wfuich is presently congested. C.3.
3. Adverse impact on already existing problems
of circulation and snow removal. c.4.
4. Excessive density and lot use for physical
conditions of development site and immediate
surroundings. C4.(a)
G~~~~
Chairman
Aspen Planning & Zoning Commission
CITY OF' ASPEN
r:; 5- ') ~. /? J(/>-u~
P. a. 8DX v . ASPEN. CDI.ORADO 111611
MESSAGE REPLY
TO
I
Karen And~son
Fiaance Dept.
I
DATE
Re: Aspen Cooperative Housing
L
..J
t:s~ ~ JZ
r~~
DATE
3-8-74
Please refund $277.31 per letter of
March 8th, 1974 to be attached with
your check
Permit was paid on
Validation I 28931
of $369.75.
Feb. 27,74
in the amount
Thank you,
~1i~'
Bldg. Dept.
y
SIGNED
lOr:'""'
DETACH AND FILE FOR FOLLOW.UP
,,,
'-
"i
CITY OF ASPEN
aspen ,coh:nrado, 81611 box v
. ..l'
';j\-"
March 8,1974
Aspen Cooperative Housing
c/o Richard W. Ferrell
PO Box 4509
Aspen, Colo. 81611
Dear Mr. Ferrell:
Ordinance 19 provides that 75% of the estimated building
permit fee be returned if the development is disapproved
at or after the conceptual presentation to the Planning
and Zoning Commission.
We are therefore returning 75% cf $369.75 or $ 277.31.
See enclosed letter from Planning and Zoning Commission
for reason of denial.
Very truly yours,
\l\),- ~". } 4===:, /\ _, . ...
"--, VV\, \ ,,)-v, l, /) U- \\-.,..... I:;
Clayt 1) H. Meyring \
Chief Building Inspector
Encl.
CHM/dc
c
--.
,
CITY,<l,.'
~_~,,-Ji',j,'
aspen ,co
PEN
hox v
TO: Building Inspector
FROM: Aspen Planning & Zoning Commission
SUBJECT: Aspen Cooperative Housing Project
DATE: March 7, 1974
At its continued meeting of February 21, 1974, the P & Z
Commission denied an application by Aspen Cooperative
Housing Project under Ordinance 19 Conceptual Review
for a four unit condominium development at 655 S. Monarch.
Denial was based on the following reasons:
Four permanent resident townhouses, which assure
continual, year around use and maximize the use
of private automobiles, are inappropriate at the
location because of:
1. Inadequate access, i.e., road width and
grade, visibility and lot entrance. C.2.(a)
2. Insufficient off street parking spaces on
street wmich is presently congested. C.3.
3. Adverse impact on already existing problems
of circulation and snow removal. c.4.
4. Excessive density and lot use for physical
conditions of development site and immediate
surroundings. C4. (a)
G C'~L~~__
Chairman
Aspen Planning & Zoning Commission
(4/65) 2
.
B.I.
BUILDINC
Q CITY OF O\SPEN
INSPECTION DEPARTMENT
COUNTY OF PITKIND Cr' ORADO
5
- . ,..., ". ',.,,,y" if ..~.. uo
ADDRESS GENERAL 1
OF JOB 655 South Monarch CONSTRUCTION
PERMIT
WHEN SIGNED AND VALIDATED BY BUILDING INSPECTION DEPARTMENT THIS PERMIT AUTHORIZES THE WORK DESCRIBED BELOW.
CLASS OF WORK: NEW,Q ADDITION 0 AL TERA nON 0 REPAIR 0 MOVE 0 WRECK 0
OWNER Partnership
NAME Aspen Cooperative Housingf ADDRESS 4509 PHONE 1211
'" LICENSE LICENSE
0 NAME (AS LICENSED) CLASS NUMBER
l-
V INSURANCE
~
a: ADDRESS PHONE 0
I-
Z
0 SUPERVISOR
V FOR THIS JOB NAME DATE CERTIFIED
LEGAL 520'Lot 14; all of Lot 15
DESCRIPTION LOT NO. N 10' Lot 16 BLOCK NO. 1 ADDITION Conner's Addition
SURVEY ATTACHED 0 DESIGN A L1C
BY BY Carr and McCaffcr" PE NO.
AREA (S.F.) 2032 HEIGHT NO. TOTAL OCCUPANCY
AT GRADE (fEET) ~o STORIES ?h UNITS u GROU P DIV.
BASEMENT FIN 0 GARAGE SINGLE o ATTACHED 0 TOTAL TYPE I fiRE
UNFIN 0 DOUBLE o DETACHED 0 ROOMS ?O CONSTR. ZONE
DEPTH FIRST )IZE. SPACING SPAN AUTHORIZED
BElOW AGENCY BY DATE
Z GRADE FLOOR
0 '" BUILDING
I- REVIEW
j: EXTERIOR '"
FOOTING 0 CEILING
~ SIZE ZONING
0 ...
Z EXTERIOR CONe. 0
::l FDN. WALL ROOF PARKING 11 /
0 THICKNESS MAS'V 0
... oJV
~~~~K 0 CAISSONS 0 ROOFING PUBLIC HEALTH
&GIl:.BEAMS MATERIAL
MA50NR Y ABOYE ABOVE ABOVE ENGINEERIN~ fA' i
EXTERlod THICKNESS 1ST FlR. 2ND FLR. 3R['I FLR.
,'y" V ~\~ cr
NALL STUD SIZE ABOVE ABOVE ABOYI::: f'.
8. SPACE 1ST FLR. 2ND FLR 3RD FLR. 'YY 1" v).'" "V
REMARKS .~
~~ ~, M' ~, ,+ ~ ~., .,,, /1/ ,j:7
.C ,V' l!9J
To PeZ 2-27-74
NOTES TO APPLICANT:
FOR INSPECTIONS OR INFORMATION CAll 925 - 7336
FOR ALL WORK DONE UNDER THIS PERMIT THE PERMITTEE ACCEPTS FULL RESPONSIBILITY FOR V ALUA TION S
COMPLIANCE WITH THE UNIFORM BUILDING CODE. THE COUNTY ZONING RESOLUTION OR CITY
ZONING ORDINANCE, AND ALL OTHER COUNTY RESOLUTIONS OR CITY ORDINANCES WHICHEVER OF WORK 120,000
APPLIES.
SEPARATE PERMITS MUST BE OBTAINED FOR ElECTRICAL. PLUMBING AND HEATING, SIGNS, PLAN TOTAL FEE
SWIMMING POOLS AND FENCES. FILED T P -0
PERMIT EXPIRfS 60 DAYS FROM DATE ISSUED UNLESS WORK IS STARTED.
DOUBLE I CHECK 0 246.50
REQUIRED INSPECTIONS SHALL BE REQUESTED ONE WORKING DAY IN ADVANCE. S 123.25plck
ALL FINAL INSPECTIONS SHALL BE MADE ON ALL ITEMS OF WORK BEFORE OCCUPANCY IS PERMITTED. FEE LJ CASH D
THIS BUILDING SHALL NOT BE OCCUPIED UNTIL A CERTIFICATE OF OCCUPANCY HAS BEEN ISSUED 0 BUILDING DEPARTMENT vVO.'v
PERMIT SUBJECT TO ~~CATlON OR ~;I VIOLATION OF ANT LAWS GOVERNING SAME.
SIGNATURE !J ~Jl rJftJ.
APPL?lANT: ' , I!/h.#l"": ~ APPROVAL BY DATE
THIS FORM .;S A PERMIT ONLY I ,"TE (/ PERMIT NO~ LICENSE Ii RECEIPTS CLASS AMOUNT
WHEN VALIDATED HERE ) ~1-1r
-27-74 w274
INSPECTOR'S COpy
_.
(4/65) 2 8.1.
BUILDINC INSPECTION DEPARTMENT
D CITY O~ ASPEN - COUNTY OF PITKIND, ,-'.ORADO
ADIl'~I\ESS
OF JOB
655 South ?lonarch
GENERAL
eONSTRueTION
PERMIT
1
NEW.Q ADDITION 0
ALTERATION 0
WHEN SIGNED AND VALIDATED BY BUILDING INSPECTION DEPARTMENT THIS PERMIT AUTHORIZES THE WORK DESCRIBED BELOW.
REPAIR 0
MOVE 0
WRECK 0
CLASS OF WORK:
OWNER
NAME Aspml Cooperat.l.ve
P".rtnersn i P
Housing/ ADDRESS
4509
LICENSE
CLASS
II/:
o
t-
V
<(
II/:
t-
Z
o
V
NAME (AS LICENSED)
PHONE
ADDRESS
SUPERVISOR
FOR THIS JOB
NAME
520'Lot
LOT NO. N 10 f Lot
1
14; all of Lot 15
16 BLOCK NO.
LEGAL
DESCRIPTION
SURVEY
BY
ATTACHED 0 DESIGN
BY
('"..... "nn '"
AREA ($.F.)
AT GRADE
2032
I HEIGHT
_ I (fEET) ?Q
h
NO. TOT At
STORIES ~ UNITS
SINGLE 0 ATTACHED 0 TOTAL
DOUBLE 0 DETACHED D ROOMS
SIZE SPACING
BASEMENT
FIN 0
UNFIN 0
'M
GARAGE
SPAN
DEPTH
BElOW
Z GRADE
0
j:: EXTERIOR
FOOTING
<( SIZE
C
Z EXTERIOR
::J FDN, WALL
0 THICKNESS
...
I~1~K 0
F1RST
FLOOR
'"
t-
~ CEILING
o
...
CONe. 0
MAS'Y 0
CAISSONS 0
& GR. BEAMS
ROOF
ROOFING
MATERIAL
EXTERIOD
WALL
REMARKS
MASONRY
THICKNESS
ABOVE
1ST FlR
ABOVE
3R(l FlR.
ABOVE
2ND FLR.
ABOVE
1ST FLR.
ABOVE
2NO FLR
ABOVE
JRD FLR
STUD SIZE
& SPACE
Tovnhn"!Oes -
n^ _ .,
,. n'~_ A..+ _ ^ ^^ ^,.
To 1'&7: 2-27-74
NOTES TO APPLICANT:
FOR INSPECTIONS OR INFORMATiON CALL 925 - 73.36
FOR ALL WORK DONE UNDER THIS PERMIT THE PERMITTEE ACCEPTS FULL RESPONSIBILITY FOR
COMPLIANCE WITH THE UNIFORM BUILDING CODE, THE COUNTY ZONING RESOLUTION OR CITY
ZONING ORDINANCE, AND ALL OTHER COUNTY RESOLUTIONS OR CITY ORDINANCES WHICHEVER
APPLIES.
SEPARATE PERMITS MUST BE OBTAINED fOR ELECTRICAL, PLUMBING AND HEATING, SIGNS,
SWIMMING POOLS AND FENCES.
PERMIT EXPIRfS 60 DAYS FROM DATE ISSUED UNLESS WORK IS STARTED.
REQUIRED INSPECTIONS SHALL BE REQUESTED ONE WORKING DAY IN ADVANCE.
ALL FINAL INSPECTIONS SHALL BE MADE ON ALL ITEMS OF WORK BEFORE OCCUPANCY 15 PERMITTED.
THIS BUilDING SHAll NOT BE OCCUPiED UNTil A CERTIFICATE Of OCCUPANCY HAS BEEN ISSUED. 0
PERMIT SUBJECT TO REVOCATION OR SUSPENSION FOR VIOLATION Of ANY LAWS GOVERNING SAME.
/'. ,- f'
SIGNATURE /) l ( f, ) /.
APPL~JANT: !f.:/'!:oiff;j)/; \' ;;/
1.'/1 ' ,
THIS FORM IS A PERMIT ONLY
WHEN VALIDATED HERE
:/ ..
.-:.--
,-i./,-/-i;"'j ./'i' (,/!",/;'/L....---
DATE [/
PERMIT NO.
)
1..11/
4B-74
-27-74
CUSTOMER'S COPY
PHONE 1211
LICENSE
NUMBER
INSURANCE
o
DATE CERTIFIED
ADDITION
Conner's
Addition
A Lie.
PE NO
OCCUPANey
GROUP
DIY,
I FIRE
ZONE
TYPE
CONSTR.
AGENCY
BUILDING
REVIEW
AUTHORIZED
BY
DATE
ZONING
PARKING
PUBLIC HEALTH
ENGINEERING
.., ,
\\
VALUATION
OF WORK $120,000
PLAN -0 TOTAL FEE
FILED T P 246 0
DOUBLE I CHECK D .5
FEE 0 I CASH 0 $ 123. 25plck
BUILDING DEPARTMENT.:lO".,~
APPROVAL BY
DATE
LICENSE Ii
RECEIPTS CLASS
AMOUNT
'-"I" ~;(' '~u~,_q.~"""",' ",~ t ,.....:....., ,,,,,,,,:,.,-~. ~
J.J CITY ~~,t;,s~:_ ~C'Ut~:~/ 'J~/~ll~KiHIJ: 'COC~)ti.:JO _._...,..._
]1u;rYAL
655 South Honarch COt'STRUCTI');!
PL r':l\lT
:;o--,'-=,'==~_________=-_" . ";:=.=.=,-"",,-,--,::-':-~'-=-=----=-=.=-=----'-==':"-:-=='='-- _ -===~",,',-=_:::'_-'-'_- :.._-:-~_--c-~.~--~
.....t~EN SIGNE~ AND VAU:':'AHD BY t(UILDING IN::,PECTlON ()(PAR11",NT THIS PERMIT AUTHORIZES THE W0i<K IJl',::'KlUED F[LOW
(.. r.31
C.I.
'; :~S
;: : ....; ;.~
." (.'0 w"r,'" >,r..'{"
...,1 .11 ,1\.' ",h. 1'4~'f x,J
. . ~.-_._-_._-~- .
ADDITION 0
AL"l;';,,\TlON 0
r:c.PlJr,O
J'.~J~'r_: []
,
.,.... Partnership
=.=!"",Iv\.E...~~!'.':~J:.'?~~rat.i_ve Housing! ADDf(ESS
~,JAME (AS l.ICENSEDl
Q509
LICENSE
CLASS
PHONE Inl
._ .__ . ________u.___. __n
- -- ~--- ~- .----
LICENSE
NUMOER
I
i
I
..1' ';';".', .~
I"
, .
-- -.
.l
A I.lfWESS
PHONE
;
)
SUI'EHVISOR
FOR 1 HIS JOB
NAME
D,A,TE (U,.III
. ,
':"".'
GAL
:SCRIPTION
JRVEY
y
520'Lot 14; all of Lot 15
LOT NO. N 101 Lot 16 SLOCK UO.
ATTACHED 0 DESIGN
BY
1
ADDITION
Conner's Addition
:(A (S.F.)
GRAtlE
2032
IlSlflllxJ!'< ~v.
FIN. 0
UNFIN.D
ttElGHT
(Hn)
?R
-~-_.
1'10.
STORIES ~___~
SINGLE 0 ATTACHf'DO
~OUBLE 0 DETACHED [J
C.<lrJ:'_ilJl.d McCafler)'
TOTAL OCCUPANCY
UNITS 11 GROU P
A .Lle
PE NO
EX:ILRIOR
f J,JT1NG
"Ill
GARAGE
L
Il-
Iff)
1'_ CEILING
C'>
-.
CONC 0 I
MAS'Y 0
TOTAL
R.OOMS
20
TYPE
CONSTR.
DIY.
r::~:"-:l~- ------.
,
\SEMENT
D[PTH
BELOW
GHADE
FIRST
FLOOR
SIZE
')PACIf',;G
SPAN
AGENCY
AUTHORIZED
BY
DA TE
BUILDING
REVIEW
ZONING
[XTERIOR
! ON VIALL
HlICI<':N[SS
-.
lHICK 0
5LA8
"OQF
PARKING
CAISSONS 0
&GR.BEAM$
ROOFING
MATERIAL
puauc HEALTH
~TER:Or:
ALL
MASONRY
THICKNESS
ABOV[
1ST FUt
ABOVE
2ND FlR.
ABOVE
3RD FLR.
ENGINEERING
STUD SIZE ABOVE ABOVE ABOVE
.... SPACE 1sT FLR. 2ND FLR 3RD FlR.
1'olinho.us.e..s...=....condos I
. . I
_~ ~~~p>a=-'''-'''''_'depL~'-'~
",(5 TO M';~I~;;~::-?7::2lf..._'"~=-~=~~~.~~~O~~_~_~ll__.__. .-.... ..-
!(Ji{ 1'~:,I'IL11{lN',OH Ir-lfl!IIMA1ION CALL 91S.1JJ6 [;0:._"'__ __.
f\!~ !.ll 'h(JP.K DONE Uf\(j(R THIS PERMIT HtE I'HMITHE ACCEprS fUll RESPONSllllllTY FOR ~UA TION
C(,fIIPlIANCE W1TH TliE UNIFORM BUILDING CODE, tHE COUNTY ZONING RfSOlLJllON OR CITY VAL .to
lOlliNG OROrt~ANCf. AND All OTHER COUNTY RESOLUTIONS OR CiTY ORDINANCES WHICHEVER OF W__O._RK.._._\J120, 000
J\PI'LIf.". ~ ~
Sll'/d';AH P[Pt.,l',ITS MUST BE OBTAINED FOR ELECTRICAL, PLUMBING AND HEATING, SIGNS, I PLAN TOTh;
S';'.'lt:.MINe; POOLS AND FENCES. T P r-\.. ' '-'
PU<MIT lX,'llU" lU DAYS fltOM DAlE ISSUED UNLESS WOf{K IS SlARTED. I FILED ..........,
I 211f\. :11.)
P(QUIR.{O INSI'f.CTlOHS SHALL BE RtQUEHED ow:: WORKING DAY IN ADVANCE. DOUrlLE Cl1lCK L.J .-.
17:,. ?~;T>:
All fiNAL INSPECTlOta mAll liE MAOE: OH All ITEMS OF WOR.K BEfORE OCCUPAHCY IS PERMITTEO. FEE [1 CA'iH [] "') --
,/11:' LUI10U"C; SHALL HOI [1(:: OCCUPllU UNTIL A CfRTIFlCATE or OCCUPANCY HAS BE[N I~SllED 0 l' BUILDING DEPAR rME~n :G(i. 7~)~
f't, MJT SULJEeT TO ~t'lOCATION OR SUSPE:~SION FOR VIOLATION OF ANY LAWS GOVEP.N1NG SAME.
!':;:V,;.:L"~E /r!/ i'l;kl/ iii /' _ /J ./:--
. "U'C.'"-',. !f~ .:';.ic-LL.:j:C 'd,-,_JiI :c, %'11'" ", ", 'c.__ '"""I''' ---- -- 1 r n:
'It,IS FORM IS A PERMIT ONLy_._~.TE.:.:.. _r~".~'~-=-- .. lICEH'~_'~~'."~~~lA'.'- ",,<oUr.'
w; JU~ VALIDATED HERE -,~.,---",.>. I l
-27-~ '18-74
---- -- - --.,"-'.'-'-'
~~AARl{S
I
..--1
- .~1
,
I
I
I
I
,
/'
/'
......,iI. _.,--
,
-
-
'...",,",
,
MEMORANDUM
TO: Aspen Planning and Zoning Commission
FROM: Aspen Cooperative Housing Partnership
SUBJ: Conceptual Review Under Ordinance 19
I' ~.,,.. t.); -_:'h.
1.UIi... __-'C(.
c-", J?:.,./".J. Hr.'\-.:'. ,,",'-vt.
;r 'J
~'l"'~-4- H ~}_<lo: .:..
-.. J c'
~k. r .Jl.>',^-,-~,
c.
DATE: February 12, 1974
- - - - - - - -
The Aspen Cooperative Housing Partnership is a partner-
ship that has been formed by four local residents to
construct a four-plex near Lift lA on South Monarch.
Each of the four resulting units will be conveyed to
the respective partners after construction. By using
this method of joint effort, we feel that we can pro-
duce reasonable housing that can be afforded by each
,
of the partners.
The site is located on South Monarch Street downhill
from the recently constructed Caribou Condominiums.
To the North the property is bounded by the Hirst
Apartments, and to the rear is the Skier's Chalet
Lodge. It is 60' by 100' and, therefore, consists
of 6,000 sq. ft. Under existing zoning and under the
Aspen Proposed Land Use Map, the property can accommo-
date four units (1500 sq. ft. of land each).
The project that we propose would incorporate the
following features:
1.
Four condominium apartment units
ap'proximately 1200 sq. ft. each.
two bedroom, two bath units.
consisting of
They shall be
2. The apartments will be in a four-plex structure
with an approximate to~al square footage of 4800.
3. Two of the apartments will be in a two story
section of the four-plex. To minimize site
coverage and maximize the limited views, the
other two apartments will be three stories. The
three story units may require a height variance.
It is envisioned that these taller units will re-
late to the Caribou which is a very high building
to the South. The height issue will be addressed
at the Preliminary Architectural Review after we
have performed detailed architectural studies.
.
........
-
-
'. .'"
Memorandum to Aspen P and Z Commission
4. Four on-site parking spaces will be provided.
5. We will attempt to preserve the large existing
cottonwood tree.
RWF: j d
Page 2
S/(lt=/C;;:' 1..:-,-1 ttLt::: I
. .
,
lbUFr
JA
,,.....,
- .. ~_ _ _ _";> 10 or" 5l-OfE
,.."
"-/
2 S1l)R. V
t 11.~ SQ.Pr.
z $Tf)~Y
:t \1.DO SQ.Fi.
3 STDf.-Y
t I z.eo sq.Pr.
3 Si1>~'1'
1: I'ZPO sa. I="r.
~ ENlAANCe:s
,
~
THf!:
c.I4-RII3o/J
A / E?)\IS-n~Gr \RfE;
JiV 11:1 & ~ER"6D
H/~sr
t1ffJRTMf}//
(p(/
sov~ MotJAR.c~ ~
I'<SYEN CCOPtR.lm\lE' HODS/l\JG- {>~H, P I Bo~ 1.(!;D'l, ASP9J
SCl\"LE" "P/3~" - II
~N