HomeMy WebLinkAboutresolution.council.091-13 RESOLUTION 491
(Series of 2013)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN,
COLORADO, APPROVING CONTRACT AMENDMENT #25 BETWEEN THE
CITY OF ASPEN AND OZ ARCHITECTURE AUTHORIZING THE CITY
MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF
ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council contract
amendment #25 for Burlingame Phase II ongoing design services for buildings 5
through 7 between the City of Aspen and OZ Architecture, a true and accurate
copy of which is attached hereto as Exhibit "A";
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves contract
amendment #25 for Burlingame Phase II ongoing design services for buildings 5
through 7 between the City of Aspen and OZ Architecture, a copy of which is
annexed hereto and incorporated herein, and does hereby authorize the City
Manager to execute said agreement on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED by the City Council of the City of
Aspen on the 23rd day of September 2013.
a
Steven Skadron, Mayor
}
I, Kathryn S. Koch, duly appointed and acting City Cler�C do certify that the
foregoing is a true and accurate copy of that resolution adopter}} by the City
Council of the City of Aspen, Colorado, at a meeting held September 23, 2013.
Kathryn S. Koch, City Clerk 24;1
EXHIBIT A
ARCHITECTURE MEMORANDUM
URBAN DESIGN
® INTERIOR DESIGN
TO: Scott Miller DATE: September 6,2013
FROM: Tim Ross PROJECT: Burlingame Ranch Phase II
SUBJECT: Burlingame Phase II PROJECT#: 809003
Contract Amendment NO.21
OZ Architecture B195-20o8
CC: Chris Everson,Rob Taylor FILE#:
Amendment 25
Proposed Amendment to AIA Document B195-2oo8 Agreement between Owner and Architect for Integrated Project
Delivery forthe Burlingame Ranch Phase II Project Dated January 25,2010.
DescriRtion of Services offered.
At the request of the Owner,OZ Architecture and its Consultants have prepared this proposal for Additional Services for
the Burlingame Ranch Phase II Project in relation to the preparation of pricing documents for Buildings 5,6,&7 to be
constructed in 2014. At the direction of the Owner's Representative,we have itemized this proposal as follows: Base
Services have been determined to be the minimum effort required to facilitate the next phase of development.Additional
scope has been divided into three(3)Add-Alternates which may be authorized incrementally on an as needed basis,as
may be determined by the Owner. The Additional Services which are proposed in this Amendment are as follows:
• Base Services:Prepare and issue a new set of site construction drawings similar in constitution to V01.4 of the
Implementation Documents,which was prepared specifically for site construction associated with Buildings 1-4.
This set shall include Civil,Landscape, Irrigation,Electrical, Plumbing and Fire Protection sheets related to the
areas of the site surrounding these three buildings only,and shall be issued as Volume 5 of the z00%
Implementation Documents. This scope of services shall include coordination of site-related ASI's,RFI's,CCD's&
CO's implemented during 2014 construction as may be applicable to the next phase of construction. This scope of
services shall also include support by the Civil,Landscape&Irrigation,Electrical,Plumbing and Fire Protection
Consultants for the pricing next years'Site Work by the Contractor of Record as well as submittal of Volume 5
documents to the City Engineer for review and approval for the planned site improvements and revision of the
documents as may be required to secure approval from the City Engineer of Volume 5.
• Add-Alternate No.is The AE Team will revise the drawings identified in the partial Volume 2 and partial Volume
3 Pricing Sets described in the previous item to coordinate changes and clarifications implemented during
construction of Buildings 1-4. Updates to the listed z00%Implementation Documents will address issues
described in the following:
• Architect's Supplemental Instructions;ASI-zoo through ASI-112
• Requests For Information;RFI-000z through RFI-0120
• Construction Change Directives; CCD-zoo through CCD-zo2
• Change Orders;CO-zoo through CO-113
• Add-Alternate No.2:The AE Team,including the Civil,Landscape and Irrigation Consultants will provide
traditional and customary professional services to support Bidding&Negotiation of the documents prepared
under Add-Alternate No.1 by potential new General Contractors. Traditional and customary services for this part
of the work would include answering of RFIs,evaluation of Substitution Requests and issuance of Addenda as may
be required during pricing by potential new General Contractors. These services would also include assistance to
B rA—0,W-- ARCHITECTURE MEMORANDUM
URBAN DESIGN
J INTERIOR DESIGN
the Owner in the evaluation of competitive bids,the selection of a new General Contractor and support for the
finalization of new GMP Documents for Buildings 5,6&7 for submittal to City Council.
Exclusions
This request does not include the following scope items. Professional fees for these items can be provided under a
separate proposal upon written request.
• Changes to the Instruments of Service or preparation of additional Instruments of Service which may be required
due to the adoption by the Authorities Having Jurisdiction of new codes or amendments to existing codes or
ordinances since the Implementation Documents were approved by the Building Department including but not
limited to changes to align with the requirements of the 2012 IBC,new ADA legislation.
• Changes to the Instruments of Service or preparation of additional Instruments of Service which may be required
to update the approved Drainage Reports,Soils Reports,Survey Documents and the like which may be required
by the City of Aspen Engineering Department in support of continued development of the project.
• Changes to the Instruments of Service or preparation of additional Instruments of Service which may be required
by the City of Aspen Zoning Department in support of continued development of the project.
• Changes to the Instruments of Service or other work which may be requested by the Owner to change the
previously approved design to accommodate modular or prefabricated construction or to otherwise change the
conceptual geometry or configuration of the structural framing.
• Changes to the Instruments of Service or other work which may be requested by the Owner or the AHJ to change
the design of the mechanical,electrical,plumbing or fire protection systems on the project.
• Contract Administration Services for Buildings 5,6&7 shall be submitted under a separate proposal.
Supporting Documents(See attached)
• Email request by OZ dated 711912013
• Partial List of Drawings for Vol. 2 and VOL 3(Architectural,Structural,MEP&Fire Protection)
• DRAFT List of Drawings for NEW Volume 5(Civil,Landscape,Irrigation&Sanitary Sewer)
• Email from M&N Engineers dated 8112113
• Email from MV Consulting dated 712412o13
• Email from BA Consulting dated 712412o13
• Email to REG dated 81512o13
• Proposal Letter from Mt.Daly dated 7125113
• Add Service Proposal from Alpine Engineers dated 712412013
Deliverables
A complete set of Volume 5 and partial drawing sets of Volumes 2 and 3 as described herein,depending on the level of
service requested,and submittal of Volume 5 to the AHJ for permit review and approval.
BOULDER PHONE:303 449.8900
1805 29TH STREET,SUITE 2054 FAX:303.449.3886
DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TAHOE BOULDER,COLORADO 80301 WWW.OZARCH.COM
S I
ARCHITECTURE MEMORANDUM
URBAN DESIGN
® INTERIOR DESIGN
Schedule
Services required for preparation of new Volume 5 (Base Services)shall be provided as expeditiously as possible pending
written authorization to proceed. The target date for the issuance of the site-related package for Pricing is September
301h and for Permit Review by November 22"d pending,of course,confirmation of the Consultants'ability to meet these
deadlines.
So as to provide the maximum amount of time for pricing by the current general contractor,support services related to
pricing the Volume 2,Volume 3 and Volume 5 drawings shall be provided to the General Contractor of Record on an as
needed basis beginning immediately.
Should the Owner choose to have the AE Team integrate all modifications to the project reflected in ASI's,RFI's,CCDs,
COs and the like issued during 2014 construction into new sets of Implementation Documents(Add-Alternate 1),this work
can be accomplished within 3o days of written authorization to proceed.
Support for Bidding and Negotiation and selection of a new General Contractor(Add Alternate No.2)can be provided
immediately upon written request to proceed.
FEE BREAKDOWN
Base Services(Volume S Drawings)
• Alpine Engineers,Inc.,new civil design and documentation $17,640.00
• MV Consulting Engineers,update electrical site design documents $ 1,000.00
• BA Consulting Engineers,update plumbing site design documents $ 1,000.00
• Shaner Consulting Engineers;update fire protection site design documents $ 1,000.00
• Mt.Daly;new landscape&irrigation design and documentation $ 4,61o.00
Consultants Fees $25,250.00
• OZ;administration of Consultants Add Services (so%per Section 4.3) $ 2,525.00
• OZ Architecture;architectural design and documentation $ 15,.Wo.00
OZ Fees $17,825.00
Subtotal $43,075.00
Reimbursable Expenses:Estimated at 1o%per contract;invoiced as accrued $ 4,307.So
Proposed Total for Base Services $47,382.50
BOULDER PHONE:303 449.8900
1805 29TH STREET,SUITE 2054 FAX:303.449.3886
DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TAHOE BOULDER,COLORADO 80301 WWW.OZARCH.COM
ARCHITECTURE MEMORANDUM
�® I URBAN DESIGN
INTERIOR DESIGN
Add-Alternate i(Update Volumes 2&:t for 2015)
• Monroe and Newell Consulting Engineers;structural design and documentation $ 4,300.00
• REG Consulting Engineers;mechanical design and documentation $ 4,700.00
• MV Consulting Engineers;electrical design and documentation $ 3600.00
• BA Consulting Engineers;plumbing design and documentation $ 2,000.00
• Shaner Consulting Engineers;fire protection design and documentation(est.by OZ) $ 1,000.00
Consultants Fees $15,500.00
• OZ;administration of Consultants Add Services (io%per Section 4.3) $ 1,550.00
• OZ Architecture;architectural design and documentation $ 25,000.00
OZ Fees $26,55o.00
Subtotal $42,050.00
Reimbursable Expenses:Estimated atio%per contract;invoiced as accrued $ 4,205.00
Proposed Total forAdd-Alternate No.1 $46,255.00
Add-Alternate 2(B&N,Evaluation and Preconstruction with new General Contractor)
• Monroe and Newell Consulting Engineers;structural design and documentation $ 2,500.00
• REG Consulting Engineers,mechanical design and documentation $ 2,500.00
• MV Consulting Engineers;electrical design and documentation $ 1,500.00
• BA Consulting Engineers;plumbing design and documentation $ 1,500.00
• Shaner Consulting Engineers,-fire protection design and documentation(est.by OZ) $ 1,000.00
• Mt. Daly;landscape&irrigation design and documentation $ 2,500.00
• Alpine Engineers,Inc.;civil design and documentation $ 2,500.00
Consultants Fees $14,000.00
• OZ;administration of Consultants Add Services (1o%per Section 4.3) $ 1,400.00
• OZ Architecture;architectural design and documentation $ 28,250.00
OZ Fees $29,65o.00
Subtotal $43,65o.00
Reimbursable Expenses:Estimated at 10%per contract,invoiced as accrued $ 4,365.00
Proposed Total forAdd-Alternate No.2 $48,015.00
BOULDER PHONE:303 449.8900
1805 29TH STREET,SUITE 2054 FAX:303.449.3886
DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TAHOE BOULDER,COLORADO 80301 WWW.OZARCH.COM
ARCHITECTURE MEMORANDUM
URBAN DESIGN
® INTERIOR DESIGN
Add-Alternate 3(Overtime require for completion of Volume 5 by Monday,September 16th)
• 4o hours at Time-and-a-Half (20X$225=) $ 9,000.00
Consultants Fees $ 9,000.00
• OZ;administration of Consultants Add Services (io%per Section 4.3) $ 900.00
• 8 hours at Time-and-a-half(8 x$225=) s i,800.00
OZ Fees $ 2,700.00
Subtotal - $11,700.00
Reimbursable Expenses:Estimated at io%per contract;invoiced as accrued $ 1.170.00
Proposed Total forAdd-Alternate No.3 $12,
Authorization
Pursuant Article 1.5 and Section 4.3 of the Owner-Architect agreement referenced above,please indicate acceptance of
the terms of Amendment 25 as described herein by providing initials beside the desired services and your signature below.
Base Services Only Add Alternate No.1
Add Alternate No.2 Add Alternate N0.3
City of Aspen OZ Architecture
t,
r }
`�-..
OwRer Architect
BOULDER PHONE:303449.8900
1805 29TH STREET,SUITE 2054 FAX:303.449.3886
DENVER BOULDER COLORADO SPRINGS LAS VEGAS LAKE TAHOE BOULDER,COLORADO 80301 WWW.OZARCH.COM