Loading...
HomeMy WebLinkAboutFile Documents.185 Forge Rd.0051.2018 (14).ARBKGenerated by REScheck-Web Software Compliance Certificate Project 0185 Forge Rd. #102 Energy Code:2009 IECC Location:Aspen, Colorado Construction Type:Multi-family Project Type:Alteration Climate Zone:7 (9922 HDD) Permit Date: Construction Site: 0185 Forge Road #102 Aspen, co 81611 Owner/Agent: Jessica Baer BSquared Staffing 0185 Forge Rd Unit102 Aspen, co 81611 970 948 0692 jessbaer1@hotmail.com Designer/Contractor: Susanne Lovell Lovell, Inc po box 3914 Aspen, CO 81612 lovellsusanne@gmail.com Permit Number: Compliance: Passes 40.0% Better Than Code Maximum UA:5 Your UA:3 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Window: Vinyl Frame 6 0.170 1 Window: Vinyl Frame 8 0.200 2 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: 0185 Forge Rd. #102 Data filename:Page 1 of 6 02/20/18Report date: susanne lovell susanne lovell 02/22/2018 03/06/2018 Inspection Checklist Requirements: 100.0% were addressed directly in the REScheck software REScheck Software Version : REScheck-Web Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2009 IECC Section # & Req.ID Pre-Inspection/Plan Review Plans Verified Value Field Verified Value Complies?Comments/Assumptions 103.2 [PR1]1 Construction drawings and documentation demonstrate energy code compliance for the building envelope. Complies Does Not Not Observable Not Applicable Requirement will be met. 103.2, 403.7 [PR3]1 Construction drawings and documentation demonstrate energy code compliance for lighting and mechanical systems. Systems serving multiple dwelling units must demonstrate compliance with the commercial code. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.6 [PR2]2 Heating and cooling equipment is sized per ACCA Manual S based on loads per ACCA Manual J or other approved methods. Heating: Btu/hr_____ Cooling: Btu/hr_____ Heating: Btu/hr_____ Cooling: Btu/hr_____ Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 0185 Forge Rd. #102 Data filename:Page 2 of 6 02/20/18Report date:03/06/2018 Section # & Req.ID Foundation Inspection Complies?Comments/Assumptions 303.2.1 [FO11]2 A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.8 [FO12]2 Snow- and ice-melting system controls installed. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 0185 Forge Rd. #102 Data filename:Page 3 of 6 02/20/18Report date:03/06/2018 Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.1, 402.3.1, 402.3.3, 402.5 [FR2]1 Glazing U-factor (area-weighted average). U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.3 [FR4]1 U-factors of fenestration products are determined in accordance with the NFRC test procedure or taken from the default table. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: A1.1 402.4.4 [FR20]1 Fenestration that is not site built is listed and labeled as meeting AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC 400 that do not exceed code limits. Complies Does Not Not Observable Not Applicable Requirement will be met. 402.4.5 [FR16]2 IC-rated recessed lighting fixtures sealed at housing/interior finish and labeled to indicate ≤2.0 cfm leakage at 75 Pa. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: See Specifications provided, A1.1 Lighting Plan 403.2.1 [FR12]1 Supply ducts in attics are insulated to ≥R-8. All other ducts in unconditioned spaces or outside the building envelope are insulated to ≥R-6. R-_____ R-_____ R-_____ R-_____ Complies Does Not Not Observable Not Applicable Exception: Ducts located completely inside the building envelope. 403.2.2 [FR13]1 All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are sealed. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.2.3 [FR15]3 Building cavities are not used for supply ducts. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3 [FR17]2 HVAC piping conveying fluids above 105 ºF or chilled fluids below 55 ºF are insulated to ≥R- 3. R-_____R-_____Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.4 [FR18]2 Circulating service hot water pipes are insulated to R-2. R-_____R-_____Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.5 [FR19]2 Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 0185 Forge Rd. #102 Data filename:Page 4 of 6 02/20/18Report date:03/06/2018 Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions 303.1 [IN13]2 All installed insulation is labeled or the installed R-values provided. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 0185 Forge Rd. #102 Data filename:Page 5 of 6 02/20/18Report date:03/06/2018 Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.2.3 [FI3]1 Attic access hatch and door insulation ≥R-value of the adjacent assembly. R-_____R-_____Complies Does Not Not Observable Not Applicable Requirement will be met. 402.4.2, 402.4.2.1 [FI17]1 Building envelope tightness verified by blower door test result of <7 ACH at 50 Pa. This requirement may instead be met via visual inspection, in which case verification may need to occur during Insulation Inspection. ACH 50 =_____ACH 50 =_____Complies Does Not Not Observable Not Applicable Requirement will be met. 403.2.2 [FI4]1 Post construction duct tightness test result of ≤8 cfm to outdoors, or ≤12 cfm across systems. Or, rough-in test result of ≤6 cfm across systems or ≤4 cfm without air handler. Rough-in test verification may need to occur during Framing Inspection. _____ cfm _____ cfm Complies Does Not Not Observable Not Applicable Exception: All ducts and air handlers are located within conditioned space. 403.1.1 [FI9]2 Programmable thermostats installed on forced air furnaces. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.1.2 [FI10]2 Heat pump thermostat installed on heat pumps. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.4 [FI11]2 Circulating service hot water systems have automatic or accessible manual controls. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 404.1 [FI6]1 50% of lamps in permanent fixtures are high efficacy lamps. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: A1.1, See Spcificitaions 401.3 [FI7]2 Compliance certificate posted.Complies Does Not Not Observable Not Applicable Requirement will be met. 303.3 [FI18]3 Manufacturer manuals for mechanical and water heating equipment have been provided. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 0185 Forge Rd. #102 Data filename:Page 6 of 6 02/20/18Report date:03/06/2018 2009 IECC Energy Efficiency Certificate Insulation Rating R-Value 0.00Above-Grade Wall 0.00Below-Grade Wall 0.00Floor 0.00Ceiling / Roof _______Ductwork (unconditioned spaces): Glass & Door Rating SHGCU-Factor 0.20Window Door Heating & Cooling Equipment Efficiency _______Heating System:_________________________ _______Cooling System:_________________________ _______Water Heater:___________________________ Name:Date: Comments 03/06/2018