HomeMy WebLinkAboutMaster Permit.104 W Cooper Ave.0077.2018.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew____Appliance Vents____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems____Ventilation Fans____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReviewDEFINITIONS104 West Cooper Avenue 2 2735-124-69-009
Aspen West
Jade Peak, LLC
Shawn Haberern 970.948.4114 shawn@b2builders.com
1319 s.f.
N.A. - Interior
X
X
X
0 s.f.
0 s.f.
333 s.f.
1319 s.f.
2
3
111
2
1
1
3
1
1R-MF
Interior remodel - remove existing interior finishes and replace. New cabinets, plumbing fixtures and lighting.
Remove 1 existing window and relocate entry door to unit to location, infill existing door location.
$120,000
4/9/2018 0077.2018.ARBK
2,941.25
325
325
705.67
705.67
678.75
210
300
4525
KH 4/9/18
X
X
X
X
X
X
BB#889-022-977
04/09/2018
RJN 6/4/180
0
0
0
N/A
6
NT 6/26/18
NT 6/26/18
sw 6/15/18
pm 4/17/18
ak 4/10/18
DAM 6/26/18
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
3/13/18
104 West Cooper Ave, Unit #2
Bob Mehall 970.923.8946 bob@rmarchitect.net
Shawn Haberern 970.948.4114 shawn@b2aspen.com
Jade Peak, LLC
N.A.
N.A.
Bob Mehall - Robert Mehall/ARCHITECT, Inc.970.923.8946 970.274.8361
PO Box 5506 Snowmass Village CO 81615
bob@rmarchitect.net
Shawn Haberern - B2 Builders 970.948.4114
shawn@b2aspen.com
B2 Builders - see above
970.544.2000
PO Box 1470 Aspen CO 81612
B2 Builders - see above
0077.2018.ARBK
04/09/2018
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
YesNo Required?YesNo Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
X
X
X
X
2 1/2 1/2
0 0 0
2 1
1
1
1
0
0
0
77 s.f.
1319 s.f.
Unit #2 - Living Room, Dining Room, Kitchen, Laundry Room, Bedroom, Bathroom, Master
Bedroom, Master Bathroom
04/09/2018
x x
2
NT 6/26/18
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
If you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
LAND USE QUESTIONS
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
Part of an approved COA Land Use Review
Work affects net leasable, net livable, or non-unit space
Work involves lot splitting or combining a lot
Work involves exterior of structure
Changing the number of residential units
Changes to number or location ofonsite parking
Work involves Landmark Parcel or Historic District
Located in 100-year flood plain or within 100’ of highwater mark
Work involves changes in occupancy to structure
Changes to elevator or stair configuration
Changes to the use of existing structure or space
Does your permit involve any of the following?
ADDITIONAL SCOPE OF WORK QUESTIONS
Exterior lighting added or changed
Work involves roof penetrations
Work adds, removes, or changes plumbing fixturesDisturbs 1,000 sq ft or more of soil within 12 months
Work occurs in public right of way
Work affects trees or occurs within thedripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
August 2017
104 W. Cooper Ave./ Unit #2
X
X
X
X
04/09/2018
04/09/2018
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989 “ban” on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called “Asbestos Ban and Phaseout Rule” and remanded it to the EPA. Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS INFORMATION
Yes No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel – examples are drywall, linoleum, ceiling tiles, roofing materials, etc.?
Yes NoCommercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel – examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit.
ASBESTOS CHECKLIST
I hereby certify that the above information is true and complete.
Owner______________________________ Phone #___________________________
Applicant (print name)_________________________________ Phone #___________________
Applicant Signature ___________________________________ Date ______________________
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have questions about asbestos, interpreting your test results, or other matters.
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
3/13/18
Jade Peak, LLC
Shawn Haberern 970.948.4114
104 West Cooper Avenue, Unit #2
04/09/2018
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
ůůĂƉƉůŝĐĂƟŽŶƐĨŽƌĂďƵŝůĚŝŶŐƉĞƌŵŝƚǁŝƚŚŝŶƚŚĞŝƚLJŽĨƐƉĞŶĂƌĞƌĞƋƵŝƌĞĚƚŽŝŶĐůƵĚĞĂĐĞƌƟĮĐĂƟŽŶŽĨĐŽŵƉůŝĂŶĐĞǁŝƚŚďƵŝůĚŝŶŐƉĞƌŵŝƚǀĂůƵĂƟŽŶƌĞƋƵŝƌĞŵĞŶƚƐ͘dŚĞĐĞƌƟĮĐĂƟŽŶŵƵƐƚďĞƐŝŐŶĞĚďLJƚŚĞƉƌŽƉĞƌƚLJŽǁŶĞƌŽƌĂƵƚŚŽƌŝnjĞĚƌĞƉƌĞƐĞŶƚĂƟǀĞ͘dŚĞĨŽůůŽǁŝŶŐĐĞƌƟĮĐĂƟŽŶƐŚĂůůĂĐĐŽŵƉĂŶLJƚŚĞĂƉƉůŝĐĂƟŽŶĨŽƌĂƉĞƌŵŝƚ͘
/͕ƚŚĞƉƌŽƉĞƌƚLJŽǁŶĞƌŽƌĂƵƚŚŽƌŝnjĞĚĂŐĞŶƚ͕ƵŶĚĞƌƐƚĂŶĚĂŶĚĐĞƌƟĨLJĂƐĨŽůůŽǁƐ͗
ŝƚLJŽĨƐƉĞŶKƌĚŝŶĂŶĐĞEŽ͘ϰϬ͕^ĞƌŝĞƐŽĨϮϬϭϲĂĚŽƉƚƐƚŚĞϮϬϭϱ/ŶƚĞƌŶĂƟŽŶĂůZĞƐŝĚĞŶƟĂůŽĚĞ;/ZͿĂŶĚ
/ŶƚĞƌŶĂƟŽŶĂůƵŝůĚŝŶŐŽĚĞ;/ͿǁŝƚŚĐĞƌƚĂŝŶĂŵĞŶĚŵĞŶƚƐ͘dŚĞƐĞĐŽĚĞƐĚĞĮŶĞďƵŝůĚŝŶŐǀĂůƵĂƟŽŶĂƐĨŽůůŽǁƐ͗
ZϭϬϴ͘ϯƵŝůĚŝŶŐƉĞƌŵŝƚǀĂůƵĂƟŽŶƐ͘ƵŝůĚŝŶŐƉĞƌŵŝƚǀĂůƵĂƟŽŶƐŚĂůůŝŶĐůƵĚĞƚŽƚĂůǀĂůƵĞŽĨƚŚĞǁŽƌŬĨŽƌǁŚŝĐŚĂ
ƉĞƌŵŝƚŝƐďĞŝŶŐŝƐƐƵĞĚ͕ƐƵĐŚĂƐĞůĞĐƚƌŝĐĂů͕ŐĂƐ͕ŵĞĐŚĂŶŝĐĂů͕ƉůƵŵďŝŶŐĞƋƵŝƉŵĞŶƚ͕ĂŶĚŽƚŚĞƌƉĞƌŵĂŶĞŶƚƐLJƐƚĞŵƐ͕
ŝŶĐůƵĚŝŶŐŵĂƚĞƌŝĂůƐĂŶĚůĂďŽƌ͘
ϭϬϵ͘ϯƵŝůĚŝŶŐƉĞƌŵŝƚǀĂůƵĂƟŽŶƐ͘dŚĞĂƉƉůŝĐĂŶƚĨŽƌĂƉĞƌŵŝƚƐŚĂůůƉƌŽǀŝĚĞĂŶĞƐƟŵĂƚĞĚƉĞƌŵŝƚǀĂůƵĞĂƚƟŵĞ
ŽĨĂƉƉůŝĐĂƟŽŶ͘WĞƌŵŝƚǀĂůƵĂƟŽŶƐƐŚĂůůŝŶĐůƵĚĞƚŽƚĂůǀĂůƵĞŽĨǁŽƌŬ͕ŝŶĐůƵĚŝŶŐŵĂƚĞƌŝĂůƐĂŶĚůĂďŽƌ͕ĨŽƌǁŚŝĐŚƚŚĞ
ƉĞƌŵŝƚŝƐďĞŝŶŐŝƐƐƵĞĚ͕ƐƵĐŚĂƐĞůĞĐƚƌŝĐĂů͕ŐĂƐ͕ŵĞĐŚĂŶŝĐĂů͕ƉůƵŵďŝŶŐĞƋƵŝƉŵĞŶƚĂŶĚƉĞƌŵĂŶĞŶƚƐLJƐƚĞŵƐ͘If, in
ƚŚĞŽƉŝŶŝŽŶŽĨƚŚĞďƵŝůĚŝŶŐŽĸĐŝĂů͕ƚŚĞǀĂůƵĂƟŽŶŝƐƵŶĚĞƌĞƐƟŵĂƚĞĚŽŶƚŚĞĂƉƉůŝĐĂƟŽŶ͕ƚŚĞƉĞƌŵŝƚƐŚĂůůďĞ
denied,ƵŶůĞƐƐƚŚĞĂƉƉůŝĐĂŶƚĐĂŶƐŚŽǁĚĞƚĂŝůĞĚĞƐƟŵĂƚĞƐƚŽŵĞĞƚƚŚĞĂƉƉƌŽǀĂůŽĨƚŚĞďƵŝůĚŝŶŐŽĸĐŝĂů͘&ŝŶĂů
ďƵŝůĚŝŶŐƉĞƌŵŝƚǀĂůƵĂƟŽŶƐŚĂůůďĞƐĞƚďLJƚŚĞďƵŝůĚŝŶŐŽĸĐŝĂů͘
ŝƚLJƉŽůŝĐLJŝŶĚŝĐĂƚĞƐƚŚĂƚƉĞƌŵŝƚǀĂůƵĂƟŽŶŝŶĐůƵĚĞƐŵĂƚĞƌŝĂůƐĂŶĚůĂďŽƌĨŽƌƚŚĞƐƚƌƵĐƚƵƌĞĂŶĚŵĞĐŚĂŶŝĐĂů͕
ĞůĞĐƚƌŝĐĂů͕ƉůƵŵďŝŶŐĂŶĚŐĂƐ͕ĮƌĞƐƉƌŝŶŬůĞƌĂŶĚĞůĞǀĂƚŽƌƐLJƐƚĞŵƐĂŶĚĞƋƵŝƉŵĞŶƚ͘WĞƌŵĂŶĞŶƚƐLJƐƚĞŵƐƐƵĐŚĂƐ
ĂƵĚŝŽǀŝƐƵĂů͕ůŝŐŚƟŶŐĂŶĚ,sĐŽŶƚƌŽůƐĂƌĞŝŶĐůƵĚĞĚŝŶƚŚĞƚŽƚĂůĂƐĂƌĞĞdžƉĞŶƐĞƐĚŝƌĞĐƚůLJƌĞůĂƚĞĚƚŽĐŽŶƐƚƌƵĐƟŽŶ
ƐƵĐŚĂƐĞƋƵŝƉŵĞŶƚƌĞŶƚĂůĂŶĚĐŽŶƚƌĂĐƚŽƌĨĞĞƐ͘&ŝŶŝƐŚŵĂƚĞƌŝĂůƐƐƵĐŚĂƐƉĂŝŶƚ͕ŇŽŽƌĐŽǀĞƌŝŶŐƐ͕ƟůĞ͕ĐĂďŝŶĞƚƐĂŶĚ
ĐŽƵŶƚĞƌƚŽƉƐĂƌĞŝŶĐůƵĚĞĚŝŶƚŚĞƉĞƌŵŝƚǀĂůƵĂƟŽŶƚŽƚĂů͘
ŽƐƚƐƐƵĐŚĂƐĂƌĐŚŝƚĞĐƚƵƌĂůĂŶĚĞŶŐŝŶĞĞƌŝŶŐĚĞƐŝŐŶĨĞĞƐ͕ůĂŶĚƐĐĂƉŝŶŐĂŶĚƉůĂŶƟŶŐ͕ƚĂƉĨĞĞƐ͕ĚĞǀĞůŽƉŵĞŶƚ
ŵŝƟŐĂƟŽŶĨĞĞƐ͕ƚƌĂƐŚƌĞŵŽǀĂů͕ĂŶĚĐůĞĂŶŝŶŐĂƌĞŶŽƚŝŶĐůƵĚĞĚ͘
AFFIDAVIT POLICY
/ĐĞƌƟĨLJƚŚĂƚƚŚĞƉĞƌŵŝƚǀĂůƵĂƟŽŶĞŶƚĞƌĞĚŽŶƚŚĞƉĞƌŵŝƚĂƉƉůŝĐĂƟŽŶĨŽƌƚŚŝƐƉƌŽƉĞƌƚLJĐŽŵƉůŝĞƐǁŝƚŚƚŚĞĂďŽǀĞǀĂůƵĂƟŽŶƌĞƋƵŝƌĞŵĞŶƚƐ͘/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚƚŚŝƐĚŽĐƵŵĞŶƚŝƐĂƉƵďůŝĐĚŽĐƵŵĞŶƚ͘
KǁŶĞƌ^ŝŐŶĂƚƵƌĞ͗ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺͺ
KǁŶĞƌWƌŝŶƚĞĚEĂŵĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Žƌ͕
ƵƚŚŽƌŝnjĞĚŐĞŶƚ^ŝŐŶĂƚƵƌĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺͺ
ƵƚŚŽƌŝnjĞĚŐĞŶƚWƌŝŶƚĞĚEĂŵĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Z^^͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺWZD/dEhDZ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ƵŐƵƐƚϮϬϭϳ
ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
104 West Cooper Ave., Unit #2
3/14/18
Shawn Haberern
04/09/2018
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Applicability: ůůĚĞǀĞůŽƉŵĞŶƚƉƌŽũĞĐƚƐŵƵƐƚĐŽŵƉůLJǁŝƚŚƚŚĞŝƚLJ͛ƐnjŽŶŝŶŐƌĞŐƵůĂƟŽŶƐ͕ŝŶĐůƵĚŝŶŐŚĞŝŐŚƚĂŶĚ
ůŽĐĂƟŽŶ͕ĂŶĚĂƌĞƐƵďũĞĐƚƚŽƉĞƌŝŽĚŝĐŝŶƐƉĞĐƟŽŶĚƵƌŝŶŐĐŽŶƐƚƌƵĐƟŽŶĂŶĚĂĮŶĂůŝŶƐƉĞĐƟŽŶƉƌŝŽƌƚŽƉƌŽũĞĐƚ
ĐŽŵƉůĞƟŽŶ͘tŚĞŶƌĞƋƵŝƌĞĚďLJƚŚĞŝƚLJ͛ƐŽŶŝŶŐKĸĐĞƌ͕ĐĞƌƚĂŝŶĚĞǀĞůŽƉŵĞŶƚƉƌŽũĞĐƚƐǁŝƚŚŝŶƚŚĞŝƚLJŽĨƐƉĞŶ
ƐŚĂůůǀĞƌŝĨLJŚĞŝŐŚƚĂŶĚͬŽƌůŽĐĂƟŽŶĐŽŵƉůŝĂŶĐĞƚŚƌŽƵŐŚƐƵďŵŝƐƐŝŽŶŽĨĂƐƵƌǀĞLJƌĞƉŽƌƚ͘
hŶůĞƐƐŽƚŚĞƌǁŝƐĞĞdžĞŵƉƚĞĚ͕ĂůůĐŽŵŵĞƌĐŝĂů͕ŵƵůƟͲĨĂŵŝůLJ͕ůŽĚŐŝŶŐ͕ĂŶĚŵŝdžĞĚͲƵƐĞƉƌŽũĞĐƚƐƉƌŽƉŽƐĞĚǁŝƚŚŝŶŽŶĞ
ĨŽŽƚŽĨƚŚĞŵĂdžŝŵƵŵƉĞƌŵŝƐƐŝďůĞŚĞŝŐŚƚŽƌǁŝƚŚŝŶŽŶĞĨŽŽƚŽĨĂůůŽǁĂďůĞƐĞƚďĂĐŬƐƐŚĂůůǀĞƌŝĨLJnjŽŶŝŶŐĐŽŵƉůŝĂŶĐĞ
through this method.
/ŶĂĚĚŝƟŽŶ͕ƚŚĞŽŶŝŶŐKĸĐĞƌŵĂLJƌĞƋƵŝƌĞƚŚŝƐŵĞƚŚŽĚďĞƵƐĞĚƚŽǀĞƌŝĨLJnjŽŶŝŶŐĐŽŵƉůŝĂŶĐĞĨŽƌƐŝŶŐůĞͲĨĂŵŝůLJͬ
ĚƵƉůĞdžĚĞǀĞůŽƉŵĞŶƚŽƌŽƚŚĞƌƉƌŽũĞĐƚƐǁŚĞƌĞĐŽŵƉůŝĂŶĐĞŵĂLJďĞŝŶƋƵĞƐƟŽŶ͘/ŶĚĞƉĞŶĚĞŶƚŽĨƚŚŝƐƉŽůŝĐLJ͕Ăůů
ƉƌŽũĞĐƚƐŵƵƐƚĐŽŵƉůLJǁŝƚŚĂůůĂƉƉůŝĐĂďůĞnjŽŶŝŶŐůŝŵŝƚĂƟŽŶƐ͘
dŚĞŽŶŝŶŐKĸĐĞƌǁŝůůŝŶĨŽƌŵƚŚĞĂƉƉůŝĐĂŶƚĚƵƌŝŶŐďƵŝůĚŝŶŐƉĞƌŵŝƚƌĞǀŝĞǁŝĨǀĞƌŝĮĐĂƟŽŶǁŝůůďĞƌĞƋƵŝƌĞĚ͘
,ŽǁĞǀĞƌ͕ĐŝƌĐƵŵƐƚĂŶĐĞƐŵĂLJƌĞƋƵŝƌĞnjŽŶŝŶŐĐŽŵƉůŝĂŶĐĞǀĞƌŝĮĐĂƟŽŶŽĨĂƉƌŽũĞĐƚǁŚŝĐŚŝƐĂůƌĞĂĚLJƵŶĚĞƌǁĂLJ͘
Timing: ,ĞŝŐŚƚǀĞƌŝĮĐĂƟŽŶƐŚŽƵůĚďĞĂĐĐŽŵƉůŝƐŚĞĚĂƚĂƉŽŝŶƚŽĨĐŽŶƐƚƌƵĐƟŽŶǁŚĞŶĞŶŽƵŐŚƌŽŽĨƐƚƌƵĐƚƵƌĞŝƐŝŶ
ƉůĂĐĞƚŽĂĐĐƵƌĂƚĞůLJŵĞĂƐƵƌĞƚŚĞƐƚƌƵĐƚƵƌĞLJĞƚĞĂƌůLJĞŶŽƵŐŚŝŶƚŚĞƉƌŽĐĞƐƐƚŽƐƟůůŵĂŬĞĐŚĂŶŐĞƐŝĨƚŚĞƐƚƌƵĐƚƵƌĞ
ŝƐƚŽŽƚĂůů͘>ŽĐĂƟŽŶǀĞƌŝĮĐĂƟŽŶƐŚŽƵůĚďĞĂĐĐŽŵƉůŝƐŚĞĚĂƚĂƉŽŝŶƚŽĨĐŽŶƐƚƌƵĐƟŽŶǁŚĞŶƚŚĞĮŶĂůĞdžƚĞƌŝŽƌŽĨƚŚĞ
ƐƚƌƵĐƚƵƌĞĐĂŶďĞĂĐĐƵƌĂƚĞůLJŵĞĂƐƵƌĞĚŝŶƌĞůĂƟŽŶƚŽƐĞƚďĂĐŬƌĞƋƵŝƌĞŵĞŶƚƐ͘ƉƉůŝĐĂŶƚƐĂƌĞĞŶĐŽƵƌĂŐĞĚƚŽĐŽŶĨĞƌ
ǁŝƚŚƚŚĞŽŶŝŶŐKĸĐĞƌƌĞŐĂƌĚŝŶŐƚŚĞƟŵŝŶŐŽĨnjŽŶŝŶŐĐŽŵƉůŝĂŶĐĞǀĞƌŝĮĐĂƟŽŶ͘ƉƉůŝĐĂŶƚƐĂƌĞĞŶĐŽƵƌĂŐĞĚƚŽ
ƉĞƌĨŽƌŵƚŚĞŝƌŽǁŶǀĞƌŝĮĐĂƟŽŶĚƵƌŝŶŐĐŽŶƐƚƌƵĐƟŽŶƚŽĞŶƐƵƌĞƚŚĞďƵŝůĚŝŶŐŝƐƉƌŽŐƌĞƐƐŝŶŐƚŽƉůĂŶ͕ŝŶĐůƵĚŝŶŐƚŚĞ
ŚĞŝŐŚƚĂŶĚůŽĐĂƟŽŶŽĨĨŽƵŶĚĂƟŽŶĨŽƌŵƐƉƌŝŽƌƚŽĐŽŶĐƌĞƚĞƉŽƵƌƐ͘
Survey Report:ŽůŽƌĂĚŽWƌŽĨĞƐƐŝŽŶĂů>ĂŶĚ^ƵƌǀĞLJŽƌƐŚĂůůĚĞƐĐƌŝďĞĂŶĚĚĞƉŝĐƚƚŚĞŚĞŝŐŚƚĂŶĚůŽĐĂƟŽŶŽĨĂ
ƐƚƌƵĐƚƵƌĞĐŽŵƉĂƌĞĚƚŽƚŚĞĚŝŵĞŶƐŝŽŶƐƐŚŽǁŶŽŶƚŚĞnjŽŶŝŶŐƐŚĞĞƚƐŽĨƚŚĞĂƉƉƌŽǀĞĚďƵŝůĚŝŶŐƉĞƌŵŝƚƉůĂŶƐĞƚ͘dŚĞ
ŝƚLJ͛ƐŽŶŝŶŐKĸĐĞƌĐĂŶĂƐƐŝƐƚŝŶĚĞƚĞƌŵŝŶŝŶŐǁŚŝĐŚĞůĞŵĞŶƚƐŽĨƚŚĞƐƚƌƵĐƚƵƌĞƐŚŽƵůĚďĞŵĞĂƐƵƌĞĚĂŶĚŝĨŶĂƚƵƌĂů
ŽƌĮŶŝƐŚĞĚŐƌĂĚĞƐŚŽƵůĚďĞƵƐĞĚ͘
dŚĞƌĞƉŽƌƚƐŚĂůůŝŶĐůƵĚĞƚŚĞĨŽůůŽǁŝŶŐŝŶĨŽƌŵĂƟŽŶ͗
ϭͲďƌŝĞĨĐŽǀĞƌůĞƩĞƌǁŝƚŚƚŚĞďƵŝůĚŝŶŐƉĞƌŵŝƚŶƵŵďĞƌ͕ŶĂŵĞŽĨƚŚĞƉƌŽũĞĐƚ͕ŶĂŵĞŽĨƚŚĞŽǁŶĞƌĂŶĚŐĞŶĞƌĂů
ĐŽŶƚƌĂĐƚŽƌ͕ǁŝƚŚĂǁƌŝƩĞŶĚĞƐĐƌŝƉƟŽŶŽĨƚŚĞŵĞĂƐƵƌĞŵĞŶƚŵĞƚŚŽĚƐŝŶĐůƵĚŝŶŐĚĂƚĞ;ƐͿŽĨŵĞĂƐƵƌĞŵĞŶƚ͘
ϮͲ&ŽƌůŽĐĂƟŽŶǀĞƌŝĮĐĂƟŽŶ͗ƉůĂŶĚƌĂǁŝŶŐƐŚŽǁŝŶŐƉƌŽƉĞƌƚLJďŽƵŶĚĂƌŝĞƐ͕ƉĞƌŵŝƩĞĚƐĞƚďĂĐŬƐ͕ďƵŝůĚŝŶŐĞŶǀĞůŽƉĞ
;ŝĨĂƉƉůŝĐĂďůĞͿ͕ůŽĐĂƟŽŶŽĨĨŽƵŶĚĂƟŽŶǁĂůůƐ͕ůŽĐĂƟŽŶŽĨƚŚĞŽƵƚĞƌŵŽƐƚĞdžƚĞƌŝŽƌŽĨĞĂĐŚƐƚƌƵĐƚƵƌĞ;ŝŶĐůƵƐŝǀĞŽĨĂůů
ĞdžƚĞƌŝŽƌǀĞŶĞĞƌŽƌŽƚŚĞƌĞdžƚĞƌŝŽƌƚƌĞĂƚŵĞŶƚƐͿ͕ĂŶĚƚŚĞůŽĐĂƟŽŶĂŶĚĚŝŵĞŶƐŝŽŶŽĨĞĂĐŚŽďƐĞƌǀĞĚŵĞĂƐƵƌĞŵĞŶƚ͘
ϯͲ&ŽƌŚĞŝŐŚƚǀĞƌŝĮĐĂƟŽŶ͗ůĞǀĂƟŽŶĚƌĂǁŝŶŐ;ƐͿƐŚŽǁŝŶŐƚŚĞŶĂƚƵƌĂůŽƌĮŶŝƐŚĞĚŐƌĂĚĞŽĨƚŚĞƉƌŽƉĞƌƚLJ͕ŵĂdžŝŵƵŵ
ƉĞƌŵŝƩĞĚŚĞŝŐŚƚ͕ďƵŝůĚŝŶŐĞůĞǀĂƟŽŶƐŝŶĐůƵĚŝŶŐƚŚĞŶŽŵŝŶĂůƌŽŽĨĨŽƌŵ;ŝŶĐůƵƐŝǀĞŽĨƚŚĞĮƌƐƚůĂLJĞƌŽĨĞdžƚĞƌŝŽƌ
ƐŚĞĂƚŚŝŶŐŽƌǁĞĂƚŚĞƌƉƌŽŽĮŶŐŵĞŵďƌĂŶĞďƵƚĞdžĐůƵĚŝŶŐĂůůĞdžƚĞƌŝŽƌƐƵƌĨĂĐĞƚƌĞĂƚŵĞŶƚƐƐƵĐŚĂƐƐŚĂŬĞƐ͕ƐŚŝŶŐůĞƐ͕
ŽƌŽƚŚĞƌǀĞŶĞĞƌƚƌĞĂƚŵĞŶƚƐŽƌŽƌŶĂŵĞŶƚĂƟŽŶͿ͕ĂŶĚƚŚĞůŽĐĂƟŽŶĂŶĚĚŝŵĞŶƐŝŽŶŽĨĞĂĐŚŽďƐĞƌǀĞĚŵĞĂƐƵƌĞŵĞŶƚ͘
ĚĚŝƟŽŶĂůƌŽŽĨƉůĂŶƐƐŚŽǁŝŶŐůŽĐĂƟŽŶŽĨŵĞĂƐƵƌĞŵĞŶƚƐŵĂLJďĞŶĞĐĞƐƐĂƌLJ͘
Z^^͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺWZD/dEhDZ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
August 2017
104 West Cooper Ave., Unit #2
04/09/2018
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
ϰͲWůĂŶƐĂŶĚĞůĞǀĂƟŽŶƐŵƵƐƚŝŶĐůƵĚĞŚĞŝŐŚƚŽƌƐĞƚďĂĐŬĞdžĞŵƉƟŽŶŝƚĞŵƐƵŶŝƋƵĞƚŽƚŚĞďƵŝůĚŝŶŐ͕ƐƵĐŚĂƐƐƚĂŝƌͬ
ĞůĞǀĂƚŽƌŽǀĞƌƌƵŶƐ͕ƵƟůŝƚLJͬŵĞĐŚĂŶŝĐĂůĂƉƉĂƌĂƚƵƐ͕ŚŽƚƚƵďƐĂŶĚƐƉĂƐ͕ĂŶĚŽƚŚĞƌŚĞŝŐŚƚŽƌƐĞƚďĂĐŬĞdžĞŵƉƟŽŶŝƚĞŵƐ
ƵŶŝƋƵĞƚŽƚŚĞƉƌŽũĞĐƚ͘
ϱͲdŚĞƌĞƉŽƌƚƐŚĂůůŝŶĐůƵĚĞĂǁƌŝƩĞŶĚĞƐĐƌŝƉƟŽŶŽƌĚƌĂǁŝŶŐŶŽƚĞƐŽĨƚŚĞďĞŶĐŚŵĂƌŬƐŽƌĐŽŶƚƌŽůƉŽŝŶƚƐƵƐĞĚƚŽ
ĞƐƚĂďůŝƐŚƉƌŽƉĞƌƚLJďŽƵŶĚĂƌŝĞƐ͕ƐĞƚďĂĐŬƐ͕ďƵŝůĚŝŶŐůŽĐĂƟŽŶ͕ďƵŝůĚŝŶŐŚĞŝŐŚƚ͕ĂŶĚŐƌĂĚĞƐĨŽƌĞĂĐŚŵĞĂƐƵƌĞŵĞŶƚ͘
ϲͲůůĚƌĂǁŝŶŐƐŵƵƐƚĐŽƌƌĞůĂƚĞǁŝƚŚƚŚĞďƵŝůĚŝŶŐůŽĐĂƟŽŶƐ͕ĞůĞǀĂƟŽŶƐ͕ĂŶĚŐƌĂĚŝŶŐͬĚƌĂŝŶĂŐĞƌĞƉƌĞƐĞŶƚĂƟŽŶƐŝŶ
ƚŚĞĂƉƉƌŽǀĞĚďƵŝůĚŝŶŐƉĞƌŵŝƚƐĞƚ͘
ϳͲdŚĞƌĞƉŽƌƚŵƵƐƚŝŶĐůƵĚĞƚŚĞƐŝŐŶĂƚƵƌĞ͕ĚĂƚĞ͕ĂŶĚƐƚĂŵƉŽĨŽůŽƌĂĚŽWƌŽĨĞƐƐŝŽŶĂů>ĂŶĚ^ƵƌǀĞLJŽƌǁŚŽ
ĐŽŶĚƵĐƚĞĚƚŚĞĮĞůĚŵĞĂƐƵƌĞŵĞŶƚƐĐĞƌƟĨLJŝŶŐƚŚĂƚƚŚĞĮĞůĚŵĞĂƐƵƌĞŵĞŶƚƐĂƌĞĂĐĐƵƌĂƚĞůLJƌĞƉƌĞƐĞŶƚĞĚ͘
Review and Acceptance of Report:dŚĞŽŶŝŶŐKĸĐĞƌƐŚĂůůƌĞǀŝĞǁƚŚĞƌĞƉŽƌƚ;ƐͿĂŶĚĞŝƚŚĞƌĐŽŶĮƌŵƚŚĞƉƌŽũĞĐƚ
ĐŽŶĨŽƌŵƐƚŽƚŚĞĚŝŵĞŶƐŝŽŶƐƐŚŽǁŶŽŶƚŚĞnjŽŶŝŶŐƐŚĞĞƚƐŽĨƚŚĞĂƉƉƌŽǀĞĚďƵŝůĚŝŶŐƉĞƌŵŝƚƉůĂŶƐĞƚĂŶĚŵĞĞƚƐ
ƚŚĞnjŽŶŝŶŐůŝŵŝƚĂƟŽŶƐĨŽƌƚŚĞƉƌŽƉĞƌƚLJŽƌƐŚĂůůĚĞƚĞƌŵŝŶĞǁŚŝĐŚĞůĞŵĞŶƚƐŽĨƚŚĞƉƌŽũĞĐƚĂƌĞŶŽƚŝŶĐŽŵƉůŝĂŶĐĞ͘
dŚĞŽŶŝŶŐKĸĐĞƌŵĂLJƌĞƋƵĞƐƚĂĚĚŝƟŽŶĂůŝŶĨŽƌŵĂƟŽŶƚŽǀĞƌŝĨLJnjŽŶŝŶŐĐŽŵƉůŝĂŶĐĞ͕ǁŚŝĐŚŵĂLJŝŶĐůƵĚĞďƵƚŝƐŶŽƚ
ůŝŵŝƚĞĚƚŽĂĚĚŝƟŽŶĂůƐƵƌǀĞLJǁŽƌŬŽƌĂƐŝƚĞǀŝƐŝƚ͘
ůůĚƌĂǁŝŶŐƐŽĨƚŚĞƐƵƌǀĞLJƌĞƉŽƌƚŵƵƐƚĐŽƌƌĞůĂƚĞǁŝƚŚƌĞƉƌĞƐĞŶƚĂƟŽŶƐŝŶƚŚĞĂƉƉƌŽǀĞĚďƵŝůĚŝŶŐƉĞƌŵŝƚƐĞƚĨŽƌ
ĂĐĐĞƉƚĂŶĐĞ͘DŽĚŝĮĐĂƟŽŶƐƚŽĮĞůĚĐŽŶĚŝƟŽŶƐŽƌĂŵĞŶĚŵĞŶƚƐƚŽƚŚĞďƵŝůĚŝŶŐƉĞƌŵŝƚŵĂLJďĞƌĞƋƵŝƌĞĚ͘
ĚĞƚĞƌŵŝŶĂƟŽŶŽĨŶŽŶͲĐŽŵƉůŝĂŶĐĞƐŚĂůůƌĞƐƵůƚŝŶƚŚĞŝƐƐƵĂŶĐĞŽĨĂĐŽƌƌĞĐƟŽŶŶŽƟĐĞĂŶĚƉŽƐƐŝďůĞǁŽƌŬ
ƐƚŽƉƉĂŐĞ͘ƉƉůŝĐĂŶƚƐĂƌĞĞŶĐŽƵƌĂŐĞĚƚŽǀĞƌŝĨLJnjŽŶŝŶŐĐŽŵƉůŝĂŶĐĞĂƐĞĂƌůLJĂƐƌĞĂƐŽŶĂďůLJƉƌĂĐƟĐĂůŝŶƚŚĞ
ĐŽŶƐƚƌƵĐƟŽŶƉƌŽĐĞƐƐƚŽŵŝŶŝŵŝnjĞĚŝƐƌƵƉƟŽŶƚŽƚŚĞĐŽŶƐƚƌƵĐƟŽŶƐĐŚĞĚƵůĞ͘
Acknowledgment:
/;ĐŽŶƚƌĂĐƚŽƌŶĂŵĞͿͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺƵŶĚĞƌƐƚĂŶĚƚŚŝƐƉŽůŝĐLJ͘/ĂŐƌĞĞƚŚĂƚƚŚŝƐƉƌŽũĞĐƚǁŝůů
ĐŽŵƉůLJǁŝƚŚƚŚĞnjŽŶŝŶŐůŝŵŝƚĂƟŽŶƐĂīĞĐƟŶŐƚŚŝƐƉĂƌĐĞůĂŶĚƚŚĞƌĞƉƌĞƐĞŶƚĂƟŽŶƐŵĂĚĞŽŶƚŚĞnjŽŶŝŶŐƐŚĞĞƚƐŽĨ
ƚŚĞĂƉƉƌŽǀĞĚďƵŝůĚŝŶŐƉĞƌŵŝƚƉůĂŶƐ͘/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚĂĞƌƟĮĐĂƚĞŽĨKĐĐƵƉĂŶĐLJǁŝůůŶŽƚďĞŝƐƐƵĞĚƵŶƟůƚŚŝƐ
ƉƌŽũĞĐƚĐŽŵƉůŝĞƐǁŝƚŚĂůůĂƉƉůŝĐĂďůĞnjŽŶŝŶŐůŝŵŝƚĂƟŽŶƐ͘
ŽŶƚƌĂĐƚŽƌ^ŝŐŶĂƚƵƌĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Z^^͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺWZD/dEhDZ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
August 2017
ƉůŝĐĂďůĞnjŽŶŝŶŐŐůŝŵŝƚĂƟŽŶƐ͘
ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
104 West Cooper Ave., Unit #2
3/14/18
Shawn Haberern
04/09/2018