Loading...
HomeMy WebLinkAboutFile Documents.104 W Cooper Ave.0077.2018 (9).ARBKDATE: NAME:0130 0559 21000 ADDRESS: SERVICE AREA: DESCRIPTION OF WORK:INTERIOR REMODEL BEDROOM 0.10 2 0.2 2 0.2 0 0.00 OFFICE 0.01 0 0 0 0 0 0.00 1ST BATHROOM 0.36 1 0.36 1 0.36 0 0.00 ADDITIONAL BATHROOM 0.24 1 0.24 1 0.24 0 0.00 TOILETS / URINALS / BIDETS 0.05 0 0 0 0 0 0.00 ADDITIONAL LAV 0.02 1 0.02 1 0.02 0 0.00 ADDITIONAL BATHING FEATURE 0.05 0 0 0 0 0 0.00 TUB OVERSIZED 0.02 0 0 0 0 0 0.00 WHIRLPOOL UPGRADE 0.05 0 0 0 0 0 0.00 STEAM ROOM / SHOWER 0.08 0 0 0 0 0 0.00 STEAM SHOWER UPGRADE 0.03 1 0.03 1 0.03 0 0.00 KITCHEN 0.25 1 0.25 1 0.25 0 0.00 DISHWASHER 0.10 1 0.1 1 0.1 0 0.00 DISPOSAL 0.05 1 0.05 1 0.05 0 0.00 ADD KITCHEN SINK / POT FILLER 0.05 0 0 0 0 0 0.00 KITCHEN / EFF. 0.15 0 0 0 0 0 0.00 BAR / HAND SINK 0.05 0 0 0 0 0 0.00 ICE MACHINE 0.05 0 0 0 0 0 0.00 WASHER 0.10 1 0.1 1 0.1 0 0.00 LNDRY /UTIL. SINK / DOG WASH 0.05 0 0 1 0.05 1 0.05 1st HOSE BIB 0.20 0 0 0 0 0 0.00 2nd HOSE BIB 0.10 0 0 0 0 0 0.00 ADD HOSE BIB 0.05 0 0 0 0 0 0.00 SPA / HOT TUB / 100 GALLONS 0.02 0 0 0 0 0 0.00 LANDSCAPE > 3000 SF 0.01 0 0 0 0 0 0.00 POOL > 1000 GAL 0.02 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00 TOTAL ECU COUNT 1.35 1.40 0.05 0.00 DOMESTIC LINE SIZE (inches)1.5 1.5 ECU MINIMUM 4 4.0 ECU BALANCE NEW ECU ESTIMATE NEW ECU TOTAL 2.60 1.40 0.00 CHARGE FOR THE SERVICE AREA 5,795.00$ 5,795.00$ ( X ) TOTAL ADDITIONAL ECU 0.05 TAP FEE 289.75$ FIXTURE EXISTING CONDITIONS PROPOSED CONDITIONS NET NEW FIXTURES ECU RATE EXISTING ECU PROPOSED ECU RESIDENTIAL ECU COST ESTIMATE PAGE THESE COLUMNS ARE COMPLETED DURING FINAL INSPECTION OF THE RESIDENCE BY AN INSPECTOR FROM THE CITY OF ASPEN FINAL CONDITIONS TOTAL FINAL ECU NON- PROPOSED FIXTURES 104 W Cooper Ave Unit 2 Shawn Haberern - B2 Builders 3/14/2018 ACCT. NUMBER: PERMIT NUMBER: INSPECTOR NOTES: CHANGE IN ECU COUNT SERVICE AREA 1