HomeMy WebLinkAboutFile Documents.312 S Mill St.0047.2018.ACBK05/10/2018
6.0 Traffic Control - n/a
8.0 Sediment Erosion Control - n/a
9.0 Fugitive Dust Control - n/a
10.0 Emissions - n/a
11.0 Noise Suppresion - n/a
Summation: In the alley behind Bosq, we will be unloading the pre -fabricated deck
and handrails from a 18" trailer by hand, hand -carry them to the site on the mall we
lease from the city, construct the deck with a drill and 3" deck screws. Total time
needed to erect the deck is roughly 5 hours. No waste removal is needed and no
heavy equipment will be used.
NS1J lEA
Uaa,wagea ®®V2iOi00 'N3dSV � 9
�
133als,l1wIs"- z I C i
U)
w
a
I
Q
O
I
W
�
O
'
I
I
r
I
a
O
+qr/
W
0
VI
Q
o
a
IlI
T
Z
0
U
O
1-
N
n
I
I
W
0
0
Q
,
wN
i
W
r
I
I
I
r
I^
N
I
r
r
I
HOS
i
i
J
O
v
O�
Y•.or
0:z
z-
wo
ssr
I il 6, Ro ai A-1 MI 1, - 5(,-'+t57MA-7-1
o
LENTSIAT-)
TSE XI.,r I G; -