Loading...
HomeMy WebLinkAboutFile Documents.433 W Bleeker St.0170.2017 (24).ARBK1 Richard Goulding From:Dan Hardin <dhardin@kumarusa.com> Sent:Friday, March 09, 2018 9:24 AM To:Richard Goulding Subject:433 W. Bleeker - Drywell Location Richard,  The proposed exterior drywell can be placed within 5 feet of the basement.  The perforations in the bottom of the  drywell should be no higher than 2 feet below the footing grade.  The bearing soils will not be adversely affected by  water from the drywell.    Don’t undermine the footing during drywell excavation.      Also, there can be no direct connection to the perimeter drain system.  The screened rock and piping in the perimeter  drain can’t be connected to the screened rock in the drywell.  May need to compact some less permeable soil such as ¾  inch road base between the perimeter drain and the drywell.  Obviously, there will always be an indirect connection  between the two systems via the natural gravel soils underlying the site.    ‐Dan Hardin, P.E.    P.S. – Ryan may have talked to Steve Pawlak about this as I was out of the office from Dec. 19th to Jan. 15th.  Total Control Panel Login  To: richardg@rfeng.biz  From: dhardin@kumarusa.com    Message Score: 1 High (60): Pass  My Spam Blocking Level: Custom Medium (75): Pass   Low (90): Pass  Block this sender Custom (68): Pass  Block kumarusa.com     This message was delivered because the content filter score did not exceed your filter level.    04/11/2018