CONSTRUCTION MANAGEMENT PLAN
FOR
433 BLEEKER
Owner:
Contractor: Kaegebein Fine Homebuilding, LLC
970-379-6228
Safety Officer: Charlie Berger
970-618-7493
Traffic Control Officer: Charlie Berger
970-618-7493
Erosion Control Officer: N/A
_______________________
BUILDING PERMIT NUMBER:
Submittal Date:
6.26.17
1. CMP INDEX:
1.INDEX 2
2. PROJECT LOCATION 3
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 2 of 14
2.1 DISTURBANCE AREA
2.2 LOCATION
2.3 DESCRIPTION
3. PROJECT DOCUMENTATION 3-4
3.1 PERMITS/OTHER DOCUMENTS
3.2 PUBLIC NOTIFICATIONS
3.3 PROJECT SIGN
3.4 CONTACT DESIGNATION
4. PROJECT IMPLEMENTATION 4-6
4.1 DATES OF CONSTRUCTION
4.2 HOURS OF CONSTRUCTION
4.3 SEQUENCE (PHASING) OF CONSTRUCTION
4.4 ADJOINING PROPERTIES
4.5 PROJECT FENCING
4.6 PUBLIC HEALTH AND WELFARE
4.7 NATURAL ENVIRONMENT
5. SITE AND RIGHT OF WAY MANAGEMENT 6-8
5.1 RIGHT OF WAY MANAGEMENT PLAN
5.2 EMERGENCY VEHICLE ACCESS AND ORDINANCE 35
5.3 CONSTRUCTION PARKING DETAILS
5.4 STAGING AREAS
5.5 RIGHT OF WAY LIMITATIONS
5.6 CONSTRUCTION TRAILER, MATERIALS STORAGE, AND WASTE MANAGEMENT
6. TRAFFIC CONTROL 8
6.1 GENERAL
6.2 HAUL ROUTES
6.3 ONSITE VEHICLE LIMITATIONS
6.4 DELIVERY REQUIREMENTS
6.5 TRAFFIC CONTROL PLAN
7. PEDESTRIAN PROTECTION 9
7.1 GENERAL
7.2 LIMITATIONS
8. SEDIMENT AND EROSION CONTROL 9
8.1 REQUIREMENTS
8.2 SMUGGLER MOUNTAIN RESTRICTIONS
9. FUGITIVE DUST CONTROL 9
9.1 FUGITIVE DUST CONTROL PLAN
9.2 REQUIREMENTS
10. EMISSIONS 9-10
10.1 GENERAL
10.2 EMISSIONS FROM DIESEL POWERED ENGINES
11. NOISE SUPRESSION PLAN 10-11
11.1 GENERAL
11.2 NOISE SUPPRESSION PLA
2. PROJECT LOCATION
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 3 of 14
2.1.DISTURBANCE AREA
The total disturbance area of the project will be the entire lot of 5900 SF.
2.2.PROJECT VICINITY MAP
See attached map. Exhibit “A”
2.3.LOCATION DESCRIPTION
Background information: Vacant Lot
Proposed Development Type: Single Family Residence
General Information: Construction of a new single family residence on a
vacant lot.
3. PROJECT DOCUMENTATION
3.1. LIST ALL PERMITS AND PROVIDE ALL COPIES OF PERMITS:
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 4 of 14
Building Permit
ROW Encroachment Permit
Construction Parking Permit
Electrical Permit
Fire Permit
Mechanical Permit (HVAC)
Mechanical Permit (Fireplace)
Plumbing Permit
Temporary Encroachment Permit
Tree Permit
Water Utility Connection Permit
A copy of the permits will be included in the onsite copy of the CMP.
3.2.PUBLIC NOTIFICATION:
The Project representative is Charlie Berger of Kaegebein Fine Homebuilding. The
Preconstruction meeting is scheduled for _______________2017 at 9 AM and will
be scheduled on site. A monthly project report will be posted on site in a
receptacle near the construction information sign. All neighbors will be notified in
writing 10 days prior to construction.
3.3.PROJECT SIGN
Project Name: 433 Bleeker
Building Permit Number: ___________________
General Contractor Name: KAEGEBEIN FINE HOMEBUILDING, LLC
General Contractor Contact: Charles Berger
General Contractor Phone #: 970-618-7493
Emergency Phone #: 970-379-6228
Sign will be green in color and meet the criteria of City Municipal Code 26.510.030B4.
3.4.CONTACT LIST:
Owner:
Contractor: Kaegebein Fine Homebuilding, LLC
970-379-6228
Safety Officer: Charlie Berger
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 5 of 14
970-618-7493
Traffic Control Officer: Charlie Berger
970-618-7493
Erosion Control Officer: N/A
_______________________
4. PROJECT IMPLEMENTATION
4.1.DATES OF CONSTRUCTION
9.15.17 – 2.15.17
4.2.HOURS OF CONSTRUCTION
Construction hours will adhere to section 4.2 of CMP requirements manual, June 26th,
2017.
4.3.CONSTRUCTION SCHEDULING AND PHASING
This is an approximate 18 month project.
Temporary Shoring: 1.0 months
Excavation: 1.0 months
Concrete: 2.0 month
Steel (phase 1): 1 months
Framing (phase 1): 2 months
Utility tie in and Backfill: 1.0 month
Steel/Framing (phase 2): 2.0 months
Interior rough in: 4.0 months
Interior/Exterior finishes: 3.0 months
Landscaping: 1.0 months
4.4. ADJOINING PROPERTIES
Micro pile shoring will be utilized to protect both the construction site and the adjoining
properties. There is no sidewalk between the property and Bleeker. As such, a
temporary encroachment permit will be applied for to:
Crane Materials onsite
The Alley to the north of the property will be used to access the construction site.
4.5.PROJECT FENCING
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 6 of 14
A silt fence will be installed around the perimeter of the construction area. A six foot
green screen chain link fence will also be installed around the perimeter of the
construction area.
See CMP site plan.
4.6.PROJECT RESPECTS PUBLIC HEALTH AND WELFARE
This construction project “shall uphold utmost respect to public health and welfare”.
Asbestos will be removed by a state qualified asbestos abatement company.
4.7.NATURAL ENVIRONMENT
Per an onsite meeting with the city forester, Ben Carlson, all trees that are to be
preserved will be fenced off at the drip line. No encroachment allowed during drilling
phase into the tree encroachment. KFH will conduct an onsite meeting with Staff to
finalize fencing prior to excavation.
5. SITE AND RIGHT OF WAY MANAGMENT
5.1.RIGHT OF WAY MANAGEMENT PLAN
Due to the limited size and accessibility of the project the use of the ROW along Bleeker
is being requested for the following:
1. Temporary storage of construction materials.
2. Park or stage and operate construction equipment, crane, and pump truck.
3. Temporary placement of field office, dumpster, construction fencing.
See CMP site plan.
5.2.EMERGENCY VEHICLE ACCESS
Emergency vehicle access will not be inhibited. The site is readily accessible from the
Alley, Monarch or Bleeker.
5.3. CONSTRUCTION PARKING DETAILS
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 7 of 14
There is no on-site parking available on this construction site. A request for 4 along
Bleeker is being submitted. (See CMP site plan)
This project will utilize the Carpool Program and project shuttle during the phases of
construction when this is practical and possible
Parking passes will be issued for those vehicles which are unable to carpool or park in
designated construction parking.
5.4.SITE LOCATIONS FOR STAGING MATERIALS
The minimal on site staging area will be utilized carefully. All possible deliveries will be
thru the alley without blocking traffic. Some staging will be done along Bleeker behind
the back of curbing. (see CMP plan)
Export of excavation truck trips: 300 (month 3)
Concrete truck trips: 10 (month 4)
Steel delivery truck trips: 5 (month 5 and 8-10)
Lumber delivery truck trips: 15 (month 5 and 8-10)
Import of backfill truck trips: 90 (month 7)
Misc. finish material truck trips: 25 (month 10-17)
Landscape truck trips: 10 (month 15)
Total truck trips: 450
5.5.RIGHT OF WAY LIMITATIONS
A. Due to the limited size and accessibility of the project the use of the ROW behind
Bleeker is being requested for the following:
1. Temporary storage of construction materials.
2. Park or stage and operate construction equipment, crane, and pump truck.
3. Temporary placement of field office, dumpster, construction fencing.
4. Temporary storage of the historic Victorian.
See CMP site plan.
B. There is no pedestrian sidewalk on Bleeker.
C. The site does not fall with the seasonal limitations for temporary encroachments.
Please contact City
Parking Dept for
space availability and
cost.
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 8 of 14
5.6.CONSTRUCTION TRAILER, MATERIALS STORAGE, AND WASTE MANAGEMENT
No loose job materials will be stored in the ROW.
On site recycling separation will occur on this project per the CMP manual section 5.6.
During demolition, concrete and scrap metal will be sorted and kept separate on site in
designated areas.
Any trash receptacle that is used for food refuse will be constructed in such a manner to
render it bear proof.
A hazardous material spill cleanup kit will be on-site if specified by the City Engineer.
6. TRAFFIC CONTROL
6.1.GENERAL
All traffic control operation shall be managed by the designated certified traffic control
supervisor.
6.2.PROJECT HAUL ROUTES
Heavy haul routes will follow Main street to Bleeker. Following the Main street out of
town as shown in appendix B of CMP manual.
6.3.ONSITE VEHICLE LIMITATIONS
Max: 40 ft and 48,000 pounds
6.4.DELIVERY REQUIREMENTS
Road closures will not be required during construction operations. If it is determined
that a road closure is required, the proper permit will be obtained from the City of Aspen
Engineering Dept.
The site has capacity for one delivery at a time and will be limited to the hours of
construction. There will be no exceptions to the delivery schedule.
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 9 of 14
6.5.TRAFFIC CONTROL PLAN
A traffic control plan will be provided if requested by City Engineer.
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 10 of 14
7. PEDESTRIAN PROTECTION
No pedestrian sidewalks will be impacted by this construction project.
8. SEDIMENT AND EROSION CONTROL
8.1.REQUIREMENTS
See Construction Erosion control and Stormwater Management Plan.
8.2.SMUGGLER MOUNTAIN RESTRICTIONS
This site is not on smuggler mountain.
9. FUGITIVE DUST CONTROL
The project will utilize the following fugitive dust control measures.
1. The back access shall be graveled to keep mud from the street.
2. A water tap shall be kept in place as to water the site daily. A water truck will not
be in place in the winter months.
3. Mud tracks and tire cleanout station shall be placed and used.
4. An onsite Bobcat with street sweeper shall be used as necessary to keep the
public ROW clean from mud and debris.
5. An onsite pressure washer shall be used to keep the public ROW clean.
6. Vehicle speeds will be kept to 15 MPH
24 HOUR EMERGENCY CONTACT: Charlie Berger 970-618-7493
10.EMISSIONS
10.1. GENERAL
All vehicles and equipment used on site shall be properly marinated such that the
engines will function within manufacture’s standards or parameters.
10.2. EMISSIONS FROM DIESEL POWERED ENGINES
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 11 of 14
Emissions from diesel engines operated within the city of Aspen shall be a shade or
density no darker than 40% opacity except for starting motion no longer than 10
seconds or for stationary operation not exceeding 10 seconds.
11.NOISE SUPPRESSION
11.1. GENERAL
All Construction equipment shall be adequately muffled and maintained to minimize
project noise.
11.2. NOISE SUPPRESION PLAN
All activity that generates noise in excess of 80 decibels will be restricted to operating
between the hours of 9AM and 5PM Monday thru Friday.
A sound barrier will be installed on the sout and east property line for the duration of
the micropile, excavation, and concrete phase of the project.
11.3. CONTINUED NOISE MONITORING
Continued noise monitoring will be installed if required by the Engineering dept.
11.4. REQUIREMENTS FOR ACTIVITIES EXCEEDING 80 DECIBELS
1. Any work producing noise levels over 80 decibels is not permitted to commence
until after 9:00 AM and is not permitted on Saturdays. This does not restrict quiet work
inside and outside that does not require a power source, including a battery, on
Saturday.
2. All neighbors within three hundred feet of the project will be notified. Informing
them of the kinds of equipment, expected noise levels and duration of work.
COMMUNICATION WITH THE NEIGHBORS WILL BE MAINTAINED AT ALL TIMES
WITH THE INTENT OF REDUCING COMPLAINTS.
3. Equipment will be operated in accordance with the manufacturer’s specifications
and with all standard manufacturers mufflers and noise reducing equipment in use and
properly operating condition.
4. Notices to inform workers, including sub-contractors, will be posted about basic
noise requirements, as well as specific noise restrictions.
5. Table 1 of Appendix C will be followed for noise barriers.
This site will qualify
as a "Major Impact
Site", and therefore
requires Sound
engineer model
report. Mitigation
efforts will be based
on this study.
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 12 of 14
6. Portable loud equipment will be moved to different sides of the property to reduce
noise impact on individual neighbors.
7. Radios will not be on prior to 8:00 AM.
11.5. SPECIFIC RESTRICTIONS RELATED TO MANUFACTURING ON SITE
There will be no manufacturing on site as described in this section of the manual.
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 13 of 14
EXHIBIT “A”
07/28/17
KAEGEBEIN FINE HOMEBUILDING, LLC
PO Box 1570, Carbondale, CO. 81623
Phone: (970) 510-5797 Fax: (970)963-1392
office@kfhomebuilding.com
www.kfhomebuilding.com
Page 14 of 14