Loading...
HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0057.2018 (4).ACBKCOMcheck Software Version 4.0.8.1 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Construction Site: 535 E. Hyman Ave. Unit 001 Aspen, CO 81611 Owner/Agent:Designer/Contractor: BG Buildingworks 251 Linden st #200 Fort Collins, CO 80524 970.221.5391 Project Information Energy Code: Aspen Core Unit 201 Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-STORAGE (Common Space Types:Storage): Exempt N/ATotal Allowed Watts = Area Category Exemption Qualifications Activity Area # Fixtures Repl./AddedPre-Alt.null Total # Watts Pre-Alt.Post-Alt. STORAGE ( Common Space Types:Storage 920 sq.ft.)6 0 Exemption: Less than 10% fixture replacement. 384.000 0.000 Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures STORAGE ( Common Space Types:Storage 920 sq.ft.): Exempt N/ATotal Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES Project Title: Data filename: Aspen Core Unit 201 \\bgce-rsnas\Data\BGProjects\9203.09 Aspen Core - Basement, Unit 001\Engineering\9203.08 Aspen Core Unit 001 Comcheck.cck 05/10/18Report date: 51 ofPage Eric Rubottom, Principal 05.10.18 05/23/2018 09/19/2018 nickt Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.8.1 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen Core Unit 201 \\bgce-rsnas\Data\BGProjects\9203.09 Aspen Core - Basement, Unit 001\Engineering\9203.08 Aspen Core Unit 001 Comcheck.cck 05/10/18Report date: 52 ofPage05/23/2018 Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Exception: Lighting controlled by occupancy sensors. C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen Core Unit 201 \\bgce-rsnas\Data\BGProjects\9203.09 Aspen Core - Basement, Unit 001\Engineering\9203.08 Aspen Core Unit 001 Comcheck.cck 05/10/18Report date: 53 ofPage05/23/2018 Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen Core Unit 201 \\bgce-rsnas\Data\BGProjects\9203.09 Aspen Core - Basement, Unit 001\Engineering\9203.08 Aspen Core Unit 001 Comcheck.cck 05/10/18Report date: 54 ofPage05/23/2018 Project Title: Data filename: Aspen Core Unit 201 \\bgce-rsnas\Data\BGProjects\9203.09 Aspen Core - Basement, Unit 001\Engineering\9203.08 Aspen Core Unit 001 Comcheck.cck 05/10/18Report date: 55 ofPage05/23/2018