Loading...
HomeMy WebLinkAboutFile Documents.610 S West End St.0061.2018.ARBK Simon Residence 610 S West End Street Gant Unit C204 Aspen, Co 81611 City of Aspen Construction Management Plan March 20, 2018 2.0 Project Introduction 2.1 Disturbance Area: None: Interior renovation 2.2 Location: 610 S West End Street, Gant Condominium C204 Aspen, CO 81611 2.3 Description: An interior renovation of 1 bedroom/ 1 bath condominium. Kitchen and baths to be completely redone. Add washer and dryer. 3.0 Project Documentation 3.1 Permits: A City of Aspen permit has been applied for on March 20, 2018 3.2 Public Notification: A project letter will be sent to the HOA and management company before the start of construction complying with City of Aspen requirements. 3.3 Project Sign N/A. 3.4 Contact List Owner: Jerome Simon Contractor: unknown Supervisor: unknown Safety Officer: unknown Traffic Officer: unknown Erosion Control representative: N/A 4.0 Project Implementation 4.1 Dates of Construction: April 7, 2018- June 23, 2018 4.2 Hours of Construction: Per City of Aspen regulations: Monday – Friday 7:30 am to 5:30 pm Saturday 9:00 am to 5:00 pm 4.3 Construction Schedule: 03/22/2018 5.0 Parking Management 5.1 Parking Management Form 5.2 Emergency Vehicle Access and Ordinance 35 Emergency vehicle access will remain open at all times 5.4 Staging Areas Gant parking as necessary, complex closed for duration on construction 5.5 Construction Trailer, materials storage and Waste Management No trailer, parking lot for material delivery, dumpster provided by HOA 6.0 Traffic Control Not Applicable to this permit 6.5 Traffic Control Plan Not Applicable to this permit 8.0 Sediment and Erosion Control Not Applicable to this permit 9.0 Fugitive Dust Control Not Applicable to this permit 10.0 Emissions Not Applicable to this permit 11.0 Noise Suppression 11.1 General Compliance with the 70-decibel noise limit will be insured from June 1st through Labor Day. Compliance of the 80-decibel noise limit will be insured from Labor Day through May 31st. 11.2 Noise Suppression Plan Exhibit”C” is the signed copy of the City of Aspen Construction Noise Suppression Plan. 11.3 Requirements for Activities Exceeding 80 Decibels All applicable rules & regulations will be complied with. Written notification to surrounding neighbors within 300 feet of the project will be distributed as necessary. 03/22/2018