Loading...
HomeMy WebLinkAboutFile Documents.1252 Snowbunny Ln.0278.2018.ARBKMarkup Summary Page: 6 Author: jackd File Name: Deck change submittal.pdf Permeable paver spec needs to conform to COA detail provided on page 8-55 of URMP. 6 (4) Page: 6 Author: jackd File Name: Deck change submittal.pdf Washed AASHTO #57 or #67 aggregate needs to be used for reservoir. Page: 6 Author: jackd File Name: Deck change submittal.pdf Concrete perimeter barrier recommended to prevent settling of pavers. This is not required. Page: 6 Author: jackd File Name: Deck change submittal.pdf Typ. No. 8 Aggregate in openings. Permeable paver spec needs to conform to COA detail provided on page 8-55 of URMP.Hayes Con Inc 970-61 nny Lane eWashed AASHTO #57 or #67 aggregate needs to be used for reservoir. Concrete perimeter barrier recommended to prevent settling of pavers. This is notrequired. Typ. No. 8 Aggregate in openings. Permeable Paver detail has been revised to conform to the detail on page 8-55 of the URMP. The detail has been revised to specify AASHTO #57 or #67 aggregate in the reservoir portion. A concrete perimeter barrier has been added to the detail. The detail has been revised to include No. 8 aggregate in the in-fill and leveling course. 03/16/2019