HomeMy WebLinkAboutMaster Permit.26 S Willow Ct.0183.2018.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
Commerical
Multi-FamilySingle Family
Use of Building Class of Work
New
Addition
Alteration
Repair
________
Yes
No
Will there be
any roof/wall
penetrations͍
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 1ϴϬ days, or
if construction or work is suspended or
abandoned for a period of 1ϴϬ days at
any time aŌer work is commenced.
__________________
_________________
__________________
____________________
________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use
IFFR
Tenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________η of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____Forced Air/'ravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____sentilation Fans
____Range Hood
____η of 'as System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-
viewer
Sign-
Off
NEW SQ FT
Project Valuation: Cost of project as defined in saluation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: 'ross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Disturbed Exterior Area: Square footage of lot affected by permit application.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO zOU LI<E DO'S͍
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReviewDEFINITIONS26 S WILLOW CT 273511309031
31 Maroone Creek Club
MAROON 31 LLC 2032524444 ads@sandersequities.com
Scot Broughton 379-6695 sbarchitectsco@mac.com
Remove existing interior non-load bearing framing, and finishes. Frame in stair opening.
53000
177
15268
157
0
0
R-15
177
177
$160,272.00
Frame in part of existing storage for area to do main level family room addition.
Add family room expansion into existing deck, and square off angled walls at breakfast bay
07/06/2018
0783.2018.arbk7/6/18
x jb 7/6/18
x
x
x
3595.67
162.50
162.50
632.86
400.68
5531.80
434
TF
TF
9/28/15
9/28/18
JRB 11/23/180
0
0
0
0
A
DAM 11/29/18
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
/NSPEd/ONS: dhe 'eneral ontractor must schedule insƉections online͘
Please ǀisit www͘asƉenƉitkin͘comͬDeƉartmentsͬommunityͲDeǀeloƉmentͲFormsͬ to do so͘
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). zou must take a test and complete the owner/building affidavit.
(CITz USE ONLz) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
Scot Broughton 927-0552 sbarchitectsco@mac.com
Harry Mayer 379-2780 buildam@sopris.net
Maroon 31 LLC 203-252-4444
62 Calpboard Ridge Rd, Greenwich, CTY 06830
artsanders@mac.com
Scot Broughton 970-927-0552, 970-379-6695
box 4096, Basalt, CO 81621
sbarchitectsco@mac.com
Scot Broughton 927-0552 379-6695
box 4096, Basalt, CO 81621
sbarchitectsco@mac.com
N/A
Evolve Structural 510-0773 618-7708
1040 Main St., Carbondale, CO 81623
sara@evolvestruct.com
Harry Mayer 927-8408 379-2780
300 Spring Ct, Carbondale, CO 81623
buildam@sopris.net
07/06/2018
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
If you check any of the boxes below, please consult with the Planner of the Day (planneroŌhedayΛgmail.com) before submiƫng your
permit application.
Does your permit involve any of the following͍
LAND USE QUESTIONS
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
Part of an approved COA Land Use Review
Work affects net leasable, net livable, or
non-unit space
Work involves lot spliƫng or combining a lot
Work involves exterior of structure
Changing the number of residential units
Changes to number or location ofonsite parking
Work involves Landmark Parcel or Historic District
Located in 1ϬϬ-year Ňood plain or within 1ϬϬ’ of highwater mark
Work involves changes in occupancy to structure
Changes to elevator or stair configuration
Changes to the use of existing structure or space
Does your permit involve any of the following͍
ADDITIONAL SCOPE OF WORK QUESTIONS
Exterior lighting added or changed
Work involves roof penetrations
Work adds, removes, or changes
plumbing fixtures
Disturbs 1,ϬϬϬ sq Ō or more of soil within
12 months
Work occurs in public right of way
Work affects trees or occurs within the
dripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
August 2017
205 S. Mill St.
07/06/2018
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy 'roup
COMMUNITz DEsELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITz OF ASPEN 13Ϭ S. 'ALENA ST ͮ ASPEN, CO ϴ1611
BUILDING CODE INFORMATION
2Ϭ15 IRC
Existing͍NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
η Stories Above 'rade ______ η Stories Below 'rade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
η Bedrooms ______ η Full Baths ______ Deck Area ______
η 3/4 Baths ______ η 1/2 Baths ______
η <itchens ______ η Wood Fireplaces ______
η 'as Appliances ______ η 'as Logs______
NFPA 13 D
RESCheck UA Alternative
zes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached 'arage Detached 'arage Carport
Is there an ADU͍
η Living Rooms_____
η <itchens _____
η Full Baths _____
η 3/4 Baths _____
η 1/2 Baths _____
η Bedrooms _____
η Other Rooms (List)____________
ADU BUILDING DESCRIPTION
zes
No
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
sA sB Is IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing н New)
A__B
B (A ф5Ϭ)
F__
H__
I __
E R__
S__
U
M
I
RC
I
B
C
2Ϭ15 IBC
(As Adopted and Amended)
zes
No Required͍zes
No Type
January 2018
2Ϭ15 IEBC
(As Adopted
and Amended)
Other _____________
'ross Area of Building: __________ 'ross Area of Unit: __________
Occupant Load: ___________
1320
2 1
Family Room addition into existing deck. Square off angled bay.
4 BEDROOMS, 4 1/2 BATHS, MEDIA ROOM, LAUNDRY, MECHANICAL, STORAGE, CRAWLS SPACES, STAIRS
ENTRY, LIVING ROOM, LIBRARY , DINING ROOM, KITCHEN, BREAKFAST ROOM, FAMILY ROOM POWDER,
STAIRS PANTRY, MUD & STORAGE, GARAGE.
MASTER BEDROOM, 2 DRESSING ROOMS, LOUNGE, OFFICE, MASTER BATH, STAIRS,
07/06/2018
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
___________________________________ _________ ___________________________
I, the property owner, certify as follows: (pick one)
This property is not subject to a homeowners association or other form of private covenant.
This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature ____________________________ Date _________________
Owner Printed Name ________________________
OR
Owner’s Attorney Signature ___________________________ Date _________________
Owner’s Attorney Printed Name _______________________
ADDRESS UNIT #PARCEL ID #
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
January 2018
xXX
26 S. Willow Court, Lot 31 Maroon Creek Club 273511309031
Art Sanders
07/06/2018
07/06/2018
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long aŌer the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989 “ban” on asbestos-containing materials is commonly misunderstood. In fact, in 1ϵϵ1 the U.S. FiŌh Circuit Court of appeals
vacated much of the so-called ͞Asbestos Ban and Phaseout Rule͟ and remanded it to the EPA. Thus, much of the original 1ϵϴϵ EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TA<E EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS INFORMATION
Yes No
Residential: Will you be removing more than 32 sq Ō, 5Ϭ linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel ʹ examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.͍
Yes No
Commercial: Will you be removing more than 16Ϭ sq Ō, 26Ϭ linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel ʹ examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.͍
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition Ɖermit͘ zou will also need to Ɖroǀide Ɖlans indicatinŐ areas to be demolished and determine if a
O state demolition license is required͘ A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. AŌer removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide zellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAzS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
ASBESTOS CHECKLIST
/ hereby certify that the aboǀe information is true and comƉlete͘
Owner______________________________ Phone #___________________________
Applicant (print name)_________________________________ Phone η___________________
Applicant Signature ___________________________________ Date ______________________
Please call the City of Aspen Environmental Health Department at ϵ2Ϭ-5Ϭ3ϵ at any time if you have questions
about asbestos, interpreting your test results, or other matters.
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
■
MAROON 31 LLC
Scot Broughton 379 7622379-6695
X
6.14.18Scot Broughton
07/06/2018
EMSL Analytical, Inc.
1010 Yuma Street Denver, CO 80204
Phone/Fax: (303) 740-5700/(303) 741-1400
http://www.EMSL.com / denverlab@emsl.com
EMSL Order:221804313
Customer ID:MISC-ACCT
Customer PO:
Project ID:
Attention:Scot Broughton Phone:(970) 379-6695
PO Box 4096 Fax:
Basalt, CO 81621 Received Date:06/15/2018 1:18 PM
Analysis Date:06/18/2018
Collected Date:
Project:26 S.Willow Ct Lot 31 Maroon Creek
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using
Polarized Light Microscopy
Non-Asbestos
Description Appearance % Fibrous % Non-Fibrous % Type
Asbestos
Sample
1-Joint Compound
221804313-0001
Lower Level Storage White
Non-Fibrous
Heterogeneous
None DetectedCa Carbonate
Non-fibrous (Other)
10%
90%
Inseparable paint / coating layer included in analysis
1-Drywall
221804313-0001A
Lower Level Storage White
Non-Fibrous
Homogeneous
None DetectedGypsum
Non-fibrous (Other)
70%
15%
15%Cellulose
These guidance limits are typically used in most scenarios. More stringent local or project specific guidelines may apply.
No Asbestos Detected Between Expected Limit of Detection and Federal
EPA Recommended Limit
Above Federal EPA Recommended Limit
Analyst(s)
Timothy Kleehammer
(2)
Amanda Lang, Asbestos Laboratory Manager
or other approved signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no
responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client
to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and
therefore EMSL recommends gravimetric reduction prior to analysis . Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available
upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Denver, CO NVLAP Lab Code 200828-0
Initial report from: 06/18/2018 11:16:29
ASB_PLMwIMG_0013_0001 Printed: 06/18/2018 11:16:31AM Page 1 of 107/06/2018
07/06/2018
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 4Ϭ, Series of 2Ϭ16 adopts the 2Ϭ15 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
RϭϬϴ͘ϯ uildinŐ Ɖermit ǀaluations͘ Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
ϭϬϵ͘ϯ uildinŐ Ɖermit ǀaluations͘ The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the oƉinion of the buildinŐ oĸcial͕ the ǀaluation is underestimated on the aƉƉlication͕ the Ɖermit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
ity Ɖolicy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HsAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, Ňoor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
AFFIDAVIT POLICY
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: _________________________ Date:___________
Owner Printed Name: _________________________
or,
Authorized Agent Signature: _________________________ Date:___________
Authorized Agent Printed Name: _________________________
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
AuŐust ϮϬϭϳ
Scot Broughton
6.14.18Scot Brougthton
07/06/2018
07/06/2018
07/06/2018
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Applicability: All development projects must comply with the City’s zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City’s Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City’s Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
07/06/2018
07/06/2018