Loading...
HomeMy WebLinkAboutMaster Permit.26 S Willow Ct.0169.2019.ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ Commerical Multi-Family Single Family Use of Building Class of Work New Addition AlterationRepair ________ Yes No Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFR Tenant FinishDemolition Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%) CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County Use Tax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub ____Lavatory (Wash Basin) ____Shower ____Kitchen Sink (+Disposal) ____Dishwasher ____Laundry Bar, Utility Sink ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartment Reviewer Sign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration. Unit Sq Ft: Gross square footage, not FAR, of permitted unit. Lot Size: Total surveyed square footage of property. Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed New Sq Ft: Total added square footage for additions to net livable or net leasable space. Building Footprint: Grade floor square footage of the permitted structure. Hardscape Area: Square footage of impervious lot surface. Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DEFINITIONSZONEDISTRICT Major Engineering Review • Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft • Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft • Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping • Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 06.13.19 0183.2018.ARBK 0169.2019.ARBK 26 S Willow Ct 273511309031 31 Marooin Creek Club Maroon 31 LLC 2032524444 ads@sandersequities.com Scot Broughton 379-6695 sbarchitectsco@mac.com Permit CO work: Add two windows to breakfast bay. Change lower level crawl space access panel to double doors. Relocate Family room door from south wall to east wall. $2500 R15A x PL 7.11.19 X JRB 10.14.19 X TF 10/11/2019 X TF 10/11/2019 25.00 3.75 X06/26/2019 DAM 10/15/19