Loading...
HomeMy WebLinkAboutFile Documents.63 Smuggler Grove Rd.0049.2018 (4).ARBK 1 info@ecosenvironmental.com www.ecosenvironmental.com ASBESTOS INSPECTION REPORT CLIENT: Aspen Construction/David Miller ADDRESS: 63 Smuggler Grove CITY/STATE: Aspen CO 81611 EMAIL: d.miller@aciaspen.com PHONE: 970-379-9331 ECOS JOB NUMBER G-18-051-AT PROJECT LOCATION: 63 Smuggler Grove Aspen CO 81611 DATE OF INSPECTION: 1/14/18 ECOS Environmental – Glenwood Springs 6690 Hwy 82 Glenwood Springs, CO 81601 Office – (970) 945-4407 3/1/18 ND 2 SUMMARY ECOS Environmental & Disaster Restoration (ECOS) was retained to conduct a limited asbestos inspection at the above location in reference to determine if there is asbestos containing material (ACM), in the building prior to remodel of the staircase. The inspection included all accessible building materials, however, should any additional building materials be discovered during demolition, those materials must be sampled and analyzed prior to continuing with the work. Three (3) samples were collected of all suspect materials throughout the building, as listed in the Lab Data Table located on Page 8 of this report. INSPECTOR QUALIFICATIONS This inspection was performed by Alison George, Colorado State Department of Public Health and Environment Certification Number 24206. SAMPLE ANALYSIS PROCEDURE Suspect material was sampled and delivered under a chain of custody for analysis to Aerobiology Laboratory in Denver, CO. Samples were analyzed by Polarized Light Microscopy. TRANSMITTAL OF BUILDING One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows:  One copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws.  The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition, renovation, remodeling or repair project. 3/1/18 3 BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations, quantities, friability and conditions of all building material types at the affected portion of the building/structure. The certified asbestos inspector is responsible for identification and assessment of all type within the affected portion of the building/structure. All building materials visually assessed shall be assumed to be asbestos containing material (ACM), unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies. The subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies both CO STATE ELAP and federal requirements, including multi- layered sample analyses, to document non-asbestos containing material. The building/structure asbestos survey shall also include the building/structure name, address, the building/structure owner’s name and address, the name and address of the owner's agent, the name of the firm performing the asbestos survey and a copy of the firm’s current asbestos handling license, the names of the certified inspector(s) performing the survey and a copy of the current asbestos handling certificate for each inspector utilized, the dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACM, all laboratory analysis reports for bulk samples collected, and copies of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos survey. REMOVAL REQUIREMENT If the building/structure asbestos survey finds that the portion of the building/structure to be demolished, renovated, remodeled, or have repair work contains asbestos containing material (ACM), which is impacted by the work, the owner or the owner’s agent shall conduct, or cause to have conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth. All ACM impacted by the demolition, renovation, remodeling or repair project shall be removed, prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling or repair work shall be commenced by any owner or the owner’s agent prior to the completion of the asbestos abatement in accordance with the notification requirements. For multi- phased work, the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other trades, or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound, the demolition is considered an asbestos project. All building/structure owners and asbestos abatement contractors on a demolition, renovation, remodeling, or repair project shall inform all trades on the work site about the ACM at the work site. 3/1/18 4 UNIDENTIFIED AND UNASSESSED ASBESTOS When any construction activity, such as demolition, remodeling, renovation or repair work, reveals suspect ACM that has not been identified by the asbestos survey, or has not been identified by other inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the suspect ACM is found. Unassessed suspect miscellaneous ACM shall be treated and handled as ACM and assumed to be ACM, unless proven otherwise by standard EPA and OSHA accepted methods. To document non-asbestos containing material, analysis must be performed by a laboratory that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal requirements. ASBESTOS PROJECTS An asbestos project is any work that involves the removal, encapsulation, enclosure, repair or disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in the release of asbestos fibers. For the purpose of compliance an asbestos project shall include any disturbance of asbestos fibers, and the planning, asbestos survey, design, background air sampling, inspection, air sampling and oversight of abatement work, cleanup, and the handling of all asbestos material subject to abatement, as well as the supervising of such activities. An asbestos project starts with Phase I when the planning, asbestos survey, and design work begins or is required to begin. The project shall not be considered completed until Phase II D is complete. (See Table 1 below). Phase I (Prior to Asbestos Abatement Contractor) Phase II Start -> Abatement -> End A B A B C D Asbestos survey, planning, and design Background air sampling Regulated abatement work area(s) preparation and enclosure construction Asbestos handling including gross removal or abatement, initial cleans, and waste Final cleaning and clearance air samples Final waste removal from site Start -> Asbestos Project ->Final Clearance 3/1/18 5 ASBESTOS RESULTS FLOW CHART ASBESTOS PROJECT SIZE Large asbestos project: An asbestos project involving the removal, disturbance, enclosure, encapsulation, repair or handling of 160 square feet or more of ACM, or 260 linear feet or more of ACM. Small asbestos project: An asbestos project involving the removal, encapsulation, enclosure, repair, disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and less than 260 linear feet of ACM. Minor asbestos project: An asbestos project involving the removal, disturbance, repair, encapsulation, enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of ACM. Asbestos Test 0% -Non Detect No Action Required < 1% OSHA Requirements NO Permit Required ECOS provides clearance (NOT required) >1% Reg. 8 Requirements Permit Clearance Testing Manifested Disposal at Approved Landfill Additional Reg. 8 Requirements >3,000 SF Project Design Project Manager Oversight 3/1/18 6 ASBESTOS REMOVAL CATEGORIES Category I Non-Friable ACM: NESHAP classification - Asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products, containing more than one percent (1%) asbestos, that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Category II Non-Friable ACM: NESHAP classification - Any material, excluding Category I Non-Friable ACM, containing more than one percent (1%) asbestos that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems Insulation (TSI), and surfacing ACM and PACM. Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics. Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations, where no more than a minor quantity of ACM, including TSI and surfacing ACM and PACM, is likely to be disturbed. Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which employees contact but do not disturb ACM or PACM and activities to clean up non-ACM dust, waste and debris resulting from Class I, II and III activities. DEFINITIONS Abatement: Procedures to control fiber release from asbestos material. This includes removal, encapsulation, enclosure, repair, and disturbance of friable asbestos or any handling of asbestos material that may result in the release of asbestos fibers. Amosite: An Asbestiform mineral of the amphibole group containing approximately 50% silicon and 40% Iron (II) Oxide, and is made up of straight brittle fibers, light gray to pale brown in color. Amphibole: One of the two major groups of minerals from which the Asbestiform minerals are derived, distinguished by their chain-like crystal structure and chemical composition. Asbestos: A generic name given to a number of naturally occurring hydrated mineral silicates that possess a unique crystalline structure, are incombustible in air, and are separable into fibers. Asbestos includes the asbesti-form varieties of chrysotile (serpentine); crocidolite (riebeckite); amosite (cummington-grunerite); anthophyllite; and actinolite. Asbestos Project: Work undertaken by a contractor which at any time involves any aspect of the removal, encapsulation, enclosure or disturbance of friable asbestos, or any handling of asbestos material that may result in the release of asbestos fiber, except work in an owner-occupied single family dwelling performed by the owner of such dwelling. An asbestos project shall include the planning, 3/1/18 7 design, monitoring, inspection, and air sampling of abatement work, as well as the supervising of such activities. Building Owner: The person in whom legal title to the premises is vested unless the premises are held in land trust, in which instance building owner means the person in whom beneficial title is vested. Electron Microscopy: A method of asbestos sample analysis which utilizes an electron beam to differentiate between fibers. Emergency: An unexpected, unanticipated or unforeseen occurrence, including but not limited to, a steam, chemical, gas or water line rupture, a boiler failure, or a building collapse, which poses (a) an imminent danger to the health and safety of the public, the response to which will constitute an asbestos project; or (b) an asbestos- related risk to the health and safety of the public from exposure to asbestos fibers. Friable Asbestos: Any materials that contain more than 1% asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure. HEPA Filter Vacuum Equipment: Vacuuming equipment with a high efficiency particulate air filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3 microns equivalent aerodynamic diameter. Homogenous: Evenly mixed and similar in appearance and texture throughout. NESHAP: National Emission Standard for Hazardous Air Pollutants OSHA: Occupational Safety and Health Administration Operations and Management Plan (OMP): Specific procedures and practices developed for the interim control of asbestos-containing materials in buildings until it is removed. Polarized Light Microscopy (PLM): An optical microscopic technique used to distinguish between different types of asbestos fibers by their shape and unique optical properties. Repair: Corrective action using required work practices to control fiber release from damaged asbestos material. TSI: Thermal Systems Insulation 3/1/18 8 LAB DATA Sample Suspect Material Detect Non Detect Percentage Friability Condition APPR. SF A1 White tape, White Joint Compound, White plaster with White Paint, White/tan drywall X 0% Yes Good 900sf A2 White tape, White Joint Compound with pink resinous material, White plaster with White Paint, White/tan drywall X 0% Yes Good 900sf A3 White tape, White Joint Compound, White plaster with White Paint, White/tan drywall X 0% Yes Good 900sf INVENTORY Homogenous Material Description A Plastered drywall taken from through property as homogenous with staircase drywall. CONCLUSIONS Visual inspection was completed of all building materials to be affected during remodeling of the staircase and addition of an elevator. Three (3) samples were collected and sent to Aerobiology Laboratories in Golden, CO, for analysis using Polarized Light Microscopy (PLM). The samples came back non-detect for asbestos. 3/1/18 9 CERTIFICATIONS 3/1/18 10 PHOTOS 3/1/18 11 FINAL NOTES This report represents the opinion of the reporting asbestos inspector at the time of the asbestos assessment survey. If you have any further questions, or if additional information is needed please do not hesitate to call. Sincerely, Alison George Colorado State EPA Asbestos Inspector #24206 ECOS Environmental & Disaster Restoration, Inc. (970) 945-4407 3/1/18 780 Simms Street Suite 104 Golden, CO, 80401 303.232.3746 Certificate of Analysis www.aerobiology.net Client Name ECOS Environmental Date Collected:02/14/18 Street address 6690 HWY 82 Date Received:02/15/18 City, State ZIP Glenwood Springs, CO 81601 Date Analyzed:02/15/18 Attn: Alison George 200860-0 Date Reported:02/15/18 Client Project Name: Miller 63 Smuggler Project ID:18004781 Job ID: Test Requested:3002, Asbestos in Bulk Samples Method:Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993. Non-Asbestos Non-Fibrous Matrix Fiber Material Material Client Percentage Percentage Composition P = Perlite B = Binder D=Diatoms NTR = Non-Asbestiform TR NAC = Non-Asbestiform AC 780 Simms Street, Suite 104, Golden, CO, 80401, 303.232.3746 A1 A2 N N 2% 3% 80% N N Trace=Less Than 1% N N 3% 5% 10% ND=None Detected CHRY=Chrysotile M = Mica CR = Crocidolite T = Tar TR = Tremolite A = Amosite Q = Quartz AC = Actinolite C = Carbonates AN = Anthophyllite G = Gypsum ND 15 85 G ND 100 G 99 1 C ND 100 C ND 99 1 ND ND 100 G ND 100 G ND 1 15 85 ND 100 C Asbestos Percentage White Tape ND 99N2% 2% Asbestos Detected White Joint Compound Laboratory Analyst Talena Oliver Asbestos Laboratory Supervisor Shannon Whitmore White/Tan Drywall White Tape White Plaster 18004781-3A 18004781-2D 18004781-2E White Joint Compound18004781-2B White Compound with Pink Resinous Material18004781-2C A3 NVLAP Lab Code 18004781-1D 18004781-2A 6% N 90% 18004781-1C N Lab Sample Number N White/Tan Drywall White Tape White Plaster with White Paint Sample Identification Physical Description of Sample/Layer Homo- geneous (Y/N) Layer Percentage 18004781-1A 18004781-1B Page 1 of 3 3/1/18 780 Simms Street Suite 104 Golden, CO, 80401 303.232.3746 Certificate of Analysis www.aerobiology.net Client Name ECOS Environmental Date Collected:02/14/18 Street address 6690 HWY 82 Date Received:02/15/18 City, State ZIP Glenwood Springs, CO 81601 Date Analyzed:02/15/18 Attn: Alison George 200860-0 Date Reported:02/15/18 Client Project Name: Miller 63 Smuggler Project ID:18004781 Job ID:0 Test Requested:3002, Asbestos in Bulk Samples Method:Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993. Non-Asbestos Non-Fibrous Matrix Fiber Material Material Client Percentage Percentage Composition P = Perlite B = Binder D=Diatoms NTR = Non-Asbestiform TR NAC = Non-Asbestiform AC 780 Simms Street, Suite 104, Golden, CO, 80401 NVLAP Lab Code Sample Identification Physical Description of Sample/Layer Homo- geneous (Y/N) Layer Percentage Asbestos Detected Asbestos Percentage Lab Sample Number 18004781-3B White Joint Compound N 3%ND A3 100 C 18004781-3C White Plaster N 10%ND 100 G G18004781-3D White/Tan Paint N 84%ND 15 85 A = Amosite AC = Actinolite C = Carbonates AN = Anthophyllite G = Gypsum CHRY=Chrysotile M = Mica Q = Quartz Laboratory Analyst Asbestos Laboratory Supervisor ND=None Detected CR = Crocidolite T = Tar TR = Tremolite Shannon Whitmore Talena Oliver Trace=Less Than 1% Page 2 of 3 3/1/18 780 Simms Street Suite 104 Golden, CO, 80401 303.232.3746 Certificate of Analysis www.aerobiology.net ECOS Environmental Date Collected:02/14/18 6690 HWY 82 Date Received:02/15/18 Glenwood Springs, CO 81601 Date Analyzed:02/15/18 Alison George 200860-0 Date Reported:02/15/18 Client Project Name: Miller 63 Smuggler Project ID:18004781 Job ID: General Notes  ND indicates no asbestos was detected; the method detection limit is 1 %.  Trace or "<1" indicates asbestos was identified in the sample, but the concentration is less than 1%. Notes Required by NVLAP  This test report relates only to the items tested or calibrated.  This report is not valid unless it bears the name of a NVLAP-approved signatory.  Any reproduction of this document must include the entire document in order for the report to be valid. 780 Simms Street, Suite 104, Golden, CO, 80401, 303.232.3746 NVLAP Lab Code  This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.  All regulated asbestos minerals (i.e. chrysotile, amosite, crocidolite, anthophyllite, tremolite, and actinolite) were sought in every layer of each sample, but only those asbestos minerals detected are listed. Amosite is the common name for the asbestiform variety of the minerals cummingtonite and grunerite. Crocidolite is the common name used for the asbestiform variety of the mineral riebeckite.  Tile, vinyl, foam, plastic, and fine powder samples may contain asbestos fibers of such small diameter (< 0.25 microns in diameter) that these fibers cannot be detected by PLM. For such samples, more sensitive analytical methods (e.g. TEM, SEM, and XRD) are recommended if greater certainty about asbestos content is required. Semi-quantitative bulk TEM floor tile analysis is accepted under NESHAP regulations.        These results are submitted pursuant to Aerobiology Laboratory Associates, Inc.’s current terms and conditions of sale, including the company’s standard warranty and limitation  of liability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted.  Unless notified in writing to return the samples covered by this report, Aerobiology Laboratory Associates, Inc. will store the samples for a minimum period of thirty (30) days before discarding. A shipping and handling charge will be assessed for the return of any samples.  Aerobiology does not guarantee the results of tape lifts, microvacs, wipe, and/or debris samples. Accurate analysis cannot be performed due to particle size, media used, and/or amount of material given. Analysis of these materials should be preformed by a TEM. A result of ND does not indicate that the sample area does not contain asbestos. It means the analyst could not identify asbestos in the specific sample for the reasons listed above. Page 3 of 3 3/1/18