HomeMy WebLinkAboutMaster Permit.63 Smuggler Grove Rd.0049.2018.ARBK COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
MASTER PERMIT: ______________________DATE:___________
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
__________________________________________________________________________________
____________________________________________________________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
PERMIT NUMBER: __________________________
CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ
Use of Building Class of Work
NewĚĚŝƟŽŶůƚĞƌĂƟŽŶ
Repair
________
Yes
No
Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍
NOTICE: This permit becomes null and ǀŽŝĚŝĨǁŽƌŬŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕ŽƌŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚĂŶLJƟŵĞĂŌĞƌǁŽƌŬŝƐĐŽŵŵĞŶĐĞĚ͘
__________________
_________________
__________________
____________________
________________
_________________
__________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
SQ FT OF LAND-SCAPE WORK
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
DŝdžĞĚͲhƐĞ
IFFR
Tenant FinishĞŵŽůŝƟŽŶ
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
ŶĞƌŐLJŽĚĞ REMP School Ded.
Zoning (50%) Plan Check
;,ŽƵƌůLJͿ
TDM Impact
Engineering Review ŽŶŝŶŐ;,ŽƵƌůLJͿ WĞĚ͘ŵĞŶŝƚLJ
CMP (50%) Engineering
;,ŽƵƌůLJͿ
Housing Cash in Lieu
Parks Review Zoning (50%) Stormwater
hƟůŝƚLJZĞǀŝĞǁ CMP (50%)ŝƚLJhƐĞdĂdž
Other Electrical ŽƵŶƚLJhƐĞdĂdž
Plumbing GIS
Mechanical ^ĂŶŝƚĂƟŽŶ
SUBMITTAL FEES ISSUANCE FEES
__________________PLANS LOCATION
_________Lot Area
_________Zone District
_________Deed Restricted
_________Census Code
_________# of Dwellings
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtubͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ
____Shower
____Kitchen Sink (+Disposal)
____Dishwasherͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ
____Clothes Washer
____Floor Sink
____Floor Drain
____Shower
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____&ŽƌĐĞĚŝƌͬ'ƌĂǀŝƚLJ^LJƐƚĞŵƐ
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
ďƐŽƌƉƟŽŶhŶŝƚ
____Boilers (includes vent)
____Air Handling Unit
ͺͺͺͺŽŽůŝŶŐ^LJƐƚĞŵƐͺͺͺͺsĞŶƟůĂƟŽŶ&ĂŶƐ
____Range Hood
ͺͺͺͺηŽĨ'ĂƐ^LJƐƚĞŵKƵƚůĞƚƐ
____^ŶŽǁŵĞůƚ^LJƐƚĞŵ^Ƌ&ƚͺͺͺͺͺͺͺͺͺ
Equipment Checklist
Zoning
HPC
Building
Fire
Engineering
CMP
hƟůŝƟĞƐ
Water
Stormwater
^ĂŶŝƚĂƟŽŶ
Env. Health
Parks
Landscape
ĸĐŝĞŶĐLJ
Approved
To Issue
Issuance
ReviewRequired Date ApprovedReviewingDepartmentReviewer/ŶŝƟĂůƐ
ĂůůƐƐĞƐƐŽƌ;ϵϳϬͲϵϮϬͲϱϭϲϬͿƚŽǀĞƌŝĨLJ
NEW SQ FT
ĞƚĂŝůƐdĞƌŵĞĮŶŝƟŽŶƐWƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘^Ƌ&ƚŽĨtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐ^ƋƵĂƌĞ&ŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘
Sq Ft of Landscape Work: Square footage of disturbed exterior area.EĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐďůĞƐƉĂĐĞ͘^Ƌ&ƚŽĨZŽŽŵƐǁŝƚŚhƟůŝƚLJtŽƌŬ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨĂůůƌŽŽŵƐǁŝƚŚƉůƵŵďŝŶŐǁŽƌŬ͘KzKh>/<K'^͍
ƵŐƵƐƚϮϬϭϳ
63 Smuggler Grove, Aspen, CO.273718106004
4 East Meadow Subdivision
34% Interior remodel including removal and replacement of existing stair, new elevator and bedroom & bath remodel.
Work also includes replacement of existing landscape and hardscape, and a new dormer at new stair.
Kim Weil kweil@billposs.com
DP Aspen LLC DBlumenfeld@BDG.NET
8511311
1,680
2,028
7,668 22
0
4
11 1
970 925-4755 (0)
516 624-1919 (0)
$1,175,000.00
3/1/18
0049.2018.arbk 3/1/18
x
x
x
x
x
x
x
x
15697.50
3158.41
325
325
1084.98
1084.98250
24150
2937.50
11287.50
JF 7/20/18
TF
TF
7/25/18
7/25/18
Dr 8/2/18
BN 8.10.18
7,668 Sq. Ft.
R-15A
0
0
0
0
0
tk 3/6/18
sw 8/10/18
pm 3/12/18
3/1/18
3/1/18
3/1/18
3/1/18
3/1/18
DP ASPEN LLC (516) 624-1919
David Miller (970)379-9331
2/22/18
SEE ATTACHED ASBESTOS INSPECTION REPORT AND ANALYSIS
3/1/18
3/1/18
3/1/18