Loading...
HomeMy WebLinkAboutMaster Permit.63 Smuggler Grove Rd.0086.2019.ARBK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalDƵůƟͲ&ĂŵŝůLJ^ŝŶŐůĞ&ĂŵŝůLJ Use of Building Class of Work NewĚĚŝƟŽŶůƚĞƌĂƟŽŶ Repair ________ Yes No Will there be ĂŶLJƌŽŽĨͬǁĂůůƉĞŶĞƚƌĂƟŽŶƐ͍ NOTICE: This permit becomes null and void if work ŽƌĐŽŶƐƚƌƵĐƟŽŶĂƵƚŚŽƌŝnjĞĚŝƐŶŽƚĐŽŵŵĞŶĐĞĚǁŝƚŚŝŶϭϴϬĚĂLJƐ͕ŽƌŝĨĐŽŶƐƚƌƵĐƟŽŶŽƌǁŽƌŬŝƐƐƵƐƉĞŶĚĞĚŽƌĂďĂŶĚŽŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨϭϴϬĚĂLJƐĂƚĂŶLJƟŵĞĂŌĞƌ work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) DŝdžĞĚͲhƐĞ IFFR Tenant FinishĞŵŽůŝƟŽŶ Change Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands ĞĚŝĐĂƟŽŶ Zoning Review (50%) CMP (50%)TDM Impact ŶĞƌŐLJŽĚĞ Review REMP WĂLJŵĞŶƚ Pedestrian ŵĞŶŝƚLJ CMP (50%) GIS Housing Cash in Lieu Parks Review ŝƚLJhƐĞ Tax Water Tap hƟůŝƚLJZĞǀŝĞǁ ŽƵŶƚLJhƐĞ Tax ^ĂŶŝƚĂƟŽŶ SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtubͺͺͺͺ>ĂǀĂƚŽƌLJ;tĂƐŚĂƐŝŶͿ ____Shower ____Kitchen Sink (+Disposal) ____Dishwasherͺͺͺͺ>ĂƵŶĚƌLJĂƌ͕hƟůŝƚLJ^ŝŶŬ ____Clothes Washer ____Floor Sink ____Floor Drain ____Water Heater (Pan Req) ____# Gas Outlets ____Water Treatment ____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater ^ĂŶŝƚĂƟŽŶ Env. Health Parks Landscape ĸĐŝĞŶĐLJ Approved To Issue Issuance Date ApprovedReviewingDepartment Reviewer^ŝŐŶͲKī NEW SQ FT WƌŽũĞĐƚsĂůƵĂƟŽŶ͗ŽƐƚŽĨƉƌŽũĞĐƚĂƐĚĞĮŶĞĚŝŶsĂůƵĂƟŽŶīĂĚĂǀŝƚ͘^Ƌ&ƚŽĨƵŝůĚŝŶŐtŽƌŬƌĞĂ͗dŽƚĂůƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨŝŶƚĞƌŝŽƌĂƌĞĂƵŶĚĞƌŐŽŝŶŐĐŚĂŶŐĞŽƌƌĞĐŽŶĮŐƵƌĂƟŽŶ͘hŶŝƚ^Ƌ&ƚ͗'ƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ͕ŶŽƚ&Z͕ŽĨƉĞƌŵŝƩĞĚƵŶŝƚ͘>Žƚ^ŝnjĞ͗dŽƚĂůƐƵƌǀĞLJĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƉƌŽƉĞƌƚLJ͘^Ƌ&ƚŽĨ^ŽŝůŝƐƚƵƌďĂŶĐĞ͗ Exterior area of the lot where the ground is disturbedEĞǁ^Ƌ&ƚ͗dŽƚĂůĂĚĚĞĚƐƋƵĂƌĞĨŽŽƚĂŐĞĨŽƌĂĚĚŝƟŽŶƐƚŽŶĞƚůŝǀĂďůĞŽƌŶĞƚůĞĂƐĂďůĞƐƉĂĐĞ͘ƵŝůĚŝŶŐ&ŽŽƚƉƌŝŶƚ͗'ƌĂĚĞŇŽŽƌƐƋƵĂƌĞĨŽŽƚĂŐĞŽĨƚŚĞƉĞƌŵŝƩĞĚƐƚƌƵĐƚƵƌĞ͘,ĂƌĚƐĐĂƉĞƌĞĂ͗Square footage of impervious lot surface.ŽŶĞŝƐƚƌŝĐƚ͗hŶĚĞƌůLJŝŶŐnjŽŶĞĚŝƐƚƌŝĐƚŽĨƉĞƌŵŝƩĞĚƉĂƌĐĞů͘ January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DEFINITIONSZONEDISTRICT Major Engineering Review • Projects involving less than 50% ŚĂƌĚƐĐĂƉĞĂƌĞĂĂŶĚǁŽƌŬĂīĞĐƟŶŐϳϱйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚƐƋŌ • Projects involving greater than 50% hardscape area and work ĂīĞĐƟŶŐϱϬйŽƌŐƌĞĂƚĞƌŽĨƵŶŝƚƐƋŌ • WƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐϭ͕ϬϬϬнƐƋŌŽĨ soil disturbance area tĂƚĞƌĸĐŝĞŶƚ>ĂŶĚƐĐĂƉŝŶŐ • Projects that trigger a major engineering review • Projects involving interior ĂůƚĞƌĂƟŽŶƐĂīĞĐƟŶŐϱϬйŽƌŵŽƌĞŽĨĞdžŝƐŝƟŶŐŐƌŽƐƐƐƋƵĂƌĞĨŽŽƚĂŐĞ THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY 04.17.2019 0049.2018.ARBK 63 Smuggler Grove, Aspen, CO 273718106004 4 East Meadow Subdivision DP Aspen LLC 516 624-1919 DBlumenfeld@BDG.net Kim Weil 970 925-4755 kweil@billposs.com change walls, delete dormer, add skylight, revise stair $2,100,000.00 8 5 11 3 1 1 2 2057.07 sf 6,107.60 sf gross 7,668 sf 2 800 sf 0 2021.81 sf 4 1 1 280 sf R-15A 04/18/2019 0086.2019.ARBK x jb 4/18/19 x x x x 25 BN 4/30/19 0 0 0 0 0 JF 5/1/19 TF 5/10/19 04/18/2019