Construction
Management Plan
100 PARK AVE, ASPEN COLORADO 81611
MARGARET MEADOWS, LOT 1, PARCEL #273718142001
HENDRICKSON CONSTRUCTION INC
1/4/181/4/18
1
Construction Management Plan
100 Park Ave, Aspen CO 81611
1.0 General
Total square feet of soil disturbed is four thousand (565 sf)
Total square feet of Interior demo is twenty five hundred (1500.0 sf)
2.0 Project Introduction
2.1 Disturbance Area: Total Project disturbance area is 4000 sf.
2.2 Location: 219 S. 3rd Street, CO 81611 Vicinity Map Attached Page 6
2.3 Description/Background Information : Interior Remodel and of a 3139.00 SF single
family residence on 4656 SF lot located at the corner of Hwy 82 and Park Ave. The
renovation will finish out the existing construction at the main level as well as create a
new kitchen living room design at the 2nd level. There are no existing structures on Lot2
where the new house will be constructed. The project also includes various site
improvements include grading, drainage, driveway, walkways, patio, and landscaping.
Construction Type V
Occupancy Group R-3
3.0 Project Documentation.
3.1 Permit Types, Permit #s. Will be attached when issued.
3.2 Public/Project Notification. The project specific Construction Management Plan will
be presented at the preconstruction meeting. The CPM will address the project
representative, project schedule and estimated impact to applicable parties. All parties
within 300 ft will be notified a minimum 10 days prior to commencement of work.
3.3 Project Sign. Project sign shall be posted according to City Municipal Code 26.510.030B4
3.4 Contact List:
Owner – TBD based upon the sale of the property and project
Contractor: Hendrickson Construction Inc
1280 Ute Ave Suite 5
Aspen, CO 81611
Contact: Chris Hendrickson 970-925-1485
Site Supervisor: Shaun Kennedy
Site Supervisor: TBD
Safety Supervisor: TBD
Architect: Alius Design – Michael Edinger
Contact 719.331.9211 : Michael@aliusdc.com
1/4/181/4/18
2
4.0 Project Implementation.
4.1 Dates of Construction: Date of permit issue plus two weeks to mobilize and 120 days to
construct.
4.2 Hours of Construction:
7:30 am - 5:30 pm Daily M-F and 9:00 am – 5:00 pm Saturday where
necessary. Holidays and various Non Working days set
forth by the City of Aspen will be followed.
4.3 Construction Sequence-Schedule: See attached Schedule.
4.4 Adjacent Property Owners: Adjacent Properties will be notified of the construction.
4.5 Construction Fencing. Sitework will take place to remove and replace the existing
sitewalls back within the property line. No Construction fencing will be installed for this
activity. All other work is interior and will not require fencing.
4.6 Public Health and Welfare. All care will be taken by project proponents to protect the
public health and welfare, including dust control, noise control, and site maintenance.
4.7 Natural Environment. All tree and natural resource protection measures is identified in
the Plan and will be in place prior to the commencement of any construction or
demolition activities. Fencing will be installed outside the drip line of trees.
5.0 Site and ROW management plan
5.1 ROW Management Plan – See attached Plan
5.2 Emergency Vehicle Access and Ordinance 35. Ordinance 35 will be adhered to,
emergency access at the property will be maintained at all times.
5.3 Construction Parking Details. Construction vehicles will follow the attached Parking
Management plan.
5.4 Staging Areas. Staging of materials will occur on site. Absolutely no staging will occur
within the City ROW.
5.5 ROW Limitations. No construction trailer will be required, all materials will be
delivered at time of use, and small materials will be stored in the unit. No loose material
will be stored in any public right-of-way.
5.6 CONSTRUCTION TRAILER, MATERIALS STORAGE, AND WASTE
MANAGEMENT
Waste management will be handled by bear proof waste carts placed on site.
Construction related materials will be sorted on site and placed in appropriate containers.
See ROW plan for details
6.0 Traffic Control.
6.1 General. All traffic control operations shall be managed by the designated certified
traffic control supervisor
6.2 Haul Routes. See attached plan.
6.3 Onsite Vehicle Limitations. All vehicles proposed to be used will qualify for road
vehicle weight and height limitations.
6.4 Delivery requirements. Trips will be coordinated to ensure that only one large truck
will be onsite at any given time. Delivery vehicles will not be allowed to idle for more
than 5 mins per City of Aspen Vehicle Idling regulations
1/4/181/4/18
3
6.5 Traffic Control Plan. There are no bus stops or school bus stops that will be impacted.
No traffic disruptions are planned or proposed. If any activities needing to interfere with
the Public ROW a Traffic Control Plan will be prepared by a state certified Traffic
Control Supervisor.
7.0 Pedestrian Protection. The project will comply with pedestrian safety per City code
21.04.060,MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33.
8.0 Sediment Control.
8.1 General. All necessary Best Management Practices (BMP’s) will be in place and
maintained in order to minimize sediment leaving the perimeter of our jobsite. Primary
strategies include:
· Avoid unnecessary site disturbance
· Maintain Grading; install silt fences and seditment traps prior to any soil
disturbance
· Due to the limited space available on site, a tracking pad will be
impractical. Screened rock and geotextile fabric will be lined along our
excavation ramp.
· Concrete washout will be done back into the concrete trucks due to lack of
space.
· Spills will be captured into hard plastic “kiddie” pools and allowed to dry,
then placed in a site trash receptacle.
· All pathways into site will be lined with screened rock over geotextile
fabric.
8.2 Smuggler Mountain Restrictions. Do not apply.
8.3 Stormwater Control Plan
1/4/181/4/18
4
9.0 Fugitive Dust Control Plan
The project will avoid unnecessary site disturbance and keep a hose and spray nozzle
available to mitigate born dust. All exported soils and other debris will be hauled off via
covered trucks. All areas directly surrounding the site will be maintained daily with
thorough cleanings.
10.0 Emissions.
10.1 General. The project intends to comply with City Code.
10.2 Emissions for Diesel Powered Engines. The project intends to comply with City Code.
11.0 Noise Suppression.
11.1 General. The project intends to comply with City Code.
11.2 Noise Suppression Plan. Formal Noise Suppression plan will not be required. Work is
primarily interior. No drilling or heavy vehicles needed
11.3 Requirements for activities exceeding 70 decibels. The Project intends to comply with
City Code. Notices will be posted to advise workers and sub-contractors of noise
requirements.
11.4 Specific restrictions related to manufacturing on site. It is not proposed that any
manufacturing will occur on site.
12.0 Enforcement.
1/4/181/4/18
5
12.1 City Construction Mitigation Officer. The project intends to comply with City Code.
12.2 Corrective Action. The project intends to comply with City Code.
12.3 Inspection Reports. The project intends to comply with City Code.
13.0 CONSTRUCTION MITIGATION COMMITTEE - The project is not applying for
any exemptions
1/4/181/4/18
1/4/181/4/18
DESIGN CORPS
ALIUS
DESIGN CORPS
ALIUS
ASPEN, CO100 PARK AVENUEMTE
N/A
ISSUE
PROJECT No:
DRAWN BY:
DRAWING SET
COPYRIGHT 2017 ALIUS DESIGN
CORPS LLC. ALL RIGHTS RESERVED
SITE PLAN
2.1
09/15/2017SCHEMATIC I
PERMIT I 10/02/201710'5'5'
EXIST. CONC. DRIVE
AND WALKWAY
TO REMAIN
NO WORK PROPOSED TO AREA
OF HOUSE/DRIVEWAY OUTSIDE OF
SETBACK
EXIST. CURB AND SIDEWALK
EXIST. SITE RETAINING WALL
TO BE REMOVED;
SOIL TO BE STABALIZED WITH FILL
@ 2:1 SLOPE WITH S150 DOUBLE
STRAW BLANKET FROM NORTH AMERICA GREEN
EXIST. BBQ TO BE REMOVED;
ALL DEVELOPMENTS ASSOCIATED
WITH EXIST. WALL TO BE REMOVED
TO BRING SITE INTO COMPLIANCE
WITH ZONING SETBACKS
EXIST. ON GRADE PATIO
TO BE REPLACED WITH PERMEABLE
GRASS/SAND SET STONE PAVER
ONLY WALL AREA IN R.O.W. TO
BE REMOVED; SAW CUT TO ALLOW
RETAINING WALL ON PROPERTY TO REMAIN
8.3'EDGE OF PAVEMENTMIDLAND AVENUELOT 2
HOUSE
WA
L
K
EDGE OF PAVEMENT50' R.O.W.ENTRYN 00°16'52"E28.43'PATIO
MAIL BOX
S 39°13'W 49.94'BBQLOT 1
7 9 6 0
12
3
4
5
6
7
8
10
13
15
16
12
11 14
9
COLO
R
A
D
O
S
T
A
T
E
HIGH
W
A
Y
N
O
. 82N 00°53'E 85.59'S 31°51'W 88.68'EAST 76.92'PARK AVENUE50' R.O.W.B.M.7959.3'
S
53
°08'07
"E
12
5
7
.14
'795579557953.3'
7953.6'
7953.1'
7953.2'
7953.4'
7953.1'
EXIST.
HOUSE
0 5'10'20'SCALE: 1" = 10'1 SITE PLAN
Dumpster
Sanitary Facility