Loading...
HomeMy WebLinkAboutFile Documents.100 Park Ave.0329.2017 (5).ARBK 0 2017 Construction Management Plan 100 PARK AVE, ASPEN COLORADO 81611 MARGARET MEADOWS, LOT 1, PARCEL #273718142001 HENDRICKSON CONSTRUCTION INC 1/4/181/4/18 1 Construction Management Plan 100 Park Ave, Aspen CO 81611 1.0 General Total square feet of soil disturbed is four thousand (565 sf) Total square feet of Interior demo is twenty five hundred (1500.0 sf) 2.0 Project Introduction 2.1 Disturbance Area: Total Project disturbance area is 4000 sf. 2.2 Location: 219 S. 3rd Street, CO 81611 Vicinity Map Attached Page 6 2.3 Description/Background Information : Interior Remodel and of a 3139.00 SF single family residence on 4656 SF lot located at the corner of Hwy 82 and Park Ave. The renovation will finish out the existing construction at the main level as well as create a new kitchen living room design at the 2nd level. There are no existing structures on Lot2 where the new house will be constructed. The project also includes various site improvements include grading, drainage, driveway, walkways, patio, and landscaping. Construction Type V Occupancy Group R-3 3.0 Project Documentation. 3.1 Permit Types, Permit #s. Will be attached when issued. 3.2 Public/Project Notification. The project specific Construction Management Plan will be presented at the preconstruction meeting. The CPM will address the project representative, project schedule and estimated impact to applicable parties. All parties within 300 ft will be notified a minimum 10 days prior to commencement of work. 3.3 Project Sign. Project sign shall be posted according to City Municipal Code 26.510.030B4 3.4 Contact List: Owner – TBD based upon the sale of the property and project Contractor: Hendrickson Construction Inc 1280 Ute Ave Suite 5 Aspen, CO 81611 Contact: Chris Hendrickson 970-925-1485 Site Supervisor: Shaun Kennedy Site Supervisor: TBD Safety Supervisor: TBD Architect: Alius Design – Michael Edinger Contact 719.331.9211 : Michael@aliusdc.com 1/4/181/4/18 2 4.0 Project Implementation. 4.1 Dates of Construction: Date of permit issue plus two weeks to mobilize and 120 days to construct. 4.2 Hours of Construction: 7:30 am - 5:30 pm Daily M-F and 9:00 am – 5:00 pm Saturday where necessary. Holidays and various Non Working days set forth by the City of Aspen will be followed. 4.3 Construction Sequence-Schedule: See attached Schedule. 4.4 Adjacent Property Owners: Adjacent Properties will be notified of the construction. 4.5 Construction Fencing. Sitework will take place to remove and replace the existing sitewalls back within the property line. No Construction fencing will be installed for this activity. All other work is interior and will not require fencing. 4.6 Public Health and Welfare. All care will be taken by project proponents to protect the public health and welfare, including dust control, noise control, and site maintenance. 4.7 Natural Environment. All tree and natural resource protection measures is identified in the Plan and will be in place prior to the commencement of any construction or demolition activities. Fencing will be installed outside the drip line of trees. 5.0 Site and ROW management plan 5.1 ROW Management Plan – See attached Plan 5.2 Emergency Vehicle Access and Ordinance 35. Ordinance 35 will be adhered to, emergency access at the property will be maintained at all times. 5.3 Construction Parking Details. Construction vehicles will follow the attached Parking Management plan. 5.4 Staging Areas. Staging of materials will occur on site. Absolutely no staging will occur within the City ROW. 5.5 ROW Limitations. No construction trailer will be required, all materials will be delivered at time of use, and small materials will be stored in the unit. No loose material will be stored in any public right-of-way. 5.6 CONSTRUCTION TRAILER, MATERIALS STORAGE, AND WASTE MANAGEMENT Waste management will be handled by bear proof waste carts placed on site. Construction related materials will be sorted on site and placed in appropriate containers. See ROW plan for details 6.0 Traffic Control. 6.1 General. All traffic control operations shall be managed by the designated certified traffic control supervisor 6.2 Haul Routes. See attached plan. 6.3 Onsite Vehicle Limitations. All vehicles proposed to be used will qualify for road vehicle weight and height limitations. 6.4 Delivery requirements. Trips will be coordinated to ensure that only one large truck will be onsite at any given time. Delivery vehicles will not be allowed to idle for more than 5 mins per City of Aspen Vehicle Idling regulations 1/4/181/4/18 3 6.5 Traffic Control Plan. There are no bus stops or school bus stops that will be impacted. No traffic disruptions are planned or proposed. If any activities needing to interfere with the Public ROW a Traffic Control Plan will be prepared by a state certified Traffic Control Supervisor. 7.0 Pedestrian Protection. The project will comply with pedestrian safety per City code 21.04.060,MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33. 8.0 Sediment Control. 8.1 General. All necessary Best Management Practices (BMP’s) will be in place and maintained in order to minimize sediment leaving the perimeter of our jobsite. Primary strategies include: · Avoid unnecessary site disturbance · Maintain Grading; install silt fences and seditment traps prior to any soil disturbance · Due to the limited space available on site, a tracking pad will be impractical. Screened rock and geotextile fabric will be lined along our excavation ramp. · Concrete washout will be done back into the concrete trucks due to lack of space. · Spills will be captured into hard plastic “kiddie” pools and allowed to dry, then placed in a site trash receptacle. · All pathways into site will be lined with screened rock over geotextile fabric. 8.2 Smuggler Mountain Restrictions. Do not apply. 8.3 Stormwater Control Plan 1/4/181/4/18 4 9.0 Fugitive Dust Control Plan The project will avoid unnecessary site disturbance and keep a hose and spray nozzle available to mitigate born dust. All exported soils and other debris will be hauled off via covered trucks. All areas directly surrounding the site will be maintained daily with thorough cleanings. 10.0 Emissions. 10.1 General. The project intends to comply with City Code. 10.2 Emissions for Diesel Powered Engines. The project intends to comply with City Code. 11.0 Noise Suppression. 11.1 General. The project intends to comply with City Code. 11.2 Noise Suppression Plan. Formal Noise Suppression plan will not be required. Work is primarily interior. No drilling or heavy vehicles needed 11.3 Requirements for activities exceeding 70 decibels. The Project intends to comply with City Code. Notices will be posted to advise workers and sub-contractors of noise requirements. 11.4 Specific restrictions related to manufacturing on site. It is not proposed that any manufacturing will occur on site. 12.0 Enforcement. 1/4/181/4/18 5 12.1 City Construction Mitigation Officer. The project intends to comply with City Code. 12.2 Corrective Action. The project intends to comply with City Code. 12.3 Inspection Reports. The project intends to comply with City Code. 13.0 CONSTRUCTION MITIGATION COMMITTEE - The project is not applying for any exemptions 1/4/181/4/18 1/4/181/4/18 DESIGN CORPS ALIUS DESIGN CORPS ALIUS ASPEN, CO100 PARK AVENUEMTE N/A ISSUE PROJECT No: DRAWN BY: DRAWING SET COPYRIGHT 2017 ALIUS DESIGN CORPS LLC. ALL RIGHTS RESERVED SITE PLAN 2.1 09/15/2017SCHEMATIC I PERMIT I 10/02/201710'5'5' EXIST. CONC. DRIVE AND WALKWAY TO REMAIN NO WORK PROPOSED TO AREA OF HOUSE/DRIVEWAY OUTSIDE OF SETBACK EXIST. CURB AND SIDEWALK EXIST. SITE RETAINING WALL TO BE REMOVED; SOIL TO BE STABALIZED WITH FILL @ 2:1 SLOPE WITH S150 DOUBLE STRAW BLANKET FROM NORTH AMERICA GREEN EXIST. BBQ TO BE REMOVED; ALL DEVELOPMENTS ASSOCIATED WITH EXIST. WALL TO BE REMOVED TO BRING SITE INTO COMPLIANCE WITH ZONING SETBACKS EXIST. ON GRADE PATIO TO BE REPLACED WITH PERMEABLE GRASS/SAND SET STONE PAVER ONLY WALL AREA IN R.O.W. TO BE REMOVED; SAW CUT TO ALLOW RETAINING WALL ON PROPERTY TO REMAIN 8.3'EDGE OF PAVEMENTMIDLAND AVENUELOT 2 HOUSE WA L K EDGE OF PAVEMENT50' R.O.W.ENTRYN 00°16'52"E28.43'PATIO MAIL BOX S 39°13'W 49.94'BBQLOT 1 7 9 6 0 12 3 4 5 6 7 8 10 13 15 16 12 11 14 9 COLO R A D O S T A T E HIGH W A Y N O . 82N 00°53'E 85.59'S 31°51'W 88.68'EAST 76.92'PARK AVENUE50' R.O.W.B.M.7959.3' S 53 °08'07 "E 12 5 7 .14 '795579557953.3' 7953.6' 7953.1' 7953.2' 7953.4' 7953.1' EXIST. HOUSE 0 5'10'20'SCALE: 1" = 10'1 SITE PLAN Dumpster Sanitary Facility 1/4/181/4/18 1/4/181/4/18 1/4/181/4/18