Loading...
HomeMy WebLinkAboutFile Documents.100 Park Ave.0329.2017 (6).ARBKFrom:Mike Horvath To:Michael Edinger Cc:chris Hendrickson (Chris@hendricksoninc.com) Subject:RE: 100 Park Demo Calculations Date:Tuesday, September 05, 2017 3:24:37 PM Michael,   I agree with those exhibits. Please include those in your building permit submission in order to verify  the calculations at time of permit.   Michael Horvath, PE, CFM Civil Engineer II Engineering Department City of Aspen mike.horvath@cityofaspen.com Ph: (970) 429-2776   From: Michael Edinger [mailto:michael@aliusdc.com]  Sent: Tuesday, September 5, 2017 12:34 PM To: Mike Horvath <mike.horvath@cityofaspen.com> Cc: chris Hendrickson (Chris@hendricksoninc.com) <Chris@hendricksoninc.com> Subject: RE: 100 Park Demo Calculations   Mike,   Please find attached a final revised demo calculation based on our discussion on Friday.  I have  moved the polyline of the hatch to the inside of the wall per your request.  Because this caused the  demolition number to increase by 2% pushing me over the 50% threshold, I kept the walls  separating the bathroom/closet from bedroom #003 making only the bathroom an area of  demolition.  This brought us down to 44%, well below the 50% threshold.  I think this is a good  meeting of the intent of the code section Mike.  Thank you for your timely review of this material  and assistance thus far.   Michael Edinger Michael@aliusdc.com 719.331.9211       From: Mike Horvath [mailto:mike.horvath@cityofaspen.com] Sent: Friday, September 01, 2017 3:08 PM To: Michael Edinger 1/4/181/4/18 Cc: chris Hendrickson (Chris@hendricksoninc.com) Subject: RE: 100 Park Demo Calculations   Michael,   I checked the areas, and they don’t match the provided areas. Please see the attached PDF for the  numbers I got. Please let me know where you think the differences are.   Michael Horvath, PE, CFM Civil Engineer II Engineering Department City of Aspen mike.horvath@cityofaspen.com Ph: (970) 429-2776   From: Michael Edinger [mailto:michael@aliusdc.com]  Sent: Friday, September 1, 2017 11:33 AM To: Mike Horvath <mike.horvath@cityofaspen.com> Cc: chris Hendrickson (Chris@hendricksoninc.com) <Chris@hendricksoninc.com> Subject: RE: 100 Park Demo Calculations   Mike,   I think this clarifies the calculations.  Thank you for your prompt attention to the matter.   Michael Edinger Michael@aliusdc.com 719.331.9211       From: Mike Horvath [mailto:mike.horvath@cityofaspen.com] Sent: Friday, September 01, 2017 9:51 AM To: Michael Edinger Cc: chris Hendrickson (Chris@hendricksoninc.com) Subject: RE: 100 Park Demo Calculations   Michael,   I do not completely agree with the numbers provided. As we discussed in our meeting, the entire  entry needs to be included besides the stairs. Please add the entry area square footage into your  calculations. The upper level demo plan depicts a demo hatch, but the hatch is excluded certain  fixtures that must be included in the square footage as well since the entire room is include. Please 1/4/181/4/18  include entire area of all rooms being effected.   Also your spreadsheet notes an increase in lot coverage of nearly 1000 SF. Where does this increase  occur? We only discussed interior work, plus the compliance work. Please verify.   Michael Horvath, PE, CFM Civil Engineer II Engineering Department City of Aspen mike.horvath@cityofaspen.com Ph: (970) 429-2776   From: Michael Edinger [mailto:michael@aliusdc.com]  Sent: Thursday, August 31, 2017 12:40 PM To: Mike Horvath <mike.horvath@cityofaspen.com> Cc: chris Hendrickson (Chris@hendricksoninc.com) <Chris@hendricksoninc.com> Subject: 100 Park Demo Calculations   Mike,   Please see attached a demolition summary included in the zoning analysis as well as demolition  calculations mapping out the areas we reviewed at your office.  Based on the applied methodology  of calculation I believe we are comfortably below the 50% demolition threshold which will not  trigger a major engineering review.  We can the treat the site walls as a separate compliance issue  as discussed and submit as one permit without drainage analysis and control for the whole site.   Please confirm this demolition demonstration and calculation meets your expectations.  Thank you  so much for your time Mike.  It was very helpful.  We are looking forward to pushing this project  forward and bringing a conclusion to the open red tag.   Michael Edinger Michael@aliusdc.com 719.331.9211     1/4/181/4/18